Professional Documents
Culture Documents
Q u i c k o p e n i n g c lo s u r e
Bandlock 2
Quick-Opening Closure
I n n ovat i v e D e s i g n F e at u r e s
The GD Bandlock 2 is the original and benchmark design for
global high-pressure applications with over 20,000 units in operation
worldwide. GD Bandlock 2 Closures provide horizontal or vertical
access to any pressure vessel in seconds. Compared with other quick-
associated equipment.
any size of unit can be opened or closed in less than a minute, with no
For complete safety, the locking band can be seen at all times, which
satisfies design code requirements and means that the operator can
Door H i ng i ng
For horizontal use the door is double pivoted on hinges with self-
lubricating bearings. The bolted fitment allows adjustment for wear and
H y d r o s tat i c T e s t i n g
Normally carried out as part of the final vessel test but an
Strainers
B a n d l o ck 2
Seal
P re s s u re Wa r n i n g
S c re w S e a l
Lo ck i n g P l a t e
and Segment
S i z e an d Pr e ssu r e Rang e
A p p r ov e d D e s i g n
pressure).
M at e r i a l s
Forged steel hubs with forged or plate doors can be
E u r o p e a n P r e s s u r e Eq u i p m e n t
D i r e ct i v e ( 9 7 / 2 3 / EC )
available.
T e c h n i ca l S p e c i f i cat i o n s
Size Range
AS M E 1 5 0 # t h r o u g h t o 2 5 0 0 #
Class Ratings
Fo r P r e s s u r e s i n e x c e s s o f 2 5 0 0 # c o n t a c t G D E n g i n e e r i n g .
AS M E V I I I D i v i s i o n 1
AS M E V I I I D i v i s i o n 1 w i t h U S t a m p
Design Specifications
AS M E V I I I D i v i s i o n 2
AS M E V I I I D i v i s i o n 2 w i t h " U " S t a m p
PD 5500 / B S E N 13445
Closure Orientation
H o r i z o n t a l o r Ve r t i c a l .
AS M E B 3 1 . 3 , B 3 1 . 4 , B 3 1 . 8
Te r m i n a t i o n D e s i g n S p e c i f i c a t i o n s
Other International standards are available on request.
Ty p e s o f C o n n e c t i o n
B u t t We l d e d , B u t t We l d e d w i t h m i t r e f o r i n c l i n e d / d e c l i n e d v e s s e l s , R e d u c e d
Access or Flanged to clients requirements.
AST M A 3 5 0 L F 2 / AS M E I I S A 3 5 0 L F 2
AST M A 1 0 5 / AS M E I I S A 1 0 5
Materials of Construction
AST M A 6 9 4 F 4 2 t o AST M A 6 9 4 F 7 0
Elastomeric Sealing
N i t r i l e , Vi t o n a n d R a p i d G a s D e c o m p r e s s i o n R e s i s t a n t . O t h e r m a t e r i a l o p t i o n s
available on request.
Removable rust preventative for client to finish paint after welding to vessel.
G r a d e 3 1 6 S t a i n l e s s S t e e l o r I n c o n n e l 6 2 5 We l d O v e r l a y
Ac c e s s o r i e s
Th e B a n d l o ck 2 C l o s u r e c a n b e f i t t e d w i t h a S m i t h F l o w C o n t r o l Ty p e D L- 3
I n t e r l o ck . O t h e r t y p e s o f i n t e r l o ck s a v a i l a b l e o n r e q u e s t .
H o r i z o n t a l C l o s u r e s c a n b e s u p p l i e d w i t h p r o t e c t i v e w e a t h e r c o v e r s ( Ve r t i c a l
closures are supplied with protective weather covers as standard).
Ba n d lo c k 2 C o m p o n e n t s
Handwheel
Name Plate
Universal
Handle
Davit Arm
Universal
Handle
Hinge
Drive
Link
Instruction
Plate
Lo ck i n g
Band
Drive
Link
Adjuster
S c re w
P re s s u re
Wa r n i n g
S c re w
P re s s u re
Wa r n i n g
S c re w
Horseshoe
Link
Lo ck i n g B a n d
D r a i n G ro o v e
Horseshoe
Link
Drive Link
Lifting Lugs
P re s s u re
Wa r n i n g
S c re w
Horseshoe
Link
Name Plate
OPERATING SE Q UENCE
Operational safety has been engineered into the
Bandlock 2 Closure at every stage of its design and
manufacture.
Step 1
Before attempting to open the closure, check that the
vessel is fully isolated, drained and vented from any
ste p 1
Step 2
When completely satisfied that the closure is safe to open,
remove the pressure warning screw and its integral locking
plate from the closure.
Step 3
Locate the universal handle into the drive link mechanism
attached to the Horseshoe mechanism. Make sure that the
ste p 3
Step 4
Rotate the universal handle anti-clockwise through
approximately 180. This will actuate the drive link and
horseshoe mechanism and progressively contract the band
onto the door recess. The universal handle should then be
removed.
ste p 4
Step 5
Using the door hinge handle, swing the door into its open
position with minimal force. The door is mounted on a
double pivot mechanism which gives a degree of straight
line movement and also allows the door to be rotated for
access to the seal and band.
Closing the Bandlock 2 Closure is simply a reversal of
the opening sequence.
ste p 5
Bandlock 2
Q UICK OPENING CLOSURE
The SPX Flow Technology segment designs, manufactures and installs highly engineered solutions used to process, blend, meter and transport fluids, in addition to solutions for air
and gas filtration and dehydration. The segment supports global food and beverage, dairy, pharmaceutical, oil and gas, energy, and industrial markets. SPX (NYSE: SPW) is a global
Fortune 500 multi-industry manufacturing leader with over $5 billion in annual revenue, operations in more than 35 countries and over 18,000 employees. For more information,
please visit www.spx.com
SPX f low t e c h n o lo gy
SPX reserves the right to incorporate our latest design and material changes without notice or obligation.
Design features, materials of construction and dimensional data, as described in this bulletin, are provided for your information only and should not be relied upon unless confirmed
in writing. Please contact your local sales representative for product availability in your region. For more information visit www.spx.com.
The green > is a trademark of SPX Corporation, Inc.
Issued: GD-1020 - EN - 01/2013