25-10
GENERATORS:
PART 10
1.
OBJECTIVE
On completion of the laboratory
the student will be able to:
L
2.
3.
4.
5.
6.
7.
2.
ae generator project,
GENERAL DESCRIPTION
2.1
Electrical Supplies
The console
is suppled from
switch at 3 phase, 208 V, 60 Hz.
August 1981
- 1 -
fuse
disconnect
..
'"wo
'"
'"
'"I
....
o
Figure 1:
photograph Showing the Control Panel Layout of the Training Synchronizing Model
.....
trip
Iow_
.." ....... ....
field
B1V
d;~_;
o 0
Steam
Supply From
ESV
control
[Q][Q][Q]
load control
field
Bo;o...
5":'1 0
BY_a_
A
ESV
w
Ontalio
H.....
Grid
system
GV
.-.
flow
Turbine
tach<>
N
W
...o'"
I
yen
volt
)'p'(
"- output to
grid
,
I
O----------------------------~
main bitt
interrupt
Figure 2:
230.25-10
3.
These include:
a)
b)
All
outstanding
have
been surrendered.
All
permits
isolations have
and
work
been removed,
authorizations
pin
boards
up-
4.
c)
All
electrical,
are available ..
pneumatic
and
hydraulic
services
d)
Main, auxiliary and emergency trip oil systems having been tested.
e)
f}
g)
- 4 -
230.25-10
Hz
(Block H).
(Block H).
"OFF".
5.
UNIT RUN-UP
5.1
run-up.
5.1.1 Open slowly the ESV's by selecting ESV and governor control switch to "Increase".
Check ESV min light "OFF" (Block I).
- ESV closed light "0FF" (Block I).
- Turbine running light liON" (Block I).
5 -
230.25-10
5.2
rev/so
5.2.2 Close field circuit breaker.
5.2.3 Clteck field circuit .bre'aker closed
indication.
5.2.4 Raise excitation to O.SA.
5.2.5 Check
v
V
6 -
230.25-10
5.3
Synchronizing
- 7 -
230.25-10
6.
A
kW
kvar
Load Current.
Output voltage.
kvars
kvars
6.2
Load Angle
Checks
8 -
230.25-10
7.
- 9 -
230.25-10
7.1.12 Check -
+-
- B. I.V. closed
NOTES
J .R.C. Cowling
10 -