You are on page 1of 2

http://www.apistraining.com/apis/schedule/courseschedule.php?

sid=410
EPC Design
Prague: 2015-05-19 - 2015-05-21 Duration: 3 daysFee: 2410
PRICE:
The price for a single seat for this course is ?2 410 (excl. VAT). We offer substantial discounts for group bookings of 2 se
ats or more, and we have corporate rates with most of the large mobile operators and equipment suppliers in the world.
To find out if you quality for discounts or corporate rates, alternatively if you would like a quotation for an in-house
delivery, please contact Apis sales.
CONTENTS:
This vendor-independent 3-days course covers design, deployment and measurement of a generic EPC Network. The
course demonstrates how EPC traffic analysis drives design and deployment for EPC nodes such as MME, SGW,
PGW, HSS and PCRF. Furthermore the course examines mobility management and measurements related to the PDNGW for a GTP based S5/S8. Measurements related to the MBMS GW and PCRF as well as Load Balancing and
Overload Control mechanisms for EPC nodes are covered. Generic walkthrough of EPC Measurement and EPC KPI?s ar
e based on 3GPP specifications.
WHO SHOULD ATTEND:
This course is for professionals working with EPC with good knowledge of the functional elements in EPC.
Analysis of EPC Architecture
? EPC Deployment scenarios
? Efficiency analysis
? EPC Attach Procedure
? UE-initiated EPS Detach procedure
? MME-initiated EPS Detach procedure
? HSS-initiated EPS Detach procedure
? Tracking area update procedure with Serving GW change
? Tracking area update procedure without Serving GW change
? EPS paging procedures
? MME control of overload related measurements for EPC
? EMM-Registered subscribers
? Handover related measurements
? Routeing area update with MME interaction
? Combined TA/LA update procedure
? Number of implicit detach related measurements
? MME Overload Control
? Architecture
? Attempted Overload Start procedure
? Attempted Overload Stop procedure
Core Network Dimensioning
? Preplanning
? Dimensioning
? Coverage Planning
? Capacity Equipment
? Parameters Planning
? Performance analysis
EPC Performance Measurement & Management

?
?
?

Measurement families
Functionality related measurements
? MME, PGW, SGW, MBMS GW, PCRF
Use case

EPC KPI?s
? EPC KPI Definitions
? Accessibility
? Mobility
? Utilization
? Use Case for EPC KPI?s
Defining Network Capacity
? Links and Paths
? Nominal Physical Link Capacity
? Capacity of the IP Layer
? Security Considerations
Core Network Overload (CNO)
? Scenarios and problems
? Architecture principles
? HLR/HSS overload handling
? GTP-c overload handling
? Evaluation
EPC Load Balancing
? EPC Load Balancing
EPC Roaming and Interconnect
? EPC Roaming and Interconnect
? RAN Congestion Awareness Function (RCAF)

You might also like