Professional Documents
Culture Documents
RELATED DOCUMENTS
A.
1.2
Drawings and general provisions of the Contract, including Conditions of Contract and
Division 1 Specification Sections, apply to this Section.
SUMMARY
A.
4.
B.
Fire-protection accessories.
1.3
SUBMITTALS
A.
3.
B.
Samples for Initial Selection: Manufacturer's color charts consisting of units or sections of
units showing the full range of colors, textures, and patterns available for each type of
cabinet finish indicated.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 1 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
C.
Samples for Verification: For each type of exposed cabinet finish required, prepared on
samples of size indicated below and of same thickness and material indicated for the Work.
If finishes involve normal color and texture variations, include sample sets showing the full
range of variations expected.
1.
1.4
QUALITY ASSURANCE
A.
Source Limitations: Obtain fire extinguishers and cabinets through one source from a single
manufacturer.
B.
NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 10,
"Standard for Portable Fire Extinguishers."
C.
Fire Extinguishers: Listed and labeled for type, rating, and classification by an independent
testing agency acceptable to the Engineer and authorities having jurisdiction.
1.
1.5
COORDINATION
A.
Coordinate size of cabinets to ensure that type and capacity of fire extinguishers indicated
and provided by the Employer under separate Contract are accommodated.
B.
Coordinate size of cabinets to ensure that type and capacity of hoses, hose valves, and hose
racks indicated are accommodated.
PART 2 - PRODUCTS
2.1
MANUFACTURERS
A.
Fire Extinguishers:
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
Amerex Corporation.
Ansul Incorporated.
Badger; Div. of Figgie Fire Protection Systems.
Buckeye Fire Equipment Company.
Fire-End & Croker Corporation.
General Fire Extinguisher Corporation.
J.L. Industries, Inc.
Kidde: Walter Kidde, The Fire Extinguisher Co.
Larsen's Manufacturing Company.
Modern Metal Products; Div. of Technico.
Moon/American, Inc.
Potter-Roemer; Div. of Smith Industries, Inc.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 2 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
2.
Fire-Protection Cabinets:
a.
b.
c.
d.
e.
f.
g.
h.
2.2
MATERIALS
A.
Cold-Rolled Steel Sheet: Carbon steel, complying with ASTM A 366/A 366M, commercial
quality, stretcher leveled, temper rolled.
B.
Aluminum: Alloy and temper recommended by aluminum producer and manufacturer for
type of use and finish indicated, and as follows:
1.
2.
C.
Stainless-Steel Sheet: ASTM A 666/A 666M, Type 302 or Type 304 alloy.
D.
Copper-Alloy Sheet, Brass: ASTM B 36/B 36M, alloy UNS No. C26000 (cartridge brass,
70 percent copper).
E.
Copper-Alloy Sheet, Bronze: ASTM B 36/B 36M, alloy UNS No. C28000 (muntz metal, 60
percent copper).
2.3
General: Provide fire extinguishers of type, size, and capacity for each cabinet and other
locations indicated.
B.
C.
D.
E.
F.
G.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
nominal capacity, in
10520 - Page 3 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
H.
I.
J.
2.4
General: Provide wheeled fire extinguishers of type, size, and capacity for locations
indicated.
B.
Carriage: Fabricate from enameled steel pipe, complete with hanger assembly, long range
nozzle, semipneumatic solid rubber tires, and the following:
1.
2.
3.
Hose: 4.6 m .
Hose: 15.2 m .
Hose: 30.5 m .
C.
D.
E.
F.
2.5
FIRE-PROTECTION CABINETS
A.
Cabinet Construction: Provide the manufacturer's standard box (tub), with trim, frame, door,
and hardware to suit cabinet type, trim style, and door style indicated. Weld joints and grind
smooth. Miter and weld perimeter door frames.
1.
Fire-Rated Cabinets: Listed and labeled to meet requirements of ASTM E 814 for fire
resistance rating of wall where it is installed.
a.
b.
2.
3.
Construct fire-rated cabinets with double walls fabricated from 1.2 mm thick,
cold-rolled steel sheet lined with minimum 16 mm thick, fire barrier material.
Provide factory-drilled mounting holes.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 4 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
B.
C.
D.
Fire extinguisher.
Fire extinguisher and fire hose valve.
Fire hose, rack, valve, and fire extinguisher.
Fire hose, rack, and valve.
Fire hose valve.
Recessed: Cabinet box recessed in walls of sufficient depth to suit style of trim
indicated.
Semi-recessed: Cabinet box partially recessed in walls of shallow depth to suit style
of trim indicated. Comply with ADA restrictions on projection of cabinet.
Surface Mounted: Cabinet box fully exposed and mounted directly on wall. Comply
with ADA restrictions on projection of cabinet.
Cabinet Trim Style: Fabricate cabinet trim in one piece with corners mitered, welded, and
ground smooth.
1.
Trimless: Surface of surrounding wall finishes flush with exterior finished surface of
cabinet frame and door, without overlapping trim attached to cabinet.
a.
2.
3.
Trimless with hidden flange of same metal and finish as box that overlaps
surrounding wall finish and that is concealed from view by an overlapping door.
Exposed Trim: One-piece combination trim and perimeter door frame overlapping
surrounding wall surface with exposed trim face and wall return at outer edge
(backbend).
a.
b.
c.
d.
e.
E.
G.
F.
Clear Float Glass: ASTM C 1036, Type I, Class 1, Quality q3, as follows:
a.
Thickness: 6 mm.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 5 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
2.
Tempered Float Glass: ASTM C 1048, Kind FT, Condition A, Type I, Quality q3, as
follows:
a.
3.
4.
5.
6.
7.
Break Glass: Clear float glass, ASTM C 1036, Type I, Class 1, Quality q3, 1.5 mm,
single strength.
Tempered Break Glass: ASTM C 1048, Kind FT, Condition A, Type I, Quality q3,
1.5 mm.
Wire Glass: ASTM C 1036, Type II, Class 1, Form 1, Quality q8, Mesh m1
(diamond), 6 mm thick.
Mirror Glass: ASTM C 1036, Type I, Class 1, Quality q2, 3 mm thick, double
strength.
Acrylic: Smooth or textured sheet, as follows:
a.
b.
8.
2.
2.6
J.
Color: Red.
I.
Thickness: 3 mm.
Color: Red.
H.
Class 1 (clear).
Provide minimum 13 mm thick door frames, fabricated with tubular stiles and rails,
and hollow metal design.
Provide inside latch and lock for break-glass panels.
Door Hardware: Provide the manufacturer's standard door operating hardware of proper
type for cabinet type, trim style, and door material and style indicated. Provide either lever
handle with cam-action latch, or exposed or concealed door pull and friction latch. Provide
concealed or continuous type hinge permitting door to open 180 degrees.
ACCESSORIES
A.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 6 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
B.
Break-Glass Strike: Provide manufacturer's standard metal strike, complete with chain and
mounting clip, secured to cabinet.
C.
Lettered Door Handle: Provide one-piece, cast-iron door handle with the word "FIRE"
embossed into face.
D.
Door Locks: Provide cylinder lock, with all cabinets keyed alike.
E.
Identification: Provide lettering to comply with authorities having jurisdiction for letter
style, color, size, spacing, and location. Locate as indicated by the Engineer.
1.
2.
2.7
2.8
Colors and Textures: As selected by the Engineer from the manufacturer's full range for
these characteristics.
FINISHES, GENERAL
A.
Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
recommendations for applying and designating finishes.
B.
C.
D.
Cabinet and Door Finishes: Provide the manufacturer's standard baked-enamel paint for the
following:
1.
2.
2.9
Exterior of cabinets and doors, except for those surfaces indicated to receive another
finish.
Interior of cabinets and doors.
ALUMINUM FINISHES
A.
Finish designations prefixed by AA comply with the system established by the Aluminum
Association for designating aluminum finishes.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 7 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
B.
C.
D.
2.
E.
Polyester Powder Coating: Approved type to meet the requirements of AAMA 603 or BS
6496 and BS 6497, consisting of powder particles of resinous material and additives to
improve performance. The coating is to be electrostatically sprayed on to produce a hard,
durable coating.
1.
2.
3.
2.10
STEEL FINISHES
A.
Surface Preparation: Clean surfaces of dirt, oil, grease, mill scale, rust, and other
contaminants that could impair paint bond using the manufacturer's standard methods.
B.
Factory Priming for Field-Painted Finish: Apply shop primer specified below immediately
after surface preparation and pretreatment.
1.
Shop Primer: Manufacturer's or fabricator's standard, fast-curing, lead- and chromatefree, universal primer, selected for resistance to normal atmospheric corrosion, for
compatibility with substrate and field-applied finish paint system indicated, and for
capability to provide a sound foundation for field-applied topcoats despite prolonged
exposure.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 8 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
C.
Baked-Enamel Finish: Immediately after cleaning and pretreating, apply the manufacturer's
standard two-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat.
Comply with the paint manufacturer's written instructions for applying and baking to
achieve a minimum dry film thickness of 0.05 mm.
1.
D.
Polyester Powder Coating: Approved type to meet the requirements of AAMA 603 or BS
6496 and BS 6497, consisting of powder particles of resinous material and additives to
improve performance. The coating is to be electrostatically sprayed on to produce a hard,
durable coating.
1.
2.
3.
2.11
Color and Gloss: As selected by the Engineer from the manufacturer's full range.
STAINLESS-STEEL FINISHES
A.
General: Remove or blend tool and die marks and stretch lines into finish. Grind and polish
surfaces to produce uniform, directionally textured polished finish indicated, free of cross
scratches. Run grain with long dimension of each piece.
B.
Polished and Buffed Finish: Oil-ground, 180 grit finish followed by buffing.
C.
D.
E.
F.
G.
H.
When polishing is completed, passivate and rinse surfaces. Remove embedded foreign
matter and leave surfaces chemically clean.
2.12
COPPER-ALLOY FINISHES
A.
Finish designations prefixed by CDA comply with the system established by the Copper
Development Association for designating copper-alloy finish systems, as defined in
NAAMM's "Metal Finishes Manual for Architectural and Metal Products."
B.
C.
D.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 9 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
1.
Clear Organic Coating: Clear, air-drying, acrylic lacquer specially developed for
coating copper-alloy products, applied by air spray in two coats per the
manufacturer's written instructions, with interim drying, to a total thickness of 0.025
mm.
a.
E.
F.
Fine-Matte Finish: CDA M42 (Mechanical Finish: Nondirectional finish, fine matte).
G.
H.
PART 3 - EXECUTION
3.1
EXAMINATION
A.
Examine roughing-in for hose valves, hose racks, and cabinets to verify actual locations of
piping connections before cabinet installation.
B.
Examine walls and partitions for suitable framing depth and blocking where recessed and
semirecessed cabinets are to be installed.
C.
D.
3.2
Proceed with installation only after unsatisfactory conditions have been corrected.
INSTALLATION
A.
Comply with the manufacturer's written instructions for installing fire-protection specialties.
B.
Install in locations and at mounting heights indicated or, if not indicated, at heights
acceptable to authorities having jurisdiction.
1.
2.
3.
Prepare recesses for cabinets as required by type and size of cabinet and trim style.
Fasten mounting brackets to structure and cabinets, square and plumb.
Fasten cabinets to structure, square and plumb.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 10 of 11
KING ABDULLAH BIN ABDULAZIZ PROJECTTHIRD SAUDI EXPANSION OF HOLY HARAM MAKKAH & SURROUNDING AREAS
CENTRAL UTILITY COMPLEX & SERVICE TUNNEL
3.3
Install cabinet with not more than 1.5 mm tolerance between pipe OD and knockout OD.
Center pipe within knockout.
B.
3.4
B.
C.
Provide final protection and maintain conditions that ensure that cabinets and doors are
without damage or deterioration at the time of Substantial Completion.
FIRE-PROTECTION SPECIALTIES
S09077-01D-TD-SPC-11B-ME-02 REV 1
PEDESTRIAN TUNNELS
10520 - Page 11 of 11