MTRC Project Title : Shatin to Central Link (SCL) @ MTR
Contract No.: 1102-Hin Keng Station and Ay ach Structures
REQUEST FOR INFORMATION NO.: 1102-RFI-POC-CS-000095 MTRC
IN DATE
(chop)
POC REF: SCL1102/304/S/L /03/057
From: MR WILSON CHU (PENTA-OCEAN CONSTRUCTION CO., LTD)
To: _ IR. PETER PANG CONSTRUCTION MANAGER (SCL)
Subject: Discrepancy of Setting Out Point Co-ordinates and Chainage for Modification Works of RWS
Date Information Required By: 23 December 2013
Request:
Refer to the Drawing 1102/W/HIK/SWLIC11/311A, there are a discrepancy of setting out point
(U92+550.888, £835702.598, NB25145.42)
1) Base on the coordinates, our survey checked that the Chainage shall be U92+562.779. The difference
is about 11.891m in Chainage. Please Clarify the setting point.
2) The Termination of on-grade shall is D92+558.775 and the clearance between the hoarding line is
about 0.2m. it is not sufficient for working space as per standard details in Drawing
1102WIHIK/SWI/C11/308B.
Attachment : 1102-RFLP Qe Es qhoossisk.o1 & KOZ
Project Manager Date: 25 November 2013,
Information:
ePMS No.: 1102-RFI-CM(SCLC)-CS-000095 (wiattachment)
Please also find our response to POC's queries
41) See attached the sketch (Affected Drawing No: 1102/WIHIK/SWLIC11/311) showing the revised
setting out points; and
2) Refer to revised setting out point in item 1) above, the working space should be sufficient,
\ngn- SCONE TST oa
PKM/J7/8C/BE7 ck U PIMSIPNII1-4F4.A1PROPOSED MOVEMENT JOINTS SHALL. ALIGN
WITH MOVEMENT JOINTS OF EXISTING
RETAINING WALL
TRANSITION SLAB
D 924550. 515]
IE 835702.598|
COPING FOR OHL
MAST INSTALLATION
TIE=IN WITH EXISTING
(FOR TOP LEVEL. STEW
PARAPET WITH 1.5m
HIGH NOISE BARRIER
"OSED REINFORCED
"CRETE PLATFORM,
VILS REFER TO DRG. NO.
"MPH IK/SHL/C1 1/306.
DAmS No. : DAmSI1102/ Sheet No.: of
Affected Dwg No.= (/02/w [nik /SWL fou / 31
Preparedby: Galen tur Date:
‘Shatin o Central Li
Contract No, 110%
tation and A