Professional Documents
Culture Documents
GR-8/leds
GR-9/leds
220-240V AC/50-60Hz
2.7W / 3VA
3W / 3.5VA
3.6V/0.6Ah
3.6V/1Ah
Battery charge indication LEDs, TEST button
24 h
1.5 h
3h
12 white LEDs
35lm / 85lm
32lm / 85lm
IP 20
EN 60598-1, EN 60598-2-22, 55015, 61547, 61000-3-2, 61000-3-3
5 to 40 o C
Up to 95%
Bayblend FR3010, transparent polycarbonate
240 x 90 x 44 mm
345gr.
350gr.
3 years (1 year for the battery)
!!!
1. Operations for installation, maintainance or
testing must be done by authorized personel
only.
2. The device must be connected to the
mains power supply thru a fuse dependent by
Page 1 from 2
923378005_23_001
Figure 1
Diffusor
Reflector
Plastic base
Installation instructions
1
2
Figure 2
Figure 3
Non-maintained Maintained
operation
operation
Figure 4
1. To instal the device you have to dismantle carefully the device with a flat screwdriver as shown in
figure 1.
2. Pass the mains cables thru the hole (point 1 in figure 2). The luminaire must be connected to a
permanent electrical installation to ensure the immobilization of the cable.
3. Mount the base plastic on the wall by using the included mounting accessories in points 2 and 3 in
figure 2.
4. Connect the battery`s cable with the appropriate terminal (figure 3).
5. Connect the mains cables to the terminal block as shown in figure 4.
6. Refit with care the removed plastic parts and power on the luminaire.
NOTE!!
After finishing the installation you must power the luminaire at least for 24 hours for battery
charging to perform the named autonomy.
NOTE: LED= Light Emitting Diode
LABELING EXPLANATION:
X: Self contained
1: Maintained (*)
A: Including test device
90: 1.5 hour duration
180: 3 hour duration
Battery replacement.
It can be done only by a competent person and after the mains interruption.
1. Dismantle the device (step 1 of the installation instructions).
2. Disconnect the connector and remove the old battery.
3. Connect the new battery with the same type (step 4 of the installation instructions) and place it in
the position of the old one.
4. Follow the step 6 of the installation procedure and power the device.
Page 2 from 2
923378005_23_001