Module 1:Introduction
Lecture 2:Introduction to Mechanical Modifications
The Lecture Contains:
Mechanical Modification
Objectives_template
Module 1:Introduction
Lecture 2:Introduction to Mechanical Modifications
Mechanical Modification
Major aim of compacting soil
Reduce compressibility.
Reduce permeability.
Prolong durability.
For Human construction fills , specify placement conditions (water content ,density ,depth of layers
etc)
Select appropriate equipment roller, vibro compaction ,tamping. Method of compactor
patterns of tamping
Set up adequate control procedures.
Static Rollers
Sheepfoot rollers
vibrating rollers
Grid rollers
Impact rollers
Objectives_template
Module 1:Introduction
Lecture 2:Introduction to Mechanical Modifications
Mechanical Modifications
Applicability of compaction Equipment
Equipment
Typical application
Wellgradedsand,gravel
or vibrating
mixtures, asphalt
fines
Grid rollers
Dams embankment
Vibrating
Subgrade Layers
Vibrating plate
Small Patches
All type
Impact roller
Subgrade earthwork
Cohesive soils
Dry,cohesionless soils
Objectives_template
Module 1:Introduction
Lecture 2:Introduction to Mechanical Modifications
Mechanical Modifications
Production Rate:
Assists in the selection of the most economical compaction equipments.
Where
P = production rate,
B = drum width,
E = efficiency
S = rolling speed. Km/h
T = Layer thickness, m
N = number of passes
Heavy tamping: A large mass is dropped in to the ground surface, causing compaction and
possibly long term consolidation.
Vibration:
compaction grouting
Mechanical Modification
Explosion:
Explosion of charges on the ground surface or in deep boreholes causes shear stresses in the soil which
break
file:///D|/Dr.patra/ground_improvement_techniques/lecture2/2_4.htm (1 of 2) [10/11/2011 12:33:17 PM]
Objectives_template
down the soil structure resulting in a reorientation of soil particles and subsequent volumetric compression.
Excess pore pressure and settlement due to explosion are related to the ratio
If
little or no liquefaction occur.It is used to estimate a safe distance from the
explosion.
According to Barendson and Kok (1983) the ratio of excess pore pressure, U over the effective
overburden pressure
as well as the ratio of surface settlement h to the height h of soil larger affected
and
is required.
Objectives_template
Module 1:Introduction
Lecture 2:Introduction to Mechanical Modifications
Applications
Netherlands:
A charge equivalent to 10 kg of TNT was used is each of the 15m deep hole, speed 16m apart.
Use of about 100g of TNT
of soil.
Heavy Tamping:
The depth D in meters to which heavy tamping is effective can be determined by