Version NRB/4.1
Framework - BCA Green Mark for New Non-Residential Buildings (Version NRB/4.1)
To achieve Green Mark Award
Pre-requisite Requirement
All relevant pre-requisite requirements for the specific Green Mark Rating
are to be complied with
Air-con
Non
Air-con
General
EffectiveDate:15Jan2013NRB/1
Point Allocations - BCA Green Mark for New Non-Residential Buildings (Version NRB/4.1)
Category
(I)
Point Allocations
Minimum 30 points
42
Section (B) Applicable to
non air-con areas
excluding carparks and
common areas
12
30
35
20
55
6
12
12
20
61
116 (Max)
10
17
Minimum 20 points
10
42
7
Green Mark Score :
190 (Max)
EffectiveDate:15Jan2013NRB/2
90 and above
85 to < 90
75 to < 85
50 to <75
Air-Conditioned Buildings
(1) Building envelope design with Envelope Thermal Transfer Value (ETTV)
computed based on the methodology and guidelines stipulated in the Code
on Envelope Thermal Performance for Buildings and this Standard.
Green Mark GoldPlus ETTV of 42 W/m2 or lower
NRB 1-1
Thermal
Performance of
Building
Envelope
NRB 1-2(a)
AirConditioning
System
500
0.80
0.70
Gold
0.80
0.70
GoldPlus
0.70
0.65
Platinum
0.70
0.65
EffectiveDate:15Jan2013NRB/3
Related Criteria
NRB 1-2(b)
AirConditioning
System
500
0.90
Gold
0.90
Gold
Plus
Platinum
0.80
(2)
Not applicable
0.85
0.78
Important notes :
(1) The efficiency of the overall air-conditioning system shall meet its design system
efficiency as well as the corresponding minimum DSE stipulated for the respective
air-conditioning system and Green Mark rating during the building operating hours
specified below:
Office Buildings:
Monday to Friday : 9 a.m. to 6 p.m.
Hotels:
Monday to Sunday : 24 Hours
Retail Malls :
Monday to Sunday :10 a.m. to 9 p.m.
(2) For building with peak building cooling load of more than 500 RT, the use of air
cooled chilled-water plant or unitary air-conditioners are not applicable for Gold
and higher ratings. In general, the system efficiency of the air cooled central
chilled-water plant and other unitary air-conditioners are to be comparable with the
stipulated efficiency for water-cooled central chilled-water plant. Buildings that are
designed with air cooled systems and for higher Green Mark rating will be
assessed on a case by case basis.
(4) Instrumentation for monitoring the water cooled chilled-water plant efficiency
is to be provided in accordance with the requirement set in the criteria.
NRB 1-2(d)
AirConditioning
System
NRB 3-1
Sustainable
Construction
NRB 3-2
Sustainable
Products
EffectiveDate:15Jan2013NRB/4
NRB 1-4(a)(ii)
Natural
Ventilation
NRB 3-1
Sustainable
Construction
NRB 3-2
Sustainable
Products
Aggregate AirConditioned
2
Spaces (m )
Ventilation
Simulation
Requirement
See Note (a)
Energy
Modeling
Requirement
See Note (b)
Justification
on Energy
Savings
See Note (c)
2000
5000
Yes
Yes
No
< 2000
5000
No
Yes
No
2000
< 5000
Yes
No
Yes
< 2000
< 5000
No
No
Yes
Important Notes :
(a) Ventilation requirement stated paragraph (7) is a pre-requisite requirement to attain
Green Platinum rating.
(b) The stipulated energy savings and Design System Efficiency (DSE) of cooling
system stated in paragraph (2) and (3) are pre-requisites to attain Green Mark
Plus
and Platinum rating.
Gold
(c) Detailed calculations to be provided to justify the savings in energy consumption
from the use of salient energy efficient features /equipment. Energy savings will be
based on the energy efficiency measures and improvements over the reference
model established for similar building types. The reference ACMV system will be of
the same type as the proposed system. The baseline used for the equipment will
be in accordance with the minimum efficiency requirement stipulated in SS 530.
For VRF system, the baseline COP of 3.37 shall be adopted. The stipulated energy
Plus
and
savings stated in paragraph (2) are pre-requisites to attain Green Mark Gold
Platinum rating.
(d) Other pre-requisite stated paragraph (1), (4), (5), (6), (8) and (9) are applicable
where relevant.
EffectiveDate:15Jan2013NRB/5
(A) Applicable to Air-Conditioned Building Areas (with an aggregate air-conditioned areas > 500 m2)
PrerequisiteRequirement:
GreenMarkGoldPlusETTVof42W/m2orless
GreenMarkPlatinumETTVof40W/m2orless
PrerequisiteRequirements
Minimum Design System
Efficiency (DSE) for central
chilled-water plant
Water-Cooled Chiller
Chilled-Water Pump
Condenser Water Pump
Cooling Tower
Baseline
< 500 RT
0.70 kW/RT
0.80 kW/RT
PrerequisiteRequirementsforHigherGreenMarkRating:
GreenMarkGoldPlus&Platinum:MinimumDesignSystem
Efficiency(DSE)of0.65kW/RTforpeakbuildingcooling
load500RTand0.7kW/RTforpeakbuildingcooling
load<500RT
EffectiveDate:15Jan2013NRB/6
(A) Applicable to Air-Conditioned Building Areas (with an aggregate air-conditioned areas > 500 m2)
Baseline
< 500 RT
0.80 kW/RT
0.90 kW/RT
10 points for meeting the prescribed airconditioning system efficiency of 0.90 kW/RT
PrerequisiteRequirements
Minimum Design System
Efficiency (DSE) for air
cooled chilled-water plant or
unitary conditioners
PrerequisiteRequirementsforHigherGreenMarkRating:
GreenMarkGoldPlus:MinimumDesignSystemEfficiency
(DSE)of0.85kW/RTforpeakbuildingcoolingload<500RT
GreenMarkPlatinum:MinimumDSEof0.78kW/RTfor
peakbuildingcoolingload<500RT
Baseline
Air Distribution System Type
AHUs/FCUs 4kW
(Constant Volume)
AHUs 4kW
(Variable Volume)
Allowable Motor
Nameplate Power
(kW/m3/s)
(W/CMH)
1.7
0.47
2.4
0.67
No baseline
Baseline
AHUs 4kW
(Variable Volume)
(kW/m3/s)
(W/CMH)
1.5
0.42
2.1
0.58
0.6
0.17
(A) Applicable to Air-Conditioned Building Areas (with an aggregate air-conditioned areas > 500 m2)
1 point
1 point
1 point
Sub-Total (A) :
EffectiveDate:15Jan2013NRB/8
(B) Applicable to Non Air-Conditioned Building Areas (with an aggregate non air-conditioned areas > 10 % of
total floor area excluding carparks and common areas)
Weight
Group
Weight range
2
(kg/m )
Light
Medium
Heavy
Under 50
50 to 230
Over 230
Maximum
Thermal
Transmittance
2
(W/m K)
0.8
1.1
1.5
EffectiveDate:15Jan2013NRB/9
(B) Applicable to Non Air-Conditioned Building Areas (with an aggregate non air-conditioned areas > 10 % of
total floor area excluding carparks and common areas)
Baseline
Air Distribution System Type
(Up to 15 points)
Allowable Motor
Nameplate Power
(kW/m3/s)
(W/CMH)
1.7
0.47
AHUs/FCUs 4kW
(Constant Volume)
No baseline
Baseline
(kW/m3/s)
(W/CMH)
1.5
0.42
0.6
0.17
Sub-Total (B) :
EffectiveDate:15Jan2013NRB/10
(C) General
Points
Allocation
1
2
3
(Up to 3 points)
(b) Daylighting for the following common areas:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
Toilets
Staircases
Corridors
Lift Lobbies
Atriums
Carparks
EffectiveDate:15Jan2013NRB/11
(C) General
Toilets
Staircases
Corridors
Lift lobbies
Atrium
1 point
EffectiveDate:15Jan2013NRB/12
(C) General
Expected
Energy
Efficiency
Index (EEI)
Include
tenants
usage
Exclude
tenants
usage
30 kWh/m2/yr
5 points
3 points
< 30 kWh/m2/yr
3 points
1.5 points
(Up to 20 Points)
Condition : The points scored for renewable energy
provision shall not result in a double grade jump in the
GM rating (i.e. from GM Certified to GoldPlus or Gold to
Platinum rating).
Sub-Total (C) :
EffectiveDate:15Jan2013NRB/13
Excellent
Weightage
8
(Up to 10 points)
10
1 point
1 point
1 point
1 point
1 point
EffectiveDate:15Jan2013NRB/14
1 point
Points
Allocation
Points Allocation
0.70
0.60
0.50
0.40
0.35
PrerequisiteRequirement:
Minimumpointstobescoredunderthiscriterion:
GreenMarkGoldPlus3points
GreenMarkPlatinum5points
PrerequisiteRequirement:
Minimumscoreunderthiscriterion:
GreenMarkGoldPlus3points
GreenMarkPlatinum4points
Very
Good
Excellent
0.5
1.5
(Up to 8 points)
EffectiveDate:15Jan2013NRB/15
GnPR
0.5 to < 1.0
1.0 to < 1.5
1.5 to < 3.0
3.0 to < 3.5
3.5 to < 4.0
4.0
Points Allocation
1
2
3
4
5
6
1 point
1 point
1 point
1 point
1 point
1 point
1 point
EffectiveDate:15Jan2013NRB/16
1 point
1 point
(b)
1 point
1 point
EffectiveDate:15Jan2013NRB/17
1 point
1 point
1 point
1 point
EffectiveDate:15Jan2013NRB/18
EffectiveDate:15Jan2013NRB/19