OptimalTimingforReplacing
AgingorObsoleteAssets
John Woodhouse MA FIAM MSaRS
Managing Director, TWPL, Hampshire, UK. john.woodhouse@twpl.com
Abstract
Aging physical assets and infrastructure are
headaches shared by many industries in many
countries around the world.
Hundreds of
billions of dollars of re-investment are going
to be needed over the coming years, at a time
when financial pressures make such
investments particularly hard to justify. The
SALVO project is addressing such problems
with a fresh look how to make the right
decisions about what to do and when, even
with limited data and uncertain assumptions.
This paper summaries the objectives, scope
and progress of the SALVO Project, and
illustrates the processes with the first of the
field trial cases that have been explored.
Introduction
See www.MACROproject.org.
1.1
1.2
b)
Integrated optimisation of an assets
life cycle (What is the best combination of
capital investment, utilization, maintenance
and life expectancy?). This is where various
simulation modelling tools exist but the
SALVO project is also breaking some new
ground to assist in whole life cost
optimization, including multiple risks and
determination of the optimal life/replacement
timings.
c)
Total activity programme delivery
and coordination of multiple activities across
multiple assets (How do we optimally
programme the conflicting urgencies of
different activities to exploit bundling
opportunities and/or to smooth resource
requirements/performance effects?).
Here
there are some existing approaches, usually
based on portfolio simulations, using assettype generic assumptions, weighted factors
and global what if? parameters. SALVO will
be refining these capabilities with better
component contributions from the bottom up
influences of individually timing-optimised
tasks.
This will enable much greater
transparency and demonstration of why the
optimal programme is indeed optimal, and
quantify the net business/financial impact of
any changes to this plan.
2
2.1
o
Just
having
identified
the
technically correct solution or decision is
not enough the outcomes must be
explainable and understandable to those
who will need to accept, endorse and/or
implement the decisions. This involves
language, presentation and communication
skills plus business process integration,
over and above the analytical steps needed
to make and optimise the decisions in the
first place.
o
Wherever possible, a quantitative,
risk-based approach will be taken this
must include the handling of uncertainty in
assumptions and available information
(e.g. by sensitivity testing).
o
A
criticality-proportionate
approach will be applied the rigour and
sophistication of method must be
2.2
The biggest challenge for optimising decisions about mature assets is the objectivity and
integration of:
Detecting which assets, in which functional locations, have the greatest urgency of
attention.
Determining the nature of the aging problem (risk, performance, economics,
obsolescence etc.)
Determining what options exist for addressing the problems (enhanced maintenance,
refurbishment/life extension, replacement, upgrade, modification, disposal etc.).
Evaluating the options for cost/benefit/risk impact and identifying their optimal timings.
Identifying and combining the best mix of options for the specific case,
Optimising the multiple interventions and activities needed across multiple assets and
their different problems (portfolio-level)
Deriving the required total expenditure profile, residual performance and risk impact,
resourcing implications etc.
The SALVO project has grouped these requirements into a generic 5-step top-down
investigation of problems, and bottom-up assembly of solutions (see figure 5).
Progress to date
3.1
3.2
3.3
Evaluating discrete
interventions
APT-PROJECT: Cost/Benefit/Risk
Evaluation of Projects & Changes
APT-MAINTENANCE: Risk/
Performance/ Cost Optimisation of
PM tasks
APT-INSPECTION: Inspection,
Condition Monitoring & Safety
Testing
Figure 7 APT-LIFESPAN method for justification & optimal timing of asset replacement
3.3.4
Work bundling and blending
The next SALVO step combines
individual tasks on individual assets or
asset groups to deliver best overall life
cycle value-for-money. Two core subprocesses are involved, drawing on very
different methods to tackle different
manifestations
of
this
complex
requirement.
3.4
modelling.
This may incorporate
degradation, risk and cost assumptions
(with block-assignment of rules or
weightings for their impact and
consequences). Various service providers
and commercial simulation tools are also
available in this area. This approach can
be excellent for macro decision-making
Conclusions
John Woodhouse
10