The data presented herein has been sourced from: the Internet; literature sources purchased by DOE; and other
independent literature sources provided openly to DOE.
December-14
SE
INTRODUCTION
Proposed Worldwide (non-U.S.) Gasification Projects Having Commercial Potential
Welcome to the Department of Energy's (DOE) Office of Fossil Energy (FE) / National Energy Technology
(NETL) Gasification Database. This Database tracks proposed large-scale gasification projects outside of
States (U.S.). Projects are categorized as either "Active," recently "Delayed/Cancelled," or "Other." The "O
is defined as projects that have been announced, but for which data are limited. Only non-domestic, propo
are included; currently operating projects are excluded. This Database presents factual rather than interpr
information. For those instances where conflicting data are found in the supporting literature, the most rec
information is used.
The data presented herein has been sourced from: publicly available information and internal in
approved for public release.
Every attempt is made to keep sources updated and accurate. However, if a source or link is found to be i
have information that you would like to have included in this database, please notify the database admini
mail: Gasification@netl.doe.gov
DISCLAIMER
Proposed Worldwide (non-U.S.) Gasification Projects Having Commercial
This report is intended to provide an overview of proposed new gasification plants that are u
This report may not represent all possible plants under consideration but is intended to illu
that exists for installation of new International gasification plants.
The Department of Energy does not warrant the accuracy or suitability of this inform
Experience has shown that public announcements of gasification plant developments do no
accurate representation of eventually commissioned gasification plants. Actual plant capaci
has historically been significantly less than new capacity announced.
The report focuses on those gasification projects that have achieved significant progress to
provide a more accurate assessment of the ability of this segment of the power generation
demand for new electricity capacity in various regions of the world.
PPA
RFP
SCFD
SNG
TBD
Carbon Dioxide
Cost of Electricity
Coal to Liquids
Environmental Impact Statement
Enhanced Oil Recovery
Front-End Engineering and Design
Fischer-Tropsch
Gallons per Year
TPD
TPY
TRIG
WTE
Hydrogen
Integrated Gasification Combined Cycle
Memorandum of Understanding
Million Tons per Year
Megawatts
Page 2
04/02/2015
Release date:
STATUS
LAST UPDATE
(Month, YY)
April-14
Forest BtL Oy
Finland,
Kemi
BTL
480 MW[th]
3,700-barrels-per-day
700 Million
D - Delayed /
Cancelled
Not identified.
In late February 2014, is was decided that planning on the Ajos BTL Project would be put on hold by the Board http://www.vapo.fi/en/media/news/1997/vapo_oy_freezes_the_kemi_biodiese
of Directors of Vapo Oy. The board stated that a lack of both operational partners (Metsaliitto withdrew from the l_project
project in 2012) and financial backing, particularly in light of recent EU climate and energy strategies released in
January 2014, particularly those related to biodiesel, which would have been the plants main product.
December-14
CTL
US $10 Billion
D - Delayed /
Cancelled
Not identified.
CTL plant will produce methanol, petrol and diesel from coal, expected start up by 2019. MoU with Lurgi of
Germany for CTL technology. Commissioning is expected to begin July 2013, using low-quality, high-ash coal,
the variety that abounds in India, to produce 5.7 million standard cubic metre per day of gas. JSPL had hoped
to begin construction in 2014; however, they have not yet been granted a license to remove coal from the
Ramchandi coal block that had been allocated to the CTL project. The coal block has been de-allocated to the
project following a lack of progress by the company to obtain a prospecting license. Following the de-allocation
of the coal block, JSPL announced that they had scrapped plans for the CTL project. JSPL chairman Naveen
Jindal stated "The CTL project was linked with the coal block. If the coal block is gone, then the project is gone."
Arckaringa Project
December-14
Altona Energy
Australia, South
CTL
AUD$33 million
A - Active
Not identified.
In February 2014, China National Offshore Oil Corporation (CNOOC) withdrew from the Arckaringa joint venture, http://www.energy-pedia.com/news/australia/new-157918
leaving Australian-based Altona Energy as the sole owner and operator of the CTL project. As a result, Altona
http://www.energy-pedia.com/news/australia/new-161570
has begun looking for new partners to invest in the proposed CTL project. The direction of the project will also http://www.energy-pedia.com/news/australia/new-159380
now shift to be directed at coal-to-liquids and coal-to-methanol. While partnered with CNOOC, the focus was on
CTL and power generation. In May 2014, Altona was informed by Sino-Aus and Wintask that they were ready to
enter into discussions about a joint venture for the Arckaringa Project. In November 2014, Alton, Sino-Aus, and
Wintask signed a joint venture agreement. Under the agreement, Sino-Aus and Wintask will provide AUD$33
million to the project. Altona was also notified by the South Australian government that the company's
application for a renewed Program for Environmental Protection and Rehabilitation had been approved. Altona
is still awaiting an extention on its Water Affecting Activity Permit.
Bluegas China
August-14
China, Xinjiang
SNG
1.25 Billion
A - Active
Wanxiang and GreatPoint Energy have entered into a joint venture and have begun engineering the Bluegas
http://www.businesswire.com/news/home/20120521005722/en/Wanxiangcomplex which, when complete, will produce one trillion cubic feet (30 billion cubic meters) of natural gas per
GreatPoint-Energy-Announce-1.25-Billion-Investment
year. The first phase is expected to commence operation in 2015 with an initial annual natural gas production
capacity of 30 billion cubic feet (0.85 billion cubic meters), which will expand to 116 billion cubic feet (3.4 billion
cubic meters) of annual natural gas output within two years. No additional information has been released since
the initial project announcement.
April-14
570 MWe
TBD
O - Other
http://sequestration.mit.edu/tools/projects/captain.html
February-13
Indonesia,
Kalimantan or Sumatra
CTL
US$2.5 billion
A - Active
Not identified.
Celanese Corporation PT Pertamina Joint Venture will develop a US$2.5 billion ethanol coal gasification
plant in Kalimantan or Sumatera, utilizing Celanese's proprietary TCX ethanol process technology.
Construction might kick off this year and start commercial operation by 2016. No additional information has
been released since the original project announcement.
http://theindonesiatoday.com/indonesia/news/business/indonesia-businessnews/item/2532-celanese-pertamina-might-kick-off-coal-gasificationproject.html
Changji
June-14
Sinopec
China, Xinjiang
SNG
8 billion m3/yr
TBD
A - Active
Not identified.
http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalto-gas-output-of-50-bil-cu-27831969
April-14
Coal waste-toliquids
US $9.5-$11.8 billion
A - Active
Not identified.
The Changji facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal.
The planned 65,000 bpd facility is expected to begin construction in the 2016/2017 timeframe and be online by
2020. The facility will use Fischer-Tropsch technology and will make use of Lurgi and Air Liquide technical
expertise. Proposed products include gasoline, diesel, A1 jet fuel, and naphta. CCI has a signed letter of intent
from German airline Lufthansa for purchase of jet fuel produced.
September-13
IGCC
166 MW
Yen 90 billion
A - Active
Construction of the CoolGen demonstration plant began on March 1, 2013 with completion of Phase I expected http://www.hitachi.com/rev/archive/2013/__icsFiles/afieldfile/2013/02/25/r201
in 2017. Hitachi will provide the EAGLE gasifier, an oxygen-blown, two-stage spiral-flow coal gasifier.
3_01_105.pdf
http://www.osaki-coolgen.jp/release/release20130301.html
CPI Yinan
October-14
SNG
A - Active
Not identified.
China Power Investment Corporation (CPI) is one of first major utilities in China to build coal to SNG using eight http://www.gasification.org/uploads/downloads/Conferences/2012/presentatio
SFG-500 Siemens gasifiers, expected COD Late 2015. Haldor Topsoe as been awarded a contract to provide ns/GTC-2012-2-3.pdf
the methanation technology as well as engineering design and catalyst services.
http://www.topsoe.com/content/china-power-investment-corporation-hasawarded-haldor-tops%C3%B8e-contract-2-billion-nm3-year
Datong
June-14
SNG
4 billion m3/yr
TBD
A - Active
Not identified.
The Datong facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal.
http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalto-gas-output-of-50-bil-cu-27831969
October-14
2Co Energy
IGCC
650MW (net)
5 billion
D - Delayed /
Cancelled
Lewis Gillies, CEO, 2Co Energy Limited said: "... We will complete the current phase of the project and meet the
knowledge-share obligations of our existing EEPR funding from the EU but we cannot take this project further
without funding from the UK government." In July 2014, 2Co Energy announced that they were in talks with
Norwegian company Sargas regarding the sale of the Don Valley CCS Project.
http://www.2coenergy.com/download.aspx?file=resources/downloads/EUs
leading carbon capture project fails to win UK government backing.pdf
http://www.2coenergy.com/download.aspx?file=resources/downloads/PRESS
%20RELEASE%20Exclusive%20negotiations%20for%20sale%20of%20Don
%20Valley%20Power%20Project%20to%20Sargas.pdf
April-14
China, Dongguan
IGCC
800 MW
TBD
A - Active
February-14
Bombardier Aerospace
Ireland, Belfast
WTE
85 Million
A - Active
Not identified.
Dongguan Taiyangzhou Power Corporation is in the initial phases of construction planning for the proposed
plant. While undiscolsed, the facility has received funding from the Chinese government's High Technology
Development Program.
In early January 2014, Bombardier Aerospace was given permission by the Northern Ireland government to
move forward with planning on the proposed waste-to-energy project in Belfast. The project will gasify nonrecycleable waste into electricity and heat for the surrounding region. It is estimated that 120,000 tonnes per
year will be gasified.
http://www.globalccsinstitute.com/project/dongguan-taiyangzhou-igcc-ccsproject
https://sequestration.mit.edu/tools/projects/dongguan.html
http://www.ciwm-journal.co.uk/archives/5558
Erdos
June-14
CNOOC
SNG
4 billion m3/yr
TBD
A - Active
Not identified.
The Datong facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal.
http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalto-gas-output-of-50-bil-cu-27831969
Fuxin
June-14
Datang
SNG
4 billion m3/yr
TBD
O - Other
Not identified.
GreenSky London
October-14
WTL
A - Active
Not identified.
The 4 billion m3/yr Fuxin SNG facility has been announced; however, it has yet to receive approval from China's http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalNational Development and Reform Commission to begin construction.
to-gas-output-of-50-bil-cu-27831969
http://people.duke.edu/~cy42/SNG.pdf
Solena Fuels in partnership with British Airways has committed to building the worlds first facility to convert
http://www.solenafuels.com/index.php/projects/greensky-london
landfill waste into jet fuel. The chosen location for this innovative project is the Thames Enterprise Park, part of
the site of the former Coryton oil refinery in Thurrock, Essex. This ground-breaking fuel project is set to
revolutionize the production of sustainable aviation fuel. Approximately 575,000 tonnes of post-recycled waste
normally destined for landfill or incineration will instead be converted into 120,000 tonnes of clean burning liquid
fuels using Solenas innovative integrated technology. British Airways has made a long-term commitment to
purchase all 50,000 tonnes per annum of the jet fuel. The facility is presently in Pre-FEED work and is
anticipated to be operational by 2017.
Guodian
June-14
China Guodian
SNG
4 billion m3/yr
TBD
A - Active
Not identified.
The Guodian facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal.
Hirono IGCC
December-14
IGCC
500 MW
TBD
A - Active
Not identified.
TEPCO, along with MHPS, has announced plans to develop an IGCC plant at the company's existing Hirono
http://www.pennenergy.com/articles/pennenergy/2014/09/coal-power-mhpsPower Station. The facility is one of two IGCC facilities that TEPCO plans to build in the Fukushima Prefecture consortium-to-build-igcc-plants-for-tepco.html
aimed at creating the industrial base and employment opportunities to promote the economic revitalization. The http://www.gasification.org/what-is-gasification/world-database/hirono-igcc
facility is planned to be online by 2020.
RWE Hurth
April-14
RWE
Germany, Hurth
IGCC
450 MW
2 billion
D - Delayed /
Cancelled
RWE initially announced plans to build the 450 MW IGCC plant with CCS capability in 2008. They had hoped to http://www.rwe.com/web/cms/en/2688/rwe/innovation/projectshave the facility completed and ready for commission in 2014; however, uncertainties regarding storage of
technologies/power-generation/fossil-fired-power-plants/igcc-ccs-powercaptured CO2 have put the project on indefinite hold.
plant/
http://www.zeroco2.no/projects/rwe-igcc-plant-with-co2-storage
April-14
Reliance Industries
India, Jamnagar
IGCC/CTC
US $4 Billion
A - Active
Not identified.
Porvair, plc has been selected to design and build char-filtration systems for the gasification plant, process
http://www.linde.ro/ro/news_and_media/press_releases/news_130409.html
petroleum coke and coal into synthesis gas using E-Gas technology licensed from Phillips 66 (now owned by
http://teqip.jdvu.ac.in/for_website/Program
CB&I). Linde to supply air separation units and synthesis gas purification plants. Construction has begun on the %2026.07.2013/Presentation_Thomas_Mathew.pdf
plant with anticipated startup in 2015.
Page 3
NOTES/INFO
December 2014
INFORMATION SOURCE
DEVELOPER
(Note: Projects are listed by type and location in three groups: Active, Delayed or Cancelled, and Other Conceptual Projects.)
LOCATION
TYPE
SIZE
COST
http://www.moneycontrol.com/news/business/jspl-to-soon-tie-up-technologypartner-for-angul-ctl-plant-_838579.html
http://www.business-standard.com/article/companies/jspl-inks-pact-with-lurgifor-rs-55k-cr-coal-to-liquid-project-113031500412_1.html
http://www.moneycontrol.com/india/newsarticle/news_print.php?
autono=679230&sr_no=0
http://www.orissadiary.com/CurrentNews.asp?id=47413
http://www.newindianexpress.com/states/odisha/Decision-to-Cancel-CoalBlocks-to-JSPL-Tatas-Unfortunate-OdishaGovt/2014/02/19/article2065191.ece
http://www.moneycontrol.com/news/business/jspl-scraps-3610-bn-coal-toliquid-project_1236232.html
http://www.gtai.de/GTAI/Navigation/DE/Trade/maerkte,did=891894.html
http://www.cleancarbonindustries.com/project.html
http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalto-gas-output-of-50-bil-cu-27831969
http://en.sxcoal.com/88544/NewsShow.html
04/02/2015
LAST UPDATE
(Month, YY)
August-14
A - Active
Not identified.
Saudi Aramco has awarded several additional construction engineering contracts for the Jazan IGCC plant.
http://www.ogj.com/articles/2014/05/saudi-aramco-lets-additional-contractsThese contracts were awarded to Saipem SPA, a subsidiary of Italian company Eni SPA. The contracts are
for-jazan-igcc-plant.html
related to engineering and construction of a gasification unit, an ash removal unit, an acid gas removal unit, and
a hydrogen recovery unit. A second contract focuses on engineering and construction for six sulfur recovery unit
trains and associated storage equipment.
April-14
China, Lianyungang
CTC
TBD
A - Active
Not identified.
Honeywell's UOP technology will be used in the world's largest methanol-to-olefins (MTO) unit, feedstock is
syngas derived from coal. Facility is expected to be operational in 2015.
May-13
SNG
US$1.6 billion
A - Active
Not identified.
SES' gasification technology was selected for the large scale, $1.6 billion coal waste to synthetic natural gas
project in Jiangxi Province, China. Construction is anticipated to begin in 2014.
Jincheng Project
February-13
TBD
A - Active
Not identified.
Air Products announced the signing of a long-term agreement with Shanxi LuAn Mining (Group) Co., Ltd. for Air http://www.airproducts.com/company/news-center/2013/02/0220-airProducts to build, own and operate four ASUs producing oxygen, nitrogen, compressed instrument air and
products-wins-four-asu-train-contract-with-lu-an-mining.aspx
steam to supply LuAns multiple process trains at its coal gasification facility to be built in Changzhi City, Shanxi
Province, China. This is the second largest ASU onsite order ever awarded. The first of the four ASUs is targeted
for onstream in July 2015. The remaining three are to be operational at one month intervals with the final ASU
scheduled for commercial operation in October 2015.
Jiutai Energy
August-14
TBD
A - Active
Not identified.
Jiutai will produce 600,000 metric tons per year of ethylene and propylene at its facility in Ordos City, Inner
Mongolia Province, China. Honeywells UOP/Hydro MTO process has been selected for the project, scheduled
to start up in 2014. General Electric's High Pressure Gasification technology has been selected by Juitai. GE
will provide a license for the gasification technology, gasification process design, technical services, and key
equipment.
http://www.uop.com/?press_release=honeywells-uop-wins-fourth-licensebreakthrough-technology-to-convert-methanol-from-coal-to-plastics
http://www.genewscenter.com/Press-Releases/Jiutai-Group-Selects-GE-sHigh-Pressure-Gasification-Solution-for-Coal-to-Methanol-ExpansionProject-4414.aspx
PROJECT NAME
DEVELOPER
LOCATION
TYPE
SIZE
COST
STATUS
NOTES/INFO
INFORMATION SOURCE
http://www.uop.com/?press_release=honeywells-uop-wins-fourth-licensebreakthrough-technology-to-convert-methanol-from-coal-to-plastics
http://www.petrochemconclave.com/presentation/2014/Mr.JGregor.pdf
http://money.msn.com/business-news/article.aspx?
feed=PR&date=20130507&id=16445306
JV Bharat Heavy Electricals Ltd. (BHEL) and NTPC India, Dadri, Uttar Pradesh
IGCC
100 MW
US$128 million
O - Other
Not identified.
Two of India's power sector majors - equipment-maker BHEL and power-generator NTPC - are collaborating to
set up a 100MW power plant based on integrated gasification combined cycle (IGCC) technology. The
collboration is expected to include funding for the project by the two groups. Over the course of the
development of the project, disputes over intellectual property rights betweent the 2 companies led to the joint
venture stalling.
http://www.hindustantimes.com/business-news/CorporateNews/BHEL-NTPCto-float-100-MW-power-joint-venture/Article1-1039950.aspx
http://www.electricityforum.com/news/oct09/IndiadevelopingIGCCplant.html
Keqi
June-14
Datang
SNG
TBD
A - Active
Not identified.
The Keqi facility is one of several SNG plants that have received approval from China's National Development
and Reform Commission to begin construction. The facility is part of the country's overall goal to develop 50
billion m3 annually from coal. The 1.4 billion m3yr Phase 1 of the 4 billion m3/yr came online in late 2013.
http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalto-gas-output-of-50-bil-cu-27831969
Kingho (Qinghua)
June-14
China, Yining
SNG
TBD
A - Active
Not identified.
The Kingho (Qinghua) facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal. The 1.38 billion m3yr Phase 1 of the 5.5 billion m3/yr came online in
late 2013.
http://www.platts.com/latest-news/natural-gas/singapore/china-targets-coalto-gas-output-of-50-bil-cu-27831969
http://people.duke.edu/~cy42/SNG.pdf
August-14
India, Kerala
IGCC
US $1 billion
A - Active
Not identified.
Petcoke feedstock from BPCL's 190,000 bpd Kochi petroleum refinery to syngas to electricity. Part of a US $4
Billion expansion project at the refinery. Construction on the IGCC plant was expected to begin in March 2014.
Petcoke for the IGCC plant will be made available upon completion of the refinery expansion, which is expected
sometime in late 2015.
http://newindianexpress.com/cities/kochi/article1511432.ece
http://newindianexpress.com/cities/kochi/High-costs-likely-to-hit-petcokeproject/2013/05/23/article1601811.ece
http://www.researchviews.com/energy/power/powergenerationequipment/NewsReport.aspx?ArticleID=626365§or=power
%20generation%20equipment
http://member.zeusintel.com/ZSRR/news_details.aspx?newsid=30056
April-14
Republic of Botswana
IGCC
1200 MW
D - Delayed /
Cancelled
Not identified.
Following the release of South Africa's second integrated resource plan, which did not provide an opportunity for http://www.jindalafrica.com/countries/botswana/mmamabula-energy-project
the Mmambula Energy Project to supply power to the country prior to 2019, the company placed the project on
hold indenfinitely.
Mozambique CTL
October-14
SGC Energia
Mozambique
CTL
9,500 BPD
TBD
A - Active
Not identified.
ThyssenKrupp Uhde has signed a license agreement that would allow SGC Energia to use Uhde's Pernflo coal- http://www.downstreambusiness.com/item/Uhde-Inks-Mozambique-CTLgasification technology for multiple CTL projects, with the first project to be located in Mozambique. SGCE will Deal-SGC-Energia_n49445
use its XTLH Fischer-Tropsch technology to convert syngas to liquid fuels.
http://www.thyssenkrupp.com/en/presse/art_detail.html&eid=TKBase_13179
69991487_780138814
Nakoso IGCC
December-14
IGCC
500 MW
TBD
A - Active
Not identified.
TEPCO, along with MHPS, has announced plans to develop an IGCC plant at the Nakoso Power Plant,
operated by subsidiary company Joban Joint Power Ltd. The facility is one of two IGCC facilities that TEPCO
plans to build in the Fukushima Prefecture aimed at creating the industrial base and employment opportunities
to promote the economic revitalization. The facility is planned to be online by 2020.
http://www.pennenergy.com/articles/pennenergy/2014/09/coal-power-mhpsconsortium-to-build-igcc-plants-for-tepco.html
http://www.gasification.org/what-is-gasification/world-database/nakoso-2-igcc
November-13
C.GEN
TBD
A - Active
A - Active
Plant is in the feasibilty stage of planning. Proposed commercial online date in 2016-2017. Combined Cycle
Gas Turbine also being explored as power generation technology.
Groundbreaking for Phase 1 of the project took place in September 2013. This first phase, capable of producing
50,000 bpd of liquid fuels from bitumen feedstock, is expected to be online sometime in 2017. The gasifier feed
will be refinery bottoms rather than oilsands bitumen. Technologies to be employed at the bitumen refinery
include UOP hydroprocessing, Lurgi Gasification and Chevron Lummus "LC Fining" hydrocracking. Praxair to
build, own and operate air separation facility.
http://www.cgenpower.com/kgh/index.html
April-14
December-14
POSCO, Copelmi
SNG
2 million m3/d
$1.8 billion
A - Active
Not identified.
POSCO, the South Korean steelmaker, has signed a MOU with Rio Grande do Sul government officials to
develop a coal to SNG gasification facility near the Triunfo petrochemical complex. The $1.8 billion facility will
have a capacity of 2 million m3/d. Rio Grande do Sul government officials have also signed a MOU with local
gas supplier Sulgas to market the produced SNG.
http://www.bnamericas.com/news/metals/posco-pens-deal-for-us18bn-coalgasification-plant-in-brazil
August-14
POSCO
Korea, Gwangyang
SNG
Not identified.
Phillips 66 Gasifiers 2 + 1, Linde Rectisol for acid gas and CO2 separation, Haldor Topsoe Methanation
Process, Jacobs FEED Contractor, POSCO E&C EPC Contractor and Eng. Detail Eng. Contractor In
construction. ConocoPhillips is providing E-Gas Technology process design, support for detailed engineering
and procurement, operations training and start-up assistance. Construction is presently underway with
commissioning expected in August 2014 and commercial operation to begin in January 2015.
http://missionenergy.org/COALASIA2012/files/2012%20Coal%20Asia_
%20Amick_r0c%20[Compatibility%20Mode].pdf
http://www.modernpowersystems.com/features/featuregasifier-projects-andigcc-the-big-picture-4188432/
http://www.platts.com/latest-news/metals/seoul/south-korean-steelmakerposco-sets-up-synthetic-26765162
SES Pakistan
February-14
Pakistan, Karachi
IGCC
90-200 MW
TBD
A - Active
Not identified.
Initial Letter of Intent has been signed between Synthesis Energy Systems, Inc. and Karachi Electric Supply
Company for feasibility study and financial evaluation for a 90 to 200 MW coal gasification plant to be
constructed near Karachi, Pakistan. Initial work would focus on identifying suitable location(s) for the plant,
developing coal supply agreements, and preliminary plant design.
http://globenewswire.com/newsrelease/2014/01/07/600670/10063181/en/Synthesis-Energy-Systems-GEPackaged-Power-ISTROENERGO-and-TUTEN-Sign-First-LOI-in-PowerVertical-Sector-With-Karachi-Electric-Supply-Company.html
Shandong
June-14
SNG
4 billion m3/yr
TBD
A - Active
Not identified.
The Shandong facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal.
http://en.sxcoal.com/88544/NewsShow.html
December-12
CTC
TBD
A - Active
Not identified.
Shandong will use UOPs advanced MTO solution to produce more than 295,000 metric tons ethylene and
propylene annually at its facility in Tancheng, Linyi City, China. In addition to technology licensing, Honeywells
UOP will provide basic engineering, catalysts, adsorbents, specialty equipment, technical services and training
for the project, which is expected to start up in 2014.
http://honeywell.com/News/Pages/Honeywell%E2%80%99s-UOP-WinsThird-License-For-Breakthrough-Methanol-To-Olefins-Technology.aspx
April-14
CTL
TBD
A - Active
24 SFG-500 Siemens gasifiers ordered, start of commissioning expected late 2016. MAN Diesel & Turbo SE has http://www.che.com/only_on_che/latest_news/MAN-supplies-compressorbeen awarded the contract to construct eleven turbomachinery trains. The MAX1 axial compressor used in all technology-for-a-major-CTL-project-in-China_10498.html
eleven machine trains was the most challenging compressor development project in the companys history.
http://www.energychinaforum.com/news/75354.shtml
Construction on the project began in September 2013.
Sinopec China
August-14
CTC
$3.1 billion
A - Active
Not identified.
Sinopec Engineering Group has entered into an agreement to develop a coal to olefins plant in northern China.
The $3.1 billion deal will produce approximately 3.6 million tonnes per year of olefins. The plant will be built in
Inner Mongolia and will be owned and operated by Zhong Tian He Chuang Co. Ltd., a joint venture that includes
Sinopec Corp and China Coal energy Company as main investors. Sinopec announced that they are holding up
plans on the facility as par tof an overall company slow down related to growing US competition and rising
opposition to oil and gas plants over environmental concerns.
http://uk.reuters.com/article/2013/12/27/sinopec-coalidUKL3N0K60NB20131227
http://business.financialpost.com/2014/04/28/sinopec-stalls-petrochemicalbuild-up-as-u-s-competition-grows/?__lsa=2fb3-d7bd
October-13
IGCC
300 MW
TBD
A - Active
Not identified.
The Taean IGCC Power Plant will be the first coal-fired IGCC plant in Korea, which, with economic success, will
support the plan for 15 IGCC plants producing up to 10GW of power by 2020. Loesche is supplying the coal
milling and drying equipment. GE will supply a 7F Syngas Turbine, a D11 steam turbine, a heat recovery steam
generator and a cyber security-featured Mark VIe integrated control system (ICS) that will run the power island
control system for the new plant.
http://www.im-mining.com/2012/01/12/more-coal-gasification-progress-withnew-ge-technology-igcc-plant-in-south-korea/
http://www.doosan.com/doosanheavy/en/pressRelease.do?
cmd=viewPressRelease&searchTxt=&no=20111128075414467393
Page 4
http://www.praxair.com/news/2013/praxair-to-supply-north-west-redwaterpartnership
http://www.industrialheartland.com/index.php?
option=com_content&view=article&id=130:projectstatus&catid=53&Itemid=160
http://www.nwrpartnership.com/index.php?
option=com_content&view=article&id=2&Itemid=3
04/02/2015
LAST UPDATE
(Month, YY)
October-14
PROJECT NAME
DEVELOPER
LOCATION
TYPE
SIZE
COST
STATUS
NOTES/INFO
INFORMATION SOURCE
U.K.Teesside/Billingham,
WTE
100MW (two of four planned for the UK, Total = $500 million (First project only) Second project cost A - Active
200 MW)
unknown but likely similar
Not identified.
November-13
U.K.
Teesside
IGCC
O - Other
2.5 Mt/y CO2 will be captured at a rate of 90% and transported for Project is one of two reserve projects that are part of the UK Government's CCS commercialization program.
long-term storage under the central North Sea in a depleted oil
field.
http://www.globalccsinstitute.com/project/teesside-low-carbon-formerly-estongrange-ccs-plant
http://sequestration.mit.edu/tools/projects/teeside.html
June-13
SNG
TBD
A - Active
Not identified.
The Tian Ming plant is licensed to use the Transport Integrated Gasification technology (TRIG) to turn low-rank
coal into syngas for use in an IGCC. The original plan was for the plant to be operational in 2011-2012, but
project delays changed the estimated operating schedule to be bumped to 2014-2015.
http://www.prnewswire.com/news-releases/southern-company-kbr-to-helpdrive-global-adoption-of-21st-century-coal-gasification-technology176242741.html
August-14
China, Tianjin
IGCC
250 MW
$420 million
A - Active
Not identified.
1 x SGT5-2000E Seimens gasifier, the gas turbine using gas was first fired on secondary fuel in October 2011,
successfully reached first syngas operation in September 2012, commission of the plant continues as planned,
which is expected to be in operation in 2016.
http://www.gasification.org/uploads/downloads/Conferences/2012/presentatio
ns/GTC-2012-2-3.pdf
http://sequestration.mit.edu/tools/projects/greengen.html
https://www.devex.com/projects/pipelines/tianjin-integrated-gasificationcombined-cycle-igcc-power-plant-project-in-china/4012
April-14
Naftogaz
Ukraine, Lugansk
SNG
TBD
A - Active
Not identified.
A feasibility study is presently underway regarding the construction of a SNG from coal plant in the Luhansk
http://www.oilandgaseurasia.com/en/news/ukraine-produce-synthetic-naturalregion. This is expected to be complete by May 2014 with the first phase of construction expected to begin
gas-china
sometime in 2015. The state oil and gas company Naftogaz signed the USD 3.656 billion credit agreement with http://www.kyivpost.com/content/business/naftogaz-ukrainy-signs-agreementthe state-owned China Development Bank to finance the program of substituting natural gas with locally
to-get-chinese-credits-for-gas-to-coal-projects-318163.html
produced coal. The program is aimed at improving Ukraine's energy security and alleviating dependence on
foreign natural gas. The contract, guaranteed by the Ukrainian government, stipulates implementation of four
separate investment projects, which are to transfer national thermal energy production facilities to using coalwater fuel, and build five coal gasification plants. If successful the project will allow the replacement of about four
billion cubic meters of natural gas with coal, create 2,020 jobs, help Ukraine save an average of USD 1.5 billion
annually and stimulate the production of 10 million tons of domestic coal per year.
Varmlands Methanol
October-14
VarmlandsMetanol
Sweden, Hagfors
BTL
TBD
A - Active
Not identified.
Vaskiluodon Voima Oy
April-13
Metso Corporation
Vaasa, Finland
BTG
140 MW
TBD
A - Active
CO2 emissions for the area will be reduced by 230,000 tonnes per The technology of the new plant is based on Metso's long-term development work. Metso's delivery included fuel http://www.environmental-expert.com/news/metso-supplied-world-s-largestyear
handling, a large-scale dryer and a circulating fluidized bed gasifier, modification work on the existing coal boiler biomass-gasification-plant-inaugurated-in-finland-360411
and a Metso DNA automation system. The bio-gasification plant was constructed as part of the existing coal4/16/13
fired power plant, and the produced gas will be combusted along with coal in the existing coal boiler. 'The
http://www.blackseagrain.net/about-ukragroconsult/news-bsg/2018largestoperational experiences so far indicate that the 140-MW bio-gasification plant functions as planned, and the
biogas-plant-on-earth2019-opens-in-finland
produced gas burns cleanly in the coal boiler and reduces emissions,' says Mauri Blomberg, Managing Director, http://metso.com/news/newsdocuments.nsf/web3newsdoc/4950FCC1037AC
Vaskiluodon Voima.
5A2C2257B2B003E89E8?
04/16/2013: The plant has been officially inaugurated and put into operation.
OpenDocument&ch=ChMetsoPaperWebEng#.U_OcJPldV0Y
April-14
China, Nanjing
CTC
TBD
A - Active
Not identified.
Xinmeng
June-14
Xinmeng Energy
4 billion m3/yr
TBD
A - Active
Not identified.
August-13
CTC
A - Active
Not identified.
Yitai Coal-to-Liquids
February-14
CTL
TBD
A - Active
Not identified.
Page 5
The 100 MW facility will process between 600,000 - 700,000 tonnes of waste per year, generating enough
http://www.airproducts.co.uk/teesvalley/
electricity to power up to 100,000 homes. the first project is nearing completion of construction with an
http://www.airproducts.co.uk/microsite/uk/teesvalley/facilities.htm
anticipated commercial operation date in 2014. The Westinghouse Plasma gasifier was delivered to the project
site on May 12, 2013 and is considered on of the largest in the world. A second of four projects is presently in
the equipment procurment phase after receiving approval via a PPA with the UK government. The second
project will also utilize a Westinghouse Plasma gasifier similar to the unit used for the first project. The second
project began construction in the spring of 2014.
http://www.biofuelstp.eu/methanol.html
http://www.varmlandsmetanol.se/dokument/History%20March%2012.pdf
Facility was commissioned for start-up in September 2013 and is presently producing commercial grad ethlene
and propylene.
The Xinmeng facility is one of several SNG plants that have received approval from China's National
Development and Reform Commission to begin construction. The facility is part of the country's overall goal to
develop 50 billion m3 annually from coal.
The Yima Joint Venture plant in Henan Province, China, reported that methanol production was recently
increased to 60% of total design capacity of 300,000 tpy.
http://www.wison-engineering.com/en/press/press_each.php?id=p130926
Government authorities have approved Yitai Coal Co.'s indirect coal-to-liquids project in Inner Mongolia. The
approval shows China's intnet to move forward and scale up the technology as a way to increase energy
securtiy.
http://www.globaltimes.cn/content/834955.shtml#.UvTyO_ldV0Y
http://en.sxcoal.com/88544/NewsShow.html
http://www.prnewswire.com/news-releases/synthesis-energy-systemsannounces-sales-of-methanol-at-commercial-scale-at-its-yima-joint-ventureplant-214892531.html
04/02/2015