21
2
344.00 m
AREA
und
cantidad
m3
30.12
1.16
833.0
S/.
S/.
S/.
243.60
15.35
7.11
S/.
S/.
S/.
7,336.13
214.90
5,922.63
98.42
2.7
S/.
S/.
15.95
2,493.04
S/.
S/.
1,569.83
6,806.39
und
2866.00
S/.
2.54
S/.
7,279.64
kg
kg
565
996
S/.
S/.
3.50
3.50
S/.
S/.
1,978.42
3,485.65
und
m2
26.24
S/.
50.00
S/.
1,311.98
344.0
S/.
28.22 S/.
9,707.68
hh
und
pie2
dia
P.U.
TOTALES
TOTAL
S/.
45,613.26
S/.
51,517.42
S/.
42,625.25
S/.
43,947.01
12
peones
mano de obra
4 operarios + 1
oficiales + 10 peon
13
321.96
hh
16.0
S/.
104.40
S/.
2,505.60
dia
2.0
S/.
1,699.28
S/.
3,398.56
m3
und
und
21.06
96
42
S/.
S/.
S/.
243.60 S/.
32.60 S/.
7.11 S/.
5,131.07
10,495.90
298.62
mano de obra
dia
1.9
S/.
1,173.12 S/.
2,241.96
und
und
184
24
S/.
S/.
38.75 S/.
19.37 S/.
7,130.00
464.88
Kg
Kg
108
126
S/.
S/.
3.50 S/.
3.50 S/.
379.06
441.70
und
m2
m2
26
S/.
50.00 S/.
1,311.98
344.0
344.0
S/.
S/.
14.60 S/.
28.22 S/.
5,022.40
9,707.68
16
2 operario +6 oficial +
2 peon
2
180 m /dia
RENDIMIENTO
6
mano de obra
peones
2 operario+ 1 oficial +
4 peon
7
1 oficial +2 peones
hh
dia
1
1.1
S/.
S/.
104.40 S/.
803.12 S/.
78.30
877.06
horas
S/.
366.40
366.40
S/.
TOTAL
dias
S/.
51,517.42
S/.
S/.
42,625.25
1,321.76
S/.
43,947.01
Tiempo de
duracion de la obra
5.0
dias
3.0
dias
S/.
S/.
149.76
$53.49
S/.
127.75
$45.63
7,570.41
Conclusiones
1
2
3
4
Para un rea de 344 m se consigue un ahorro de S/. 7570.41 nuevos soles, esto es 14.6% menos del Techo Convencional
El Ahorro en tiempo de ejecucin de la Losa aligerada es de : 2 das, en este caso concreto: 40% de ahorro en tiempo
El ahorro en peso de la losa es de 55 Ton. Esto es 53% menos del peso de la losa convencional y brinda mas seguridad ante un sismo
Es 32% mas resistente que el sistema convencional segn los ensayos de Flexion realizados en los lab de estructuras de la PUCP.