You are on page 1of 19

Cost Analysis

1. You can do your analysis according to your labour, material, plant and etc costs.
However, you need to set up your R2 code table and applied the code into your built
up rates or rate breakup sheet.
2. To set up a R2 code table; go to job summary level, click on File and select View
R2 Code File.

3. You will see the following table come out, if not you click open. To create a new
code file, type in the new code file name and click Open.

Type in the new code


file name and click
Open.

If the above table


didnt appear, click
on this icon.

4. You will see the following table come out. You can key in the items that you want to
analysis under the description column. Then you need to key in the code to
representing it. You can key in the code up to 6 characters (must not have the same
code for each item). After that, click on Close icon.

Type in the code for


each description.

Type in the
description

5. If you already built up your standard rates inside the Price List (library), go to your
rate breakup sheet and go to select Screen Columns.
Click on this icon

6. You will see the following screen and tick on Group R2. Then you will see the
Group R2 column come out.

Tick this
box.

7. Double click the cell under group R2 which is beside the item and you will see the
code table come out and double click the code that relative to that item. Otherwise, if
you remember the code, you can directly key in the code.

Double click the cell


or click on Transfer.

Highlight
the cell

8. Then you will see the code appear beside the item.

You can see the


code

9. Exit the price list, and open the job that is link to that price list. Go to the Trade
Breakup Level, click on the items rate cell, which you want to transfer the rate from
your price list and click on Quick Copy from a Price List.

Click on this icon.

Highlight the cell

10. You will see your price list come out and go to select the rate that you want to transfer
to

Select the
trades and
click OK.

11. Click on the related item and make sure you tick on the Transfer Rate Breakups,
then click on Transfer Current Rate.

Make sure
you tick
this box.

Then click on
this icon.

12. You will see the rate had transfer to your job.

The rate
already
transferred.

Click on this icon and tick on Group


R2, in order to show the R2 code.

13. Double click the rate cell; you will see the rate breakups. If you want to see the R2
code, you can go to Select Screen Columns and tick on Group R2.

14. Repeat the step 10 to 12 for the others item pricing.


15. After you had done your pricing for all items, close the job.

Click on
this icon

16. At the Job Manager screen, make sure highlight the job, click on R2 Analysis.
Make sure
highlight the job.

Type in the
new job
name.

17. You will see the following screen, type in the new job name and click OK.

Make sure you tick


Yes for this.

18. You will see the following screen. You need to tick Yes for the Analyze rate
breakup sheets? and Accumulate trade quantities? if you want to know
If youthe
want
total
to
quantities. Then click OK. The program will run the analysis then you
know
will
thesee
total
a
new job come out.
quantity, tick Yes
for this.

19. Open that job; at the job summary level you will see the codes with description. (You
can edit/delete the description if you want. Uncoded are the items that you forgot or
This
did not
code
putdescription
in the codewill
willcome
comeout.
out under uncoded. You can go to next level to see
You
whatwill
the know
items.the
Youtotal
canquantity
see the total cost and quantity for the labour, plant and
You
material
will from
knowyour
the total
job. cost

Under
Labour
Cost

20. You can see the detail by going to next level. You will see the item description and
with the individual rate (not composite rate).
The description from
your previous job.

The Bill Reference is


from your original
job.

The labour rate and not


composite rates.

21. You can print out the report by going to Print menu at the job summary level or
trade breakup level.

22. If you want to print out in BoQ format, when you click on BOQ menu at job
summary level, you will see all the sub menus are grayed out and you could not
select.

23. So, you close the job and go to Job Manager screen,
Clickmake
on sure you highlight that
job, go to Defaults menu and select Reset Job BOQ
Options
and then click OK.
this.

Make sure
highlight the job.

24. Open the job again and you should be able to print out in BOQ format.
25. If you are not built up your rates in your price list, you can straight away do your
build up rates inside the job and apply the code under the rate breakup sheets such as
the steps 5 to 8.