SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Pump and Other Components Instalation on Lift Station
PROJECT TITLE

SAIC NUMBER

SAIC-G-2023
WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

DATE APPROVED

QR NUMBER

25-May-05

Plumb

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

A1

Each lift station shall have two sets of pumps, one set to handle normal
incoming flow, and the other set to handle the maximum incoming flow.
Exceptions:
1. This requirement is not applicable to the controlled drainage of diked
area. In this case the lift station shall have at least one set of pumps to
handle normal incoming flow.
2. Sumps, outside diked areas, for bulk plants and air fueling operations
shall be sized to hold 32,000 liters plus a maximum of five minutes of
deluge flow as specified in SAES-B-070 as a minimum.
3. If the difference between normal and maximum flows is 10% or less, a
single set of pumps sized for the maximum flow condition may be used.

A2

The Pump Set handling normal flow shall meet the following
requirements:
a) The Pump Set shall consist of one pump or a group of pumps of equal
operating capacity and one equal capacity standby pump.
b) The total capacity of operating pumps shall be based on normal
washdown, sampling, vessel drainage, etc.
c) The pumps may have a common power source

A3

The Pump Set handling maximum shall consist of one pump or a group
of pumps of equal operating capacity and one equal capacity standby
pump.

SAES-S-020
Para 4.14.5

A4

If the difference between normal and maximum flows is 10% or less, a


single set of pumps sized for the maximum flow condition may be used.

SAES-S-020
Para 4.14.6

A5

The pumps shall be spaced to prevent vortexing cavitations when the


pumps are operating.

SAES-S-020
Para 4.14.15

A6

There shall be no physical connection between any potable water supply


and a wastewater lift station, which under any conditions might cause
contamination of the potable water supply.

SAES-A-104
Para 5.2.1.4

A7

The pumps shall be spaced to prevent vortexing cavitations when the


pumps are operating

SAES-S-20
4.14.15

A8

The pumps shall be removable without disturbing the discharge piping

SAES-S-20
4.14.16

A minimum of 12 air changes per hour is required for lift stations with
continuous ventilation. A capacity of 30 air changes per hour is required
when ventilation is intermittent.

SAES-A-104
Para 5.2.3.1

SAES-S-020
Para 4.14.3

SAES-S-020
Para 4.14.4

B1

Page 1 of 2

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-INSP DATE

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)


SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Pump and Other Components Instalation on Lift Station
PROJECT TITLE

ITEM
No.

DATE APPROVED

SAIC-G-2023
WBS / BI / JO NUMBER

ACCEPTANCE CRITERIA

REFERENCE

B2

Dampers shall not be used on exhaust or fresh air ducts.

SAES-A-104
Para 5.2.3.3

B3

Where the pump pit is below the ground surface or within an enclosure,
mechanical ventilation is required which shall ventilate the dry well and
the wet well independently.
Note: There shall be no interconnections between the wet well and the
dry well ventilating systems

SAES-A-104
Para 5.2.3.2

B4

Dampers shall not be used on exhaust or fresh air ducts.

SAES-A-104
Para 5.2.3.3

QR NUMBER

25-May-05

Plumb

CONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-INSP DATE

REMARKS:

REFERENCE DOCUMENTS:
SAES-A-104 -- Wastewater Treatment, Reuse and Disposal, June, 30, 2003
SAES-S-020 -- Industrial Drainage and Sewers, 30 November, 2002

Contractor / Third-Party

Saudi Aramco

Construction Representative*

PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

PID Representative

QC Inspector
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

Proponent and Others

QC Supervisor
Quality Record Approved:
Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED