DC Evaluation Criteria

NOIDA-1
Category

Description

DC Parameter

Generic Information

NOIDA-2

Whitefield

Siruseri

Pune

Bhuvaneshwar

Generic Information

Generic Information

Generic Information

Generic Information

Generic Information

Facility Info

Complete Address

A-14 Sector 62 Noida 201307

Date of construction / Inaguration ( Age of Building)


Building
Information

Total Number of Floors in Building


Type of Facility

Owned/Leased
Tier Level
Major & Minor roads
Public transport available
Nearest Airport
Nearest Railway Station
Nearest Police Station
Nearest Fire Station
Nearest Hospital
Nearest National Highway

Access to the
Facility

Others

Number of entrances/exits to data center?

Floor, Terrace, Basement

7 Floor

Height & width of all entrances/exits to the proposed


data center?

Two entries of 18 feet each


86112 sq ft
149500 Sq ft

Total IDC Floor Plate (sq ft)

30000 Sq ft

Total Saleable Area (sq ft)


Total Saleable Area (in Rack Nos)

Raised Floor (Yes / No)


Raised Floor Height (mm)
What is the manufacturer (make) & model of raised
floor?

It should not be on ground or top floor. In case of


ground floor, it should be at least 4ft from the ground
Min 600 mm

Bharti Airtel Ltd, Plot no


#111/112, Road 7, EPIP area,
Whitefield, Bangalore- 560066.

Bharti Airtel, Plot # F-08, Siruseri,


Bharti Airtel limited, North Tower, Bharti Airtel Limited,
IT Park,Sipcot.Chennai,
E-park, S.N. 3/1, MIDC Kharadi, E13/1,Infocity,Chndaka Inds.
Kancheepuram Distt,
Pune-411014.
Estate,Bhubaneswar-751024.
TamilNadu.Pin -603 103.

40080

2008 (4 years)

42 Months

Inaguration - Jun 2010

2nd Floor,terrace

5 floors (-1 basement, 5 floors &


cafeteria)

B+G + 7 + Terrace.

7 nos (B1, GF, 1F, 2F, 3F, 4F &


Terrace)

G+6,Terrace,Basement-1

Data center and office area

Telecom

Dedicated for DC use

Data Center, MSC, Mobility Office

Owned

Owned / 99 yrs

Leased

Leased

Tier3

2104
Tier 3

2090
Tier3+

22.01.2072
Tier3

Is the building a sole use data centre facility? If No


what other businesses reside in the building i.e..
Data Center and Office
Data Centre Facility
Warehouse, offices, manufacturing etc.
Do you own or lease the building containing the Data
Owned
Owned
Centre?
If lease, when will the lease expire?
NA
Tier3,Tier3+,Tier-4
Tier3
Tier3+,
The roads should not be in a "No Drive" area in the
event of an Earthquake
Number of traffic lanes in front of the building
2 Lan
One
parking space
No
No
Bus, Train, Metro,Taxi, Auto etc.
Bus, Taxi & Auto
Bus,Taxi, Auto etc.
Distance in Kms
IGI Airport Delhi 37 KM
50KM
Distance in Kms
Ghaziabad 10 KM
30KM
Distance in Kms
Sec 58 Noida 4 KM
1KM
Distance in Kms
Sec 58 Noida 4.3 KM
500Mtr.
Distance in Kms
Fortis Hospital 1.3 KM
2Km
Distance in Kms
NH 24 0.5 KM
6Km
FM 93.5 at 15 Km distance Noida Not Available anywhere near to
Proximity of Radio/TV transmitters/radar
Sec 16
the facility
Weather station
Not Available anywhere near to
Proximity of commercial port
NA
the facility
Not Available anywhere near to
proximity of landfills,dumps,Junk yards, quarries
No
the facility
Not Available anywhere near to
Missile/Military bases
No
the facility
Not Available anywhere near to
Nuclear power facility
No
the facility
Not Available anywhere near to
power plant/Fuel depot/Chemical or fertilizer plant
No
the facility
Not Available anywhere near to
Dam/reservoir/water plant/sewage plant
No
the facility

Total Plot Area (sq ft)


Super Built Area (sq ft)

Proposed DC raised floor is on which floor .

Bharti Airtel Ltd,


Plot # B-192/B Phase II Noida
(U.P.)

Existing entrances/exits Height


2377mm & width 1920 mm
79,400sq ft.
84,500sq ft.

Not in "NO DRIVE' area

No

Complied

No

2
Yes, Available
Yes, Available
50
8
0.75
5
0.5
12

2
Nil
Taxi, Auto
Meenambakkam/ 29 KM.
Thiruvanmiyur / 20 KM
Kelambakkam/ 9KM
Sipcot/ 30 mtr
Chettinad/ 6KM
NH 45 / 29 KM

NA
GF & Basement
Yes
10Km
10Km
1Km
3Km
1Km
15Km

1
Yes
Bus,Taxi, Auto
16KM
12KM
2KM
2KM
2KM
8KM

No

Radar/ 29 KM

25KM

No

Commercial Port/39 KM

250KM

Yes

No

Dumps/15 KM

N/A

Yes

No

Military Base/11KM

20KM

No

No

Nuclear Plant/ 46 KM

No

No

No
No

2 One Entrance and One Exit


89700 Sq ft
180000 Sq ft
36100 Sq feet (1st, 2nd, 4th DC 1
& 4th DC2)

No

No

Sewage/39 KM

60KM

No

9400 (Sq ft)

28,500sq ft.

Need to be measure

2440 sq ft

162

725

766 racks

79

Ist & 2nd floor

It is measured 4 Feet.

1st, 2nd & 4th floor

4th&5th Floor

Yes
450mm

Yes
600mm

Yes
600 mm

Yes
600 mm
Make-Unitiles/ Model- USF 1500.

Ensemble

Uniflair

If raised floor, what is the sub-floor static pressure?


1500 kg/Sq mtr for 1st & 2nd
floor..

Structural Slab Floor Loading (Kg / sq mtr)

Min. 1000 kg/Sq mtr

Raised Floor Loading (Kg / sq ft)

At least 1350 kg/Sq mtr.


Aluminum die-case(surface: melamine facing plate
with antistatic)
600 X600 (fixed to pedestrals)
1) All diffusing grill are required to support min. 50%
free air flow.
2) Full or half tile grill or both.
1) Dust proofing coating.
2) Slab should be covered with sealed & bonded
thermal insulation blanket

Material
Floor Panel size (in mm)
Diffusers

Slab beneath raised floor


Facility / Server
Hall Info

1200 kg/sq mtr

1. Yes
2. Full

2500 kg/Sq mtr

1250 kg/Sq mtr

1500 Kg/sqmeter

1500Kg/sq mtr

540 Kg/sq ft

1500kg/sq ft

2025kg/ Sq mtr

1620 kg/sq meter

1620Kg/sq mtr

Yes

Yes

600 X600 (fixed to pedestrals)

600mm*600mm

600 X600

600 X600 (fixed to pedestrals)

Yes

It is present.

1)Yes
2) both.

Full

Grill tile is support Min400CFM to


max1200CFM air flow

Used nytrile rubber.

Yes

Yes

Yes

Used nytrile rubber.

Yes

Yes

Yes

4th floor No false ceiling / 5th


floor False ceiling present

False ceiling available in


passages only.

Yes

3073mm

2250 mm,

3100mm

3530mm
3530mm

3000mm
3000mm

3100mm
3000

91X74 inches

Existing entrances/exits Height


2377mm & width 1920 mm

2380 mm &1710mm

Yes

Yes

Yes

3 ton goods elevator

Lift capacity 2000 Kg

Equipment lift installed of


capacity 3 ton.

Yes

Yes/No
In case windows are facing to the external must be
equipped with 3M Ultra 600 anti blast film.
Please provide details of your standard cable
reticulation:
- power and IT below floor
- power and IT above floor
- power below floor and IT above floor
- power above floor and IT below floor
Y/N
Y/N
1) Y/N
2) Provision for caging from true floor to ceiling
Y/N
Y/N
1) Yes/No.
2) Area per seating space.
3) Number of seats available at present?

Meeting Room or Conference Room (Y/N)

No. of seats

Incomer Feed (Single / Dual)

The power incoming routes should have different


supply routes and preferably from different
substations. Two or more different entry points into
the building are recommended. In the event that one
feeder is damaged or unavailable the other should
not be affected.

DC Power capacity (Details)

1) Capacity in MVA or kVA.


2) 1 phase, 3-phase
3) Future scalability or expansion possible.

1) DC power plant available


2) If yes, then what is the redundancy (at least N+1)

Distribution path (1, 1+Alternate,2,2 simultaneously


active)

Power to equipment rack


Power

Is there an option for additional circuit panels at the


PDUs or RPPs for expansion. If so, how many?
Does the electrical distribution system utilize
transient voltage surge suppression or TVSS ?
Is Lightning Arrestor installed on the building?
Usable power
Standard Density Area (kVA)
High Density Area (kVA)
Phase & ground capacity
Neutral conductor capacity

Are the electrical circuits distributed to the


server/network racks below the raised floor or above
the server/network racks?

Yes/No
At least 5 kVA
At least 15 kVA
On UPS distribution phase & ground conductors
should be sized at 100%
200% of the breaker rated load.
1) min.500 lux at raised floor

No

No

NA

NA

How much lux is available during emergency?

What is the designed supply redundancy (N, N+1,2N)


of transformers?
Distribution voltage
Future expansion possible
Installed Capacity (kVA)
Backup - Fuel tank capacity in Ltrs.
Backup - Running Hrs at Full Load
Configuration of DG

Yes/No. If yes, then up to what capacity?

N+1

How often are the Generators tested? Are they


tested under load? How large is the load? What is
used for the load (data center, load bank, grid)?

Make & Model


UPS capacity
UPS redundancy (e.g. 2N, N+1)
Backup at Max Load

NA

70

Single

1) 6 MVA
2) 3- Phase
3) NA

Amount of time needed to transfer critical load from


UPS to the generators?
Storage battery composition

Maintenance

Make & Model


Capacity in Tonnes
Indoor Unit Redundancy

2 strings , 4 strings etc


The check record must be taken once or more a year
(The legal inspection follows the regulations).
Onsite maintenance team and coverage hours - e.g.
engineers, electricians, plumbers (please specify
details)

N+1

CRAC units

CRAC units servicing customer equipment or the


immediate area shall have as a minimum N+1
redundancy (with more than 20% redundant units)
with a preference for a dual medium or dual chilled
water delivery system to the
CRAC equipment with diverse power supplies
servicing the equipment.

Does the current mechanical cooling utilize an open


plenum return air pathway, ducted return air pathway
and/or Hot or Cold air containment system partition
system?
Outdoor Unit Capacity
Outdoor Unit Type
Outdoor units redundancy (N/ N+1)
Temperature Maintained (Range)
20 to 24 deg C
Humidity Level Maintained (Range)
40% to 60% RH
Temp and smoke/fire Alarm? (Y/N)
Smoke / Fire Detection System? (Type/Make)
Smoke / Fire Suppression System? (Type/Make)
Min. 2 hours of fire rated walls from slab to slab.

Yes/No

If it is a gas fire suppression system, how much gas


volume is stored? (in terms of how many times the
largest space can be flooded).

1) Volume of gas stored.


2) No. of cylinders

Is there a smoke extraction system?

Yes/No

Wind protection

Monitoring alarms extended to BMS?

Same floor or different floor


Horizontally
Vertically(under floor to overhead)

Dual

Single

Single

Single

1) 4 MVA
2) 3-phase
3) Yes-Future expansion
possible.

1) 230V 32A, 230V 63A, 415V


32A & 415V 63A.
2) yes available
3)IE sockets (Industrial socket).

PDU

Yes

PDU

Both

BBT option available

Above the raised floor

Yes

Yes

Yes

Available in UPS (in Build)

Yes

Yes

Yes

Yes
3306 KVA
4.70 KVA per Rack.
10.90 KVA per Rack

Yes
7.4 MVA
6 KVA
11 KVA

Yes
1832 KVA
Yes
Yes

Yes
3200KVA
5KVA
11-15 KVA

Yes
1400KVA
1190KVA
210KVA

4kva
10 kva
100% Neutral

Yes (AT PDU level)

100
3 Transformer
Ground Floor

Yes (AT PDU level)


1) Min.500 lux at raised floor
2) A lightning temp of at least
4000 Kelvin
3) Light fixtures shall be mounted
100mm above the rack top &
caged to prevent accidental
damage.
450 lux
3*3600 KVA
Building Back Side ( Trf Yard)

Yes

Yes

Yes

Yes

Yes
Yes

Yes
Yes

Yes
Complained

Yes

Yes

Yes

More than 100mm

Yes

Yes

Yes

more than 300 lux


6
Outdoor - Ground floor HT yard

Yes- Available
6 Nos
Indoor & Out Door

More than 200 lux


3 Nos
GF substation

500 lux
2 Nos
External

N+1 Configuration

N+N

N+N

N+1

2N

415 V

415V

415 V

415V

415VAC

No
11650 KVA
40 KL
33 Hours
N+1

No
7000 KVA
60000 Ltrs
45 Hrs
N+1

No
10000 KVA
80KL
48 Hrs
N+1

No
8200 Kva
30 KL
48 Hrs
Yes, N+N

No, designed for 100% load


10MVA
30KL
40hrs
N+1

No
3 X 1500KVA
30KL
72Hrs
N+1

Daily testing without load, Total


load is 4200 kw

One time daily without load

1)DG testing on daily basis. 2)


tested under load 3)4800 KVA,
4)Data center.

Quarterly once/ yes /Entire facility


Load.

As per Indian electricity scenario,


power outages happens very
often (at least once in a
week),hence DG runs on the
current capacity of DC load.

Weekly With 500KVA load

MTU 16 V 4000

MTU SG , 16V4000

Cummins & QSKG64

Cummins/ Qst 30 g4/ Qsk 60 g4.

Caterpillar - 3516B

Cummins, Model no-KTA 50

800 KVA X 10

800 KVA* 10 no's

Threat Assessment and Crime Survey

10nos x 800KVA

N+N Configuration

N+N

N+N

N+N

Approx 1.5 Minutes

20 min on full load.

20 mins Back up time

Less than 1 minute


Less than 1 minute

1 Min

Approx 1.5 Minutes

Within 60 seconds.

60 sec for load transfer.

3 Strings

VRLA Storage Batteries

2 string

3 strings

Quarterly

Records are available

Every Quarterly

3 Months, Once

2 Hourly readings

Coverage is 24*7 by Onsite O&M


team

24*7*365 by engineers,
electricians.

MGE, Galaxy 9000


330 TR *5
N+1

Emersom & Hi-pulse


1884TR
N+1

40* 30 Tr

9TR*2, 18TR*17, 24TR*43 &


44TR*12.

N+25%

Yes with gas based cracks units

13+1 PAHU Machines are


available inside DC Ground floor
and 15+1 PAHU machines are
available for DC first floor.

open plenum return air pathway


with cold air contamination

Open plenum return air pathway

Air cooled
N
241C
505% RH
Yes
Honeywell make smoke detector
and sprinkler
FM 200 Kidde
Yes

20 to 24 deg C
45% to 55% RH
Yes
EST 3/GE
RE-GRL/Ravel
Yes

116 Cylinder

1) Volume of gas stored.- 5410Kg


2) No. of cylinders - 94 cylinders

No

Yes

Basement is not there in our DC

Yes

Team size - 35nos,

O & M Team Honeywell,24 X 7

APC Schneider - Galaxy 9000


4nos x 390TR
N+1

Emerson, Model-High Pulse


770Tr
N+1
PAHU-37nos,3 X 30tr,12 X
20tr,10 X 18tr,4 X 16tr,2X10tr,2 X
7Tr,4 X 3 tr
1500 watts per sq mtr

N+ N chillers available

Complied

Plenum return air pathway & cold


air containment provided

Hot or Cold air containment


partition system

Open plenum return air pathway


Hot or Cold air containment
system

1884TR
Air cooled
N
22, + or - 2.
45% to 55%
Yes
VESDA, Smoke
detectors/Honeywell
FM 200/Kidde
Yes

NA
NA
NA
20 to 24 deg C
45% to 55% RH
Yes
Make - Honeywell, Type - Analog
Addressable
Make - Kidde, Type - FM 200.
Yes

4 Nos x 390TR
Air cooled chiller
N+1
20 to 24 deg C
40% to 60% RH
Yes
Smoke detector, vesda,
Schneider make
FM-200, kidde make
Yes

Yes
Yes

1) 8756 Kg
2) 141 no's

2244 kg / No: Of cylinders - 41.

1. 7% of DC hall valume
2. 98nos

(1)80ltr/cylinders
(2)33nos of cylinder

27nos x 30TR, 7nos x 22TR

Yes

NA
NA
NA
NA
Yes
Yes
Yes
Yes

No

No

No

Enough precautions taken care


during design

No

NA

NA

Yes

NA

NA

Yes

NA

NA

Yes

Yes

Yes Tac Vista/5.0.1-59

Yes, IBMS/Honeywell

Yes

Yes

Yes
Can be arranged as per
requirement
Yes
Different floor
Yes

Yes

120sec

Quarterly PM schedule is in place

24/7

Basement is not there in our DC

Same floor
Horizontally
Vertically(under floor to
overhead)

120sec

Emerson / Hi pulse
249 try x 7 Nos
N+N
25 x 14.5 TR (PAHU +PEX), 4
x40 TR(XDP + XDC), 4x 6.5TR
(UCS)

Yes, Honeywell, EBI 310

Yes
different floor
Yes

Source-A(3 X 500KVA) ,SourceB(3 X 500KVA)


2N

3 string

Yes

NA

Yes/ Honeywell/ EBI- model 310i


, 400.
Yes

NA

Yes

Yes

Yes,Honeywell,Model no-EBI14.1
Yes

Scalable

N X STM1/STM4

Yes
All floor

Multiple Path
Same Floor
Yes

Yes, Schneider make

Yes

Yes

Yes
Can be arranged as per
requirement

NO
Yes

Bharti Airtel, TATA, Reliance


Tulip,PGCIL,Sify ,BSNL

Airtel, Voda, TCL, TTML, BSNL

Yes

1
3000 Kg

1
2000Kg

3 no's
1 Ton

1 Nos
1500 kg

1no
3000kg

3nos
2 X 1500Kg, 1 X 2500Kg

9X9X9 feet

2718mm,1752.6mm,1600mm,

2300mm, 1600mm, 1500mm.

height -2600mm, width -1700mm,


Depth -2000mm.

2750mm, 2080mm, 2940mm

(2700 X 1500 X 2300)-1no,(2300


X 1550 X 1600)-2nos

Yes
Yes
Yes
Yes
Yes
Yes
Yes

Sec/supX1,sec/gdX7
154 Cameras
Yes
Yes
Yes

Yes
Yes
No
Yes
Yes
Yes
Yes

Yes
140nos
Yes
Yes
Yes
Yes
Available

Yes
Yes
NA
Yes
Yes
Yes
Yes

Yes

Yes

Tier3+,
No
Yes
No
Yes
Yes

Yes
Yes
Yes
Limited to 42U.
Designed PUE 1.8 & March 2012
PUE is 1.81.
Tier 3 & ETI
No
Yes
Yes
No
Yes

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Only Conference Room &
Parking.
Yes
Yes
No
2

Available

Yes

Available
Available
No
Designed for 1.8, present 2.9 at
20%load.

Yes
Yes
42U

Yes

ISO 27001

Yes

BS 25999

2.4
Tier-3

Yes
Yes
Yes

No
No

Seismic Zone 2
No

Zone III
Nil

3
No

III
Nil

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes
1. Accces card policy. 2)Material
IN/OUT police 3)Work permit
police
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Document not available
Document not available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available
Yes, Available

Yes

Yes

Yes

BSIP

Sequirity & safty,DC House


rule,BCMS

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Available
Available
Under Process
Available
Available
Available
Available
Available
Available
Zone-3
Available
Available
Available
Available
Available
Available
Available
Available

Yes
Yes
W/P
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Yes

Yes

Yes

Yes

BCMS AUDIT

All visitors are properly identified


with a current valid form of
identification and be given a
temporary facility badge allowing
access to certain areas within the
data center. This processof
documenting in a ticketing
system is not available.

Yes

Yes

Yes

Yes
Medical insurance, PF, ESI,
Gratuty
Yes
Yes
Yes
Yes
Yes
NA
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

The Data Center should articulate their threat


assessment and crime survey results and
procedures or mitigation strategies that are in place
to address or mitigate the risks identified from their
assessment.

1600 KVA

2N
1 Min

At least 1.8

Yes/No

Yes
Yes
Yes
Yes

415 Volt

Yes

Please list down all the policies which your


organization folows.

1) 230 VAC 32 Amp dual circuit


& 400VAC 63A Dual circuit

No

1.83

Security & Access control policy

Yes Available
Yes Available
Yes Available
Yes Available
Yes Available
Yes Available
NA
Yes Available
Yes Available
Yes Available
Yes Available
Yes Available
NA
Yes Available
Yes Available
Yes Available

Visitors

All visitors must be properly identified with a current,


valid form of identification and must be given a
temporary facility badge allowing access to certain
areas within the data center. This process must be
documented in a ticketing system also.

Yes

Procees is in place.

Security Systems and 24x7 Backup Power

The data center's security systems should be


functioning at all times, complete with uninterruptible
power supply (UPS) for ensuring its continuous
operation.

Yes

Yes it is powered by UPS supply.

Yes

Yes

Yes

Yes

Mechanical Room, Electrical Room, Computer


Rooms (PODS), MDF Rooms, Network Rooms

These structures are to be separated from common


data center areas by self closing doors that are
controlled with access control and intrusion detection
devices. The hinges for each door is on the interior
(inside the POD or other controlled space) side of the
door, or is appropriately secured to prevent removal
of the hinge pin and subsequent removal of the
door. Double doors are to have one side fixed to
facilitate securing the swinging door.

Yes they are seprated from the


DC space.

These structures are separated


from common data center areas
by self closing doors that are
controlled with access control
detection devices. The hinges for
each door is on the interior inside
the POD. Double doors are
installed have one side fixed to
facilitate securing the swinging
door.

Yes

Yes

Yes

Not available

Yes

Yes

No

BMS room

No

No

Yes

Yes

Yes

All data centers should have a man trap that allows


for secure access to the data center "floor"
(production area).

Security Control Room

Electronic Access Control Systems

Access to all entry points into and within the data


center should be protected by electronic access
control mechanisms which allow only authorized
individuals to enter the facility. Included within the
framework of electronic access control should also
be biometric safeguards, such as palm readers, iris
recognition, and fingerprint readers. All ingress
access control devices are to include two factor
authentication (i.e. badge swipe and PIN). All doors
with ingress access control devices are to be
equipped with an egress access control device (I.e. a
card reader) to facilitate positive in/out (anti-pass
back).

Security

Yes

Yes

Access to the Security Control Room is to be


controlled by access control and intrusion detection
devices on the door. A pass through (Transaction)
window from the security control room to the data
center lobby is to be installed to facilitate with the
identification and badging of visitors to the data
center while they (the visitor) are still in the lobby
area of the data center. This room will be the center
for local intrusion alarm monitoring, monitoring of all
CCTV cameras for the data center, as well as central
dispatch for security officers in the data center .

Roof Hatch

The roof hatch is secured from the inside of the data


center (i.e. locked) and has contact alarms pads for
intrusion detection.

Local Door Alarm

All exterior doors (including emergency exits) and


interior doors with access control and intrusion
detection devices (card readers and key pads) are to
be equipped with a local siren.

Cameras

The facility should have a mixture of security


cameras in place throughout all critical areas, both
inside and out, of the data center. This should
include the following cameras: Fixed and pan, tilt,
and zoom (PTZ) cameras. Video images from all
CCTV cameras are to be recorded and stored for a
minimum of 90 days.

N+N

PDU

one workstation is available


Conference Room, Cafeteria is
available
Yes/No
Yes/No
42U,45U,47U,etc.

Certificate from Electrical Inspectorate


Fire Safety Organogram Chart
HSD
Insurance
Lease Deed/Possesion certificate
Lift License
Pollution Control
Power quality audit report
Air quality audit report
Siesmic Zone
SLD
Building Fire protection certificate
Dual Fiber entry routes
Emergency power OFF systems
Floor Loading Certificates
Pest Insects & Rodent control certificate
Approval for Transformer & DG set
Business Continuity plan

1. 230 VAC 32 Amp dual circuit


2. 32A & 63A, 1ph & 3ph PI
boxes, Schneider make.

1)Yes, (2)

2 simultaneously active

PDU

Yes
Yes
42 U

Yes/No (Staff ,Security,M&E vendors,etc at the DC)

Yes

1)1780KVA ,(2) 3-phase, (3)Yes

No Electrical circuits are there


from below the false flooring.

24 x 7 Manned Security at Multiple Levels


CCTV Cameras
Pin Card Access
Customer Access Control
Biometric Access Control System
Remote Hand & Eye Support 24x7
Workstations
Support Amenities (Conference Room, Cafeteria,
Parking etc)
Storage Area
Yes/No
Staging Area
Yes/No
Is there any limitation on rack dimension?
42U,45U,47U,etc.

Health & Safety policies

1. 3200KVA (UPS power)


2. 1 phase, 3-phase
3. designed for 100% load

NO

Freight Elevator

At least 1.8

Yes

(1)Yes, (2)25 sq ft, (3)42nos

PDU

Airtel, Vodafone, TCL, TTSL,


Reliance

Tier 3 or Tier 4 . Agency like uptime,EPI,etc

Yes
Yes

Yes
Yes

Yes,30nos

2 simultaneously active

Network Interconnects (Name all ISP / Carrier


present)

PUE

Power above floor and IT below


floor

Yes, Max 15 nos

NA

Yes

Tier Level certification & from which agency


ISO 27000
ISO 27001
SAS 70
ISO 20000
BS 25999
Others if any?
Seismic Zone
Flooding Risk

Yes
Yes
Yes, Provision for caging from
true floor to ceiling available
Yes
Yes
1. Yes
2. approx 40sqft
3. 40nos

2 simultaneously active

Riser cupboard

Dimentions (height, width, Depth)

Power and IT below floor

(Simultaneously active)

Interconnect Circuit Patching

Quantity (nos)
Capacity (kg)

No

Available bandwidths

MMR trays location

No
NA

1. Yes
2. N+N

1) At least one of the access routes to the building


must be routed above the flood level boundary.
2) Basement areas containing plant room spaces
should also be above the level

Diverse building cable entry

No
NA

No

If building in located in an area with greater than 2%


annual probability of winds in excess of 80 mph
"hardening" of the facility should be incorporated into
the design.
The building should be located so that the lowest
basement level is above the flood level boundary as
set out on Mumbai flood hazard Map or any other
publicly released references released by the local
authorities.

BMS (Y/N, is yes Brand / model)

Yes

Yes, 60ft

Yes / 10 Seats.

1) Capacity in MVA or kVA.


3.5 MVA
1)7.4 MVA
2) 1 phase, 3-phase
32)3-phase
phase
3) Possible.
3) Future scalability or expansion
possible. Yes

Electromagnetic Interference or Radio Frequency Immunity should not exceed 20mG of magnetic field
Interferences
nor 130 dB(3V/m) electric field within the data center

Flood protection

Purpose not known

Yes (68 no's)

Single Supply Source are


available.

1) 230 VAC 32 Amp dual circuit &


400VAC 32& 63Amp.
2) Canalis KSB32CP 32A 690V
3L+N+PE
3) No

Yes
Yes,1:12

Loading bay in GF, DC in 2F/3f,


connected with Freight lift

Yes/ approx 15 feet

1) Yes
2) N+N

106 with 7.5, 15, 21.5 and 30 tr


capacity
At least 1500 watts per sq mtr
CRAC units should be configured in a redundant
fashion to support alternate heat rejection systems.
Either system should be capable of providing the full
rated cooling load.

24 seats in three meetings room,


one in ground floor and two
meeting rooms at second floor.

Yes
2400mm X1200mm - normally
2300mm

Yes
3 ton capacity Freight lift
available.
3 ton capacity hydraulic platform
available.

1) Yes
2) N+1

Emerson Hipluse

Indoor number of units & capacity of each


Air-conditioning distribution (W/sq mtr)

24 meters

Yes
2300mmx1500mm

1) DC power plant available Yes


2) If yes, then what is the
redundancy (at least N+1)
(
N+N configuration)

800X5 KVA
N+1,2N,etc
Amount of time needed to transfer critical load from
UPS to the generators?

Available

1)1st floor- power above floor


and IT below floor. 2) 2nd floor
AW- power and IT below floor.
3)2nd floor BW- power above
We are Using Bus bar trunking
Power above floor and IT below
Power and IT below floor
inside DC Power is from the TOP floor and IT below floor. 4) 4th
floor
and IT/Network from the bottom. floor DC1- power above floor and
IT below floor 5) 4th floor DC2power above floor and IT above
floor.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
1) Yes
Yes
No
Yes
2) Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
1) Yes
1) Yes
Yes / 2Sq Feet, 18Seats
25 sq feet
2) 16sqft per seat
2) 25 Sq ft
availability,
700
3) 96 seats are available
3) 297

Lightning
3) Light fixtures shall be mounted 100mm above the
rack top & caged to prevent accidental damage.

Yes
Entry Door Height 2349mm/
width1115mm, Exit Door Height
2349mm / width 1409mm.
Yes

Signal Grid earthing reference


Yes, common loading dock for
1st, 2nd & 4th DC . Approximate
distance from loading Dock to DC
20 meters.
No

2) A lightning temp of at least 4000 Kelvin

Emergency Lightning
How many transformers?
Location of transformers?

Yes

NK

Yes, 30 feet

1) 230 VAC 32 Amp dual circuit


2) Specifications of Taper Boxes available(in case of 32 Amps, 3 Ph and single phase.
63 Amps three Phase supplied by
BBT)
C&SS
3) Specifications of Industrial sockets (in case of
cables)

Does the proposed DC space utilize power


distribution units (PDU) or remote power panels
(RPP)?

Statutory
approvals &
facility related
documents

Yes

No
Yes

Yes

AC Power capacity (Details)

Policies

Yes

3270mm
600mm

Seating space Y/N

Threats

1500Kg/sq mtr

2570mm

Services Available

Certifications

20Pa

1620 kg/sq meter

1500 kg/Sq mtr for 1st & 2nd


floor. 400Kg/Sq mtr for 4th floor.

Yes

Colocation
Racks

Other Services

Unitile,Model no-USF-1200

3623.71 mm
609.6 mm

Cages

Security

Yes
450 mm

Uniltile

3291.48 mm

Privates Suites
Managed Services

Connectivity

Yes
600mm

20Pa external static pressure of


each PAHU

No

Cable Reticulation

Environment &
Protection

260
3rd & 4th Floor

NA

If Yes to above clause then

Air Conditioning

10500sq ft

2700 mm
3300

False ceiling? (Y/N)

Any Windows inside the DC

UPS

2nd & 3rd floor

65000sq ft
64712sq ft
21404sq ft

Total Height in mm (Raised Floor to True Ceiling)


Clear Height in mm (Raised Floor to Slab)
Is there a dedicated equipment ingress/egress
passage as well as a dedicated man passage?
Height & Width of all entrances/exits to the proposed
data center?

DG Set

1250kg/ Sq mtr

65924 Sq ft (2F & 3F)


9526 sq ft (2F carrier-3314, 3F
Corp HD-, 2071, 3F Corp. colo4141)
312 nos (2F carrier-111, 3F Corp
HD-52, 3F Corp. colo-149)

2400 X 1200 MM

Floor Height in mm (Raised Floor to False Ceiling)

Receiving dock for material?


Yes/No
Is there a ramp for delivery of server racks &
equipment to raised floor? If so, what is rise/run
ratio? If no ramp, is there an equipment lift
(capacity?)
Is concrete slab under the raised floor anti-static or
electro-static dissipative? Please provide
model/method of treating the concrete slab if
applicable.
Does main facility have a Loading Dock? If so, what
is the distance to loading dock from data center
room?

Base Building
Main Electrical
Plant

Yes

Power Plant/46 KM

Entrance Width- 46 feet / Height 1 Entrance & 1 Exit to each DC


Open Space,
hall & 3 common fire exit to all
Exit Width- 46 feet / Height floor. 2300mmx1500mm
Open Space
104000 (Sq ft)
13510 Sq mtr / 145420sqft
104000
141326 sq ft

6500 Sq ft

Strength- stiffness of raised floor (in kg/sq mtr)

2 Years

Access to the Security Control


Room is controlled by access
control devices on the door. A
pass through (Transaction)
window from the security control
room to the data center lobby is
installed to facilitate with the
identification and badging of
visitors to the data center while
they (the visitor) are still in the
lobby area of the data center.
This room is center for local
intrusion alarm monitoring,
monitoring of all CCTV cameras
for the data center.

Yes

Yes

Yes

Yes with 30 days back up

Access to all entry points into and


within the data center is protected
by electronic access control
mechanisms which allow only
authorized individuals to enter the
Access Control Software
facility. Included within the
available through which all
framework of electronic access
authorization could be controlled.
control should also be biometric
Entry and Exit to DC is controlled
safeguards, such as palm
by Biometric with palm scanning
readers,and fingerprint readers.
option.
All doors with ingress access
control devices are equipped with
an egress access control device
(I.e. a card reader) to facilitate
positive in/out (anti-pass back).

Not available

NO such roof hatches for


Datacenter

NA

All emergency exits and interior


doors with access control and
detection devices (card readers
and key pads) are equipped with
a local siren.

Yes

Yes

Yes

Yes, 30 days

Yes

30 Days

The facility have a mixture of


security cameras in place
throughout all critical areas, both
Total 154 Cameras are installed inside and out, of the data center.
all around the facility with back up This include the following
of recording is maintained for 30 cameras: Fixed and pan, tilt, and
days.
zoom (PTZ) cameras. Video
images from all CCTV cameras
are recorded and stored for a
minimum of 30 days.

No