1
GENERAL
1.1
2.1
Definition
2.2
Abbreviations
STANDARDS
ENVIRONMENTAL CONDITIONS
GENERAL REQUIREMENTS
5.1
5.2
Tagging
EQUIPMENT CHARACTERISTICS
7.1
Mechanical requirements
7.2
Electrical Requirements
7.2.1
Converter
7.2.2
Measuring Instruments
7.2.3
Mimic Panel
7.2.4
Remote Monitoring
7.3
Distribution Board
7.4
Wiring
7.5
Overvoltage Protection
PAINTING
INSTALLATION
10
TESTS
10
10
11
ADDITIONAL INFORMATION
11
11
P a g e 3 of 11
2013
GENERAL
1.1
ILF-SPC-SRT-EL-808-0
07.11.2013
This specification defines the minimum requirements for the design, manufacturing, construction, installation, test and commissioning of DC power supply equipment in the new
Amman Strategic Reserve Terminal for Petroleum Products.
2.1
Definition
In the present document the following definitions were used. Their meaning is explained
in the table below.
2.2
Definition
Explanation
Client
Engineer
Contractor
Terminal
Abbreviations
Abbreviation
Explanation
LV
Low Voltage
DC
Direct Current
IEC
API, NEC
P a g e 4 of 11
2013
ILF-SPC-SRT-EL-808-0
07.11.2013
STANDARDS
The design, manufacturing, construction, installation, test and commissioning of DC
power supply shall be in accordance with the IEC/API and ISO standards.
The following standards shall be applied, at least:
API RP 540
API RP 500
EN 50110
IEC 60269
Low-voltage fuses
IEC 60439
IEC 60664
IEC 60715
IEC 60947
As far as the energy provider or permits of other authorities require additional codes and
standards, respectively impose additional requirements, these are also part of the contract.
In the case of the conflict between the various codes, standards and order, the most
stringent of the requirements shall generally govern. The Contractor shall refer any such
conflict and any other matter, which requires further interpretation, to the attention of the
Engineer and Clients interpretation shall be final.
All conflicts between the requirements of this specification, contract documents, data
sheets, or drawings shall be referred to Engineer for clarification before proceeding with
the fabrication of the affected parts.
ENVIRONMENTAL CONDITIONS
The DC power supply related components have to be designed and constructed for continuous operation at full load under the climatic and environmental conditions as described in the specification Design and Construction of Power Supply Systems.
P a g e 5 of 11
2013
GENERAL REQUIREMENTS
5.1
ILF-SPC-SRT-EL-808-0
07.11.2013
The Contractor has to take care that all components and equipment are selected considering easy maintenance, simple and quick diagnosis and long maintenance intervals.
All components and equipment shall be designed for continuous duty at rated load and
under the given climatic conditions. Standard industrial high performance systems and
components of suppliers standard lists shall be used as far as possible. Components
and equipment of same kind and type shall be selected for equivalent functions. The interchange ability must be guaranteed.
5.2
Tagging
All components, equipment and installations shall receive the respective tagging plates,
labels, etc., which have to be of extremely durable material resistant against the environmental conditions. Tagging plates or labels on fronts of enclosures shall be fixed with
screws.
converter,
distribution board.
DC power supply will be equipped with one or two redundant converter supplied from the
230/400V low voltage switchgear. (number of converters should depend on their duty).
During normal network conditions the DC consumers will be supplied via the converter
circuit connected to 230VAC UPS network. Therefore no additional batteries are required
for 24VDC system
P a g e 6 of 11
2013
EQUIPMENT CHARACTERISTICS
7.1
Mechanical requirements
ILF-SPC-SRT-EL-808-0
07.11.2013
The DC power supplies equipment shall be industrial type, metal enclosed, factory assembled, mountable into standard self-standing cabinets
7.2
Electrical Requirements
7.2.1
Converter
The DC power supply shall be equipped with a converter. The converter shall be suitable
to supply all connected consumers, and shall function as an isolating transformer (with
appropriate certificate and marking)
The converter shall be designed for operation with natural air cooling. If forced air-cooling
is required, then 2 x 100 % fans with monitoring and alarm signal (local and remote) shall
be provided.
Each converter set shall mainly consist of the following:
indicator board for all signals of the system (mounted in the door of the cabinet).
For indication of signals for the systems one indicator board can be used.
The converter shall be equipped with the following supervisory devices:
7.2.2
Measuring Instruments
The DC power supply shall be equipped with the following measuring instruments:
P a g e 7 of 11
2013
7.2.3
ILF-SPC-SRT-EL-808-0
07.11.2013
Mimic Panel
For the DC power supply a coloured mimic panel shall be provided. The mimic panel/diagram shall show the main power circuit with all necessary switch positions, device
symbols and important alarms.
All measuring instruments shall be allocated to the respective symbols of devices. The
signals which are incorporated in the mimic panel may not be indicated on the indicator
boards.
7.2.4
Remote Monitoring
For remote monitoring to station control system the following signals shall be wired on
terminal strip:
The transfer of the mentioned signals shall be carried out via potential free contacts.
7.3
Distribution Board
For each DC power supply a distribution board shall be provided.
The distribution board shall be located in a separated part of the converter cabinet. If the
cabinet is not sufficient for distribution board installation or if inside of the cabinet there is
no space, a separate cabinet shall be foreseen.
The distribution boards shall be equipped with 2-pole miniature circuit breaker, sized according to the requirements and with the respective terminal stripes. For future extension
each distribution board shall have at least 20 % full installed spare and further 20 %
spare place to install additional devices.
In addition, the bus bars of distribution boards shall be equipped with the following
measuring instruments:
Voltmeter
P a g e 8 of 11
2013
7.4
ILF-SPC-SRT-EL-808-0
07.11.2013
Wiring
The wires shall be selected according to load, insulation level, function and operating requirements. The wires shall be adequately rated and equipped with fuses/circuit breakers
of adequate size.
The wiring colours and the minimum cross sections shall be according to specification
Design and Construction of Power Supply System.
The wiring shall be carried out solid and safe against damages. Wires shall be bundled
and fixed. The wiring shall be laid inside of wiring channels, preferably. If wiring channels
will be used, a spare of 20 % shall be foreseen for connection of future tanks.
All circuits and auxiliary contacts shall be terminated on terminal strips. Terminal strips
shall have at least 10 % spare terminals. If wires with different potential will be terminated on one terminal strip the respective terminals shall be separated by means of isolating
plates. The termination of multiple stranded wires has to be carried out by means of multiple core cable ends.
Terminals shall be marked durable and easy readable, corresponding to the drawings.
Wires shall be marked on the termination of each wire with the number of the corresponding connection point.
7.5
Overvoltage Protection
The DC power supply shall be designed in a manner such that overvoltage caused by
switching and flashes, do not impair the safety in operation of the units.
The incomers of DC power supply and the bus bar of the distribution board shall be
equipped with additional overvoltage protectors. The electronic devices shall be separately protected against overvoltage.
PAINTING
All appropriate components and devices shall have a resistant, long term stable, high
quality painting (as per approved color code). Damages, caused by transport, installation, cabling or commissioning shall be repaired in a way, that the original quality is restored.
INSTALLATION
The delivery, installation and commissioning of the DC power supply equipment shall include, but not limited to the following items:
P a g e 9 of 11
2013
ILF-SPC-SRT-EL-808-0
07.11.2013
grounding and potential equalisation for the parts, including connection with
the next grounding bus bars,
briefing of the operation personnel in operation and maintenance during installation and commissioning phase and during a training on site.
The installation and as well the tests and the commissioning shall be carried out with
Contractors own staff and with own tools and measuring/test devices.
10
TESTS
10.1
Workshop Tests
All components of the DC power supply system shall be tested completely and detailed
in manufacturers workshop. All tests required by the codes and standards as well as all
manufactures tests have to be performed.
The test program for the work shop test has to be submitted at least 3 weeks prior to
start of the tests.
The following tests shall be performed, at least:
Detailed test protocols of all tests performed have to be submitted prior to installation.
ILF CONSULTING ENGINEERS
P a g e 10 of 11
2013
10.2
ILF-SPC-SRT-EL-808-0
07.11.2013
Site Tests
The site tests shall include the following steps:
test runs
performance test.
The aim of the tests is to ensure the proper function of the complete scope of delivery.
11
ADDITIONAL INFORMATION
For documentation requirements, shipping instructions, spare parts policy refer to document: Design and Construction of Power Supply Systems - Specification.
P a g e 11 of 11
2013