PRE- QUALIFICATION
ISO CERTIFIED DOCUMENTS INDEX
9001-2000

ANNEXURE - I : SCOPE OF ACTIVITES

ANNEXURE - II : ABOUT THE COMPANY

ANNEXURE - III : ORGANIZATION STRUCTURE

ANNEXURE - IV : KEY PERSONNEL

ANNEXURE - V : COMPLETED PROJECTS

ANNEXURE - VI : ISO CERTIFICATION

ANNEXURE - VII : SAFETY CERTIFICATIONS

ANNEXURE - VIII : APPRAISAL CERTIFICATES

ANNEXURE - IX : HIGH TECH. CNC MACHINES

ANNEXURE - X : VIEW ON SOME OF OUR PROJECTS

ANNEXURE - XI : CONTACT INFORMATION

www.akphi.com.sa
ISO CERTIFIED
9001-2000
SCOPE OF ACTIVITIES
DESIGN, FABRICATION & ERECTION OF CARBON
STEEL, STAINLESS STEEL FOR PROCESS AND STORAGE
TANKS
DESIGN, FABRICATION & SUPPLY OF CARBON STEEL,
STAINLESS STEEL, AIR & GAS DUCTING,DUST
COLLECTOR, BOILER AND REFORMER CASING.

SOFTWARE USED

AS PER API 650 STANDARDS WITH TANK VER: 2.2

ANNEXURE I www.akphi.com.sa
ISO CERTIFIED
9001-2000 ABOUT THE COMPANY

The Steel Fabrication Division of ABDULLA B. AL- KHALIFA & SONS CO. was
formed in 1980. Since that time it has grown till the formation of the FACTORY
ABDULLA B. AL- KHALIFA & PARTNERS CO., HEAVY INDUSTRIES LTD. in
1996, and independently operating as a company specialized and licensed by the Ministry
of Industries to Design, Fabricate and Install 7,000 ton per year of Plate work (Ducts and
Stacks in Carbon and Stainless Steel).
AK & PARTNERS CO., LTD. is also specialized in Design, Fabrication and Installation
of a fixed roof Storage Tanks as per API 650 Standard up to 50MTR DIA.
To Gain the edge to our competitors and to increase the speed and the reliability of our
Engineering Dept. we have installed X-Steel software Ver.12 which is now operated by
numerous professional Engineers/ Draftsman.

AK & PARTNERS CO., HEAVY INDUSTRIES LTD. has an extended arm of Design
and Detail Engineering Company based in Egypt (G4 Engineering) where it can provide
2,500 ton per month of high quality Engineering works, and to react swiftly to
accommodate any fast necessity from the client
Continue…

ANNEXURE II www.akphi.com.sa
ISO CERTIFIED ABOUT THE COMPANY
9001-2000

The Fabrication Shop is seated on an area of 96,000 sq. meters. And has a Total
covered area of 30,000 sq. meters. and served with several Computer Numerical
Machines (CNC Machines) that guarantees precise and high quality product for massive
production. Possessing overhead cranes and all necessary fabrication equipments. These
equipments include Plate rolling, Plate bending, Pipe bending, Guillotines and Heavy 300-
ton break press. The shop has semi automatic and Mig/Tig welding capability.

AK & PARTNERS CO., HEAVY INDUSTRIES LTD. believe that good Management
and a high ratio of efficient and experienced supervisory staff is the key to successful
project completion.

All supervisory staffs are screened not only for experience and ability but also for
motivation and attitude.
All welders are carefully vetted and tested prior to employment
High supervisory ratio and care in recruitment ensure our clients of the best possible
service and AK & PARTNERS CO., HEAVY INDUSTRIES LTD. of the best
reputation.

www.akphi.com.sa
ISO CERTIFIED Organizational Chart
9001-2000
General Manager

Deputy General Manager

Administration Projects and Safety and QA/QC Manager Accountants Purchasing


Manager Manufacturing Manager Health QMR Manager

Sales and Contract Design and


Shop
CM Procurement
Recruiting and Packing and Shipping Drawing ISO Matters and
Training Quality Planning
Production and
Engineering and Material Consumable
Planning Quality Supplier Materials Store
Planning Assurance Evaluation
General Services Production
Raw Materials Calibration Mechanical
Material Preparation and Store Maintenance
Cutting Process
Fabrication Housing and
Govt. Relations
Inspection Civil
Fabrication Process
Welding Painting
Welding Process Quality Control Inspection Inspection
Information
Technology Electrical Maintenance
Coating Galvanizing
Inspection Inspection
Coating Process Paint Store

ANNEXURE III www.akphi.com.sa


ISO CERTIFIED
KEY PERSONNELS
9001-2000

Mr. ABDULLAH OMAR LABBAD


General Manager

Mr. BASSAM OMAR LABBAD


Deputy General Manager

Mr. ABDALLA AHMED FAHMY


Projects and Manufacturing Manager

Mr. MOHAMMED ASIM


QA/QC Manager/ QMR

Mr. SAEEDEDDIN AL- HALLAQ


Purchasing Manager

ANNEXURE IV www.akphi.com.sa
COMPLETED PROJECTS
ISO CERTIFIED
9001-2000

SL NAME OF PROJECTS QUANTITY PROJECT DESCRIPTION VALUE(SR) LOCATION / PROJECT


& CLIENTS DURATION
01 P & C OF UPGRADE OF 01 No. DESIGN, FABRICATION & 1.400 JUBAIL, KSA 4 MONTHS
R.O. UNITS AND INSTALLATION OF 7500M3 MILLION
SUPPORT FACILITIES FIXED ROOF POTABLE WATER
SAUDI CONDRECO & STORAGE TANK AS PER API 650
AL- MABANI GENERAL STD.
CONTRACTORS CO.

02A GULF STABILIZER 01 No. DESIGN, FABRICATION, 1.500 JUBAIL, KSA 4 MONTHS
02B INDUSTRIES INSULATION & MILLION
SAUDI SHINWHA CO. TESTING 304L STAINLESS STEEL
LTD. TANKS AS
GULF STABILIZER PER API 650 STD.
INDUSTRIES

03 SAUDI SHINWHA CO. 07 Nos. DESIGN, FABRICATION, 0.700 JUBAIL,KSA 4 MONTHS


LTD. INSULATION & TESTING OF MILLION
CARBON STEEL TANKS AS PER
API 650 STD.

04 UNITED LUBE OIL 05 Nos. DESIGN, FABRICATION, 0.600 JUBAIL, KSA 4 MONTHS
INSULATION & TESTING AS PER MILLION
API 650 OF CARBON STEEL

05 THE GENERAL SYRIAN 01 No. DESIGN OF TANK 7,200 CUBIC 1.300 DAMASCUS, 4 MONTHS
GLASS METER IN DESIGN OF TANK MILLION SYRIA
& CERAMIC 7,200 CUBIC METER IN 8.75 MTRS
INDUSTRIES CO. HIGH ACCORDING TO API 650
THE GEN. CHEMICAL STD.
IND. CORP

06 GENERAL COMPANY 04 Nos. DESIGN AND CONSTRUCTED OF 3.300 DAMASCUS, 8 MONTHS


FOR 4 STEEL TANK ACCORDING TO MILLION SYRIA
BUILDING API 650 STD.

Continue…
ANNEXURE V www.akphi.com.sa
ISO CERTIFIED
9001-2000

SL# NAME OF PROJECTS QUATITY PROJECT DESCRIPTION VALUE(SR) LOCATION PROJECT


& CLIENTS DURATION

07 SHARQ PE EXPANSION 01 FABRICATION AND ERECTION 0.450 JUBAIL,KSA 3 MONTHS


PROJ. SAUDI SHINWHA OF 575M3 CAPACITY WATER MILLION
CO., LTD. STORAGE TANK

08 AL- YUSR TOWNSEND & 02 DESIGN, FABRICATION & 0.200 JUBAIL,KSA 2 MONTHS
BOTTUM CO. LTD. INSTALLATION OF 2 SWEET MILLION
WATER TANK, EACH CAPACITY
OF 120 CUBIC METER &
4.0MX15.0M DIMENSION

09 KHONAINI PETROLEUM 11 DESIGN, FABRICATION AND 0.500 JUBAIL,KSA 2 MONTHS


SERVICES ERECTION OF 8 STORAGE TANK MILLION
WITH DISHED ENDS AS PER API
650 & DESIGN, FABRICATION
AND
ERECTION OF 3 STORAGE
TANKS 50M3 CAPACITY

10 UREA PLANT - I 600 TONS DEBOTTLENECKING AND 5 MILLION KUWAIT 6 MONTHS


TECNIMONT ITALY GRANULATION PROJECT MDP 3.
PETROCHEMICAL IND. KUWAIT.
CARBON STEEL & STAINLESS
STEEL DUCTS AND STACKS

11 IBN RUSHD (MYAS 300 TONS FABRICATION & SUPPLY OF 1.07 YANBU, KSA 3 MONTHS
POWER STATION BOILER INLET AND TURBINE MILLION
EXTENSION) BYPASS ASSEMBLY DUCTS
MECANICA DE LA OF 30M2 CROSS SECTION FOR
PENA, SPAIN IBN RUSHD PROJECT

Continue…
www.akphi.com.sa
ISO CERTIFIED
9001-2000
SL NAME OF QUANTITY PROJECT DESCRIPTION VALUE(SR) LOCATION PROJECT
PROJECTS & DURATION
CLIENTS
12 SAUDI ARABIAN 500 TONS PROCUREMENT, FABRICATION 3 MILLION JUBAIL, KSA 4 MONTHS
FERTILIZER CO. AND SUPPLY OF STAINLESS STEEL ,
SACFO DUCTS AND HOPPERS
TECNIMONT
ARABIA LTD.

13 SAUDI ARABIAN 700 TONS FABRICATION AND SUPPLY OF 3.03 JUBAIL,KSA 4 MONTHS
FERTILIZER CO. CARBON STEEL/ STAINLESS STEEL, MILLION
SAFCO DUCTS, STACKS, STRUCTURAL
CHIYODA SUPPORTS AND PLATFORM
PETROSTAR LTD. STAIRCASES ETC.

14 SPC PDH / PP 120 TONS FABRICATION AND SUPPLY OF 0.8 MILLION JUBAIL,KSA 4 MONTHS
PROJECT MANIFOLDS AND DUCTS FOR AIR
FBM HUDSON FAN COOLER SYSTEM

15 SAUDI INT'L 1300 TONS COMPLETE STEEL STRUCTURE FOR 5.6 MILLION JUBAIL,KSA 6 MONTHS
PETROCHEM. CO REFORMER
SMJ REFORMER
STR.
CHIYODA
PETROSTAR LTD

16 AL JUBAIL GAS-V 650 TONS STRUCTURE STEEL OF COLD BOX 6.6 MILLION JUBAIL,KSA 4 MONTHS
SEPERATION SHELL
SABIC
LINDE AG
ENGINEERING
DIV.

17 AIR SEPERATION 650 TONS Fabrication, Supply And Erection of 7 MILLION Jubail-K.S.A. 6 Months
UNIT GAS V Cold Box GAS SABIC
PROJECT Linde. Structure

www.akphi.com.sa
SL NAME OF QUANTITY PROJECT DESCRIPTION VALUE(SR) LOCATION PROJECT
PROJECTS & DURATION
CLIENTS
18 DAELIM 4 Nos. FABRICATION AND SUPPLY 2.5 MILLION JUBAIL, KSA IN PROGRESS
INDUSTRIAL CO., OF CARBON STEEL/
LTD Al Waha PDH STAINLESS STEEL TANKS
PP Project

19 TECNIMONT ITALY 3 Nos. FABRICATION AND SUPPLY 6.3 MILLION JUBAIL, KSA IN PROGRESS
TECNIMONT OF CARBON STEEL/
ARABIA LTD STAINLESS STEEL TANKS

20 QATAR LIQUIFIED 138 TONS FABRICATION OF STEAM 1.5 MILLION RAS LAFFAN 6 MONTHS
GAS CO. (QATAR DUCTS OF AIR COOLED QATAR
GAS II CONDENSER
DEVELOPMENT)
GEA-BTT
COMPANY JOB
NO. 22683

21 RABIGH REFINING 82 TONS FABRICATION OF STEAM 1.8 MILLION RABIGH, KSA 5 MONTHS
& PETRO DUCTS, MANIFOLDS
CHEMICAL CO. CONDENSATE TANKS FOR
GEA-BTT AIR COOLED CONDENSER
COMPANY

22 QATAR LIQUIFIED 174 TONS FABRICATION OF STEAM 2 MILLION RAS LAFFAN 6 MONTHS
GAS CO. DUCTS OF AIR COOLED QATAR
(QATAR GAS 3&4 CONDENSER
ONSHORE )

23 ABU DHABI GAS 34 TONS FABRICATION OF 0.6 MILLION ABU DHABI 4 MONTHS
IND,. LTD GASCO MANIFOLDS AND UAE
ONSHORE GAS CONDENSATE TANKS FOR
DEV. PHASE III AIR COOLED CONDENSER

24 BTT – SHELL Pearl 916 TONS FABRICATION OF STEAM 13.5 QATAR 6 MONTHS
GTL Project. DUCTS, MANIFOLDS MILLION
CONDENSATE TANKS FOR
AIR COOLED CONDENSER

www.akphi.com.sa
ANNEXURE VII
ANNEXURE VIII
ANNEXURE IX
ANNEXURE X
ISO CERTIFIED
9001-2000 CONTACT INFORMATION

Factory Abdulla B. Al-Khalifa & Partners Co., Heavy Industries


Limited.

Post Box No. 768 – Jubail 31951


Kingdom of Saudi Arabia
Phone: +966 3 362 3307 (Six Lines)
Fax: +966 3 362 4229
Email: alabbad@akphi.com.sa

Web Site: www.akphi.com.sa