You are on page 1of 2
MTRC Project Title : Shatin to Central Link (SCL) @ MTR Contract No.: 1102-Hin Keng Station and Ay ach Structures REQUEST FOR INFORMATION NO.: 1102-RFI-POC-CS-000095 MTRC IN DATE (chop) POC REF: SCL1102/304/S/L /03/057 From: MR WILSON CHU (PENTA-OCEAN CONSTRUCTION CO., LTD) To: _ IR. PETER PANG CONSTRUCTION MANAGER (SCL) Subject: Discrepancy of Setting Out Point Co-ordinates and Chainage for Modification Works of RWS Date Information Required By: 23 December 2013 Request: Refer to the Drawing 1102/W/HIK/SWLIC11/311A, there are a discrepancy of setting out point (U92+550.888, £835702.598, NB25145.42) 1) Base on the coordinates, our survey checked that the Chainage shall be U92+562.779. The difference is about 11.891m in Chainage. Please Clarify the setting point. 2) The Termination of on-grade shall is D92+558.775 and the clearance between the hoarding line is about 0.2m. it is not sufficient for working space as per standard details in Drawing 1102WIHIK/SWI/C11/308B. Attachment : 1102-RFLP Qe Es qhoossisk.o1 & KOZ Project Manager Date: 25 November 2013, Information: ePMS No.: 1102-RFI-CM(SCLC)-CS-000095 (wiattachment) Please also find our response to POC's queries 41) See attached the sketch (Affected Drawing No: 1102/WIHIK/SWLIC11/311) showing the revised setting out points; and 2) Refer to revised setting out point in item 1) above, the working space should be sufficient, \ngn- SCONE TST oa PKM/J7/8C/BE7 ck U PIMSIPNII1-4F4.A1 PROPOSED MOVEMENT JOINTS SHALL. ALIGN WITH MOVEMENT JOINTS OF EXISTING RETAINING WALL TRANSITION SLAB D 924550. 515] IE 835702.598| COPING FOR OHL MAST INSTALLATION TIE=IN WITH EXISTING (FOR TOP LEVEL. STEW PARAPET WITH 1.5m HIGH NOISE BARRIER "OSED REINFORCED "CRETE PLATFORM, VILS REFER TO DRG. NO. "MPH IK/SHL/C1 1/306. DAmS No. : DAmSI1102/ Sheet No.: of Affected Dwg No.= (/02/w [nik /SWL fou / 31 Preparedby: Galen tur Date: ‘Shatin o Central Li Contract No, 110% tation and A

You might also like