CARPENTRY WORKS

LOW

DESCRIPTION
A.

Qty

Unit

4.00
4.70
6.16
4.70

MH/SM

FORM WORKS INSTALLATION


1.1 Wall in Ground
1.2 Wall above ground
1.3 Beams
1.4 Columns
1.5 Suspended slab
0 - 18"
18 - 36"
1.6 Elevated and shored slab forming
Forming only
Forming and shoring
1.7 Wood wall and partition

3.34
6.66

MH/SM

17.20
22.00
1.00

MH/SM

B.

FORM WORKS FABRICATION

C.

STRIPPING OF FORM WORKS


1.1 Wall in Ground
1.2 Wall above ground
1.3 Beams
1.4 Columns
1.5 Suspended slab
0 - 18"
18 - 36"
1.6 Elevated and shored slab forming
1.7 strip of forms
Floor Slab at grade strip of forms

D.

Man-hour per quantity


AVERAGE
Qty
Unit

HIGH
Qty

Unit

1.60
1.88
2.46
1.88

MH/SM

1.34
2.66

MH/SM

MH/SM

2.00
2.35
3.08
2.35

MH/SM

1.67
3.33

MH/SM

MH/SM

MH/SM

8.60
11.00
0.50

MH/SM

6.88
8.80
0.40

2.15

MH/SM

1.08

MH/SM

0.86

MH/SM

0.50
2.58
2.06
1.70

MH/SM

0.25
1.29
1.03
0.85

MH/SM

0.20
1.03
0.82
0.68

MH/SM

1.67
2.16

MH/SM

0.83
1.08

MH/SM
MH/SM

0.67
0.86

MH/SM

MH/SM

7.00

MH/SM

3.50

MH/SM

2.80

MH/SM

5.60

MH/SM

2.80

MH/SM

2.24

MH/SM

2.00
0.29
0.73
0.53
1.94
0.85
0.70
1.60
0.43
0.27
0.53
0.91

MH/PC

1.00
0.14
0.36
0.27
0.97
0.43
0.35
0.80
0.21
0.13
0.27
0.46

MH/PC

0.80
0.11
0.29
0.21
0.77
0.34
0.28
0.64
0.17
0.11
0.21
0.36

MH/PC

2.00
0.83

MH/PC

1.00
0.42

MH/PC

0.80
0.33

MH/PC

2.66
2.00
0.26

MH/SM

1.33
1.00
0.13

MH/SM

1.06
0.80
0.10

MH/SM

MH/SM
MH/SM
MH/SM

MH/SM

MH/SM

MH/SM
MH/SM
MH/SM

MH/SM
MH/SM
MH/SM

MH/SM

MH/SM

MH/SM
MH/SM
MH/SM

MH/SM
MH/SM
MH/SM

MH/SM

MH/SM
MH/SM

MH/SM
MH/SM
MH/SM

MH/SM

INSTALLATION OF CARPENTRY WORKS


1.1 Plywood partition
1.2 T & G Flooring and Siding
1.3 Ceiling Framework
1.4 Siding Framework
1.5 Flooring framing
1.6 Wooden Post Erection
1.7 Truss Fabrication
1.8 Truss Installation
1.9 Girt Installation
2 Plates Installation
2.1 Purlins Installation
2.2 Facia Board Installation
2.3 1/4" or 3/4" thck plywood
cutting by manual
assembly
2.4 Ceiling Framework
Frame Installation
Plywood Installation
2.5 Cabinet Boarding

Carpentry Works

MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF

MH/SH

MH/SM
MH/BF

Pages 1 of 10

MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF

MH/SH

MH/SM
MH/BF

MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF
MH/BF

MH/SH

MH/SM
MH/BF

CARPENTRY WORKS
LOW

DESCRIPTION
2.6 Cabinet Framing
2.7 Wood Wall Partitions
2.8 Panel Wall
2.9 Forming Weight Anchor Bolts
3.0 Net Forming
E.

Qty
0.36
1.00
14.00
9.00
7.00

Unit
MH/BF
MH/SM
MH/SM
MH/SM
MH/SM

Man-hour per quantity


AVERAGE
Qty
Unit
0.18
MH/BF
0.50
MH/SM
7.00
MH/SM
4.50
MH/SM
3.50
MH/SM

HIGH
Qty
0.14
0.40
5.60
3.60
2.80

Unit
MH/BF
MH/SM
MH/SM
MH/SM
MH/SM

DOORS AND WINDOWS


1.1 W-Panel Installation
1.2 Steel Windows Installation
1.3 Louver Windows Installation
Fixed Asbestos
Fixed Metal Louver
Fixed G.I. Sheet
Fixed Glass
Fixed Wooden
1.4 Aluminum Framed Windows
1.5 Sliding Glass Door
1.6 Hollow Metal Door
1.7 Rolling Doors
1.8 Fixed Window
1.9 Door Lockset
2.0 Door Jamb: Fabrication
Installation
2.1 Cyclone wire Installation

Carpentry Works

0.8
4.00

MH/PC

9.26
6.24
9.26
6.24
6.76
20.00
24.00
20.00
50.00
0.63
3.20
0.44
0.66
6.24

MH/SM

MH/PC

MH/SM
MH/SM
MH/SM
MH/SM
MH/EA
MH/EA
MH/EA
MH/EA
MH/SF
MH/SET
MH/BF
MH/BF
MH/SM

Pages 2 of 10

0.40
2.00

MH/PC

4.63
3.12
4.63
3.12
3.38
10.00
12.00
10.00
25.00
0.31
1.60
0.22
0.33
3.12

MH/SM

MH/PC

MH/SM
MH/SM
MH/SM
MH/SM
MH/EA
MH/EA
MH/EA
MH/EA
MH/SF
MH/SET
MH/BF
MH/BF
MH/SM

0.32
1.60

MH/PC

3.70
2.50
3.70
2.50
2.70
8.00
9.60
8.00
20.00
0.25
1.28
0.18
0.26
2.50

MH/SM

MH/PC

MH/SM
MH/SM
MH/SM
MH/SM
MH/EA
MH/EA
MH/EA
MH/EA
MH/SF
MH/SET
MH/BF
MH/BF
MH/SM

MASONRY WORKS
DESCRIPTION
1.1 Grouting and Tol Plastering
1.2 Pebble Finished
1.3 Marble Installation
1.4 1/4" x 2 x 8 Red Bricks
1.5 Glazed Tiles
1.6 Unglazed Tiles
1.7 Glazed Wall Tiles
1.8 Concrete Block Ext. Wall
1.9 Concrete Block Int. Wall
2 Brickwork
2.1 Plaster Wall and Ceiling
2.2 Hollow Tile Wall
2.3 Acoustic Ceiling
2.4 Vinyl Floor Tile
2.5 Unglazed or Mosaic Floor Tile
2.6 Laying of CHB and Adobe
2.7 Cement Finish
2.8 Concrete Hollow Blocks Laying
6" CHB
4" CHB
8" CHB
2.9 Vit. Tiles Floor
3.0 Vit. Tiles Wall

Masonry Works

LOW
Qty
Unit
3.34
MH/SM
2.86
MH/SM
4
MH/SM
10.00
MH/SM
21.06
MH/SM
8.70
MH/SM
6.00
MH/SM
9.00
MH/SM
8.00
MH/SM
1.00
MH/SM
6.00
MH/SM
4.00
MH/SM
2.40
MH/SM
3.60
MH/SM
17.00
MH/SM
2.28
MH/SM
1.43
MH/SM
3.20
2.66
4.00
10.66
11.94

MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

Pages 3 of 10

Man-hour per quantity


AVERAGE
Qty
Unit
1.67
MH/SM
1.43
MH/SM
2.00
MH/SM
5.00
MH/SM
10.53
MH/SM
4.35
MH/SM
3.00
MH/SM
4.50
MH/SM
4.00
MH/SM
0.50
MH/SM
3.00
MH/SM
2.00
MH/SM
1.20
MH/SM
1.80
MH/SM
8.50
MH/SM
1.14
MH/SM
0.72
MH/SM
1.60
1.33
2.00
5.33
5.97

MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

Qty
1.34
1.14
1.60
4.00
8.42
3.48
2.40
3.60
3.20
0.40
2.40
1.60
0.96
1.44
6.80
0.91
0.57
1.28
1.06
1.60
4.26
4.78

HIGH
Unit
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

TINSMITHING WORKS
DESCRIPTION
1.1 Coorugated G.I. Sheet
Lifting
Installation
1.2 Installation of Asbestos Roofing
1.3 Installation of Aluminum or G.I. Sheet
1.4 Copper Cladding Roof Deck
1.5 Fabrication of G.I. Gutter
1.6 G.I. Sheet Roofing
1.7 Fabrication of G.I. Gutter
1.8 Fabrication of Downspout
1.9 Gutter Cut and Shape
2 Installation of Gutter
2.1 Downspout Cut and Shape
2.2 Downspout Installation
2.3 Corr. G.I. Roofing
2.4 Corr. Aluminum Roofing
2.5 Built-up Roofing 4-ply
2.6 Protected Metal
2.7 Corr.Asbestos Insy., lifting Hauling
2.8 Leaders and Gutters

Tinsmithing Work

LOW
Qty
Unit
2.16
6.12
2.00
1.60
1.01
6.94
1.64
1.05
1.94
0.32
1.78
0.59
0.27
3.60
3.60
17.00
4.00
3.40
1.20

MH/SM
MH/SM
MH/SH
MH/SH
MH/LM
MH/SM
MH/SH
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

Pages 4 of 10

Man-hour per quantity


AVERAGE
HIGH
Qty
Unit
Qty
Unit
1.08
3.06
1
0.8
0.505
3.47
0.82
0.525
0.97
0.16
0.89
0.295
0.135
1.8
1.8
8.5
2
1.7
0.6

MH/SM
MH/SM
MH/SH
MH/SH
MH/LM
MH/SM
MH/SH
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

0.86
2.45
0.80
0.64
0.40
2.78
0.66
0.42
0.78
0.13
0.71
0.24
0.11
1.44
1.44
6.80
1.60
1.36
0.48

MH/SM
MH/SM
MH/SH
MH/SH
MH/LM
MH/SM
MH/SH
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

CONCRETE WORKS
DESCRIPTION
1.1 Placing Concrete
Slab on Fill
Slip Form
Floor Finish Unhardened
Concrete Finish Hardened
1.2 Rebar Works
Ground Floor Installation
Upper Floor Installation
Fabrication
1.3 Mixing Manual
1.4 Mixing Machine
1.5 More Than 1.80cm Pour
Chute From Truck
Crane and Bucket
Wheeling
Finishing
1.6 Concrete Pour on Elevated and Shored Slab
Forming, chute and bucket
1.7 Placement of Rebars on Footing
1.8 Field Fabrication of Rebars

Concrete Works

LOW
Qty
Unit

Man-hour per quantity


AVERAGE
HIGH
Qty
Unit
Qty
Unit

10.00
50.00
2.00
2.86

MH/CM
MH/CM
MH/SM
MH/SH

5.00
25.00
1.00
1.43

MH/CM
MH/CM
MH/SM
MH/SH

4.00
20.00
0.80
1.14

MH/CM
MH/CM
MH/SM
MH/SH

0.14
0.16
0.20
32.00
3.60

MH/KG
MH/KG
MH/KG
MH/CM
MH/CM

0.07
0.08
0.10
16.00
1.80

MH/KG
MH/KG
MH/KG
MH/CM
MH/CM

0.06
0.06
0.08
12.80
1.44

MH/KG
MH/KG
MH/KG
MH/CM
MH/CM

14.00
28.00
54.00
5.60

MH/CM
MH/CM
MH/CM
MH/SM

7.00
14.00
27.00
2.80

MH/CM
MH/CM
MH/CM
MH/SM

5.60
11.20
21.60
2.24

MH/CM
MH/CM
MH/CM
MH/SM

42.00
1.06
0.66

MH/CM
MH/KG
MH/KG

21.00
0.53
0.33

MH/CM
MH/KG
MH/KG

16.80
0.42
0.26

MH/CM
MH/KG
MH/KG

Pages 5 of 10

EARTHWORKS
LOW
Qty
Unit

DESCRIPTION
1.1 Machine Excavation
Sand
Sand and Marl
Marl
1.2 Granural Backfill
1.3 Granural Soil Backfill
1.4 Manual Foundation Excavation and Backfill
Sand
Excavation of Sand and Marl
Excavation of Marl
Backfill of sand
Backfill of Sand and Marl
Backfill of Marl
1.5 Floor Slab and Grade
Grading, Manual
Excavation and Backfill
1.6 Fine Grading and Finishing
Grading
Finishing soil surface
Dikes
Road Works
Base Coarse
Curbes and Gutters
4" Thck Road
6" Thck Road
8" Thck Road
Trowel Topping
Special Topping
4" Stone or Shell Road
6" Stone or Shell Road
8" Stone or Shell Road
Acid Proofing
1.7 Asphalt Paving
Fine Grading
Place Base Course
Asphalt
1.8 Acid Block or Paving Block
Fine Grading
Install Brick
1.9 Crush Stone or Shell Surfacing
Fine Grading
Place, Spread and Compact Stone To 4" thk
Over 8" thk
2.0 Tank Cushions
Sand Cushions
Asphalt Retainer Ring
2.1 Non-Granular Backfill
2.2 Excavation - Manual
Common Earth
Loan of Sand
Clay and Heavy Soil

Earthworks

1.20
1.6
2.20
2.40
3.00

MH/CM

8.00
13.00
21.00
11.00
16.00
24.00

MH/CM

2.60
36.00
0.90
1.10
2.40
0.24
3.60
2.60
2.80
3.00
0.64
2.40
0.64
0.84
1.04
1.20

MH/CM
MH/CM
MH/CM
MH/CM

MH/CM
MH/CM
MH/CM
MH/CM
MH/CM
MH/SM
MH/CM
MH/SM
MH/SM
MH/CM
MH/SM
MH/CM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

0.84
0.40
0.40

MH/SM

0.84
8.40

MH/SM

0.64
0.84
1.04

MH/SM

1.40
0.40
4.00

MH/CM

16.00
2.62
3.28

MH/CM

Pages 6 of 10

MH/SM
MH/SM

MH/SM

MH/SM
MH/SM

MH/SM
MH/CM

MH/CM
MH/CM

Man-hour per quantity


AVERAGE
HIGH
Qty
Unit
Qty
Unit
0.60
0.80
1.10
1.20
1.50

MH/CM

4.00
6.50
10.50
5.50
8.00
12.00

MH/CM

1.30
18.00
0.45
0.55
1.20
0.12
1.80
1.30
1.40
1.50
0.32
1.20
0.32
0.42
0.52
0.60

MH/CM
MH/CM
MH/CM
MH/CM

MH/CM
MH/CM
MH/CM
MH/CM
MH/SM
MH/CM
MH/SM
MH/SM
MH/CM
MH/SM
MH/CM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

0.42
0.20
0.20

MH/SM

0.42
4.20

MH/SM

0.32
0.42
0.52

MH/SM

0.70
0.20
2.00

MH/CM

8.00
1.31
1.64

MH/CM

MH/SM
MH/SM

MH/SM

MH/SM
MH/SM

MH/SM
MH/CM

MH/CM
MH/CM

0.48
0.64
0.88
0.96
1.20

MH/CM

3.20
5.20
8.40
4.40
6.40
9.60

MH/CM

1.04
14.40
0.36
0.44
0.96
0.10
1.44
1.04
1.12
1.20
0.26
0.96
0.26
0.34
0.42
0.48

MH/CM
MH/CM
MH/CM
MH/CM

MH/CM
MH/CM
MH/CM
MH/CM
MH/SM
MH/CM
MH/SM
MH/SM
MH/CM
MH/SM
MH/CM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM
MH/SM

0.34
0.16
0.16

MH/SM

0.34
3.36

MH/SM

0.26
0.34
0.42

MH/SM

0.56
0.16
1.60

MH/CM

6.40
1.05
1.31

MH/CM

MH/SM
MH/SM

MH/SM

MH/SM
MH/SM

MH/SM
MH/CM

MH/CM
MH/CM

EARTHWORKS
DESCRIPTION
Rock
2.3 Mechanical Excavation
Common Earth
Rock w/ Jackhammer
2.4 Backfilling
Common Manual
Gravel Fill Manual
2.5 Trenching and Backfilling of Underground
2.6 piping using excavation materials manual
from 0 - 2mtrs depth
2 - 3mtrs depth
3 - 4mtrs depth
4 - 5mtrs depth
2.7 Placing Binder - Gravel
2.8 Escombro Backfilling
2.9 Spreading, Tamping, and Grading
3 Mechanical Compaction, Plate Compaction
3.1 Manual Clearing and Grubbing
Clearing undergrowth and tress 12"
Clearing undergrowth and scrubs
3.2 Disposal of Soil
3.3 Hauling of Soil
3.4 Gravel Fill
3.5 Excavation - crane and Clampshell
with 8-men and 2-carpenters

Earthworks

LOW
Qty
Unit
5.26
MH/CM
13.34
33.34

MH/CM

1.64
10.00

MH/CM

2.50
3.34
5.00
6.66
0.21
0.42
0.96
0.11

MH/LM

MH/CM

MH/CM

MH/LM
MH/LM
MH/LM
MH/CM
MH/CM
MH/SM
MH/CM

0.10
0.06
3.38
2.00
4.14

MH/CM

2.14

Pages 7 of 10

Man-hour per quantity


AVERAGE
HIGH
Qty
Unit
Qty
Unit
2.63
2.10
MH/CM
MH/CM
6.67
16.67

MH/CM

0.82
5.00

MH/CM

1.25
1.67
2.50
3.33
0.11
0.21
0.48
0.06

MH/LM

MH/CM

MH/CM

MH/LM
MH/LM
MH/LM
MH/CM
MH/CM
MH/SM
MH/CM

MH/CM

MH/CM

0.05
0.03
1.69
1.00
2.07

MH/CM

1.07

MH/SM
MH/SM
MH/CM

5.34
13.34

MH/CM

0.66
4.00

MH/CM

1.00
1.34
2.00
2.66
0.08
0.17
0.38
0.04

MH/LM

MH/CM

MH/CM

MH/LM
MH/LM
MH/LM
MH/CM
MH/CM
MH/SM
MH/CM

MH/CM

MH/CM

0.04
0.02
1.35
0.80
1.66

MH/CM

0.86

MH/CM

MH/SM
MH/SM
MH/CM

MH/SM
MH/SM
MH/CM
MH/CM

PLUMBING WORKS
DESCRIPTION
1.1 Laying Asbestos Pipe
1/2" Dia
3/4" Dia
1-1/4" Dia
1 1/2" - 2" Dia
2 1/2" Dia
3"
3 1/2" Dia
4"
1.2 Cast Iron Pipe
2"
4"
6"
8"
10"
12"
14"
16"
18"
20"
24"
30"
1.3 Laying of PVC Pipe
1/2" - 3/4" Dia
1" - 1 1/4" Dia
1 1/2" - 2" Dia
2 1/2" Dia
3"
4"
5"
6"
1.4 Laying RCP 8men (1 team)
24"
36"
48"
6' - 18"
1.5 Lavatory
1.6 Water Closet
1.7 Urinal Utility Stall
1.8 Urinal, Pedestal Type
1.9 Shower and Stall
2 5-man Group Shower
2.1 Bath Tubs
2.2 Slope Sink
2.3 Hot Water Heater
2.4 6-person Wash Sink

Plumbing Works

LOW
Qty
Unit
1.32
1.32
1.48
1.64
1.97
2.16
2.30
2.64

MH/LM

4.38
6.58
9.84
13.14
19.70
20.62
24.10
27.38
30.68
32.86
36.14
41.08

MH/LM

0.38
1.48
1.64
1.96
2.16
2.62
3.28
4.92

MH/LM

8.00
12.80
21.34
2.66
16.00
24.00
48.00
32.00
20.00
72.00
48.00
28.00
28.00
52.00

MH/LM

Pages 8 of 10

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

Man-hour per quantity


AVERAGE
HIGH
Qty
Unit
Qty
Unit
0.66
0.66
0.74
0.82
0.99
1.08
1.15
1.32

MH/LM

2.19
3.29
4.92
6.57
9.85
10.31
12.05
13.69
15.34
16.43
18.07
20.54

MH/LM

0.19
0.74
0.82
0.98
1.08
1.31
1.64
2.46

MH/LM

4.00
6.40
10.67
1.33
8.00
12.00
24.00
16.00
10.00
36.00
24.00
14.00
14.00
26.00

MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

0.53
0.53
0.59
0.66
0.79
0.86
0.92
1.06

MH/LM

1.75
2.63
3.94
5.26
7.88
8.25
9.64
10.95
12.27
13.14
14.46
16.43

MH/LM

0.15
0.59
0.66
0.78
0.86
1.05
1.31
1.97

MH/LM

3.20
5.12
8.54
1.06
6.40
9.60
19.20
12.80
8.00
28.80
19.20
11.20
11.20
20.80

MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM
MH/LM

PLUMBING WORKS
DESCRIPTION
2.5 Drinking Fountain
2.6 Eye Wash
2.7 Miscellaneous Fixtures
2.8 Partitions
2.9 Laying of 24" Dia. RCP
3 Laying of 36" Dia. RCP
3.1 Laying of 48" Dia. RCP

Plumbing Works

LOW
Qty
Unit
26.00 MH/LM
16.00 MH/LM
4.00 MH/LM
16.00 MH/LM
8.00 MH/LM
12.80 MH/LM
21.32 MH/LM

Pages 9 of 10

Man-hour per quantity


AVERAGE
HIGH
Qty
Unit
Qty
Unit
13.00 MH/LM
10.40 MH/LM
8.00 MH/LM
6.40 MH/LM
2.00 MH/LM
1.60 MH/LM
8.00 MH/LM
6.40 MH/LM
4.00 MH/LM
3.20 MH/LM
6.40 MH/LM
5.12 MH/LM
10.66 MH/LM
8.53 MH/LM

INSULATION
LOW

DESCRIPTION
Qty
A. Equipment Installation
Vessel, Exchanges and Tanks
Field Fabrication Insulation
Field Fabrication Sheet Metal Cover
Apply Insulation
Apply Sheet Metal Cover
Pumps, Compressors and Turbines
Fabricate
Apply
Pipings and Component Insulation
Field Fabricate
Field Fabricate Sheet Metal Cover
Apply Insulation
Apply Sheet metal or Paper Cover
Fabricate Instrument Cover
Install Instrument cover
Insulate Pipe hangers
For Steam Traced Lines
Removal of Old or Existing Insulation

Insulation

Man-hour per quantity


AVERAGE
Unit
Qty
Unit

5.00
24.00
10.00
10.00

MH/SM

34.00
60.00

MH/SM

8.00
1.60
5.40
3.00
16.00
12.00
8.00
7.40
3.00

MH/FLG

MH/SM
MH/SM
MH/SM

MH/SM

MH/SM
MH/LM
MH/EA
MH/EA
MH/EA
MH/EA
MH/EA
MH/EA

Pages 10 of 10

2.50
12.00
5.00
5.00

MH/SM

17.00
30.00

MH/SM

4.00
0.80
2.70
1.50
8.00
6.00
4.00
3.70
1.50

MH/FLG

MH/SM
MH/SM
MH/SM

MH/SM

MH/SM
MH/LM
MH/EA
MH/EA
MH/EA
MH/EA
MH/EA
MH/EA

Qty

HIGH
Unit

2.00
9.60
4.00
4.00

MH/SM

13.60
24.00

MH/SM

3.20
0.64
2.16
1.20
6.40
4.80
3.20
2.96
1.20

MH/FLG

MH/SM
MH/SM
MH/SM

MH/SM

MH/SM
MH/LM
MH/EA
MH/EA
MH/EA
MH/EA
MH/EA
MH/EA