GENERAL REQUIREMENT
a. The exact types and ranges of the relays and/or schemes; to be used; shall be subject to approval
by the company.
b. Whether specified in details or not, the contractor shall provide the relays, protection schemes and
all other related equipment/devices etc., to highest degree of engineering standards in judgment of
the company.
c. The contractor shall be responsible for any omissions in delivering best quality engineering design
and shall change / modify the scheme if it is observed by company that it does not meet the
requirements to best engineering design.
d. Relay selection, its application, schemes, AC and DC wiring diagrams, relay and metering diagrams,
schematic diagram
e. It is the contractor responsibility to visit the WORK SITE and to satisfy himself as to the extent of
WORK, location and all conditions under which the WORK will be carried out. NO claims based on
the lack of any such knowledge shall be entertained.
f. For numerical relays under this contract, it is the contractor responsibly to provide the latest
updated configuration/settings original software(s) ensuring proper relays configurations and
functionality of the entire protection scheme as approved by the company.
g. For all Numerical Protections provided under this project, all optional features as declared by the
manufacturer must be provided including fault recording, event recording, GPS synchronization &
manufacturer(s) [softcopy & hardcopy] during Bid stage.
h. The CONTRACTOR'S setting proposals and configuration for any Numerical Relay, to be used shall
be proposed and installed on PED computer for review, testing and approval during detailed design
stage before drawings are issued for construction.
i.
j. CONTRACTOR shall update all drawings (protection AC/DC schematics, One line diagram, one line
relaying and metering diagram etc.) affected by this work.
k. Additionally, all numerical relays involved in this project should be equipped with facilities and have
the capability to be connected to the remote master station at ERB Hq.
l.
Trip signal should be sent to remote ends.
13-526-30502301
m. All proposed relays should be numerical relays type and provided with full options.
n. A minimum of two (2) years of satisfactory operating experience with a major electric utility. If the
type of the test report is not considered to be comprehensive enough, the CONTRACTOR shall
perform additional tests as specified by the COMPANY.
1.1 PROTECTION PHILOSOPHY
Design of the protective relay system shall have maximum reliability, selectivity and security. The
protection of the substation(s) shall generally be achieved on primary circuit basis, except in few cases
where the same shall be achieved on substation basis. The protective relays shall not maloperate
under all normal service conditions. The protective relays shall also allow operation under abnormal
emergency operation conditions but only upto limited duration, which shall be determined on case-tocase basis.
Under all conditions, the protection system(s) shall be designed such that it will initiate tripping action
at the earliest such that equipment is saved from being damaged. Once faulty
equipment/section/zone/portion is damaged shall be isolated at the earliest possible time. The
protective system(s) shall coordinate with neighboring systems such that unwanted tripping are
avoided. Whenever, requirements of high-speed and security shall conflict each other, the security shall
be given priority over speed. However, maximum tripping time shall be governed by the requirements
of tripping time specified in this specification. All areas of diametrically opposite interests of security
and speed shall specially be brought to the notice of company for review/approval.
Each and every relay, relay system, relay schemes shall be designed in such a way that they shall not
issue any mal-tripping signal. Maximum priority shall be given on achieving high degree of reliability.
In order to provide definite trip, the protection of each equipment shall be based on one-out of two
principles except for specified bus-bar wherein main and check zone relaying shall be followed. The
protection of each primary equipment, except specified bus bar, shall be divided into two separate sets
so called set-1 & set-2. Common device protections could be mounted in interface panels. Both set-1
& set-2 protections shall be electrically and mechanically separate for 115KV. Separation shall also be
maintained in all AC & DC wiring. The criss- crossing must be avoided. For 115Kv line protection, set-1
& set-2 shall be from two different manufacturers.
In case criss-crossing cannot be avoided, the same shall generally be achieved through interface
panels. Interface panels shall not be supplied if it does not house any relays. In applications, where
interface panels is not available and crises-crossing is imminent and cannot be avoided e.g., intertripping of tripping function (lockout) relays, the same shall be provided but only after due approval of
Company. The protection scheme shall be designed such that even if all protections of any one group
is not available for any reason what so ever, the other group shall protect the primary equipment.
Complete redundancy shall be maintained within frame work of this specification including DC supply
wiring, cabling and cable selections etc., such that non-availability of any protection group of
protection, DC supply, cables/cabling etc., shall not be the cause that equipment is not adequately
protected. In case above requirement are not met, the contractor shall be responsible for the
omissions and shall change/revise modify the wiring/scheme etc., even if they are
installed/wired/commissioned at site.
Protection overlapping shall be provided around all CBs.
1.2 OVERALL CONSTRUCTION AND LAYOUT OF EQUIPMENT
Following basic requirements in construction and layout of protective equipment and panels etc., shall
be met in substation.
Protection against environment.
13-526-30502301
Layout, separation and arrangement of panels shall be done by grouping protection systems on primary
circuit basis to maintain each circuit in operation. While deciding the panel grouping, following criteria
shall be fulfilled.
1. It must be possible to take out of service and work safely on the equipment for an individual
primary circuit without risk of interfering with the operation of other primary circuit.
2. Provision must be made for the easy installation of equipment of new primary circuits.
3. It must be possible to disconnect the auxiliary supplies to the equipment associated with each
individual primary circuit independently.
4. Clear segregation of the terminal wiring for each primary circuit must be provided to avoid
error.
5. An outage of any part of the system must be acceptable for the time required to repair or
replace the part and restore it to service.
6. A fault on any one equipment must not affect the continuous operation of equipment for other
primary circuits. This requirements is also applicable to each protective system where duplicate
systems are provided for one primary circuits.
Consequently following grouping shall be provided in protection of primary equipment.
i.
Circuit Protections
Each primary circuit (lines, cable etc.) shall be protected by electrically and mechanically
duplicate protections called set 1 & set-2. Segregation must be maintained between each
Relays shall have all their optional features available as per relay manual.
ii.
iii. Auto-Reclosing equipment for each over head line (if specified).
iv. Bus Bar Protections including backup of each bus, bus-sectionalizer and bus coupler.
v.
Various following systems and component shall usually be grouped together on a substation
basis.
a. Sequence of event recorder, data logging, remote control and fault recorder etc.
b. Interfacing systems such as relays and transducers.
c. Synchronizing devices.
2.0
13-526-30502301
a. The exact types and ranges of the relays and/or scheme to be used shall be subject to
approval by COMPANY.
b. Numerical type relays of modular design shall be used for protection and Electro-mechanical
type all-or-nothing relays shall be used for tripping functions. DC/DC converters shall be
provided for all numerical relays. Series resister type power supply units to drop the voltage
are not acceptable. All the relay shall confirm to IEC60255. The relays used for transformer
protection shall confirm to IEEE C37.91 STD. All over-current inverse time characteristics
shall be selectable inverse to IEC60255 or BS-142.
c. Relay selection, its application, schemes, AC & DC wiring diagrams, relay and metering
diagrams, schematics diagrams, terminal wiring diagrams, cabling diagrams, relay settings
and coordination, etc. of all protection relays, and protective signaling equipment, etc., shall
all be subject to approval of SEC-ERB.
d. Each protective relay, auxiliary relay, lockout relay etc., which either initiate tripping function
(lockout) relays, and/or tripping to circuit breakers or initiate annunciation etc., shall be
provided with positive means of indicating either by flag or LED. All definite time delayed
tripping relays shall be provided with flag or LED indications only on their respective timer
units but not in its instantaneous units. Hand or electrical reset targets/ indications shall
be provided on all relays. In addition to above, all protective relays, auxiliary relays, lockout
relays, tripping function relays etc., as stated above shall be provided with adequate
contacts for following functions. If necessary, auxiliary relays shall be provided to
accomplish these requirements.
Annunciation
Sequence of event recorders
Remote indication on SCADA
Fault recorder
Spares
case of summation of currents by direct galvanic connections, the neutral shall be grounded at
one point at the entry terminal block.
Separate current transformer cores shall be used for relay set-1 & 2.
per CT requirement section of this scope.
NOTE:
The above tripping time shall; but not limited to; include relay operating time + carrier or fiber
optics signaling time (if any) + tripping functions (lockout) relay time. It implies that if more time
is lost in relay, the same shall recovered from other devices and vice-versa. However, tripping
time of individual devices/relays shall not exceed those specified in respective clauses.
The tripping time of backup/slow operating relays shall include relay operating at its setting plus
lockout-relay operating time. In cases, where instantaneous units are provided along with overcurrent protections, the maximum tripping-time from instantaneous unit shall not exceed 40 msec
for any application.
In application, where operating time is excessively reduced due to use of ultra high speed relays,
or where operating time exceeds the above set limits, special approval shall be obtained from
company who may reject any or both proposals. And in case of any of such rejections above
time limits shall be binding on the contractor.
Cascade application of multiple lockout relays is not allowed and should not be practiced for
tripping functions. Series flag relays should be used where required.
2.6 SENSITIVITY:
The sensitivity of line, BF & busbar relays shall be to operate at 10% rated current.
2.7 OVERLOAD RATINGS:
The protective relays shall have the following minimum overload capabilities:
AC Voltage
AC Current
time within guaranteed and specified limits. Relay should never maloperate due to cable/other
capacitances in the entire DC system and boost charging voltage level. The contractor should
justify this by calculation with respect of the total distributed capacitance on the DC system and
also field test should confirm it.
Supervision relays shall be provided for each and every lockout/ tripping relay coil and its DC
supply.
All lockout relays shall be of mechanically latched type design with electrical or manual reset. All
tripping relays used for line protection and transformer mechanical targeting function auxiliary
relays applications shall be of self-reset with hand reset target type.
All lockout/tripping relays shall have 3 NO & 2NC contacts available as spare and wired upto
terminal blocks of respective panels.
For transformers protection, lockout relays of primary set 86-1 and 86-3 shall energize trip coil-1
of HV/LV CBs and lockout relay of backup set 86-2 and 86-4 shall energize trip coil-2 of HV/LV
CBs. For lockout relay classification, refer to Relaying and Metering One Line Diagram of new
substation.
All tripping, lockout and receive relays shall be of high burden, high security type. These relays
should not operate due to capacitive discharge currents due to cabling in the DC system or any
devices in the DC system. The CONTRACTOR must justify the relay stability by calculation and
field test.
2.9 TESTING FACILITIES:
All individual relays used in the protective relaying shall be tested in accordance with the
requirements of IEC-60255 or equivalent ANSI, British etc., as per company and manufacturer
recommended test practices.
Each protective relay shall be capable of being tested completely from the front of the panel.
Manufacturer test blocks shall be provided. Company approved manufacturer test blocks shall be
provided. FT switches can be used if manufacturer test blocks are not available or not
acceptable. However, in this case one testing facility to isolate both AC/DC at the same time shall
be provided. Test switches shall facilitate shorting and grounding of the CTs and be clearly
labeled. Each tier of the protective relay rack (regardless of the number of relay manufacturers
in that tier) shall be equipped with sufficient number of test blocks to facilitate individual relay
testing.
by COMPA
All protective relays shall be capable of being tested individually, with adequate safety and
without the risk of spurious tripping. Single-phase relays shall be equipped with separate test
blocks to facilitate testing of relays individually and carry out load check.
The design shall be such that external test equipment can be connected to the protection system
at a permanently mounted connector in front of the relay panel by means of test plugs.
Special test equipment supplied by the relay manufacturers and required or recommended by the
relay manufacturers for acceptance and/or maintenance test shall be provided. This shall include
connecting cables, plugs & operating manuals etc.
For relays equipped with ser
relevant software and connecting cords shall be provided.
13-526-30502301
13-526-30502301
isolating facilities at the first panel of entry in the control room or in the case of the switchgear,
the control cabinet.
NOTE:
The first panel of entry, control panel or relay panel for a CT circuit shall have a shorting type
terminal block similar or equivalent to the terminal block used at the power circuit breaker and
power transformer cabinet etc.
2.13 CT, PT, CONTROL CABLES
All control cables for CT & PT/CVT circuits for various relaying, recording and metering functions
shall be lead sheathed/shielded type unless relay or recorder manufacturer additionally requires
twisted pair cables also. The shield shall be grounded at both ends, i.e. in 115KV GIS S/S and in
relay/control house at inlet of the concerned panels. The cross sectional area of the cables and
current carrying capacity of the shield shall be adequately sized to suit the application. The
Contractor shall furnish the calculations for approval of the Company. Maximum cross-sectional
area of the CT lead shall not exceed 10mm cu. Neutral of all CT and PT shall be grounded at
first entry point in relay panel. However, facility shall be provided to ground CT & PT neutrals
(temporarily for maintenance purposes) in switchyard also. In any case neutral shall be grounded
at only one place at a time and that is in relay room for permanent position.
2.14 PT FUSE-FAILURE SUPERVISION RELAY:
Fuse-failure relays shall be provided to supervise both failure of PT fuses and any open circuiting
of PT secondary circuits/loopings etc. Thereby, PT fuse-failure relay shall be connected in the
end of PT secondary looping. The fuse failure relays shall supervise single, poly and three phase
fuse-failure conditions. The operating time of the fuse-failure relay shall be less than 8 msec
such that its output can be used to block protection from maloperation. For 3failure relay shall be based on either detection of zero-sequence voltage or balanced voltage
principle. The relay shall not maloperate on system ground faults. Zero-sequence current
o' principle. Additional
voltage signal parallel to any of the fuses shall be provided to make relay suitable to detect 3phase fuse-failure for
relays operating on Vo principle. For singlevoltage balance principle. The relay shall be provided for each relay utilizing voltage supply such
as distance, DEF, directional O/C, neutral displacement, synchro-check relays and dead-line/bus
check feature (where provided).
a. Relaying standards
b. For capacitor bank protections
ANSI/IEEE C37.99 - 1990 - IEEE guide for protection of
capacitor banks.
shunt
As per specification.
13-526-30502301
not brochures)
shall be provided to Protection Engineering Division of company and accepted prior to
acceptance of relays or relay systems. Other complete manuals must be provided to the
company before relays or relay systems are delivered to the construction site. This
information shall allow the company to determine all settings, to set and calibrate, to verify
correct installation and connections, and to repair in place the relay or relay system.
b. Information in the manuals and documentation for the relay system shall not contain less
than the following:
pecification and characteristics.
External connections.
Description and drawing of the construction and principals of operation. Additionally
for relay systems, the module layout, interconnection drawings, internal wiring, and
component descriptions.
All setting calculation instructions explained with examples.
All setting and calibration procedures and instructions.
Receiving inspections and acceptance test on instructions.
Installation requirements and instructions.
Routine maintenance requirements and instructions.
Repair and recalibration instructions.
Parts list.
Design test reports.
Irrespective of the CT tap used, each new CT shall have required continuous thermal rating
in accordance with the primary connected equipment maximum capability & shall also be
suitable for Relay thermal ratings.
Number of CT cores and their requirements to be provided on either side of CBs shall be
coordinated with all concerned departments, and also shall meet the protection
requirements as required by the intended protection.
otherwise specified.
, RCT, Rb etc
must be attached for each & every class CT involved under the project
Also, note that required parameters for the CTs indicated in this PTS & drawings are only
minimum requirement & are not a limiting factor for the performance of any CT. Should
any CT with higher performance, change in tap etc becomes necessary as per the
calculations performed by the contractor, the same shall be highlighted and proposed for
the Company approval. However, no justifications or proposals for CTs with lower
performance than PTS indicated on any parameter will be accepted.
For Secondary circuit wire length cable route layout must be attached for each & every
protection. A multiplication factor of 1.2 shall be used over the length as per proposed
cable route plan
For all protective cores, minimum safety margin of 20% in knee point voltage shall be
provided. In addition, to above, the knee point voltage shall be rounded to nearest
round/whole figure.
The calculations for selection and sizing of all CTs shall be furnished by the contractor
along with tender for approval by the company. CTs shall not be procured prior to CTs
approval. If in its judgment of the company these CTs found not adequate, contractor
shall change the CT and provide adequately sized CT.
All protection CT cores shall have continuous thermal rating of two times In i.e., 2 x In for
all taps.
CTs shall be located on either side of CBs to provide complete overlap of protections
around the CB.
All protection class CTs shall be identical, so that their interchangeability could be possible.
Breaker interrupting capacity shall be used as basis for CT sizing.
All spare bays CTs for future protection shall be sized both for distance and line differential
protection by considering Minimum length 4 km for distance protection & 1 km for line
13-526-30502301
Minimum two (2) tap steps on higher side and three (3) tap steps on lower side in CT ratio
must be available to cope up with future modifications in the grid/system operating
conditions.
In case any protective (distance, differential) relay requires lower knee point voltage than
those calculated above, the same shall not be accepted unless and until relay manufacturer
furnishes type test report to prove the CT requirements without increasing the relay
operating time under full CT remenance and 100% DC off-set conditions and 3-open-close
sequence.
In case knee point voltage at the highest tap of the CT core is more than 2000V (r.m.s)
suitable non-linear surge suppresser devices (e.g. lightening arrestors etc.) shall be
permanently wired in parallel with secondary winding of respective CT core in respective
CT terminal box located in switchyard to limit the peak voltage less than 3000V (peak).
The calculations to prove the application and characteristics of above non-linear surge
suppresser device shall be furnished by contractor for the approval of the company.
(maximum CT knee point voltage requirement for various protections at applicable tap). In
these calculations the short circuit level shall be the short circuit interrupting capability of
the circuit breaker.
Following formulae shall be used in sizing the minimum CT knee point voltage
requirements for various protections at applicable tap irrespective of type of relay used.
In case, any particular relay requires more CT knee point voltage, the same shall be
overriding these requirements. Margin shall be provided for remanence while using CT
adequacy formula. The calculations shall be based on CB interrupting capacity.
a. For distance protections
The higher of the following two requirements shall be chosen:
a. Vk1> If1. (X/R+1) (RCT+Rl+Rr+Rb)
b. Vk2> K.If2.(RCT+R1+Rr+Rb)
WHERE:
13-526-30502301
If 1
If 2
RCT
Rl
Rr
Relay resistance.
Rb
X/R
Is
RCT
RL
Rr
Relay resistance
Rb
The above requirement presumes that if CT saturates after six (6) cycles, it will have
adequate harmonics in its secondary to make relay remain stable on through fault. In case
the offered relay does not remain stable, the number of cycles shall be suitably increased.
The transformer differential HV side (115kV) CT shall have extended thermal rating of 2xIn
(In is rated current of CT). The CONTRACTOR shall furnish the calculations along with its
justification to prove the above requirements to COMPANY for its approval.
c. Restricted Ground Fault Protection, STUB BUS and High Impedance Bus Bar
Differential Protection
Vk > 2Vs
Vs > K.IFs (RCT +2 Rl)
Ip = T. (Ir+nIm+IM+Isp+Iv)
WHERE:
Ip
13-526-30502301
Vk
Vs
Constant (e.g. 2)
CT ratio
Ir
IM
Isp
Iv
IFs
Im
Rct, Rl
NOTE:
All CTs involved in these protections should have matching characteristics in ratio, Vk, Im
and design etc.
d. Low impedance bus bar differential protection
Specific recommendation of CT requirements of offered relay shall be furnished by
contractor along with his tender. The CT requirement recommendations shall be supported
by high-current tests on through fault stability and extreme transient CT saturation including
high degree of remenance in the CT. The CT shall have knee point voltage derived by the
formula recommended by relay manufacturer.
e. For inverse time protection
To suit the applications provided inter-changeability and other requir
all.
The CT shall have Knee-point voltage derived from the following formulae:
Vk > Is (RCT + RL + Rr + Rb)
WHERE:
Vk
Is
13-526-30502301
WHERE:
Vk
Is
CT
secondary
current
interrupting current.
corresponding
to
Switchgear
calculation
shall
be
based
on
the
manufacturer
350In then ,
Vk
In
CT rated current
RCT
RL
13-526-30502301
The requirements for Numerical Relays for data communication shall be as follows:
Evaluation Master Station PC (latest type) should be provided to PED at SEC-ERB HQs, which shall
through the Substation
Automation System (SAS) Engineering Workstation PC (for Substation with SAS) and through data
retrieval system (for substation without SAS) for Relay monitoring & data retrieval and Analysis.
This is required to & from all involved substations under this project to PED Evaluation center.
to have full access to the
numerical relays including software/hardware required to get the system functioning shall be
provided.
The communication protocol used should conform to a well-known standard and should be capable
to be upgraded to any further new systems (open system) as per the SAS appendix. This shall be
compatible with various type & make of Numerical Relays involved under this project at each S/S
end.
Required setting & configuration software shall be installed on PED PC during detailed design stage
numerical relay to be used shall be proposed and installed on PED computer for review, testing and
approval during detailed design stage before drawings are issued for construction.
A detailed training on the installed Relay monitoring & data retrieval and Analysis system for both
engineering & field personnel shall be provided.
All proposed relays should be numerical relays type and provided with full options.
2.21 Impedance Measurements for all transmission lines/cables involved in this project:
The following requirement shall be included under the T/L PTS under relevant section:
a. SOIL RESISTIVITY MEASUREMENT
There shall be sufficient number of Measurements for various 'Electrode spacing' (in
tabular form) to provide a clear indication of Resistivity of various underlying layers. These
tests must be performed in strict compliance with IEEE Guidelines under standard 81.
These measurements shall be accompanied with calculations and 'interpretations' as per
the mentioned standard.
Finally, based on the soil Resistivity pattern and other Geotechnical considerations and
involved standards, the T/L contractor shall provide equivalent single soil Resistivity value
for use with HV and EHV fault calculations, suggested by an approved 'Independent
Agency'.
These measurement and Equivalent Soil Resistivity values must be submitted individually
for each T/L under this project.
E&DD/EHVE&DD shall include this requirement in the relevant section of the PTS to be
provided at the 'Final Line construction stage'. These data must be submitted to SMD/PED
as well as to the S/S contractor in order to prepare relay settings & fault analysis.
b. IMPEDANCE MEASUREMENT
The contractor shall have line impedances measured by 'TWO INDEPENDENT APPROVED'
agencies for all newly constructed lines.
13-526-30502301
CALCULATED IMPEDANCES
The Contractor shall provide line impedance calculations for all T/L lines based on physical
line construction using 'Equivalent Soil Resistivity'. These calculated impedances shall be
submitted to SMD/PED and S/S contractor for each line at the time of start of the project
as well as at the time of final testing of the lines.
d.
13-526-30502301
Spacing coordinate X, Y for each phase conductor (X=0, Y=0 shall be centre line of
structure at ground surface).
Sag for phase a, b & c (average, minimum and maximum).
Ground wire type, size and details.
Spacing coordinate X, Y for each Ground wire (for both OPGW & OGW).
Sag for each ground wires (average, minimum and maximum).
le,
Parallel running line information in sketch form with name, KV and length marked for
each parallel line.
Transposition details, phasing and length in sketch for from end to end.
Total length of line from Bus-bar to Bus-bar at two ends (i.e. Gantry to Gantry +
Gantry to GIS or CB).
All bid proposals shall be submitted as per the form as per attachment BIDDER FORM.
Any submitted bid proposals shall be completed in this form and any bid submittals with
missing/ omitted information shall not be reviewed by SMD/PED.
It is the concern department/division responsibility to make sure all bidders have this form
and use it for there submittals.
2.23
13-526-30502301
SECTION II
Protection Relaying Requirements
A. NEW AL-KHAFJI 380/115/13.8KV BSP SUBSTATION
1. 115kV Protection Relay Panels:
The CONTRACTOR shall provide and install the following new 115kV relay panels in the
substation control building. Number of panels shall be decided based on detailed design
schemes & space requirement and as per E&DD requirements.
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
13-526-30502301
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
AUTO-RECLOSING SCHEME:
New Auto-Reclosing relay (79) for selectable high speed & delayed reclosing of
115kV line shall be provided as stand alone along with dedicated synchro check
plus live-line/dead bus and dead-line/live-bus scheme per CB for the line with Fuse
supervision Relays (for each VT input of each sync check relay), Dc supervision
relays etc. The auto reclosing relay & its scheme shall be (As per the main relay
specification attachment AR-79+25).
CT REQUIREMENTS:
The existing CT's at Khafji-2 shall be used with the new line distance protection . It is the
contractor responsibility to visit the existing substations to get all required CT information
(local and remote) and provide those information along with the CT sizing calculation to
PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
The minimum thermal rating for CTs when not specified shall be two (2) times rated
at all taps.
All CTs shall be multi-ratio type. Two (2) taps above and two (2) taps below the
indicated tap shall be used. Margin shall be provided for remanence while using CT
adequacy formula. The calculations shall be based on CB interrupting capacity.
13-526-30502301
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
13-526-30502301
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
The minimum thermal rating for CTs when not specified shall be two (2) times rated
at all taps.
All CTs shall be multi-ratio type. Two (2) taps above and two (2) taps below the
indicated tap shall be used. Margin shall be provided for remanence while using CT
adequacy formula. The calculations shall be based on CB interrupting capacity.
2.3 KHAFJI SUB-4 Line Protection (both lines):
The following are the required new protection sets for 115kV line to KHAFJI SUB-4
at NEW AL-KHAFJI 380/115/13.8KV BSP Substation.
SET # 1
New Line Differential set (87/21/DEF-1) for 3-phase and ground fault
protection. The relay shall be numerical type with built in Distance, DEF (67N)
and O/C (67 & 67N) for phase and ground faults and provided with full
options (as per the related attachment 87L).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
13-526-30502301
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
New Line Differential set (87/21/DEF-2) for 3-phase and ground fault
protection. The relay shall be numerical type with built in Distance, DEF (67N)
and O/C (67 & 67N) for phase and ground faults and provided with full
options (as per the related attachment 87L).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
CT REQUIREMENTS:
The new line differential protection shall be suitable for used with the existing CT's at
Khafji-4. It is the contractor responsibility to visit the existing substations to get all required
CT information (local and remote) and provide those information along with the CT sizing
calculation to PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
The minimum thermal rating for CTs when not specified shall be two (2) times rated
at all taps.
All CTs shall be multi-ratio type. Two (2) taps above and two (2) taps below the
indicated tap shall be used. Margin shall be provided for remanence while using CT
adequacy formula. The calculations shall be based on CB interrupting capacity.
13-526-30502301
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
13-526-30502301
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
The minimum thermal rating for CTs when not specified shall be two (2) times rated
at all taps.
All CTs shall be multi-ratio type. Two (2) taps above and two (2) taps below the
indicated tap shall be used. Margin shall be provided for remanence while using CT
adequacy formula. The calculations shall be based on CB interrupting capacity.
2.5 RAS AL-MISHAB PORT Line Protection:
The following are the required new protection sets for 115kV line to Ras Al-Mishab
Port at NEW AL-KHAFJI 380/115/13.8KV BSP Substation.
SET # 1
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
13-526-30502301
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
SET # 2
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
AUTO-RECLOSING SCHEME:
New Auto-Reclosing relay (79) for selectable high speed & delayed reclosing of
115kV line shall be provided as stand alone along with dedicated synchro check
plus live-line/dead bus and dead-line/live-bus scheme per CB for the line with Fuse
supervision Relays (for each VT input of each sync check relay), Dc supervision
relays etc. The auto reclosing relay & its scheme shall be (As per the main relay
specification attachment AR-79+25).
CT REQUIREMENTS:
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
The minimum thermal rating for CTs when not specified shall be two (2) times rated
at all taps.
All CTs shall be multi-ratio type. Two (2) taps above and two (2) taps below the
indicated tap shall be used. Margin shall be provided for remanence while using CT
adequacy formula. The calculations shall be based on CB interrupting capacity.
3. Existing 115KV system:
13-526-30502301
The existing Khafji BSP 115KV breaker failure scheme, 115KV under frequency scheme
and pole discrepancy scheme shall be modified to be used with all new lines protections.
The contractor shall be responsible for connection, modification, commissioning and all
related equipment/devices etc., to accomplish the scheme as per the related attachment
BFP including breaker failure transfer tripping to the other line end.
Also, the existing breaker failure scheme shall be modified to transfer trip the LV side
breakers of the Khafji-1 Transformers.
Moreover, existing bus bar protection shall be modified to include the 115kV
feeders/Transformers
etc, shall be provided by the contractor.
One (1) numerical three phase percentage biased differential protection (87T)
with harmonic restraints provided with Interposing CT's suitable for use with 1A
on HV side & 5A on LV side. (as per the related attachment 87T).
One (1) restricted earth fault (high impedance type) protection relay (87REF). (as
per the related attachment 87REF). The relay shall be based on high stability
circulating current relay with externally mounted, continuously variable series
stabilizing resister and current range 5% to 40% In.
New lockout relays (86) for tripping HV and LV sides of the transformers (the
number of lockout relays shall be similar to the existing lockout relays).
lockout supervision relays (74/86) .
One (1) DC supervision relay (74/DC-1).
The auxiliary relay shall be provided with adequate number of contacts for trip,
alarm, SOE, SCADA and as spare.
13-526-30502301
Auxiliary targets relays for transformer mechanical protection shall also have the
same performance requirements as the line tripping relay.
SET-2:
Two separate numerical relay each having (3) phase (50/51) and ground
(50N/51N) over current protection shall be provided for transformer high side
connected in series. The phase and ground Over current functions shall have a
harmonic restrained. (as per the related attachment 50/51P&N)
One numerical (3-Phase & Ground), directional over current protection relay (67
and 67N) having selectable inverse time characteristics with instantaneous unit
for transformer low side. (as per the related attachment 67/67N and
50/51P&N).
Provide PT fuse failure relays (98) for blocking each voltage dependent
protection.
One (1) numerical neutral time over current protection relay (51G) with
selectable inverse time characteristics. (as per the related attachment
50/51P&N, but without instantaneous unit).
Buchholz protection for both main tank and OLTC (63), having two (2) stages
(one for alarm and one for tripping).
New lockout relays (86) for tripping HV and LV sides of the transformers (the
number of lockout relays shall be similar to the existing lockout relays).
lockout supervision relays (74/86)
One (1) DC supervision relay (74/DC-2).
Lot - Separate auxiliary high burden voltage operated relays for trip stage with
hand resettable target for the following transformer safety devices:
o Buchholz Relay Trip (Annunciator, SCADA)
o Winding Temperature Trip (Annunciator, SCADA)
o Oil Temperature Trip, (Annunciator, SCADA)
o Pressure Relief Device Trip for Main Tank and OLTC (Annunciator,
SCADA)
o Pressure switch trip for OLTC (Annunciator, SCADA)
The auxiliary relay shall be provided with adequate number of contacts for
trip, alarm, SOE, SCADA and as spare.
Auxiliary targets relays for transformer mechanical protection shall also have
the same performance requirements as the line tripping relay.
13-526-30502301
Lot - Auxiliary voltage operated high burden relays for alarm stage with self reset
coil and hand reset target, with adequate number of contacts for alarm, SCADA
and as spare, shall be provided for the following function/device:
o Buchholz Relay (1st stage) Alarm
o Winding Temperature - High (1st stage) Alarm
o Oil Temperature - High (1st stage) Alarm
o Magnetic Oil Level - Low Alarm
o Cooler Trouble Alarm
NOTE :
The arrangement of 115/13.8kV power transformer lockout relays shall be exactly
similar to the existing lockout arrangements and tripping scheme.
CT REQUIREMENTS :
The contractor shall propose new transformer differential with Interposing CT's that are
suitable for use with the existing CT's at Khafji BSP (5A) on HV side & at Khafji-1
13.8KV LV side (5A CT).It is the contractor responsibility to provide the calculations for
the Interposing CT's proving their suitability for use with the transformer differential
protection (5A & 1A).
It is the contractor responsibility to visit the existing substations to get all required CT
information (local and remote) and provide those information along with the CT sizing
calculation to PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in this
scope.
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
13-526-30502301
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
AUTO-RECLOSING SCHEME:
New Auto-Reclosing relay (79) for selectable high speed & delayed reclosing of
115kV line shall be provided as stand alone along with dedicated synchro check
plus live-line/dead bus and dead-line/live-bus scheme per CB for the line with Fuse
supervision Relays (for each VT input of each sync check relay), Dc supervision
relays etc. The auto reclosing relay & its scheme shall be (As per the main relay
specification attachment AR-79+25).
CT REQUIREMENTS:
The existing CT's at Khafji-2 shall be used with the new line distance protection . It is the
contractor responsibility to visit the existing substations to get all required CT information
(local and remote) and provide those information along with the CT sizing calculation to
PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
3. Existing 115KV system:
The existing Khaji Sub-2 breaker failure scheme, Bulbar differential scheme shall be
modified to be used with the new line protection. The contractor shall be responsible for
connection, modification, commissioning and all related equipment/devices etc., to
accomplish the scheme as per the related attachment BFP including breaker failure
transfer tripping to the other line end.
Also, the existing Khaji Sub-2 breaker failure scheme shall be modified to transfer trip the
LV side breakers of the Khafji-1 Transformers.
13-526-30502301
Moreover, existing Khaji Sub-2 bus bar protection shall be modified to include the 115kV
feeders/Transformers
etc, shall be provided by the contractor.
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
13-526-30502301
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
AUTO-RECLOSING SCHEME:
New Auto-Reclosing relay (79) for selectable high speed & delayed reclosing of
115kV line shall be provided as stand alone along with dedicated synchro check
plus live-line/dead bus and dead-line/live-bus scheme per CB for the line with Fuse
supervision Relays (for each VT input of each sync check relay), Dc supervision
relays etc. The auto reclosing relay & its scheme shall be (As per the main relay
specification attachment AR-79+25).
CT REQUIREMENTS:
The existing CT's at Khafji-5 shall be used with the new line distance protection. It is the
contractor responsibility to visit the existing substations to get all required CT information
(local and remote) and provide those information along with the CT sizing calculation to
PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
3. Existing 115KV system:
The existing Khaji Sub-5 115KV breaker failure scheme, 115KV under frequency scheme
shall be modified to be used with the new line protection. The contractor shall be
responsible for connection, modification, commissioning and all related equipment/devices
etc., to accomplish the scheme as per the related attachment BFP including breaker
failure transfer tripping to the other line end.
Also, the existing Khaji Sub-5 breaker failure scheme shall be modified to transfer trip the
LV side breakers of the Khafji-1 Transformers.
13-526-30502301
Moreover, existing Khaji Sub-5 bus bar protection shall be modified to include the 115kV
feeders/Transformers
etc, shall be provided by the contractor.
New Line Differential set (87/21/DEF-1) for 3-phase and ground fault
protection. The relay shall be numerical type with built in Distance, DEF (67N)
and O/C (67 & 67N) for phase and ground faults and provided with full
options (as per the related attachment 87L).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
New Line Differential set (87/21/DEF-2) for 3-phase and ground fault
protection. The relay shall be numerical type with built in Distance, DEF (67N)
and O/C (67 & 67N) for phase and ground faults and provided with full
options (as per the related attachment 87L).
13-526-30502301
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
CT REQUIREMENTS:
The new line differential protection shall be suitable for used with the existing CT's at
Khafji-4. It is the contractor responsibility to visit the existing substations to get all required
CT information (local and remote) and provide those information along with the CT sizing
calculation to PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
3. Existing 115KV system:
The existing Khaji Sub-4 115KV breaker failure scheme, 115KV under frequency scheme
shall be modified to be used with the new line protection. The contractor shall be
responsible for connection, modification, commissioning and all related equipment/devices
etc., to accomplish the scheme as per the related attachment BFP including breaker
failure transfer tripping to the other line end.
Also, the existing Khaji Sub-4 breaker failure scheme shall be modified to transfer trip the
LV side breakers of the Khafji-1 Transformers.
Moreover, existing Khaji Sub-4 bus bar protection shall be modified to include the 115kV
feeders/Transformers
etc, shall be provided by the contractor.
F.
13-526-30502301
New Line Distance set (21/DEF-1) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 & 67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-1) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-1).
Trip coil supervision relay (74) for TC-1 of CB.
DC supervision relay (74) for DC-1 set 1.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N)
Receive relay (85DTTR) with operating speed of less than 10msec., self-reset
type with the target shall be provided for each breaker failure/ pole
discrepancy protection channel for NEW AL-KHAFJI 380/115/13.8KV BSP S/S
line. This relay shall be provided on Set # 1 protection portion of the panel
and will operate 94-1 & 94-2.
SET # 2
New Line distance set (21/DEF-2) for 3-phase and ground fault protection.
The relay shall be numerical type with built in DEF (67N) and O/C (67 &67N)
for phase and ground faults and provided with full options (as per the related
attachment DIS-21).
Electro magnetic tripping relay (94-2) with adequate contacts for alarms, SOE,
TFR etc.
Supervision relay (74) for tripping relay (94-2).
Trip coil supervision relay (74) for TC-2 of CB.
DC supervision relay (74/DC-2) for set -2.
PT fuse failure relay (98) for blocking the 87L built-in distance feature and
DEF (67N).
NOTE:
Set-2 should be from different manufacturer than set-1.
13-526-30502301
AUTO-RECLOSING SCHEME:
New Auto-Reclosing relay (79) for selectable high speed & delayed reclosing of
115kV line shall be provided as stand alone along with dedicated synchro check
plus live-line/dead bus and dead-line/live-bus scheme per CB for the line with Fuse
supervision Relays (for each VT input of each sync check relay), Dc supervision
relays etc. The auto reclosing relay & its scheme shall be (As per the main relay
specification attachment AR-79+25).
CT REQUIREMENTS:
The existing CT's at Khafji-3 shall be used with the new line distance protection. It is the
contractor responsibility to visit the existing substations to get all required CT information
(local and remote) and provide those information along with the CT sizing calculation to
PED-E for review and approval.
Contractor shall get the complete data of the existing CTs of the respective CTs at
remote end substations. The new CTs shall be sized as per requirement provided in
this scope.
3. Existing 115KV system:
The existing Khaji Sub-3 115KV breaker failure scheme shall be modified to be used with
the new line protection. The contractor shall be responsible for connection, modification,
commissioning and all related equipment/devices etc., to accomplish the scheme as per
the related attachment BFP including breaker failure transfer tripping to the other line
end.
Also, the existing Khaji Sub-3breaker failure scheme shall be modified to transfer trip the
LV side breakers of the Khafji-1 Transformers.
Moreover, existing Khaji Sub-3 bus bar protection shall be modified to include the 115kV
feeders/Transformers
etc, shall be provided by the contractor.
13-526-30502301
SECTION III
Communication Requirement
All equipment/devices required for interfacing protective relaying schemes with communication
system shall be provided by the contractor. It shall be subject to approval of the company. It shall
be of proven type for its reliability, dependability, security etc., and shall not be new to SEC-ERB.
These equipment/devices shall be provided in each sides of the line wherever either new and/or
modified protection schemes require the same. It shall have adequate number of channels. The
protective relaying/communication interfacing equipment shall be separate for each set of relay-set
and transfer-trip etc., such that its availability shall not be jeopardized under maintenance and nonavailability conditions. Adequate number of guard signals shall be provided to avoid maloperation. In
addition, codes and regenerating codes shall be provided to safeguard the signals. Adequate number
of signaling channels shall be provided for various protection and transfer trip signals. The number of
channels for protective relaying and transfer trips in each 115kV lines shall be as per protective
relaying channel requirements stated below.
A. NEW AL-KHAFJI 380/115/13.8KV BSP - KHAFJI SUB-2 NEW AL-KHAFJI
380/115/13.8KV BSP - KHAFJI SUB-2 115KV Line [ Both Ends per each line ]:
One channel for breaker failure/ Pole Discrepancy direct intertrip send/receive.
B. NEW AL-KHAFJI 380/115/13.8KV BSP - KHAFJI SUB-5 115KV Line [ Both Ends per
each line ]:
One channel for breaker failure/ Pole Discrepancy direct intertrip send/receive.
C. NEW AL-KHAFJI 380/115/13.8KV BSP - KHAFJI SUB-4 115KV Line [ Both Ends per
each line ]:
13-526-30502301
One channel for breaker failure/ Pole Discrepancy direct intertrip send/receive.
D.
NEW AL-KHAFJI 380/115/13.8KV BSP - KHAFJI SUB-3 115KV Line [ Both Ends per
each line ]:
One channel for breaker failure/ Pole Discrepancy direct intertrip send/receive.
13-526-30502301
SECTION IV
SOE & TFR Point Lists
I.
II.
III.
13-526-30502301
Existing SOE shall be modified/expanded to incorporate the addition of new line protections
(including provision of additional panels, if required).
Number of TFR/SOE points shall be as per the related attachment TFR & SOE.
13-526-30502301
ATTACHMENTS
To Protective Relaying System Requirements
SOE
SOE Point List
1.
Bus Differential Protection With Main & Check Zone And With CT Supervision Feature
LEGEND
ALARM CODE
13-526-30502301
2.
ALARM CODE
LEGEND
XXXXXXX XXXKV LINE-X SET-X 87L-X XXXXXX PH-A OPTD
CIRCUIT ID
XXXXXX XXXKV LINE-X SET-X 87L-X XXXXXX PH-B OPTD
XXXXXX XXXKV LINE-X SET-X 87L-X XXXXXX PH-C OPTD
ALARM CODE
9
9
9
13-526-30502301
3.
Line Directional Non-Directional O/C Phase And Ground Protection Built-In Feature
Of Numerical Line Protections
LEGEND
4.
XXXXXX XXXKV LINE-X GROUND 67N XXXXX DIR INST O/C OPTD
5.
ALARM CODE
ALARM CODE
LEGEND
ALARM CODE
13-526-30502301
6.
ALARM CODE
7.
Circuit Breaker
LEGEND
ALARM CODE
IF GIS SCHEME HAS DIFFERENT TYPE OF COMPARTMENT ARRANGEMENT AND HAS DIFFERENT TYPE OF TRIP BLOCK, TRIPPING, BLOCK CLOSE,
BLOCK TRIP SCHEME SAME SHALL BE USED
ALARM CODE SHALL BE 9 IF BLOCK TRIP OR TRIPPING IS RESULTED UPON OPERATION OF MECHANICAL/SF6 LOW ALARM
ALARM CODE SHALL BE M IF INVOLVES ONLY BLOCK CLOSE
13-526-30502301
8.
ALARM CODE
9.
50/51 Function
LEGEND
ALARM
CODE
ALARM
CODE
13-526-30502301
11. High Impedance Bus Diff With CT Supervision & Without Check Zone
LEGEND
XXXKV BUS-XX DIFF 87 XXXXX PH-A OPTD *
BUS ID
XXXKV BUS-XX DIFF 87 XXXXX PH-B OPTD *
ALARM
CODE
9
9
ALARM
CODE
F
M
F
F
M
M
M
XXXKV
XXXKV
XXXKV
XXXKV
BUS
BUS
BUS
BUS
TIE
TIE
TIE
TIE
ALARM
CODE
4
4
4
4
8
M
13-526-30502301
ALARM CODE
8
8
8
8
M
M
8
8
M
M
5
5
TXXX
TXXX
TXXX
TXXX
5
4
4
4
SET-2
SET-2
SET-2
SET-2
TXXX SET-2 LV PH-A 67 XXXXX DIR INST O/C OPTD (FOR LV WITH DIR O/C RELAYS)
TXXX SET-2 LV PH-B 67 XXXXX DIR INST O/C OPTD (FOR LV WITH DIR O/C RELAYS)
TXXXX SET-2 LV PH-C 67 XXXXX DIR INST O/C OPTD (FOR LV WITH DIR O/C RELAYS)
TXXX SET-2 LV GROUND 67N XXXXX DIR TOC OPTD (FOR LV WITH DIR O/C RELAYS)
TXXX SET-2 LV GROUND 67N XXXXX DIR INST OPTD (FOR LV WITH DIR O/C RELAYS)
5
5
4
5
M
8
IF SUDDEN PRESSURE RELAY AVAILABLE THEN IT WILL REPLACE THE POINTS FOR BUCHHOLZ
13-526-30502301
TFR
Analog & Digital Points List
13-526-30502301
13-526-30502301
13-526-30502301
13-526-30502301
13-526-30502301
BFP
Circuit Breaker Failure Protection
13-526-30502301
13-526-30502301
13-526-30502301
87L
Differential Protection (87L) With Distance Protection (21) And O/C (50/51 &
50N/51N) + DEF (67N) Features
13-526-30502301
13-526-30502301
13-526-30502301
DIS-21
Numerical Distance Protection Relay
13-526-30502301
13-526-30502301
DEF
Numerical Directional Comparison Ground Fault Protection Relay
13-526-30502301
50/51P&N
Numerical Phase & Ground Overcurrent Protection Relays
13-526-30502301
13-526-30502301
13-526-30502301
13-526-30502301
87T
Numerical Percentage Biased Differential Protection Relay
13-526-30502301
87REF
Restricted Ground Fault Protection Relay
67/67N
Numerical directional Backup Phase & Ground Fault Protection Relay
13-526-30502301
LI-87BBP+BFP
Low Impedance Bus Bar Differential Protection With Built-In BF Scheme
13-526-30502301
HI-87BBP
Busbar Protection Relay (High Impedance Type)
13-526-30502301
95B
CT Open Circuit Supervision Relay
SC-25
Synchrocheck Relay Protection
13-526-30502301
AR-79
13.8KV Automatic Reclosing Relays
13-526-30502301
CAP-59
Capacitor Bank Over voltage protection
CAP-27
Capacitor Bank Under Voltage Protection (27 + 2/27)
CAP-50/50N
Harmonically Desensitized Instantaneous Overcurrent Relay
13-526-30502301
CAP-50/51P&N
Capacitor Bank Non Directional Overcurrent Protection
13-526-30502301
AR-79+25
Auto Reclosing With Synchrocheck Relay
13-526-30502301
13-526-30502301
UV-27
Under Voltage Load Shedding Protection (27-1 To 27-4)
13-526-30502301
UF-81
Under Frequency Relaying (81-1 to 81-4)
13-526-30502301
BIDDER FORM
All Bid Proposals Shall Be Submitted In This Form
BIDDER (Name)
OFFER (Name)
SUBSTATION (Name)
Relay function
Bidder Proposal
SMD/PED acceptance
87L-1 (115KV)
87L-2 (115KV)
85-DTTR
87B (115KV)
51PH (115KV-BC/BS)
51N (115KV-BC/BS)
87T
87REF
Bidder response
50/51 (PH-HV)
10
50/51 (N-HV)
11
67P/N-LV
12
51G-LV
13
AVR
14
94
15
86
16
74/CB TC
17
74/94,86
18
74/DC
19
98
20
25MC
21
50/N capacitor
22
51P/N capacitor
23
64 capacitor
24
59-1 capacitor
25
59-2 capacitor
26
27 capacitor
27
13.8KV 87B
28
13.8KV 95
29
13.8KV BT 51-PH
30
13.8KV BT 51-N
31
32
27 (13.8KV)
33
81
34
TFR
13-526-30502301