You are on page 1of 57

SULTANATE OF OMAN

MINISTRY OF TRANSPORT AND COMMUNICATIONS


DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT
MUSCAT

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT


TENDER NO. 51/2012
MONTHLY PROGRESS REPORT NO. 5
MAY 2014

CONSULTANT:

CONTRACTOR:

RENARDET S.A. & PARTNERS CONSULTING


ENGINEERS LLC.
P.O. Box 579, Muscat, P.C. 100,
Sultanate of Oman

CONSOLIDATED CONTRACTORS CO. LLC


P.O. Box 614,
Muscat, P.C. 100,
Sultanate of Oman

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Table of Contents

S. No.

Description

Page No.

1.

Project Particulars

2.

Scope of Work

3.

Typical Cross Sections

4.

Site visits/ Meetings

Engineers Site Staff

6.

Progress Review

7.

Financial Status

16

8.

Contractors Resources

17

9.

QA/ QC Reports

22

10.

Engineers Comments

28

11.

Project Correspondence

29

12.

Progress Photographs

33

RENARDET S.A. & PARTNERS

Page 1

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Project Particulars
Client:

Ministry
of
Transport
&
Communications
P.O. Box 684, Muscat, Postal Code 113
Directorate General of Roads
Sultanate of Oman.

Consultant:

Renardet S.A & Partners L.L.C.


P.O. Box 579, Muscat, Postal Code 100
Sultanate of Oman.

Contractor:

Consolidated Contractors Company


L.L.C.
P.O. Box 614, Muscat, Postal Code 100
Sultanate of Oman.

Project Commencement Date:

30.10.2013

Mobilization Period:

60 Days

Construction Period:

548 Days

Completion date:

29.06.2015

Original Contract Value:


(Including Contingencies)

R.O. 17,884,403.000

Amount of Contingencies:

R.O. 1,402,155.613

Original Contract Value:


(Excluding Contingencies)

R.O. 16,482,247.387

Planned physical progress


cumulative up to end of May 2014

23.21 %

Achieved physical progress


cumulative up to end of May 2014

RENARDET S.A. & PARTNERS

10.66 %

Page 2

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Scope of Work
This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and
consists of construction of an interchange in place of existing roundabout along with allied works.
Total length of the project along Batinah highway is about 4.0 km which shall be converted from four
lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of
work is the construction of service roads, pedestrian underpasses.
The work also includes expropriation of properties, relocation/protection of services (sewerage,
telephone, electricity, water, irrigation) road lighting works and traffic signals.
Major items within the scope of work consist of but not limited to the following:
Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve
the designed profile and gradient.
Removal of existing drainage structures and construction of new ones including protection works
as shown on construction drawings and as directed.
Expropriation of open/built up properties and removal of existing structures thereupon.
Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and
service roads.
Provision of new street lighting system/traffic signals and removal/disposal of existing street light
poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the
proper completion of the job.
Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base
course and bituminous wearing course as per details on the construction drawings.
Installation of road side furniture (traffic signs, road marking etc.) and protection works on
embankment slopes.
Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items
(transformers etc.) as per the requirements of concerned authority.
Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and
irrigation) as per the requirements of concerned authorities.
Provision of ducts for future utilities as per the requirements of utility operator.
Construction of concrete safety barriers, fixing of guard rails and paving tiles.
Provision of traffic diversion in coordination with concerned authorities.

RENARDET S.A. & PARTNERS

Page 3

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Site visits/ Meetings


S. No.

Details of Site Visit

Date

Final Outcome/ Decisions

ROP Traffic Dept. visited the site in


the night and inspected the Traffic
Diversion arrangements in Detours.

02.05.2014

Traffic Diverted on the newly


constructed Detours successfully.

Eng. Waleed from DGR visited the


Project site and detours.

07.05.2014

Inspected the locations of access


location for Oman Oil and Shell
Filling Stations and informed about a
meeting to be attended at HE
Governors Office.

Meeting with HE Governer regarding


the access for Shell and Oman Oil
Filling Stations

08.05.2014

Decided to provide an additional lane


to provide access to the filling
stations.

Meeting with Eng. Salem Al Makbari,


in Sohar Municipality regarding the
drainage issues of the project region.

15.05.2014

Mr. Salem will write a letter to DGR


seeking clarification of hydraulic
design of the culverts provided in the
project.

Site visit of Wadi Al Zizi road along


with Col. Mohd. Rashid Al Shibli and
other companies

19.05.2014

ROP requested to take up the


rehabilitation of Existing Overpass
Bridge, Service Road adjacent to
Wadi and Irish Crossing across wadi.

Meeting with Eng. Fares Jawad at


Project Office.

21.05.2014

Discussed the following points:


Requirements at Wadi Al Zizi
Drainage layout of Bridge
Land Appropriation
Consultants Quantity Surveyor
Contractors
proposal
to
provide ABC Class B

RENARDET S.A. & PARTNERS

Page 6

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Engineers Site Staff


1.

Roberto Benigni

Head Supervision Projects

2.

Muneer Abdul

Resident Engineer

3.

Hussein Shah

Material Engineer

4.

Ernesto B. Paredes

Bridge Engineer

5.

Sande H Tangaras

Civil Engineer

6.

Mohamed Safie

Land Surveyor

7.

Aseef Iqbal

Site Inspector

8.

Alaa Aldin Abdelfatah

Site Inspector

9.

Walid Samy Abdoh Mostafa

Material Inspector

10.

Haneefa Mohmmed Al Zadjali

Secretary

RENARDET S.A. & PARTNERS

Page 7

RENARDET S.A. & PARTNERS

16,225

59,858

49,908

Structural
Excavation

Subbase &
Aggregate Base

Bituminous
Pavement

Incidental
Construction

MSE walls

MEP Works &


Ducts

2,110,744

52,646

133,108

295,866

31,794

526,091

CUMULATIVE PROGRESS

MONTHLY PROGRESS

TOTAL

Drainage Works

776,807

62,320

Embankment

Concrete for
Box Culvert
/Underpas
Concrete for
Bridge

43,397

Clearing &
Removal of
Obstructions

62,724

Road Diversions

Budget
Man-Hrs

Description

Item

0.00
0.00
0.00
-

Actual

CL14 Plan %

Actual

CL14 Plan %

Actual

CL14 Plan %

Actual

0.00
0.00
0.00
0.00
0.00
0.00
0.01
-

CL14 Plan %

Actual

CL14 Plan %

Actual

CL14 Plan %

Actual

CL14 Plan %

Actual

CL14 Plan %

Actual

CL14 Plan

Actual Cum

0.01
0.01
-

Actual per Month

CL14 Org Plan Cum ulative %

Actual Cum ulative

Dec

2013

Actual

0.00

0.00

CL14 Plan %

CL14 Plan %

Actual

0.00

Actual

CL14 Plan %

0.30

Dec

2013

CL14 Plan %

Plan/
Actual

CL14 Org Plan per Month %

100.000

2.49

6.31

14.02

1.51

24.92

36.80

2.36

2.84

0.77

2.95

2.06

2.97

Wtd.
%

0.40

0.26

0.40

0.25

Jan

0.40

0.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.09

0.00

6.62

8.67

Jan

0.59

1.67

0.19

1.42

Feb

0.59

1.67

0.00

0.00

0.00

0.00

0.00

4.02

0.23

0.00

0.00

1.01

0.00

10.09

0.38

13.03

19.23

Feb

1.67

5.91

1.08

4.23

Mar

1.67

5.91

0.13

0.00

6.16

4.43

0.00

2.50

0.00

0.01

15.21

0.48

1.43

0.00

0.00

5.00

9.21

0.78

17.59

20.37

22.36

26.89

Mar

4.63

13.15

2.95

7.25

Apr

4.63

13.15

5.52

0.00

9.87

17.23

0.00

14.39

0.00

6.05

34.62

1.26

2.97

0.00

0.00

5.00

29.30

4.35

6.58

19.52

47.70

37.31

31.77

Apr

10.66

23.21

6.04

10.06

May

10.66

23.21

9.26

0.17

17.63

33.36

2.61

0.00

14.39

0.38

14.73

57.89

5.59

10.17

0.00

0.00

36.24

45.91

16.76

70.55

48.33

43.00

36.64

May

32.64

9.42

Jun

2014

32.64

0.79

49.13

0.00

1.21

69.26

23.65

0.00

0.00

56.90

29.38

48.33

41.51

Jun

2014

42.37

9.73

Jul

42.37

1.43

65.07

2.80

2.63

81.40

36.51

0.00

0.00

62.24

41.37

48.33

46.39

Jul

MANHOURS OVERALL PROJECT S-CURVE

52.58

10.21

Aug

52.58

5.65

80.79

17.87

3.42

83.38

51.47

0.00

11.07

64.59

58.64

48.33

51.26

Aug

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT - OMAN

62.37

9.79

Sep

62.37

13.41

93.82

43.85

4.23

83.46

63.06

0.08

26.27

67.94

66.60

48.33

56.13

Sep

70.86

8.49

Oct

70.86

21.84

100.00

61.59

5.50

84.50

74.26

7.77

41.98

69.08

74.18

48.33

61.01

Oct

76.59

5.72

Nov

76.59

30.56

100.00

72.98

6.08

92.89

75.97

19.32

59.98

69.08

82.85

48.33

65.88

Nov

81.13

4.55

Dec

81.13

32.94

100.00

81.15

6.08

99.96

77.37

31.22

78.73

75.05

84.75

48.33

70.76

Dec

84.69

3.56

Jan

84.69

70.94

100.00

83.94

34.35

100.00

80.05

44.94

79.90

82.85

84.75

59.91

75.63

Jan

87.48

2.79

Feb

87.48

75.04

100.00

84.42

99.38

100.00

82.40

51.98

79.90

93.48

85.24

77.84

80.50

Feb

91.31

94.86

3.55

Apr

94.86

96.43

100.00

92.86

99.76

100.00

92.13

90.14

89.45

100.00

92.34

94.93

2015

3.83

Mar

91.31

94.02

100.00

85.35

99.76

100.00

88.97

52.14

85.20

98.64

92.34

90.27

90.25

Apr

May-14

2015
85.38

Mar

REV.:
0
PERIOD ENDING:

98.33

3.47

May

98.33

100.00

100.00

96.39

100.00

100.00

98.55

90.14

92.60

100.00

98.36

100.00

95.13

May

Jun

100.00

1.67

Jun

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 8

RENARDET S.A. & PARTNERS

% MONTHLY

Dec

MONTHLY PROGRESS

2013

Jan

CUMULATIVE PROGRESS

MONTHS

10

Apr

Mar

Feb

Actual Cum ulative

CL14 Org Plan Cum ulative %

Actual per Month

CL14 Org Plan per Month %

CL14 Org Plan per Month %


2013

0.01

0.01

Dec

Jul

Jun
0.40

0.26

0.40

0.25

Jan

0.59

1.67

0.19

1.42

Feb

Aug
1.67

5.91

1.08

4.23

Mar

Actual per Month

2014

Sep
4.63

13.15

2.95

7.25

Apr

Dec

Nov

Oct
10.66

23.21

6.04

10.06

May

32.64

9.42

Jun

2014

42.37

9.73

Jul

52.58

10.21

Aug

CL14 Org Plan Cumulative %

62.37

9.79

Sep

Jan

May

12

Mar
Feb
70.86

8.49

Oct

76.59

5.72

Nov

81.13

4.55

Dec

Actual Cumulative

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT PROJECT - OMAN


MONTHLY CL 14 PLANNED VS. ACTUAL MANHOURS

84.69

3.56

Jan

2015

87.48

2.79

Feb

May
2015

91.31

3.83

Mar

Jun
94.86

3.55

Apr

98.33

3.47

May

0.00

20.00

40.00

60.00

80.00

% Cumulative
100.00

1.67

Jun

100.00

120.00

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 9

Apr

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Progress of Permanent Works

RENARDET S.A. & PARTNERS

Page 10

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE


as of 31 MAY 2014
LOCATION

PILE NO.

CASTING
SEQUENCE

SETTING
OUT

P3R
P3R
P3R
P3R
P3R
P1R
P1R
P3R
P3R
P3R
P1R
P1R
P1R
P3R
P3L
P1R
P1R
P1R
P3L
P3L
P3L
P1R

EP 01
EP 02
EP 03
EP 04
85
87
83
81
79
63
65
86
84
82
68
66
61
80
28
62
67
69
26
30
32
64

3
2
1
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

26/3/2014
25/3/2014
25/3/2014
26/3/2014
04-07-2014
04-07-2014
04-08-2014
04-08-2014
04-08-2014
04-09-2014
04-09-2014
04-10-2014
04-10-2014
04-10-2014
04-12-2014
04-12-2014
04-09-2014
13/4/2014
13/4/2014
04-12-2014
14/4/2014
14/4/2014
15/4/2014
15/4/2014
15/4/2014
16/4/2014

BORING,
REBARS, &
CONCRETE
26/3/2014
25/3/2014
25/3/2014
26/3/2014
04-08-2014
04-08-2014
04-09-2014
04-09-2014
04-09-2014
04-10-2014
04-10-2014
04-12-2014
04-12-2014
04-12-2014
13/4/2014
13/4/2014
13/4/2014
14/4/2014
14/4/2014
15/4/2014
15/4/2014
15/4/2014
16/4/2014
16/4/2014
16/4/2014
17/4/2014

P1L

6 WP

23

16/4/2014

17/4/2014

05-11-2014

P1L
P3L
P3L
P3L
P2R
P2R
P2R
P2L
P3L
P3L
P1L
P1L
P1L
P2L
P2L
P2L
P1L

14
25
27
29
78
76
74
23 WP
24
31
8
10
12
17
18
22
7

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

16/4/2014
17/4/2014
17/4/2014
17/4/2014
19/4/2014
19/4/2014
19/4/2014
21/4/2014
21/4/2014
20/4/2014
22/4/2014
22/4/2014
22/4/2014
23/4/2014
23/4/2014
23/4/2014
24/4/2014

17/4/2014
20/4/2014
20/4/2014
20/4/2014
21/4/2014
21/4/2014
21/4/2014
22/4/2014
22/4/2014
22/4/2014
23/4/2014
23/4/2014
23/4/2014
24/4/2014
24/4/2014
24/4/2014
26/4/2014

05-11-2014
28/4/2014
28/4/2014
28/4/2014
05-11-2014
05-11-2014
05-11-2014
28/4/2014
28/4/2014
05-11-2014
05-11-2014
05-11-2014
05-11-2014

RENARDET S.A. & PARTNERS

INTEGRITY
TEST
23/4/2014
23/4/2014
23/4/2014
23/4/2014
23/4/2014
28/4/2014
28/4/2014
23/4/2014
23/4/2014
23/4/2014
28/4/2014
28/4/2014
28/4/2014
23/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014

LOAD TEST
7-8/5/2014
16-17/4/2014
5-6/4/2014
13-14/5/2014
30/4/2014 to
1/5/2014
-

Page 11

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE


as of 31 MAY 2014

24/4/2014
24/4/2014
26/4/2014
26/4/2014
28/4/2014
27/4/2014
28/4/2014
29/4/2014
29/4/2014
29/4/2014
05-04-2014
05-04-2014
05-04-2014
05-05-2014
05-05-2014
05-05-2014
05-06-2014
05-06-2014
05-06-2014

BORING,
REBARS, &
CONCRETE
26/4/2014
26/4/2014
27/4/2014
27/4/2014
29/4/2014
29/4/2014
29/4/2014
30/4/2014
30/4/2014
30/4/2014
05-05-2014
05-05-2014
05-05-2014
05-06-2014
05-06-2014
05-06-2014
05-07-2014
05-07-2014
05-07-2014

05-11-2014
05-11-2014
05-11-2014
05-11-2014
05-11-2014
05-11-2014
05-11-2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014

64

05-07-2014

05-08-2014

65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89

05-07-2014
05-07-2014
05-10-2014
05-10-2014
05-10-2014
05-10-2014
05-10-2014
05-10-2014
05-12-2014
05-12-2014
05-12-2014
14/5/2014
14/5/2014
14/5/2014
13/6/2014
13/6/2014
15/5/2014
15/5/2014
19/5/2014
19/5/2014
19/5/2014
19/5/2014
20/5/2014
20/5/2014
20/5/2014

05-08-2014
05-08-2014
05-11-2014
05-11-2014
05-11-2014
05-12-2014
05-12-2014
05-12-2014
13/5/2014
13/5/2014
13/5/2014
15/5/2014
15/5/2014
15/5/2014
14/6/2014
14/6/2014
17/5/2014
17/5/2014
20/5/2014
20/5/2014
20/5/2014
20/5/2014
21/5/2014
21/5/2014
21/5/2014

21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
-

LOCATION

PILE NO.

CASTING
SEQUENCE

SETTING
OUT

P1L
P1L
P1L
P2L
P2L
P2L
P2R
P2R
P2R
P2R
P5R
P5R
P5R
P5R
P5R
P5R
P5R
P5R
P5R

9
13
11
16
15
20
70
71
73
75
105
104
103
102
101
100
97
98
99

41
42
43
44
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

P5L

48 WP

P5L
P5L
P5L
P5L
P5L
P5L
P5L
P5L
AB1 R
AB1 R
AB1 R
AB1 L
AB1 L
AB1 L
AB1 R
AB1 R
AB1 L
AB1 L
AB2 L
AB2 L
AB2 L
AB2 R
AB2 L
AB2 R
AB2 R

49
50
42
44
46
43
45
47
56
58
60
1
3
5
57
59
2
4
51
53
55
106
54
108
110

RENARDET S.A. & PARTNERS

INTEGRITY
TEST

LOAD TEST
24/5/2014 to
25/5/2014
-

Page 12

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE


as of 31 MAY 2014
LOCATION

PILE NO.

CASTING
SEQUENCE

SETTING
OUT

AB2 L
AB2 R
AB2 R

52
107
109

90
91
92

21/5/2014
21/5/2014
21/5/2014

BORING,
REBARS, &
CONCRETE
22/5/2014
22/5/2014
22/5/2014

INTEGRITY
TEST

LOAD TEST

BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE


As of 31 May 2014
SUB-STRUCTURE WORK PROGRESS (LHS)
ACTIVITY
PEDESTAL

PIER

AB1 L

P1L

P2L

P3L

P4L

P5L

N/A

N/A

AB2 L

2nd Lift

Height (m)

1st Lift

on-going

Height (m)

BIT. PAINTING

28-May-14

17-May-14

PILE CAP

17-May-14

08-May-14

N/A

11-May-14

01-May-14

on-going

N/A

AB2 R

F/P & BLINDING

SUB-STRUCTURE WORK PROGRESS (RHS)


ACTIVITY
PEDESTAL

PIER

AB1 R

P1R

P2R

P3R

P4R

P5R

N/A

N/A

2nd Lift

on-going

on-going

Height (m)

1st Lift

20-May-14

on-going

26-May-14

Height (m)

0.37

0.65

BIT. PAINTING

12-May-14

25-May-14

08-May-14

31-May-14

PILE CAP

04-May-14

13-May-14

30-04-2014

20-May-14

N/A

27-Apr-14

07-May-14

22-Apr-14

14-May-14

N/A

F/P & BLINDING

PREVIOUS MONTH

RENARDET S.A. & PARTNERS

THIS MONTH

Page 13

STATION

1
0+000 - 0+022
2
0+022 - 0+040
3
0+040 - 0+052
4
0+052 - 0+070
5
0+070 - 0+100
6
0+100 - 0+104
7
0+104 - 0+122
8
0+122 - 0+139
9
0+139 - 0+150
10
0+150 - 0+170
11
0+170 - 0+182
12
0+182 - 0+200
13 0+200 - 0+213.5
14 0+213.5 - 0+232
15
0+232 - 0+250
16
0+250 - 0+258
17
0+258 - 0+267
TOTAL LENGTH (m) =
BALANCE (m) =

NO.

22.00
18.00
12.00
18.00
30.00
4.00
18.00
17.00
11.00
20.00
12.00
18.00
13.50
18.50
18.00
8.00
9.00
267.00
71.50

LENGTH
(m)

1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 1.5
1.0 x 1.5
1.0 x 1.5
1.0 x 1.5

TYPE (1 Cell) &


DIMENSION (m)

RENARDET S.A. & PARTNERS


MARCH 2014

on-going
28-May-14
15-Apr-14
05-Mar-14
02-Mar-14
10-May-14
10-May-14
10-May-14
05-Mar-14
02-Mar-14
19-May-14
19-May-14
24-Feb-14
10-Apr-14
23-Apr-14
-

F/P &
BLINDING

16-Apr-14
24-Mar-14
05-Mar-14
17-May-14
14-May-14
01-Apr-14
06-Mar-14
22-May-14
21-May-14
27-Feb-14
13-Apr-14
26-Apr-14
-

Rebars

APRIL 2014

16-Apr-14
24-Mar-14
05-Mar-14
17-May-14
14-May-14
01-Apr-14
06-Mar-14
22-May-14
21-May-14
27-Feb-14
13-Apr-14
26-Apr-14
-

Concrete

BASE SLAB

MAY 2014

19-Apr-14
08-Apr-14
06-Mar-14
20-May-14
17-May-14
05-Apr-14
05-Apr-14
25-May-14
01-Mar-14
15-Apr-14
27-Apr-14
-

Concrete

WALL

19-Apr-14
08-Apr-14
06-Mar-14
20-May-14
17-May-14
05-Apr-14
05-Apr-14
on-going
25-May-14
01-Mar-14
15-Apr-14
27-Apr-14
-

Rebars

FALAJ RCBC PROGRESS SCHEDULE


(Chainage 23+411.400)
As of 31 May 2014

21-Apr-14
12-Apr-14
11-Mar-14
24-May-14
19-May-14
08-Apr-14
12-Apr-14
on-going
04-Mar-14
19-Apr-14
01-May-14
-

Rebars

21-Apr-14
12-Apr-14
11-Mar-14
24-May-14
19-May-14
08-Apr-14
12-Apr-14
04-Mar-14
19-Apr-14
01-May-14
-

Concrete

TOP SLAB

29-Apr-14
19-Apr-14
19-Mar-14
29-May-14
29-May-14
12-Apr-14
10-Apr-14
10-Mar-14
13-May-14
13-May-14
-

Bituminous
Paint (2 Coats)

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 14

RENARDET S.A. & PARTNERS

21+260
21+485
21+838
21+972.4
Block 1
Block 2
Block 3
Block 4
Block 5
Block 6
Block 7
Block 8
Block 9
Block 10
Block 11
Block 12
Block 13
Block 14
Block 15
Block 16
Block 17
Block 18
Block 19
Block 20
Block 21
Block 22
Block 23
Block 24
Block 25
Block 26
Block 27
Block 28
Block 29
Block 30
Block 31
Block 32
Block 33

1
2
3
4

RHS

RHS

LHS

STATION

NO.

3 cells - 2.0 x 1.5


1 cell - 2.0 x 1.5
2 x 4 cells - 2.0 x 1.5
11 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0
1 x 4 cells - 3.0 x 2.0

TYPE & DIMENSION

49.079
55.790
63.250
65.647
28.038
28.031
28.026
28.022
28.019
28.018
28.019
28.022
28.026
28.031
28.038
21.015
21.010
21.006
21.003
21.001
21.000
21.001
21.003
21.006
21.010
21.015
6.635
6.782
6.819
7.217
7.975
8.571
9.267
9.949
10.260
10.262
10.265

LENGTH (m)

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

SKEW ( )

THIS MONTH

Rebars

P R E V IO US
M ON T H

Concrete

Concrete

WALL

Rebars

BASE SLAB

24-May-14
24-May-14
17-May-14 25-May-14 25-May-14
18-May-14
18-May-14 29-May-14 29-May-14
18-May-14
18-May-14
26-May-14
26-May-14
28-May-14
28-May-14
-

F/P &
BLINDING

RCBC PROGRESS SCHEDULE (BARREL)


As of 31 May 2014

Rebars

Concrete

TOP SLAB

Bituminous
Paint (2 Coats)

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 15

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Status of Payment Certificates Till May, 2014

Payment
Certificate
No.

Particulars

Original Contract Amount


1

Advance Payment

Contract
Amount
(RO)

Certified
Amount
(RO)

Approved
Amount
(RO)

17,884,403
1,648,225

1,648,225

Interim Payment

514,442

513,608

Interim Payment

434,917

Interim Payment

407,538

Total Amount

RENARDET S.A. & PARTNERS

Balance
Amount
Available (RO)

17,884,403

3,005,122

2,161,833

14,879,281

Page 16

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

List of Contractors Equipment at site


Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
37
34

DESCRIPTION
COMPRESSOR
AIR COMPRESSOR
GENERATOR
CRANES
CRANES 30 TON / 25 TON / 70 TON
VEHICLES H.D.
DIESEL TANKER
FLAT TRAILER
HIAB TRUCK
P/MOVER + TIPPING TRAILER
TIPPER TRUCKS
WATER TANKER 5000 GAL
EARTH MOVING PLANT
BOBCAT
EXCAVATOR
JCB 4CX / 3CX
SHOVEL / WHEEL LOADER
DOZER D9N/D8R
TELEHANDLER
CIVIL ENGINEERING EQUIPMENT
CONCRETE MIXER
DYNAPAC S/ROLLER
E/WORK ROLLER
MOTOR GRADER
TITAN PAVER MACHINE
TYRE / PTR ROLLER
PAVER MACHINE
L. D. VEHICLES & TRUCKS
DYNA TRUCK
MAINTENANCE TRUCKS
ASHLOK 55 SEAT
TOYOTA COASTER BUS 24 S
TOYOTA COROLLA/CIVIC/YARIS
TOYOTA PICKUP/ISUZU
NISSAN PATHFINDER/X-TRAIL
TOYOTA LAND CRUISER/FORTUNER
Total

RENARDET S.A. & PARTNERS

CCC

TOTAL
HIRED AVAILABLE
AT SITE

0
2

1
0

1
2
2

0
0
0
3
12
2

0
1
2
0
0
0

0
1
2
3
12
2

1
0
0
3
0
0

0
2
4
0
1
0

1
2
4
3
1
0

0
0
1
0
0
0
0

0
0
0
1
0
0
0

0
0
1
1
0
0
0

2
1
5
1
0
5
0
0
40

1
0
0
0
8
7
5
4
37

1
5
1
8
12
5
4
77

Page 17

No. of EQUIPMENT

20

40

60

80

55

68

Feb-14

100

66

87

Mar-14

120

68

95
Apr-14

87
202
66
154

95
297
68
222

107
Jun-14

68
115
55
88

77

93
May-14

47
47
33
33

93
390
77
299

107
497

108

110
607

Aug-14

33

47

PLANNED TOTAL PER MONTH


PLANNED CUMULATIVE
ACTUAL TOTAL PER MONTH
ACTUAL CUMULATIVE

110

Jul-14

Jul-14

108
715

102
817

Aug-14 Sep-14

102

100
917

Oct-14

98
1,015

Nov-14

PROJECT MONTHS

Sep-14

2014

100

Oct-14

Jun-14

98

Nov-14

May-14

87
Dec-14

Apr-14

87
1,102

Dec-14

82

53
1,459

ACTUAL TOTAL PER MONTH

PLANNED TOTAL PER MONTH

41
1,500

May-15 Jun-15

66
1,406

79
1,263

Apr-15

82
1,184

77
1,340

2015
Jan-15 Feb-15 Mar-15

Jan-15

Mar-14

79

Feb-15

Feb-14

77

Mar-15

Jan-14

66
Apr-15

EQUIPMENT HISTOGRAM

53
May-15

CONSOLIDATED CONTRACTORS CO. OMAN LLC


UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

41

Jun-15

RENARDET S.A. & PARTNERS

Jan-14

Total

299

1500

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 18

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

LIST OF DIRECT & INDIRECT MANPOWER BY CATEGORY

Sl.No.

Manpower Category

Expat
Employees

Omani Employees Total Employees

AC Mechanic

Asst Cook

Asst Electrician

Asst Security Supervisor

Asst. Surveyor

Asst. Lab Technician

Asst. Mechanic

Asst.Store Keeper

Auto Electrician

10

Butcher

11

C/H Auto Electrician

12

C/H Carpentry

19

19

13

C/H Civil

14

C/H Earth Works

15

C/H Electrician

16

C/H Masonary

14

14

17

C/H Mechanical (Plant)

18

C/H Plumbing

19

C/H Rigger

20

C/H Scaffolding

21

C/H Steel Fixing

22

Carpenter

70

70

23

Chainman / Level man

24

Cleaner

25

Clerk-Filling /Clerk Tech

26

Cook

27

Crane Operator

28

Dozer Operator

RENARDET S.A. & PARTNERS

Page 19

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Sl.No.
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Total
1
2
3

Manpower Category
Drill Operator
Earthwork Checker
Electrician
F/M Carpentry
Grader Operator
Heavy Duty Driver
Heavy Duty Mechanic
Helper/Store Helper
Kitchen Attendant
Lab Helper
Labour/Rockman/Fuel
attendant
Laundry Attendant.
Light Duty Driver
Maintenance Mechanic
Mason
Office Boy / Office Asst
Pastry Maker
Pipe Fitter
Rigger
Roller Operator
Room Attendant.
Safety Officer
Shovel Operator
Sign Bord Writer
Steel Fixer
Time Keeper
Trailer Driver
Transport Officer
Turner
Tyreman
Waiter
Watchman
Sub Total of Direct +
Indirect Manpower
Site and Office Engineers &
Staff
Subcontractors
Grand Total

RENARDET S.A. & PARTNERS

Expat
Employees
1
1
1
1
2
8
4
3
2
4

Omani
Employees

113
3

25

23
1

Total Employees
1
1
1
1
2
31
5
3
2
4

463

39
140

138
3
27
1
71
6
1
1
8
2
2
1
3
1
57
5
7
1
1
2
5
39
603

435

146

581

47
13

54
13
648

27
1
71
6
1
1
5
1
2
2
1
55
5
6

3
1
1
1
2
1
1

1
2
5

Page 20

No. of Men

100

200

300

400

340

Dec-13

500

57

391

Jan-14

600

222

596

Feb-14

700
630

ACTUAL TOTAL PER MONTH - ( DIRECT + INDIRECT )

PLANNED TOTAL PER MONTH - ( DIRECT + INDIRECT )

425

Mar-14

800

340

340

68
26
731

391

657

Apr-14

900

11

18

638

365

848

715
581
49
630
1,957

291
550
46
596
1,327

May-14

11

Jun-14

322

748

50

851

425

36

52

2,614

657

54

603

1,353

638

858

222

0
Jul-14

57

57

3,362

748

57

691

2,202

848

854

23

59

3,362

3,052

851

854

3,362

3,362

4,764

3,910

60
854

59
858

PROJECT MONTHS

Aug-14

0
Sep-14

11

764

PLANNED TOTAL PER MONTH - ( DIRECT )


PLANNED TOTAL PER MONTH - ( INDIRECT )
PLANNED TOTAL PER MONTH - ( DIRECT + INDIRECT )
PLANNED CUMULATIVE
ACTUAL TOTAL PER MONTH - ( DIRECT )
ACTUAL TOTAL PER MONTH - ( INDIRECT )
ACTUAL TOTAL PER MONTH - ( DIRECT + INDIRECT )
ACTUAL CUMULATIVE

Oct-14

3,362

5,618

854

61

Sep-14
793

541

Aug-14
794

0
Nov-14

Jul-14
799

3,362

6,383

764

63

Oct-14
701

442

2014

3,362

6,923

541

61

Nov-14
480

0
Dec-14

Jun-14
792

3,362

3,362

7,691

7,365

57
326

61

Jan-15
269

442

Dec-14
381

326

May-14
791

0
Jan-15

Apr-14
586

297

Mar-14
375

3,362

7,988

297

51

Feb-15
246

354

Feb-14
186

0
Mar-15

Jan-14
34
47

3,362

8,342

354

3,362

8,693

351

44

Apr-15
307

2015
Mar-15
307

351

Dec-13
6

0
Apr-15

MANPOWER HISTOGRAM (DIRECT & INDIRECT)

0
3,362

3,362

9,212

9,033

30
179

35

Jun-15
149

340

May-15
305

340

2013

May-15

CONSOLIDATED CONTRACTORS CO. OMAN LLC

179

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

0
Feb-15

RENARDET S.A. & PARTNERS


Jun-15

3362

250

3112

9,212

9215

914

Total
8301

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 21

Upgrading of Falaj Al Qabail Roundabout

RENARDET S.A. & PARTNERS

Monthly Progress Report May 2014

Page 22

Upgrading of Falaj Al Qabail Roundabout

RENARDET S.A. & PARTNERS

Monthly Progress Report May 2014

Page 23

Upgrading of Falaj Al Qabail Roundabout

RENARDET S.A. & PARTNERS

Monthly Progress Report May 2014

Page 24

Upgrading of Falaj Al Qabail Roundabout

RENARDET S.A. & PARTNERS

Monthly Progress Report May 2014

Page 25

Upgrading of Falaj Al Qabail Roundabout

RENARDET S.A. & PARTNERS

Monthly Progress Report May 2014

Page 26

MAS/CCC/FQI/BBC/001

MAS/CCC/FQI/GTI/002

MAS/CCC/FQI/MSE/003

MAS/CCC/FQI/PVC/004

MAS/CCC/FQI/HDPE/005

MAS/CCC/FQI/PW/006

MAS/CCC/FQI/MC/007

MAS/CCC/FQI/RS/008

MAS/CCC/FQI/PT/009-1

MAS/CCC/FQI/PT/009-2

MAS/CCC/FQI/PT/009-3

MAS/CCC/FQI/PB/010A-Rev.1

MAS/CCC/FQI/PB/010B

MAS/CCC/FQI/HDPE/011

MAS/CCC/FQI/RCBC/012

MAS/CCC/FQI/BP/013

MAS/CCC/FQI/EJ/014A-Rev.1

MAS/CCC/FQI/RC/015

MAS/CCC/FQI/WS/016 B

MAS/CCC/FQI/TW/017

MAS/CCC/FQI/EW/019

MAS/CCC/FQI/EC/020

MAS/CCC/FQI/PS/021

MAS/CCC/FQI/LL/022

MAS/CCC/FQI/LP/023A

MAS/CCC/FQI/FP/024

MAS/CCC/FQI/JS/026

MAS/CCC/FQI/GT/026

CCC/FQI/REN/MAS/002

CCC/FQI/REN/MAS/003

CCC/FQI/REN/MAS/004

CCC/FQI/REN/MAS/005

CCC/FQI/REN/MAS/006

CCC/FQI/REN/MAS/007

CCC/FQI/REN/MAS/008

CCC/FQI/REN/MAS/009-1

CCC/FQI/REN/MAS/009-2

CCC/FQI/REN/MAS/009-3

CCC/FQI/REN/MAS/010A-Rev.1

CCC/FQI/REN/MAS/010B

CCC/FQI/REN/MAS/011

CCC/FQI/REN/MAS/012

CCC/FQI/REN/MAS/013

CCC/FQI/REN/MAS/014A-Rev.1

CCC/FQI/REN/MAS/015

CCC/FQI/REN/MAS/016 B

CCC/FQI/REN/MAS/017

CCC/FQI/REN/MAS/019

CCC/FQI/REN/MAS/020

CCC/FQI/REN/MAS/021

CCC/FQI/REN/MAS/022

CCC/FQI/REN/MAS/023A

CCC/FQI/REN/MAS/024

CCC/FQI/REN/MAS/025

CCC/FQI/REN/MAS/026

MAR No.

CCC/FQI/REN/MAS/001

Reference No.

RENARDET S.A. & PARTNERS


Geotextile

Joint Sealant (Polyseal)

Street Lighting Feeder Pillar

Street Lighting Poles (Mid-Hinged)

Street Lighting Luminaries

Package Substation

MV & LV Cables

Electrical Works

Telephone Works

Water Stop G EE-25

Reinforced Concrete Pipe (450,600,700mm dia)

Bridge Expansion Joints

Bituminous Paint Material (Rubberized)

Single cell Precast Box Culvert

HDPE Water Pipes

Bridge Pot Bearings

Bridge Pot Bearings

Post Tensioning Work - Strand

Post Tensioning Work - Duct

Post Tensioning Work - Anchorage

Reinforcing Steel

Bitnuminous Prime Coat (MC-70)

Piling Works

HDPE Pipes & Fittings

UPVC Pipes

MSE Wall System

Geotechnical Investigation

Bituminous Base Course

Material/ Work

Modern East Trading & Con.

Al Inma Building Materilal LLC

Stars Light LLC

Stars Light LLC

United Engineering Projects

United Engineering Projects

United Engineering Projects

United Engineering Projects

National Telephone Services

Sika LLC Oman

Amiantit Oman

Al Ammar International

Al Inma Building Materilal LLC

Amiantit Oman

Amiantit Oman

Building Supplies & Services

Al Ammar International

Freyssinet Arabian Sea LLC

Freyssinet Arabian Sea LLC

Freyssinet Arabian Sea LLC

Muscat Steel Industries

Emirates Lube Oil Co. (Muscat)

APCC LLC

Amiantit Oman

Amiantit Oman

Freyssinet Arabian Sea LLC

Swissboring & Company LLC

Tarmac Zawawi LLC Oman

Supplier/ Subcontractor

Material Approval Status

21/05/2014

27/03/2014

27/03/2014

22/05/2014

27/03/2014

22/03/2014

19/03/2014

22/03/2014

12/03/2014

25/03/2014

02/03/2014

07/05/2014

02/03/2014

22/02/2014

22/02/2014

11/05/2014

07/05/2014

22/02/2014

22/02/2014

22/02/2014

02/02/2014

30/01/2014

26/01/2014

26/12/2013

26/12/2013

26/12/2013

26/12/2013

22/12/2013

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

REN/FQI/CCC/111

SO/FQI/CCC/091

SO/FQI/CCC/090

SO/FQI/CCC/089

SO/FQI/CCC/063

SO/FQI/CCC/069

SO/FQI/CCC/026

SO/FQI/CCC/020

SO/FQI/CCC/019

SO/FQI/CCC/014

SO/FQI/CCC/015

SO/FQI/CCC/087

25/03/2014

09/03/2014

SO/FQI/CCC/064

SO/FQI/CCC/038

25/05/2014 REN/FQI/CCC/122

---

27/03/2014

27/03/2014

27/03/2014

20/03/2014

09/03/2014

19/02/2014

09/02/2014

09/02/2014

02/02/2014

02/02/2014

01/04/2014

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

SO/FQI/CCC/077

SO/FQI/CCC/083

SO/FQI/CCC/082

16/04/2014 REN/FQI/CCC/100

27/03/2014

17/03/2014

16/04/2014 REN/FQI/CCC/099

23/03/2014

20/05/2014 REN/FQI/CCC/123

Renardet Not Approved 20/04/2014 REN/FQI/CCC/105

Renardet

Renardet

Renardet

Renardet Not Approved

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

Renardet

28/04/2014

03/04/2014

03/04/2014

28/04/2014

02/04/2014

31/05/2014

05/05/2014

26/03/2014

11/03/2014

31/05/2014

13/05/2014

14/04/2014

14/04/2014

14/04/2014

24/03/2014

27/03/2014

25/02/2014

18/02/2014

18/02/2014

12/02/2014

12/02/2014

07/04/2014

MOTC
Renardet
Submitte Remarks
Via Renardet
Comment
Letter
d To
By MOTC
Letter Ref. No.
Submitted
s dated
Dated
Date

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 27

Monthly Progress Report May 2014

Upgrading of Falaj Al Qabail Roundabout

Engineers Comments
The percentage of progress as per the construction program is 23.21%.
The percentage of progress as per the actual work is 10.66%.
There is a shortfall of 12.55% in progress which needs to be recovered in the
coming 03 months.
Traffic is diverted on to the Detours on 03.05.2014 early hours and traffic is moving
smoothly without any hiccups.
Construction works for relocation of Falaj completed in 190m out of 270m.
Load testing of 02 no. expendable piles and 02 no. working piles completed and the
results are in compliance with standards.
Pile Foundation works are completed for all Piers except Pier No. 4 by 22.05.2014.

RENARDET S.A. & PARTNERS

Page 28

CCC

CCC

CCC

CCC

CCC

4/14/2014

RENARDET S.A. & PARTNERS

4/15/2014

4/17/2014

4/19/2014

4/22/2014

16

15

14

13

12

11

9
10

CCC

4/1/2014

CCC

CCC

CCC

4/24/2014

4/28/2014

4/28/2014

CCC

DGR

4/24/2014

4/30/2014

CCC

4/23/2014

CCC

CCC

4/23/2014

4/30/2014

CCC

4/22/2014

CCC

3/25/2014

From

Date
Received

S.
No.

FQI/REN/TR-074

FQI/RENARDET/124

FQI/REN/TR-072

FQI/REN/TR-071

FQI/REN/TR-069

2391

FQI/RENARDET/122

FQI/RENARDET/121

FQI/RENARDET/120

FQI/RENARDET/119

FQI/REN/TR-065

FQI/REN/TR-063

FQI/REN/MAS/014A

FQI/RENARDET/116

FQI/RENARDET/101

FQI/RENARDET/91

Reference No

Reference No.

SO/FQI/CCC/097

Approved

Approved

REN/FQI/CCC/093

5/11/2014 REN/FQI/CCC/107

4/24/2014

4/24/2014

4/22/2014

4/24/2014

5/13/2014 REN/FQI/CCC/109

5/13/2014 REN/FQI/CCC/110

Reply date

Extension of piles at Abutment 1 and


5/3/2014
Abutment 2
REN/FQI/CCC/104
Upgrading of falaj alqabail Roundabout
Starting at projects work .(MAS of Pot
Bearing)
5/14/2014 REN/FQI/DGR/033/14
SOL- 1 ( Batinah Highway ) cross section at
4/27/2014 Approved
CH . 21+150 to CH.21+320
Dimension and details of cell Box culvert 1
5/15/2014 Approved
(2.0*1.5)skew Angle 0 @ CH.24+570
Bar Bending schedulal for 9 cell Box
5/15/2014 Revise & Resubmit
culvert upstream
Static load testing for work pile# 06 at
pier 1 LHS.
SOL- 1 ( Batinah Highway ) cross section at
5/11/2014 Approved
CH . 21+340 to CH.22+240

Clause 14 program - ( Rev. 2 )

Concrete mix design calculations (C15,C30


and C35 )
Approal for bridge exparision joints
MAR.No. MAS/CCC/FQI/EJ/014A
SOL- 1 ( Batinah Highway ) cross section at
CH . 21+140 to CH.21+320
SOL-1(Batinah Highway ) cross section at
CH.22+580 to CH: 23+260
Static load test for expendable (nonworking ) pile EP-02

Reimbursement of Embankment fill


material under both detours RHS&LHS
Contract No.51/2012 - up-gradation of
falaj al-qabail Roundabout

Subject

CORRESPONDENCE RECORD FOR THE MONTH OF MAY 2014


Remarks

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 29

RENARDET S.A. & PARTNERS

5/1/2014
5/1/2014

5/4/2014
5/4/2014
5/4/2014
5/4/2014

5/4/2014
5/4/2014

5/4/2014

5/4/2014

5/4/2014

5/4/2014

5/5/2014

5/5/2014

5/5/2014

18
19

20
21
22
23

24
25

26

27

28

29

30

31

32

5/6/2014

5/1/2014

17

33

Date
Received

S.
No.

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC
CCC

CCC
CCC
CCC
CCC

CCC
CCC

CCC

From

FQI/REN/TR-090

FQI/REN/TR-089

FQI/REN/TR-088

FQI/REN/TR-087

FQI/REN/TR-086

FQI/REN/TR-085

FQI/REN/TR-084

FQI/RENARDET/133

FQI/RENARDET/128
FQI/RENARDET/129

FQI/REN/TR-079
FQI/RENARDET/132
FQI/RENARDET/125
FQI/RENARDET/126

FQI/REN/TR-077
FQI/SM/04

FQI/RENARDET/127

Reference No

Dimension and details of cell Box culvert


1 (2.0*1.5)skew Angle 0 @ CH.24+235
Working on Friday
Shope drawing for Bridge Bearing setting out @ CH.23+269.50 TO 23+509.50
Revised plan and profile (( Rev.30))
Safety officers at site
Calibration cell check certificate -load
Alternative Source for Bituminous Base
course
Quotation for Additional Electrical works
Project progress photographs & videeos
soft copy
SOL- 1 ( Batinah Highway)cross section
at CH.23+520 to CH. 23+940
Bar Bending Schedule for 44 cell Box
culvert upstream - Block : 01 to 11
Bar Bending Schedule for 44 cell Box
culvert Downstream - Block :12 to 33
Dimension Co-ordinates details Plan and
section 5 cell Box culvert( 3.0*2.0 skew
Angle 0 ) @ CH.23+490
Dimension and details of 3 cell Box
culvert 3 (2.0*1.5)skew Angle 0 @
CH.21+260
Dimension and details of 1 cell Box
culvert 1 (2.0*1.5)skew Angle 0 @
CH.21+485
Dimension and details of 1 cell Box
culvert 1 (2.0*1.5)skew Angle 0 @
CH.23+997

Monthly Progress Report No.4

Subject

Approved

Revise & Resubmit

Reference No.

Approved

Approved

Approved

Approved

5/15/2014 Approved

5/15/2014 Approved

5/6/2014

5/11/2014 Approved

5/8/2014

5/8/2014

5/6/2014

5/15/2014 REN/FQI/CCC/114

5/11/2014 REN/FQI/CCC/106

5/6/2014

5/3/2014

Reply date

Remarks

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 30

Date
Received

5/6/2014
5/6/2014
5/7/2014
5/7/2014
5/7/2014

5/12/2014
5/13/2014

5/14/2014

5/17/2014

5/19/2014

5/19/2014

5/20/2014

5/20/2014

5/21/2014

5/21/2014

5/21/2014
5/21/2014
5/21/2014
5/21/2014

5/21/2014

S.
No.

34
35
36
37
38

39
40

41

RENARDET S.A. & PARTNERS

42

43

44

45

46

47

48

49
50
51
52

53

Page 31

CCC

CCC
CCC
CCC
CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC
CCC

CCC
CCC
CCC
CCC
CCC

From

Subject

Dimension and details of 1 cell Box


culvert 1 (2.0*1.5)skew Angle 0 @
CH.24+235
FQI/REN/TR-091
FQI/RENARDET/134 Safety officers Diversion
FQI/RENARDET/135 Relocation of Telephone Cables
FQI/RENARDET/136 Street lighting poles
FQI/RENARDET/137 Aggregate Base Course
Static load test of Expendable pile Abut
FQI/RENARDET/140 #2 - Ch.23+900
FQI/RENARDET/141 Clause 14 program - ( Rev. 2 )
Entrance and Exit points to FQI Site from
FQI/RENARDET/142 Detour
Approved General layout plan - Rev . C FQI/RENARDET/143 Underpasses location
Shop drawing of the post tensioning
works Bridge 1.2.3.4
FQI/REN/TR-100
Co- Ordinates plan for Drain Channel at
ch.23+400
FQI/REN/TR-101
Existing Riprap ( To be removed ) at
Ch.24+229.242 to 24+343.300 To
ch.25+503.203&24+573.975
FQI/REN/TR-102
Cleaning and Grabing at CH.21+150
to25+223.009
FQI/REN/TR-103
Approval for Getotextile
CCC/FQI/REN/MAS/026MAR.NO.MAS/CCC/FQI/GT/026
Existing Bollard ( To be removed ) at
Ch.24+145.381 to 24+186.574
FQI/REN/TR-104
SOL- 1 ( Batinah Highway)cross section
at CH.23+349.500 to CH. 23+429.500
FQI/REN/TR-105
Bearing location Scheme
FQI/REN/TR-106
FQI/RENARDET/144 Drainage Layout Plan
FQI/RENARDET/145 Aggregate Base Course
Static load test for Expendable (NonFQI/RENARDET/146 working) pile # EP-01

Reference No

Reference No.

5/25/2014 REN/FQI/CCC/116

5/31/2014 Approved
5/27/2014 Approved
5/28/2014 REN/FQI/CCC/121

5/25/2014 Approved

5/27/2014 REN/FQI/CCC/119

5/31/2014 Approved

5/21/2014 Approved

5/18/2014 REN/FQI/CCC/115

5/15/2014 Approved

Reply date

Remarks

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

RENARDET S.A. & PARTNERS

5/21/2014

5/22/2014
5/22/2014

5/22/2014

5/22/2014

5/25/2014

5/25/2014
5/25/2014

5/26/2014

5/26/2014

5/27/2014

5/28/2014

5/29/2014
5/29/2014
5/31/2014
25/2014

54

55
56

57

58

59

60
61

62

63

64

65

66
67
68
69
70

71

Date
Received

S.
No.

CCC

CCC
CCC
CCC
CCC
CCC

CCC

CCC

CCC

CCC

CCC
CCC

CCC

CCC

CCC

CCC
CCC

CCC

From

Subject

Reply date

Static load test for Expendable (NonFQI/RENARDET/147 working) pile # EP-04


5/27/2014
Drainage inlet type - I Details of 3 cell
Box BOX Culvert @Ch .21+260
FQI/REN/TR-107
6/1/2014
FQI/RENARDET/148 Static load testing
5/26/2014
Static Load Test of working pile#48, AbutFQI/RENARDET/149 5 LHS
Approval for Street lighting poles
MAR.NO.MAS/CCC/FQI/LP/023A
CCC/FQI/REN/MAS/023A
Drainage inlet type - I Details @Ch
.21+380 to 1 Cell Box Culvert @
Ch.21+485
FQI/REN/TR-108
6/1/2014
Completion of piling works - Excluding
FQI/RENARDET/151 location pier 4 ( RHS&LHS)
FQI/REN/TR-109
Shop drawing of 3 way # 150 mm UPVC elect5/25/2015
Summer Working Hours ( JUNE , July &
FQI/RENARDET/152 August)2014
Drainage inlet type - I Details @Ch
.21+560 to Ch.21+620
FQI/REN/TR-110
6/1/2014
Drainage Inlet Type -III Details 8 cell Box
culvert @ Ch 21+838
FQI/REN/TR-111
6/1/2014
Pier Bearing level Details @
Ch.23+349.500 to Ch.23+429.500
FQI/REN/TR-112
5/28/2014
Pier Bearing level Details @
Ch.23+309.500 to Ch.23+469.500 ( P 1 L
& P1R) TO ( P5L&P5R)
FQI/REN/TR-113
1.6.2014
FQI/RENARDET/153 Pending Drawing Submittals
FQI/RENARDET/154 ROP. Approval Detour Plan
FQI/RENARDET/150 AL-Israa Wa l Mi raj 2014
FQI/RENARDET/138 Interim payment Application #04
Static load test Report for 1000mm
FQI/RENARDET/139 working pile #SOP 06
5/11/2014

Reference No

REN/FQI/CCC/108

Approved

Approved

Approved

Approved

Approved

Approved

Approved
REN/FQI/CCC/118

REN/FQI/CCC/120

Reference No.

Remarks

Upgrading of Falaj Al Qabail Roundabout


Monthly Progress Report May 2014

Page 32

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

PROGRESS PHOTOGRAPHS

Bed Preparation for Construction of Falaj in progress

Blinding Concrete for construction of Falaj in Progress

RENARDET S.A. & PARTNERS

Page 33

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Placing of Epoxy coated reinforcement for Falaj in Progress

Waterproofing of Completed Falaj

RENARDET S.A. & PARTNERS

Page 34

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Traffic Diversion in Detours

Traffic Diversion in Detours U Turn

RENARDET S.A. & PARTNERS

Page 35

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Removal of Existing Asphalt in Progress

Removal of Existing Asphalt in progress

RENARDET S.A. & PARTNERS

Page 36

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Bed Preparation for Blinding Concrete of Pile Cap in Progress

Blinding Concrete for Pile Cap in Progress

RENARDET S.A. & PARTNERS

Page 37

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Piles for Abutment No. 1 Completed to Ground Level

Placing of Reinforcement for Abutment Piles in Progress

RENARDET S.A. & PARTNERS

Page 38

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Pile Integrity Test in Progress

Curing of Pile Cap in Progress

RENARDET S.A. & PARTNERS

Page 39

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Protection of Reinforcement while Curing of Pile Cap in Progress

Waterproofing of Completed Pile Cap

RENARDET S.A. & PARTNERS

Page 40

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Placing of Reinforcement for Pier in Progress

Fixing of Shuttering for Pier in Progress

RENARDET S.A. & PARTNERS

Page 41

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Reinforcement Fixing in 44 Cells Box Culvert in Progress

Removal of Street Lighting Poles in Progress

RENARDET S.A. & PARTNERS

Page 42

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Unloading of Precast Box Culverts in Progress

Investigation of Underground Utilities in Progress

RENARDET S.A. & PARTNERS

Page 43

Upgrading of Falaj Al Qabail Roundabout

Monthly Progress Report May 2014

Pre-casting of New Jersey Barriers

Installation of Future Utility Ducts in Progress

RENARDET S.A. & PARTNERS

Page 44