You are on page 1of 89

Month: Februarie / February

Year:
2013

Day

Date

Days
Worked

Arr

Dep

Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break
Cumul

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)
Work Description

Fr

Sa

Su

Mo

Tu

1
1

9.00

18.30 15,30-17,00

8.00

We

9.00

18.30 15,30-17,00

8.00

Th

9.00

18.30 15,30-17,00

8.00

Analisis of the first 15teen most important items

9.00

18.30 15,30-17,00

8.00

Acknowlegde the Technical Design

Acknowledge the Contract 5R2


Acknowledge the Contract, BoQ, Price
description

Fr

Sa

Su

10

Mo

11

9.00

18.30 15,30-17,00

8.00

1
1
1
1

9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30

15,30-17,00
15,30-17,00
15,30-17,00
15,30-17,00

8.00
8.00
8.00
8.00

GI - Overview, LOT 6 - centralizare articole


(oscar)
LOT 6 - centralizare articole (oscar)
LOT 6 - centralizare articole (oscar)
LOT 6 - centralizare articole (oscar)
LOT 6 - centralizare articole (oscar)

1
1
1
1
1

9.00
9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30
18.30

15,30-17,00
15,30-17,00
15,30-17,00
15,30-17,00
15,30-17,00

8.00
8.00
8.00
8.00
8.00

LOT 6 - centralizare articole (oscar)


LOT 6 - centralizare articole (oscar)
LOT 6 - centralizare articole (oscar)
LOT 6 - centralizare articole (oscar)
LOT 6 - centralizare articole (oscar)

Tu

12

We

13

Th

14

Fr

15

Sa

16

Su

17

Mo

18

Tu

19

We

20

Th

21

Fr

22

Sa

23

Su

24

Mo

25

9.00

18.30 15,30-17,00

8.00

Tu

26

We

27

1
1

9.00
9.00

18.30 15,30-17,00
18.30 15,30-17,00

8.00
8.00

9.00

18.30 15,30-17,00

8.00

Th

TOTAL

28

18
Summary of Days Worked To Date

Contract
TOTAL

Previous
Month

This Month

18

5R3 - pregatire IPS 03 / PV predare


echipamente IT / Pregatire foi evident GI/
Pregatire foi evidenta Bill 2
IPS 03 - Pregatire foi evidenta Bill 3
IPS 03 - Pregatire foi evidenta Bill 4, IPS 03,
IPS 03, LOT 6 - Documente Suport VO-uri
(oscar)

144.00
Cumulated

18

Employee's Signature

Project Manager

Crlig C-tin

Antonio Jose Seve Martin

Date:
2/28/2012

Date:
2/28/2012

Date:
2/28/2012

OBS.

Month: Martie / March


Year:
2013

Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)

Day

Date

Days
Worked

Arr

Fr

9.00

18.30 15,30-17,00

8.00

Planning future activities / Cost analisys Retaing Walls, Slope Reinforcements / LOT 6
- additions on claim items (OSCAR)

Sa

Su

Mo

9.00

18.30 15,30-17,00

8.00

Start Working On Breakdowns - Planning /


LOT 6 - additions on claim items (OSCAR)

Tu

9.00

18.30 15,30-17,00

8.00

Dep

Cumul

We

9.00

18.30 15,30-17,00

8.00

Th

Fr

1
1

9.00
9.00

18.30 15,30-17,00
18.30 14,00-15,00

8.00
8.00

9.00
9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00
8.00

Sa

Su

10

Work Description

Working On Breakdowns - Planning (Microsoft


Project) / Building the format for breakdowns /
Internal Weekly Meeting / Building the
pursuance sheets for 5R3 items
Breakdowns CO 01f (Retaing wall) - base for
discution / Breakdown Concrete - discution
Base / Building the pursuance sheets for 5R3
items / LOT 6 - additions on claim items
(OSCAR)
IPS 03
IPS 03 / Letter to Engineer (IPS 02)

Mo

11

Tu

12

We

13

1
1
1

Th

14

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

Breakdowns CO 04 - case study


Breakdowns CO 04
IPS 03
IPS 03 / Preparing List of Reports that was to
be performed by the Contractor for 5R3 (along
with ms. Guran)
IPS 03 /

1
1
1
1
1

9.00
9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30
18.30

14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00

8.00
8.00
8.00
8.00
8.00

IPS 03
IPS 03
IPS 03 - sent to engineer
ITEM LIST PREPARATION - bridges
ITEM LIST PREPARATION - bridges

ITEM LIST PREPARATION - bridges


ITEM LIST PREPARATION - bridges
MONTHLY MEETING / ITEM LIST
PREPARATION - bridges
DAILY JOURNAL / MONTHLY REPORT OF
PERSONEL AND MACHINES
IPS 04 - UPDATE GI / UPDATE LIST OF
CORESPONDENCE OF CLAIMS / IPS 04

Fr

15

Sa

16

Su

17

Mo

18

Tu

19

We

20

Th

21

Fr

22

Sa

23

Su

24

Mo

25

Tu

26

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

We

27

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

Th
Fr

28

Sa

29
30

Su

31

TOTAL

21
Summary of Days Worked To Date

Contract
TOTAL

Previous
Month

This Month

168.00
Cumul

18

21

39

Employee's Signature

Project Manager

Crlig C-tin

Antonio Jose Seve Martin

Date:
3/29/2013

GRAL DESIGN S.R.L.


rlig Constantin - Florin
TY SURVEYOR (5R3)
OBS.

Month: Aprilie / April


Year:
2013

Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break

Date

Days
Worked

Arr

Mo

9.00

18.30 15,30-17,00

8.00

1
1
1
1

9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30

15,30-17,00
15,30-17,00
15,30-17,00
14,00-15,00

8.00
8.00
8.00
8.00

9.00
9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00
8.00

Day

Dep

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)
Work Description

Cumul

Sa
Su

Tu

We

Th

Fr

Sa

Su

Mo

Tu

We

10

1
1
1

Th

11

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

Fr

12

Sa

13

Su

14

Mo

15

9.00

18.30 14,00-15,00

8.00

Tu

16

9.00

18.30 14,00-15,00

8.00

We

17

9.00

18.30 14,00-15,00

8.00

Th

18

Fr

19

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

Sa

20

Su

21

Mo

22

9.00

18.30 14,00-15,00

8.00

Tu

23

9.00

18.30 14,00-15,00

8.00

We

24

Th

25

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

9.00

18.30 14,00-15,00

8.00

Fr
Sa

26
27

Su

28

Mo

29

9.00

18.30 14,00-15,00

8.00

Tu

30

9.00

18.30 14,00-15,00

8.00

TOTAL

22
Summary of Days Worked To Date

Contract
TOTAL

Previous

This Month

39

22

IPS 04 - UPDATE LIST OF


CORESPONDENCE
Checking daily journal / Meeting
View over technical Drawings /
View over technical Drawings /
Monthly Report -

IPS 04
IPS 04
IPS 04
IPS 04 / FOTO REPORT 1 - APRIL /
Identification of existing Billboards
IPS 04 - IPS 03 Joit

IPS 04 / UPDATE LIST OF


CORESPONDENCE
IPS 04 / ELECTRICAL RELOCATION CEZ
ANALYSIS
PRINT, LETTER, BOUND - IPS 04,
BREAKDOWN CO 04,
BREAKDOWN CO 04, CO 13a
BREAKDOWN CO 13a

BREAKDOWN CO 13a, Culvert 94+698


BREAKDOWN CO 04, CO 13a, CO 13b, IPC
18 - Caransebe Bypass
IPC 18 - Caransebe Bypass
TIMIOARA - DRDP IPC 18 for Approval
VO 11 - LOT 6 Caransebe Bypass - List of
Overpass Quantites / Starting to gather
supporting documents

VO 11 - LOT 6 Caransebe Bypass Supporting documents


VO 11 - LOT 6 Caransebe Bypass Supporting documents

176.00
Cumul

61

Employee's Signature

Project Manager

Crlig C-tin

Antonio Jose Seve Martin

Date:
5/2/2013

GRAL DESIGN S.R.L.


rlig Constantin - Florin
TY SURVEYOR (5R3)
OBS.

Month: Mai / May


Year:
2013

Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break

Day

Date

Days
Worked

Arr

We

8.00

17.30 14,00-15,00

4.00

Th

9.00

18.30 15,30-17,00

8.00

Fr

9.00

18.30 14,00-15,00

8.00

Sa

Dep

Cumul

Su

Mo

Tu

9.00

18.30 14,00-15,00

8.00

We

9.00

18.30 14,00-15,00

8.00

Th

9.00

18.30 14,00-15,00

8.00

Fr

10

9.00

18.30 14,00-15,00

8.00

Sa

11

Su

12

Mo

13

9.00

18.30 14,00-15,00

8.00

Tu

14

9.00

18.30 14,00-15,00

8.00

We

15

Th

16

1
1
1

9.00
9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00
8.00

EASTER

Fr

17

Sa

18

Su

19

Mo

20

Tu

21

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

We

22

9.00

18.30 14,00-15,00

8.00

Th

23

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

8.00

Fr

Sa

24
25

Su

26

Mo

27

9.00

18.30 14,00-15,00

1
1
1
1
22

9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30

Tu

28

We

29

Th

30

Fr

31

TOTAL

14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00

8.00
8.00
8.00
8.00
172.00

Summary of Days Worked To Date


Contract
TOTAL

Previous

This Month

61

22

Cumul

83

Employee's Signature

Project Manager

Crlig C-tin

Antonio Jose Seve Martin

Date:
5/31/2013

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)
MONTHLY TIME SHEET
Work Description

VO 11 - LOT 6 Caransebe Bypass - Supporting


documents
VO 11 - LOT 6 Caransebe Bypass - Supporting
documents
VO 12 - LOT 6 Caransebe Bypass - Supporting
documents

VO 12, VO 13 - LOT 6 Caransebe Bypass - Summary


Text
Find, read, study OG 43/1997, HG 84/02.02.2011 - on
Caransebe Bypass - Issue
Meeting at UM 01440 - Caransebes, LOT6
VO 12, VO 13 - LOT 6 Caransebe Bypass - Summary
Text

VO 12, VO 13 - LOT 6 Caransebe Bypass - Final


checkings, Scan, Print, Bound, Copy, Letters / IPC 19 LOT 6
VO 10 - preparation, sent to G. Rice / IPC 18 preparation an electronical copy for Mr. Borlovan, sent /
IPC 19 - LOT 6
Preparing IPC 19 - LOT 6
Preparing IPC 19 - LOT 6
Preparing IPC 19 - LOT 6

Preparing IPS 05 - 5R3


Preparing IPS 05 - 5R3
Preparing to send IPS 05 - 5R3/ Breakdown GI 01 - 5R3
/ LOT 6 - IPC 19 - Escalation
Caransebes - Meeting LOT 6
Draft letter VO10 (for David Saiz) / Scanat VO11 documente justificative / Telefon DRDP Timisoare GI11 si
GI12 / Recomandation Letter COPISA CONSTRUCTII
SA - Draft / Scrisoare - Neconformitati LOT 6 - Borlovan

Recomandation Letter Copisa Constructii / Draft Letter to


DRDP Timisoara - Maintenance 5r3 / IPS 06 - 5r3
IPC 02 - 5r3
IPC 02 - 5r3 - finalised to be send
IPS 06 - 5r3 - prepared and ready to send
IPC 02 - version 2 - preparation and ready to send.

OBS.

Project Manager

Antonio Jose Seve Martin

Month: Iunie / June


Year:
2013

Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break

Day

Date

Days
Worked

Arr

Mo

9.00

18.30 14,00-15,00

8.00

Dep

Cumul

Tu

We

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

Th

9.00

18.30 14,00-15,00

8.00

Fr

9.00

18.30 14,00-15,00

8.00

Sa

Su

Mo

10

9.00

18.30 14,00-15,00

8.00

Tu

11

9.00

18.30 14,00-15,00

8.00

We

12

9.00

18.30 14,00-15,00

8.00

Th

13

9.00

18.30 14,00-15,00

8.00

Fr

14

9.00

18.30 14,00-15,00

8.00

Sa

15

Su

16

Mo

17

9.00

18.30 14,00-15,00

8.00

Tu

18

9.00

18.30 14,00-15,00

8.00

We

19

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

Th
Fr

20

Sa

21
22

Su

23

Mo

24

9.00

18.30 14,00-15,00

8.00

Tu

25

We

26

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

9.00

18.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

Th

27

Fr
Sa

28
29

Su

30

TOTAL

20
Summary of Days Worked To Date

Contract
TOTAL

160.00

Previous

This Month

Cumul

83

20

103

Employee's Signature

Project Manager

Crlig C-tin
Date:
7/2/2013

Antonio Jose Seve Martin

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)
MONTHLY TIME SHEET
Work Description

MEETING 5R3 in TG JIU/ IPC 19 - LOT 6 with DRDR


Timisoara
IPC 19 - LOT 6 with DRDR Timisoara
IPC 19 - LOT 6 with DRDR Timisoara
Summary LOT 6 - issues to be clariffied / Send
recomandation to G. Rice / Send Vo 12 and Vo 13 to G.
Rice / Resend IPC 2 - 5r3 to Hugh MM, Hyder's RE and
QS / Papers for bridges payed on LOT 6 (expasion
joints)
VO 11 - clarifications

Make a copy of IPS 19 - LOT 6 for CNADNR.


Site visit with Owner of the Electrical Cables for
identification
Craiova - for IPC 02
IPS 06 - supplementary docs , revision according with
the yesterday meeting, also IPC 02 - 5r3 ,
VO 12 AND VO 13, BREAKDOWNS

Went to Caransebes, meeting with mr Orbulesc to


prepare the tomorrow meeting
Went to Caransebes, meeting with mr Borlovan, clariffing
parapets, carriage gutter, cleaning river bed, coating
slopes on water course regularization
Monthly meeting - TG Jiu, meeting with Hyder's QS
Processing data from Monday and Thusday caransebes
Breakdowns - culverts

Finalised VO 12 - support papers, copies, calculation


roundabouts lightining
VO 12 - left from yesterday
Breakdowns / Meeting with Mr. Diaconu at Lainici
Tg Jiu - Finalising IPC 02 with QS Hyder and RE Hyder
Preparing IPC 02 to be sent (scanner, copies, packaging)
/ Start to print support documents for VO 11 - copy 2 and
copy 3

Project Manager

OBS.

Antonio Jose Seve Martin

Month: Iulie / July


Year:
2013

Contract Number:
Name of Company:
Employee's Name:
Title:

MONTHLY TIME SHEET


Iulie / Julio / July 2013

Hour
Break

Day

Date

Days
Worked

Arr

Mo

9.00

18.30 14,00-15,00

8.00

Tu

9.00

18.30 14,00-15,00

8.00

We

9.00

18.30 14,00-15,00

8.00

Th

9.00

18.30 14,00-15,00

8.00

Fr

9.00

18.30 14,00-15,00

8.00

Sa

Su

Mo

9.00

20.30 14,00-15,00

8.00

Tu

9.00

18.30 14,00-15,00

8.00

We

10

9.00

18.30 14,00-15,00

8.00

Th

11

9.00

20.30 14,00-15,00

8.00

Fr

12

9.00

18.30 14,00-15,00

8.00

Sa

13

Su

14

Mo

15

9.00

20.30 14,00-15,00

8.00

Tu

16

9.00

20.30 14,00-15,00

8.00

We

17

9.00

19.30 14,00-15,00

8.00

9.00

18.30 14,00-15,00

8.00

9.00 18.30 14,00-15,00


10.00 14.00

8.00
4

Th
Fr
Sa

18
19
20

Dep

10.30 15.30

Cumul

Su

21

Mo

22

9.00

18.30 14,00-15,00

8.00

Tu

23

9.00

18.30 14,00-15,00

8.00

We

24

9.00

18.30 14,00-15,00

8.00

Th

25

Fr

9.00
9.00

18.30 14,00-15,00
18.30 14,00-15,00

8.00
8.00

Sa

26
27

1
1

Su

28

Mo

29

Tu

30

We

31

TOTAL
Contract
TOTAL

1
9.00 18.30 14,00-15,00
1
9.00 18.30 14,00-15,00
1
9.00 18.30 14,00-15,00
23
Summary of Days Worked To Date
Previous

103
Employee's Signature

Crlig Constantin-Florin
Date:
7/25/2013

This Month

8.00
8.00
8.00
193.00
Cumul

23
126
General Manager
Antoni Ronda i Rodriguez

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)

MONTHLY TIME SHEET


Iulie / Julio / July 2013

Work Description

Preparing IPC 02 to be sent (scanner, copies, packaging)


/ Start to print support documents for VO 11 - copy 2 and
copy 3
VO 12 AND 13 - PREPARATION TO BE SENT ON
COPISA's office Bucharest / Prepare cover sheet for VO
11 items /
IPS 07 / VO 12 and VO 13 - talk with G .Rice / VO 11 cover sheets for VO 11
Writing VO 11 / daily mesurements for 5R3 - culverts /
removal existing pavement / demolition of existing
concrete guard rails / demolition of existing retainig wall
VO 11 / 5R3 - daily mesurements

IPC 18 / IPC 19 CLARIFICATIONS FOR MARIUS


PIRNUTA / SEND IPC 02 - 5R3 at CNADNR
VO 12 AND 13 - clarification woth Marius Pirnuta / 5r3 daily mesurements
Send VO 11 cover sheets at DRDP Timisoara for
Signature and Revision (if the case)
Bound VO 11, copies, prepare to be send on Bucharest /
Daily mesurements for 5r3
VO 11 sent on Bucharest / Clarification on VO 11, 12 and
13 with Mirela Tanase / Covering letters for VO 11, 12
and 13
Daily Mesurements 5r3
Follow the Vo 11, 12 and 13 - talk with Marius Pirnuta,
Mirela Tanase, Dragos Enasescu, mr. Borlovan / Daily
Mesurements for 5r3
Follow the Vo 11, 12 and 13 - talk with Marius Pirnuta
and Mirela Tanase / Daily mesurements on 5r3 / Prepare
supporting documents for GI 01 / Breakdown GI 01
Went to sign PV for GI 11 june 2013 Livezeni and Meri
Districts / Daily evidence af works 5R3 - Culverts /
Forwarding letters GI 11 and GI 01 / Start working on VO
14 - Royalty Mining - priority Zero.
Finalising BD for GI 01 / Working on VO 14 - Royalty
Mining - written section
Working on VO 14 - Royalty Mining - tables finished
Daily Mesurements 5r3

OBS.

Working on VO 14 - Find supporting documents, put


them togethr, copy, forder them - prepare to be sent to
COPISA Bucharest / Daily mesurements on Culverts 5R3
VO 14 - copy, forder them - prepare to be sent to
COPISA Bucharest / Daily mesurements on Culverts 5R3
Went to Bucharest with IPC 01 - 5R3 / Change table for
VO14
IPC 19 - add VO14 and finalising guard rails
5R3 - DAILY MESUREMENTS

5R3 - DAILY MESUREMENTS


5R3 - DAILY MESUREMENTS
5R3 - DAILY MESUREMENTS

Project Manager

Antonio Jose Seve Martin

Month: August / August 2013


Year:
2013

Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
August / Agosto / August 2013
Hour
Break

Days
Worked

Arr

Dep

1
1

9.00
9.00

18.30
18.30

14,00-15,00
14,00-15,00

8.00
8.00

9.00

20.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

20.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa
Su

10
11

Mo

12

9.00

20.30

14,00-15,00

8.00

Tu

13

9.00

20.30

14,00-15,00

8.00

We

14

9.00

19.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

Day

Date

Th

Fr

Sa

Su

Mo

Th

15

Fr

Cumul

Sa

16
17

Su

18

Mo

19

9.00

18.30

14,00-15,00

8.00

Tu

20

9.00

18.30

14,00-15,00

8.00

We

21

9.00

18.30

14,00-15,00

8.00

Th

22

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

Fr
Sa

23
24

Su

25

Mo

26

9.00

18.30

14,00-15,00

8.00

Tu

27

9.00

18.30

14,00-15,00

8.00

We

28

Th

29

1
1

7.30 11.30
15.30 19.30

4.00
4.00

Fr

30

TOTAL
Contract
TOTAL

1
9.00 18.30 14,00-15,00
22
Summary of Days Worked To Date
Previous

126
Employee's Signature

Crlig Constantin-Florin
Date:
8/29/2013

This Month

8.00
168.00
Cumul

22
148
General Manager
Antoni Ronda i Rodriguez

S.C. INTEGRAL DESIGN S.R.L.


Crlig Constantin - Florin
QUANTITY SURVEYOR (5R3)

MONTHLY TIME SHEET


August / Agosto / August 2013
Work Description

Daily measurement 5r3 / Materials on site


Construction book - LOT 6 / IPS 07 - Estimation

Construction book - LOT 6 / IPS 07 - Daily


measurements - culverts
Construction book - LOT 6 / IPS 07 - Daily
measurements - demolition of existing retaing walls and
existing guard-rails
Construction book - LOT 6 / IPS 07 - Daily
measurements - removal of the existing pavement
Construction book - LOT 6 / IPS 07 - Daily
measurements - explozion
Deva - With Juan Obradors / IPS 07 - Advance Payment
- First Instalment - the above IPS 07 will become IPS 08

IPS 07 - Advance Payment - 1st instalment arrangement to be sent / Gault Rice returnal to Romania
- arange for VO 14 to be signed / IPS 08 - daily
mesurements
IPS 08 - daily measurements E08-1/E08-3 - Prepare
draft letters for ... Asking payment for IPC 01
VO 11 - sent editable format to M. Pirnuta / Site visit
Daily measurement 5r3 / Materials on site / Culverts /
Reading claim letters from Clive Horridge
Report to David - IPC 19, VO11, VO12, VO13, VO14 /
Daily measurements - preparing table for works on 5R3

G. Rice - VO14 - Telephone/Push for VO14 (until the end


of the week will have an answer) / Ask M. Pirnuta about VO11, VO12, VO13
Answer M- Pirnuta's e-mail with clarifications regardind
VO11
Draft letter - IPC 19 COPISA - CNADNR and DRDP
Timisoara
IPs 08
BD GI 01 - Arsin / Culverts table evidence of Justification
and Comparation with Fisical Status / Ips 08 / VO 11 H018 - clarifications for CNADNR

IPS 08 - daily measurements - culverts / Materials on site


IPS 08 - daily measurements - culverts / Materials on site
/ Cutting trees / LOT 6 - VO 12 / VO 13
IPC 08 - daily measurement - culverts / Materials
IPC 08 - daily measurement - culverts / Materials

OBS.

VO 12 - VO 13 - VO 14 - clarifications

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

September / Septiembre / Septembrie


2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


September / Septiembre / Septembrie
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa
Su

7
8

Mo

9.00

18.30

14,00-15,00

8.00

Tu

10

9.00

18.30

14,00-15,00

8.00

We

11

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14.00-15.00

8.00

Th
Fr

12
13

Sa

14

Cumul

Su

15

Mo

16

9.00

18.30

14,00-15,00

8.00

Tu

17

9.00

18.30

14,00-15,00

8.00

We

18

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

1
1

9.00
9.00

18.30 14,00-15,00
18.30 14.00 - 15.00

8.00
8.00

Th
19
Fr
Sa

20
21

Su

22

Mo

23

9.00

18.30

14,00-15,00

8.00

Tu

24

9.00

18.30

14,00-15,00

8.00

We

25

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

Th
26
Fr
Sa

27
28

Su

29

Mo

30

TOTAL
Contract
TOTAL

1
9.00 18.30 14,00-15,00
23
Summary of Days Worked To Date
Previous

148
Employee's Signature

Crlig Constantin-Florin
Date:
10/1/2013

This Month

8.00
184.00
Cumul

23
171
General Manager
Antoni Ronda i Rodriguez

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013

TIME SHEET / HOJA DE ASISTENCIA MENSUAL


September / Septiembre / Septembrie
Work Description

IPS 08 - Daily Program - Monthly Report


IPS 08 - Materials on site - Daily Program - Monthly Report - Explosion
110+930 - Answer to G. Rice regarding VO14
Daily measurements - curverts - Clarifications VO14 - Daily Program Monthly Report
IPS 08 - Daily measurements - materials - Clarifications VO14 - Daily
Program - Monthly Report
IPS 08 - Daily measurements - Clarifications VO14 - Daily Program Sent - Monthly Report - august 2013 - Sent IPS 08
LOT 6 - Earth Filling - Materials Tests - Daily Activity Program - Daily
Journal
VO 14 - clarifications / IPS 08 - more attachments - Daily Activity
Program
Targu Jiu - IPS 08 - Daily Activity Program
Update Culverts - Prepare IPS 09 - Advance Payment - Daily Activity
Program
VO 14 - draft letter from G. Rice - Analisys / IPS 08 - more
attachments / Daily Activity Program / Daily Journal
VO 14 - preparing clarifications for VO 14 - tables of excavations /
summary of bad quality of earth excavated on LOT 6
IPS 08 - clarificari / Daily Activity Program
VO 12 - clarifications / Update Culverts / Daily Activity Program / Daily
Journal
VO 12 and VO 13 clarifications / Update Culverts / Daily Activity
Program / Daily Journal / IPS 08 - print support documents culverts
VO 12 and VO 13 clarifications - counting verical signals and clarifying
horisontal marking an Marius Pirnuta comments / Update Culverts /
Daily Activity Program / Daily Journal
At Trgu Jiu at Engineer's QS for IPS 08
Final clarifications and preparations for Monday IPC 19 - LOT 6
At Timisoara with IPC 19 - Daily Activity Program
LOT 6 - IPC 19 updating final clarifications from yesterday / DN 66 Daily Activity Program
Breakdown C02-2 / C02-2' / Demolition / Excavation / Formworks /
Concrete C8/10, C12/15 / Placing Precasted tipe P2 / Mortar M100 /
Waterproof - Orisontal and Vertical / Drain /
Daily Activity Program / Daily Site Journal / Support Documents
Culverts IPS 08
Clarification for IPS 08 - DN 66 / Minutes of GI - DN 66 - for the
following IPS / Input new dates received from DRDP Timisoara - LOT 6
IPC 19 - Riverbed cleaning / Site daily journal / Daily Activity Program /
Select pictures from site - Ernest-Dorian-Bob /
DN 66 - BD culverts / Photo monthly Report - started / Daily Activity
Program

OBS.

At Tg Jiu - DN 66 - IPS 08 issues

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Octombrie / Octubre / October


2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Octombrie / Octubre / October
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Tu

9.00

18.30

14,00-15,00

8.00

We

Th

1
1

9.00
9.00

18.30
18.30

14,00-15,00
14,00-15,00

8.00
8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa
Su

5
6

Mo

9.00

18.30

14,00-15,00

8.00

1
1
1
0.5

9.00
9.00
9.00
9.00

18.30
18.30
18.30
13.00

14,00-15,00
14,00-15,00
14,00-15,00

8.00
8.00
8.00
4.00

1
1
1
1
1
0.5

9.00
9.00
9.00
9.00
9.00
11.00

18.30
18.30
18.30
18.30
18.30
18.30

14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14.00-15.00

8.00
8.00
8.00
8.00
8.00
4.00

Tu

We

Th

10

Fr

11

Sa

12

Su

13

Mo

14

Tu

15

We

16

Th

17

Cumul

Fr

18

Sa

19

Su

20

Mo

21

9.00

18.30

14,00-15,00

8.00

Tu

22

9.00

18.30

14,00-15,00

8.00

We

23

9.00

18.30

14,00-15,00

8.00

Th

24

9.00

18.30

14,00-15,00

8.00

Fr

25

9.00

18.30

14,00-15,00

8.00

Sa

26

Su

27

Mo

28

9.00

18.30

14,00-15,00

8.00

Tu

29

9.00

18.30

14,00-15,00

8.00

We

30

9.00

18.30

14,00-15,00

8.00

Th

31

9.00

18.30

14,00-15,00

8.00

TOTAL

23
Summary of Days Worked To Date

184.00

Contract
TOTAL

Previous

171
Employee's Signature

Crlig Constantin-Florin
Date:
10/31/2013

This Month

Cumul

23
194
General Manager
Antoni Ronda i Rodriguez

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Octombrie / Octubre / October
Work Description

Preparation Breakdown CULVERTS V2 / Culvers daily update / Daily


site journal / Daily activity program
Preparation Breakdown CULVERTS V3 / At Tg Jiu with IPS 08
At Tg Jiu with IPS 08 / Daily site journal / Daily activity program
Update culverts summary / Photographic report / Daily site journal /
Daily activity program
Monthly Report / Culvers / IPS 10 / Daily site journal / Daily Activity
Program
Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
IPS 08 / Daily site Journal / Daily Activity Journal

Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal


Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
Tg Jiu - IPS 08 / Daily site Journal / Daily Activity Journal
IPC - IPS 08 - Update culverts summary / Photo monthly report
IPC - IPS 08 - Update culverts summary
Tg Jiu - IPC 03 / Summary list for mr. Chesnoiu /Daily site Journal /
Daily Activity Journal
Preparation IPS 10 - september / Daily site journal / Daily Activity
Journal
LOT 6 - dragos enasescu visit - VO11-VO12-VO09(Valea Mica) / Daily
site Journal / Daily activity Program / Daily measurements culverts /
Ips 10 - Gi / Daily site Journal / Daily activity Program / Daily
measurements culverts /

Meeting Tg Jiu 5r3 - IPS nr.08 - respond to the queries on rejection


letter of IPS 08 / / Daily site Journal / Daily activity Program /
Build IPS 10 - culverts - situation of Missing Supporting Documents / /
Daily site Journal / Daily activity Program /
Ips 10 - culverts / LOT 6 - Marius Pirnuta queries on LOT 6 VO 12 AND
VO13 / Daily site Journal / Daily activity Program / Daily measurements
culverts /
Ips 10 - print / Answer to querries regarding Materials on site IPS 08 5r3
/ Daily site Journal / Daily activity Program / Daily measurements
culverts /

OBS.

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Noiembrie / Noviembre / November


2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Noiembrie / Noviembre / November
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Fr

9.00

18.30

14,00-15,00

8.00

Sa
Su

2
3

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

9.00

18.30

14.00-15.00

8.00

Su

10

Mo

11

9.00

18.30

14,00-15,00

8.00

Tu

12

9.00

18.30

14,00-15,00

8.00

We

13

9.00

18.30

14,00-15,00

8.00

Th

14

9.00

18.30

14,00-15,00

8.00

Fr

15

9.00

18.30

14,00-15,00

8.00

Sa

16

9.00

18.30

14.00-15.00

8.00

Su

17

Mo

18

9.00

18.30

14,00-15,00

8.00

Tu

19

9.00

18.30

14,00-15,00

8.00

We

20

9.00

18.30

14,00-15,00

8.00

Th

21

9.00

18.30

14,00-15,00

8.00

Fr

22

9.00

18.30

14,00-15,00

8.00

Sa

23

9.00

18.30

14.00-15.00

8.00

Cumul

Su

24

9.00

18.30

14.00-15.00

8.00

Mo

25

9.00

18.30

14,00-15,00

8.00

Tu

26

9.00

18.30

14,00-15,00

8.00

We

27

9.00

18.30

14,00-15,00

8.00

Th

28

9.00

18.30

14,00-15,00

8.00

Fr

29

TOTAL
Contract
TOTAL

1
9.00 18.30 14,00-15,00
25
Summary of Days Worked To Date
Previous

194
Employee's Signature

Crlig Constantin-Florin
Date:
11/29/2013

This Month

8.00
200.00
Cumul

25
219
General Manager
Antoni Ronda i Rodriguez

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Noiembrie / Noviembre / November
Work Description

Ips 10 - print / Finish, sent to Engineer/ Daily site Journal / Daily activity
Program / Daily measurements - Excavations /
Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity
Program / Daily measurements - Excavations, Culverts /
IPS 11 - GI / Breakdown for Slope Mesh / Daily site Journal / Daily
Activity Journal / Monthly Report - Photo Report
Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity
Program / Daily measurements - Excavations, Culverts Monthly Report Copies and Scan
Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity
Program / Daily measurements - Excavations, Culverts / Monthly Report
- Sent to Engineer
Targu Jiu - at Engineer Office - final preparations for IPC 02 / Daily
activity Program / Daily measurements - Excavations, Culverts
IPS 11 - GI / Daily Measurements - Culvets
IPS 11 - GI / Daily Measurements - Culverts / Daily site Journal / Daily
Activity Journal
IPS 11 / Daily Measurements - Excavations / Daily site Journal / Daily
Activity Journal
IPS 11 / Daily Measurements - Asphalt / Daily site Journal / Daily
Activity Journal
IPS 11 / Daily Measurements - Conterlevels / Daily site Journal / Daily
Activity Journal
IPS 11 - Daily Measurements - Material - Final preparation - Sent at
Targu Jiu for handover and explanations / Daily site Journal / Daily
Activity Journal
IPS - Updating Materials List for Precast Elements / Sand / Balast /
Cement / IPS - Update of Status of Culverts on Site - Justified and Built
IPS 12 - GI's / Daily Measurements - Culverts / Daily site Journal / Daily
Activity Journal
IPS 12 - Daily Measurements - Slope Mesh / Preparing Breakdown for
Slope Protection - Mesh / Daily site Journal / Daily Activity Journal
IPS 12 - Daily Measurements - Slope Mesh, Asphalt and Excavations /
Preparing Breakdown for Slope Protection - Mesh / Daily site Journal /
Daily Activity Journal
IPS 12 - Daily Measurements - Culverts / Final - Breakdown for Slope
Protection - Mesh / Daily site Journal / Daily Activity Journal
IPS 12 - Daily Measurement - Materials - Print to be sent to Engineer Way to Tg Jiu to handover IPS 12 and explanations / Daily site
Journal / Daily Activity Journal
IPC 03 - Preparation along with Engineer QS, answering the queries /
Preparing Copies Ready for CNADNR approval - Deadline Monday 25th
nov.

OBS.

Way to Craiova - IPC 03 - Obtaing signatures needed from Resident


Engineer and from Project Manager - Deadline Monday 25th nov.
IPS 11, 12, IPC 03 - Way to Bucharest at CNADNR to handover the IPC
03 / Daily site Journal / Daily Activity Journal
LOT 6 - Caransebes Bypass / DRDP Timisoara clarifications for Valea
Mica, planning VO 11, 12 and 13 / Daily site Journal / Daily Activity
Journal
Planning IPS 13 / Measurents Valea Mica, ballast and
extraexcavations / Daily Site Journal / Daily Activity Program
Review of IPC 2 and 3 to detarmine difference in payments regarding
on planning IPS 13 / Measurents Valea Mica, ballast and
extraexcavations / Daily Site Journal / Daily Activity Program
IPS 13 - GI / Daily Site Journal / Daily Activity Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Decembrie / Diciembre / December


2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Decembrie / Diciembre / December
Hour
Break

Days
Worked

Arr

Dep

1
1

9.00
9.00

18.30
18.30

14,00-15,00
14,00-15,00

8.00
8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

10

9.00

18.30

14,00-15,00

8.00

We

11

9.00

18.30

14,00-15,00

8.00

Th

12

9.00

18.30

14,00-15,00

8.00

Fr

13

9.00

18.30

14,00-15,00

8.00

Sa

14

Su

15

Mo

16

9.00

18.30

14,00-15,00

8.00

Tu

17

9.00

18.30

14,00-15,00

8.00

We

18

9.00

18.30

14,00-15,00

8.00

Th

19

9.00

18.30

14,00-15,00

8.00

Fr

20

8.30

17.30

14,00-15,00

8.00

Sa

21

Su

22

Mo

23

8.30

17.30

14,00-15,00

8.00

Tu

24

8.30

17.30

14,00-15,00

8.00

We

25

Th

26

Fr

27

8.30

17.30

14,00-15,00

8.00

Sa

28

Su

29

Mo

30

8.30

17.30

14,00-15,00

8.00

Tu

31

8.30

17.30

14,00-15,00

8.00

Day

Date

Mo

Tu

TOTAL

20

Cumul

160.00

Summary of Days Worked To Date


Contract
TOTAL

Previous

219
Employee's Signature

Crlig Constantin-Florin
Date:
12/18/2013

This Month

Cumul

20
239
General Manager
Antoni Ronda i Rodriguez

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Decembrie / Diciembre / December
Work Description

IPS 13 - GI / Daily Site Journal / Daily Activity Program


Monthly Report - November 2013 / Daily Site Journal / Daily Activity Program
Monthly Report - Photographic Report - November 2013 / Daily Site Journal / Daily Activity Program
At Caransebes at the Military Unit - Meeting for Reception with Anedan and Military Unit Representative
Monthly Progress Report - Anexe / Daily site Journal (signed by Resident Engineer) - Prepare copies /
Scan original / Sent / Daily Site Journal / Daily Activity Program

Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by
the Consultant of Ministry of Transport / Daily Site Journal / Daily Activity Program
Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by
the Consultant of Ministry of Transport. / Daily Site Journal / Daily Activity Program
Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by
the Consultant of Ministry of Transport. / Daily Site Journal / Daily Activity Program
IPS 13 - GI - Clearing Utilities Documents / Daily Site Journal / Daily Activity Program
IPS 13 - Daily Measurements - Various Tables - Mainly Culverts / Daily Site Journal / Daily Activity
Program

Table of IPC'es details for LOT 6 - asked by DRDP Timisoara - New Engineer Team Office/ Daily Site
Journal / Daily Activity Program
Table of VO's details for LOT 6 - asked by DRDP Timisoara - New Engineer Team Office/ Daily Site
Journal / Daily Activity Program
IPS 13 - Ballace of culverts between requests and payed / Clarification of Remaining Supportig
Documents / Daily Site Journal / Daily Activity Program
IPS 13 - Final checking / Daily Site Journal / Daily Activity Program
Ballace of culverts between requests and payed / Clarification of Remaining Supportig Documents /
Daily Site Journal / Daily Activity Program

Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site Journal
Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site Journal
FELIZ NAVIDAD !
Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site Journal

Monthly Report - December 2013 / Daily Site Journal / Daily Activity Program
Monthly Report - Photographic Report - December 2013 / Daily Site Journal / Daily Activity Program

OBS.

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Ianuarie / Enero / January


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Ianuarie / Enero / January
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

Tu

We

1
1
1
1
1

9.00
9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30
18.30

14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00

8.00
8.00
8.00
8.00
8.00

9.00
9.00
9.00
9.00

18.30
18.30
18.30
18.30

14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00

8.00
8.00
8.00
8.00

Th

Fr

10

Cumul

Sa

11

Su

12

Mo

13

Tu

14

We

15

Th

16

1
1
1
1

Fr

17

9.00

18.30

14,00-15,00

8.00

Sa

18

Su

19

Mo

20

9.00

18.30

14,00-15,00

8.00

Tu

21

9.00

18.30

14,00-15,00

8.00

We

22

9.00

18.30

14,00-15,00

8.00

Th

23

9.00

18.30

14,00-15,00

8.00

Fr

24

9.00

18.30

14,00-15,00

8.00

Sa

25

Su

26

Mo

27

9.00

18.30

14,00-15,00

8.00

Tu

28

9.00

18.30

14,00-15,00

8.00

We

29

Th

30

Fr

31

TOTAL
Contract
TOTAL

1
9.00 18.30 14,00-15,00
8.00
1
9.00 18.30 14,00-15,00
8.00
1
9.00 18.30 14,00-15,00
8.00
21
168.00
Summary of Days Worked To Date
Previous

239
Employee's Signature

Crlig Constantin-Florin
Date:

This Month

21
General Manager
Carlos Galido

Cumul

260

1/31/2014

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Ianuarie / Enero / January
Work Description

Monthly Report - December 2013 - Written section / Daily Site Journal to be singned by Engineer ,
Print, Scan, Copy, Tide it, Prepare the Letter / Daily Site Journal / Daily Activity Program

Sent Monthy Report December 2013 at Engineer / Daily Site Journal / Daily Activity Program
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/

IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/


IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
LOT 6 - Overview Unapproved Variation Orders / Daily Site Journal / Daily Activity Program/
LOT 6 - Overview Unapproved Variation Orders - Contact Diana Pogaci and/or Marius Pirnuta / Daily
Site Journal / Daily Activity Program/

LOT 6 - Overview Unapproved Variation Orders / Daily Site Journal / Daily Activity Program/
Way to Caransebes and then to Timisoare to search for IPC 17 - LOT 6 Caransebes Bypass / Daily
Activity Program / Daily site Journal
Contact Diana Pogaci (CNADNR - LOT 6 QS - replaces Marius Pirnuta) for VO11, VO12 and VO13 /
Contact Liliana Toma - Ramboll and Marius Pirnuta - ask for IPC17 Lot 6 / Prepare Front Tables for
VO11-Vertical Signals in accordance with Diana's Request / Daily Activity Program / Daily Site Journal
Prepare IPS 17 Lot 6 on M. Pirnuta format / Daily Activity Program / Daily Site Journal
Various Checks on Quantities 5R3 / Preparing Tables / Overview Supporting Documents / Daily Activity
Program / Daily Site Journal

Various Checks on Quantities 5R3 / VO 11 - Vertical Signal - Supporting Document, Quantities DDE/
Daily Activity Program / Daily Site Journal
VO 11 - Vertical Signal - Supporting Document, Quantities DDE/ Letter LOT6 - IPC17-Retention Money /
Daily Activity Program / Daily Site Journal
IPS 13 - January 2014 / Work Procedure for IPS'es / Daily Activity Program / Site Journal
IPS 13 - January 2014 / Daily Activity Program / Site Journal
IPS 13 - January 2014 / Daily Activity Program / Site Journal

Project Manager

Antonio Jose Seve Martin

OBS.

Month/Mes:
Year/Ao:

Februarie / Fevrero / February


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Februarie / Fevrero / February
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

10

9.00

18.30

14,00-15,00

8.00

Tu

11

9.00

18.30

14,00-15,00

8.00

We

12

9.00

18.30

14,00-15,00

8.00

Th

13

9.00

18.30

14,00-15,00

8.00

Fr

14

9.00

18.30

14,00-15,00

8.00

Sa

15

9.00

18.30

14,00-15,00

8.00

Su

16

Mo

17

9.00

18.30

14,00-15,00

8.00

Tu

18

9.00

18.30

14,00-15,00

8.00

We

19

9.00

18.30

14,00-15,00

8.00

Th

20

9.00

18.30

14,00-15,00

8.00

Fr

21

9.00

18.30

14,00-15,00

8.00

Sa

22

Su

23

Cumul

Mo

24

9.00

18.30

14,00-15,00

8.00

Tu

25

9.00

18.30

14,00-15,00

8.00

We

26

9.00

18.30

14,00-15,00

8.00

Th

27

9.00

18.30

14,00-15,00

8.00

Fr

28

9.00

18.30

14,00-15,00

8.00

TOTAL
Contract
TOTAL

21
Summary of Days Worked To Date
Previous

260
Employee's Signature

Crlig Constantin-Florin
Date:
2/28/2014

This Month

21
General Manager
Carlos Galido

168.00
Cumul

281

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Februarie / Fevrero / February
Work Description

In Tg Jiu at Engineer Office / Photographic Report - January 2014 / Daily Site Journal / Daily Activity
Program
Monthly Report - January 2014 - Print, Scan / Daily Site Journal / Daily Activity Program
IPS 13 - November, December, January - Summary Review _ Materials on Site / Daily Site Journal /
Daily Activity Journal
LOT 6 - Caransebes Bypass - VO's Summary Sheet / 5R3 - IPS 13 / IPC Payment Details / Daily
Activity Program / Daily Site Journal
IPS 13 - November, December, January - Summary Review _ Materials on Site / Daily Site Journal /
Daily Activity Journal

LOT6 - Caransebes Bypass - Prepare and sent e-mail explanations regarding IPC 17 to DRDP
Timisoara / 5r3 - Mining Royalty Fee_Financial Implications_Changes in Law / Daily Site Journal /
Daily Activity Program
DRDP Timisoara - LOT 6 - clarifications IPC 17 and VO's / Daily Site Journal / Daily Activity Program
DRDP Timisoara - LOT 6 - clarifications IPC 17, survey Valea Mic, quantities Valea Mic, Editing
Minute of Appendix of 20th dec 2013, Taking - Over Minute, Variation Orders / Daily Site Journal /
Daily Activity Program
DRDP Timisoara - LOT 6 - clarifications IPC 17, survey Valea Mic, quantities Valea Mic, Editing
Minute of Appendix of 20th dec 2013, Taking - Over Minute, Variation Orders / Daily Site Journal /
Daily Activity Program
Preaparing Breakdown GI 06 / Daily Activity Program / Daily site Journal
Preaparing IPC 13 - Supporting Documents
IPS 13 - Supporting Document / Daily Measurements - CUlverts / Daily Activity Program / Daily site
Journal
IPS 13 - Supporting Document / Daily Measurements - Cantilevers / Daily Activity Program / Daily
site Journal
IPS 13 - Supporting Document / General Items_Print_Scan / Daily Activity Program / Daily site
Journal
Handing over the IPS 13 at Targu Jiu_Engineer Office / Daily Activity Program / Daily Site Journal
Daily Measurements - Bridges / Daily Activity Program / Daily site Journal

OBS.

Preparing Breakdowns_ E14 - Umplutura cu Material Drenant / Preparing Breakdowns _ MS5 Parapet New Jersey pe zid de sprijin / Daily Activity Program / Daily Site Journal
Study for preparation of Breakdowns_ B38 - Injectare fisuri cu rasini epoxidice, E13 - 4 _ Excavarea
in roci stancoase cu exploziv , B72 - Derocare stanca - fara explozibil / CO 07 - Console din beton
armat / Daily Activity Program / Daily Site Journal
Preparing Breakdowns_ E13 - 4 _ Excavarea in roci stancoase cu exploziv , B72 - Derocare stanca fara explozibil / Daily Activity Program / Daily Site Journal
Preparing Breakdowns CO 07 - Console din beton armat / Daily Activity Program / Daily Site Journal

Preparing Photographic Report _ february 2014

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Martie / Marzo / March


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Martie / Marzo / March
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

10

9.00

18.30

14,00-15,00

8.00

Tu

11

9.00

18.30

14,00-15,00

8.00

We

12

9.00

18.30

14,00-15,00

8.00

Th

13

Fr

14

1
1

9.00
9.00

18.30
18.30

14,00-15,00
14,00-15,00

8.00
8.00

Sa

15

Su

16

Mo

17

9.00

18.30

14,00-15,00

8.00

Tu

18

9.00

18.30

14,00-15,00

8.00

We

19

9.00

18.30

14,00-15,00

8.00

Th

20

9.00

18.30

14,00-15,00

8.00

Fr

21

9.00

18.30

14,00-15,00

8.00

Sa

22

Su

23

Mo

24

9.00

18.30

14,00-15,00

8.00

Tu

25

9.00

18.30

14,00-15,00

8.00

We

26

9.00

18.30

14,00-15,00

8.00

Th

27

9.00

18.30

14,00-15,00

8.00

Fr

28

9.00

18.30

14,00-15,00

8.00

Cumul

Sa

29

Su

30

Mo

31

TOTAL
Contract
TOTAL

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

22
Summary of Days Worked To Date
Previous

281
Employee's Signature

Crlig Constantin-Florin
Date:
3/31/2014

This Month

22
General Manager
Carlos Galido

176.00
Cumul

303

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Martie / Marzo / March
Work Description

In Tg Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for Photographic Report - February
2014 / Daily Site Journal / Daily Activity Program
Preparing Photo Report / Monthly Report - under construction / Daily Site Journal / Daily Activity
Program
Mesurement of real DDE quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly Report under construction / Daily Site Journal / Daily Activity Program
Mesurement of real DDE quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly Report under construction / Daily Site Journal / Daily Activity Program
Measurement LOT 6 - Vertical Signal DDE, for VO signals and markings / Daily Site Journal / Daily
Activity Program

In Tg Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for Photographic Report - March 2014 /
Daily Site Journal / Daily Activity Program
Breakdows 5r3 / Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily
Site Journal / Daily Activity Program
Breakdows 5r3 / Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily
Site Journal / Daily Activity Program
Breakdows 5r3 / Daily Site Journal / Daily Activity Program
Breakdows 5r3 / Daily Site Journal / Daily Activity Program

5R3 - IPS14 / Daily Site Journal / Daily Activity Program


5R3 - IPS14 / LOT 6 - Prepare Electronic Statement at Completion for Liliana Toma and Doru
Borlovan / Daily Site Journal / Daily Activity Program
5R3 - IPS14 / Daily Measurements - Culverts / 5r3 - Daily Site Journal / 5r3 - Daily Activity Program
5R3 - IPS14 / Daily Measurements - Materials / LOT 6 - Arrangements with Liliana Toma regarding
IPC17 for Andrew Inmann arrival on 25th March / 5r3 Daily Site Journal / 5r3 Daily Activity Program /
5r3 - Taking pictures for Monthly Report - March / Taking contact with Subcontractor's staff for Daily
Activity Sheets
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program

5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / LOT 6 - Get knowledge about SAT in preparation for Tomorrow meeting with DRDP
Timisoara Engineer Representatives
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / LOT 6 - Meeting with DRDP Timisoara Engineer Representatives - presenting the SAT for
LOT 6 and planning a schedule of work
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / LOT 6 - Overview IPS 19 in relation with SAC (for DRDP Timisoara)
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Went to site for pictures in preparation of Photo Report - March 2014
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Preparating of Photo Report - March 2014. Went on site with technical office to analize
consola in specific areas.

OBS.

5R3 - Daily Site Journal / 5r3 Daily Activity Program / LOT 6 - Overview IPS 19 in relation with SAC
(for DRDP Timisoara) , VO 11 and VO 12 Vertical Signal and Horizontal Markings
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Preparating of Photo Report - March 2014.Preparing the Monthly Report _ March 2014

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Aprilie / Abril / April


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Aprilie / Abril / April
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

10

9.00

18.30

14,00-15,00

8.00

Fr

11

9.00

18.30

14,00-15,00

8.00

Sa

12

9.00

13.00

Su

13

Mo

14

9.00

18.30

14,00-15,00

8.00

Tu

15

9.00

18.30

14,00-15,00

8.00

We

16

9.00

18.30

14,00-15,00

8.00

Th

17

9.00

18.30

14,00-15,00

8.00

Fr

18

9.00

18.30

14,00-15,00

8.00

Sa

19

Su

20

Mo

21

Tu

22

9.00

18.30

14,00-15,00

8.00

We

23

9.00

18.30

14,00-15,00

8.00

Cumul

4.00

Th

24

9.00

18.30

14,00-15,00

8.00

Fr

25

9.00

18.30

14,00-15,00

8.00

Sa

26

9.00

18.30

14,00-15,00

8.00

Su

27

Mo

28

9.00

18.30

14,00-15,00

8.00

Tu

29

9.00

18.30

14,00-15,00

8.00

We

30

9.00

18.30

14,00-15,00

8.00

TOTAL

23
Summary of Days Worked To Date

Contract
TOTAL

Previous

303
Employee's Signature

Crlig Constantin-Florin
Date:
4/30/2014

This Month

23
General Manager
Carlos Galido

180.00
Cumul

326

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Aprilie / Abril / April
Work Description

5R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal /
5r3 Daily Activity Program / Preparating of Photo Report - March 2014.Preparing the Monthly Report
_ March 2014
Went ot Tg Jiu at Hyder, engineer office to close the Daily Site Journal for March 2014 / 5r3 Daily
Activity Program / Taking Pictures for Photo Report - April 2014. / Preparing the Monthly Report _
March 2014
5R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal /
5r3 Daily Activity Program / Preparing the Monthly Report _ March 2014
LOT 6 - Discutions on IPC at Completion / 5R3 - IPS14 / Daily Measurements - Culverts, Bridge
125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparing the Monthly
Report _ March 2014 - scan, copies, bounding - ready to be sent to Engineer up to 7th of March
according with the contract.

LOT 6 - Ask clarifications about the time of completing a determination / LOT 6 - Answer to Dragos
Enasescu's e-mail regarding A027B justifications / 5R3 - Daily Measurements - Culverts, Bridge
125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Send Monthly Report _
March 2014.
LOT 6 - Finalyse and send explanations for A027b/ 5R3 - Preparing daily site journal - blank, for
subcontractors / Daily measurements - Slope protection / Daily measurements - culverts / Daily
Activity Program / Daily Site Journal
LOT 6 - Finalyse and send explanations for A027b/ 5R3 - Preparing daily site journal - blank, for
subcontractors / Daily measurements - Slope protection / Translating Index for Informe tecnico/ Daily
measurements - culverts / Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Bridge 125+320 / Daily measurement - Culverts / Translating Informe
tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Daily Activity
Program / Daily Site Journal / Working on Photo Report for April 2014
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Daily Activity
Program / Daily Site Journal / Working on Photo Report for April 2014
5R3 - Daily measurements - Update IPS 14 - under construction / Daily Activity Program / Daily Site
Journal / Working on Photo Report for April 2014
EASTER
Second Day of EASTER
5R3 - Daily measurements - Update IPS 14 - under construction / Daily Activity Program / Daily Site
Journal / Working on Photo Report for April 2014
Targu Jiu at Engineer office to sign the Daily Site Journal / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site Journal

OBS.

LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily
Activity Program / Daily site Journal
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the
FEDR Dep in Transport Ministry is looking to cut them / 5R3 - Daily Activity Program / Daily site
Journal
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily
Activity Program / Daily site Journal
5R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since
the FEDR Dep in Transport Ministry is looking to cut them / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site Journal
5R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since
the FEDR Dep in Transport Ministry is looking to cut them / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site Journal
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the
FEDR Dep in Transport Ministry is looking to cut them / 5R3 - Daily Activity Program / Daily site
Journal

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Mai / May / Maio


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Mai / May / Maio
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

10

11.00

16.00

Su

11

Mo

12

9.00

18.30

14,00-15,00

8.00

Tu

13

9.00

18.30

14,00-15,00

8.00

We

14

9.00

18.30

14,00-15,00

8.00

Th

15

9.00

18.30

14,00-15,00

8.00

Fr

16

9.00

18.30

14,00-15,00

8.00

Sa

17

12.00

16.00

Su

18

Cumul

5.00

4.00

Mo

19

9.00

18.30

14,00-15,00

8.00

Tu

20

9.00

18.30

14,00-15,00

8.00

We

21

9.00

18.30

14,00-15,00

8.00

Th

22

9.00

18.30

14,00-15,00

8.00

Fr

23

9.00

18.30

14,00-15,00

8.00

Sa

24

9.00

18.30

14,00-15,00

8.00

Su

25

Mo

26

9.00

18.30

14,00-15,00

8.00

Tu

27

9.00

18.30

14,00-15,00

8.00

We

28

9.00

18.30

14,00-15,00

8.00

Th

29

9.00

18.30

14,00-15,00

8.00

Fr

30

9.00

18.30

14,00-15,00

8.00

Sa

31

TOTAL

25
Summary of Days Worked To Date

Contract
TOTAL

Previous

326
Employee's Signature

Crlig Constantin-Florin
Date:
5/30/2014

This Month

25
General Manager
Carlos Galido

193.00
Cumul

351

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Mai / May / Maio
Work Description

5R3 - Preparing photograph for Photo Monthly Report - April 2014 / Preparing Monthly Report - April
2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Preparing Monthly Report - April 2014 - Scan / 2 Copies / Bounding - as final preparation to be
ready for sent / LOT 6 - Review answer prepared by TEA for DRDP Timisoara and prepare papers to
be sent to DRDP accordingly. / 5R3 - Daily Site Journal / Daily Activity Program

5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Working on Photo Report for
April 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Daily Activity Program / Daily
Site Journal / Working on Photo Report for April 2014 / LOT 6 - speak with Marius Pirnuta about
VO11/12/13 - sent by e-mail previously named document for review in preparation for the next week
meeting / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / Prepare answer for AM POST
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA in order to send an answer
to DRDP TIMISOARA - BoQ
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA in order to send an answer
to DRDP TIMISOARA - Variation Orders
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA, PM-s in order to send an
answer to DRDP TIMISOARA - Variation Orders / Preparations for tomorrow meeting with DRDP
Timisoara and with CNADNR
LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR
representative Marius Pirnuta / / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR
representative Marius Pirnuta . Also at the meeting attended David Saiz, Marian Copilu and Liliana
Dimitriu / / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR
representative Marius Pirnuta . Also at the meeting attended Liliana Dimitriu / / 5r3 - Daily Site
Journal / Daily Activity Program
LOT 6 - Preparation of Minute of the discutions held durring the week / Ask lette VO9 to Liliana Toma
/ Send the Minute to all participants at the meeting / Make a plan of solving the issues on SaC and
PM along with Oscar / / 5R3 - Update the quantities - collect the datas from production department /
Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program

OBS.

5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA, PM-s in order to send an
answer to DRDP TIMISOARA - Variation Orders / Preparations for tomorrow meeting with DRDP
Timisoara and with CNADNR
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Preparing the IPS no. 14 / 5r3 Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site
Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC also way to Casansebes, in the firs part of the day - to check on site the step dichs,
the ditches and the quantities on roundabouts / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Iunie / June / Junio


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Iunie / June / Junio
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

10

9.00

18.30

14,00-15,00

8.00

We

11

9.00

18.30

14,00-15,00

8.00

Th

12

9.00

18.30

14,00-15,00

8.00

Fr

13

9.00

18.30

14,00-15,00

8.00

Sa

14

11.00

16.00

Su

15

Mo

16

9.00

18.30

14,00-15,00

8.00

Tu

17

9.00

18.30

14,00-15,00

8.00

We

18

9.00

18.30

14,00-15,00

8.00

Th

19

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

Fr

20

Sa

21

Cumul

5.00

Su

22

Mo

23

9.00

18.30

14,00-15,00

8.00

Tu

24

9.00

18.30

14,00-15,00

8.00

We

25

9.00

18.30

14,00-15,00

8.00

Th

26

9.00

18.30

14,00-15,00

8.00

Fr

27

Sa

28

Su

29

Mo

30

TOTAL

9.00

14,00-15,00

8.00

1
9.00 18.30 14,00-15,00
8.00
22
173.00
Summary of Days Worked To Date

Contract
TOTAL

Previous

351
Employee's Signature

Crlig Constantin-Florin
Date:
6/30/2014

18.30

This Month

22
General Manager
Carlos Galido

Cumul

373

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Iunie / June / Junio
Work Description

5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Preparing Monthly Report Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program

5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program
5R3 - Daily measurements - Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site
Journal / Daily Activity Program
5R3 - Daily measurements, Receiving Minutes from Quality Department (Proces verbal - Podete /
Console) and keeping accounts of the work in relation with production to build the IPS 14 / Preparing
Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - VO 14 - PM 10 / 5r3 - Daily Site Journal / Daily Activity Program

LOT 6 - VO 14 - PM 10 / 5r3 - Daily Site Journal / Daily Activity Program


LOT 6 - VO 14 - PM 09 and Overpassed quantities summary sheets / 5r3 - Daily Site Journal / Daily
Activity Program
LOT 6 - went to Caransebes for signature on Variation Orders VO13 meeting DRDP representatives,
Dragos Enasescu and Doru borlovan / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity Program

OBS.

LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity Program

LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Iulie / July / Julio


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Iulie / July / Julio
Hour
Break

Day

Date

Days
Worked

Arr

Dep

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

10

9.00

18.30

14,00-15,00

8.00

Fr

11

9.00

18.30

14,00-15,00

8.00

Sa

12

Su

13

Mo

14

9.00

18.30

14,00-15,00

8.00

Tu

15

9.00

18.30

14,00-15,00

8.00

We

16

9.00

18.30

14,00-15,00

8.00

Th

17

9.00

18.30

14,00-15,00

8.00

Fr

18

9.00

18.30

14,00-15,00

8.00

Sa

19

9.00

18.30

14,00-15,00

8.00

Su

20

Mo

21

9.00

18.30

14,00-15,00

8.00

Tu

22

9.00

18.30

14,00-15,00

8.00

We

23

9.00

18.30

14,00-15,00

8.00

Th

24

9.00

18.30

14,00-15,00

8.00

Cumul

9.00

18.30

14,00-15,00

8.00

28

9.00

18.30

14,00-15,00

8.00

Tu

29

9.00

18.30

14,00-15,00

8.00

We

30

9.00

18.30

14,00-15,00

8.00

Th

31

9.00

18.30

14,00-15,00

8.00

Fr

25

Sa

26

Su

27

Mo

TOTAL

24
Summary of Days Worked To Date

Contract
TOTAL

Previous

373
Employee's Signature

Crlig Constantin-Florin
Date:
7/29/2014

This Month

24
General Manager
Carlos Galido

192.00
Cumul

397

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Iulie / July / Julio
Work Description

LOT 6 - preparation of 2 copies for VO13 - overpass quantities / 5r3 - Daily Site Journal / Daily
Activity Program
LOT 6 - preparation of 2 copies for VO13 - PM's / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - VO 13 - scanning and packaging to be sent to Buchares / 5r3 - Daily Site Journal / Daily
Activity Program
5r3 - Preparing Monthly Report - June 2014 / 5r3 - Daily Site Journal / Daily Activity Program

5r3 - Materials on Site / Daily Measurements - slope protection / 5r3 - Daily Site Journal / Daily
Activity Program
5r3 - Materials on Site / Daily Measurements - culverts / 5r3 - Daily Site Journal / Daily Activity
Program
5r3 - Materials on Site / Daily Measurements - culverts, earthworks / 5r3 - Daily Site Journal / Daily
Activity Program
5r3 - Went on Tg Jiu at Engineer Office with Antonio - disscution over IPS / Daily Site Journal / Daily
Activity Program
5r3 - Materials on Site / Daily Measurements - general items / 5r3 - Daily Site Journal / Daily Activity
Program

Preparing summary tabels for IPS 14 in order to send the IPS to Engineer / 5r3 - Daily Site Journal /
Daily Activity Program
Preparing summary tabels for IPS 14 in order to send the IPS to Engineer / Sent the IPS to Engineer
- the letter and a summary / 5r3 - Daily Site Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts) - Download, classify them, put them in
forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts, contilevels, slope protection) Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site
Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 Daily Site Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 Daily Site Journal / Daily Activity Program
Went to Tg Jiu with supporting documents for IPS 14 - Receiving documents from the Quality
Department (culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them
in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity Program
5r3 - Materials on Site - Summary for IPS 14 - see the last attachents for the months of May,
June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity Program
5r3 - Materials on Site - Summary for IPS 14 - see the last attachents for the months of May,
June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program

OBS.

At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program

LOT 6 - Clarifing tabels for Liliana Toma in order to close the VO13 / 5R3 - Summary of Materials on
Site - Preparing the final attachments for IPS 14 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

August / August / Agosto


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA M


August / August / Agosto
Hour

Day

Date

Days
Worked

Arr

Dep

Break

Cumul

Fr

9.00

18.30

14,00-15,00

8.00

Sa

15.00

17.00

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

10

Mo

11

9.00

18.30

14,00-15,00

8.00

Tu

12

9.00

18.30

14,00-15,00

8.00

We

13

9.00

18.30

14,00-15,00

8.00

Th

14

9.00

18.30

14,00-15,00

8.00

Fr

15

9.00

18.30

14,00-15,00

8.00

Sa

16

Su

17

4.00

Mo

18

9.00

18.30

14,00-15,00

8.00

Tu

19

9.00

18.30

14,00-15,00

8.00

We

20

9.00

18.30

14,00-15,00

8.00

Th

21

9.00

18.30

14,00-15,00

8.00

Fr

22

9.00

18.30

14,00-15,00

8.00

Sa

23

Su

24

Mo

25

9.00

18.30

14,00-15,00

8.00

Tu

26

9.00

18.30

14,00-15,00

8.00

We

27

9.00

18.30

14,00-15,00

8.00

Th

28

9.00

18.30

14,00-15,00

8.00

Fr

29

9.00

18.30

14,00-15,00

8.00

Sa

30

11.00

19.00

Su

31

TOTAL

23

8.00

180.00
Summary of Days Worked To Date

Contract
TOTAL

Previous

397
Employee's Signature

Crlig Constantin-Florin
Date:
8/29/2014

This Month

23
General Manager
Carlos Galido

Cumul

420

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013

THLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


August / August / Agosto
Work Description

5r3 - Daily Measurements / Daily Site Journal / Daily Activity Program


5r3 - Preparing the Monthly Report - July 2014

5r3 - At Engineer Office in Tg Jiu for IPS 14 / Preparing the Monthly Report - July 2014 / Daily Site
Journal / Daily Activity Program
LOT 5 - summary table for VO13 asked by Liliana Toma / Preparing the Monthly Report for July 2014 / 5r3
- Daily Site Journal / Daily Activity Program
5r3 - Preparing the Photo Report for July 2014 to be sent / 5r3 - Daily Site Journal / Daily Activity Program
IPS 14 - daily measurements, Receiving documents from the Quality Department - calculations, processing
in order to be sent and attached to IPC 06 - Daily Site Journal - Daily Activity Program
IPS 14 - Went to Tg Jiu at engineer office to hand over the documents - calculations in order to be sent
and attached to IPC 06 - Daily Site Journal - Daily Activity Program

IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Receiving
documents from the Quality Department - calculations, processing in order to be sent and attached to IPC
06 - Daily Site Journal - Daily Activity Program
Went to Tg Jiu with supporting documents for IPS 14 - Receiving documents from the Quality Department
(culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them in forlders, put
them in summary sheets / 5r3 - Daily Site Journal / Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program

OBS.

IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Scanning Copies for CNADNR final preparation before sending - Daily Site Journal - Daily Activity Program

IPS 15 - Under Construction - Summaries of Unpaied items - planning works for the ongoing IPS - Daily
Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
5r3 - Stating Prepartion of the Monthly Report - August 2014 / IPS 15 - Under Construction - Summary
Sheet for IPS 15 items - General Items - Daily Site Journal - Daily Activiy Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Septembrie / September / Septiembre


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA M


Septembrie / September / Septiembre
Hour

Day

Date

Days
Worked

Arr

Dep

Break

Cumul

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

9.00

18.30

14,00-15,00

8.00

Su

Mo

Tu

We

10

Th

11

VACANTA

Fr

12

Sa

13

Su

14

Mo

15

9.00

18.30

14,00-15,00

8.00

Tu

16

9.00

18.30

14,00-15,00

8.00

We

17

9.00

18.30

14,00-15,00

8.00

Th

18

9.00

18.30

14,00-15,00

8.00

Fr

19

9.00

18.30

14,00-15,00

8.00

Sa

20

9.00

18.30

14,00-15,00

8.00

Su

21

Mo

22

9.00

18.30

14,00-15,00

8.00

Tu

23

9.00

18.30

14,00-15,00

8.00

We

24

9.00

18.30

14,00-15,00

8.00

Th

25

9.00

18.30

14,00-15,00

8.00

Fr

26

9.00

18.30

14,00-15,00

8.00

Sa

27

11.00

19.00

14,00-15,00

8.00

Su

28

Mo

29

9.00

18.30

14,00-15,00

8.00

Tu

30

9.00

18.30

14,00-15,00

8.00

TOTAL

20

160.00
Summary of Days Worked To Date

Contract
TOTAL

Previous

420
Employee's Signature

Crlig Constantin-Florin
Date:
9/29/2014

This Month

20
General Manager
Carlos Galido

Cumul

440

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013

THLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Septembrie / September / Septiembre
Work Description

5r3 - Preparing IPS 15 / Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity
Program
5r3 - Preparing IPS 15 - at Tg Jiu meeting with road engineer to clarify the supporting documents/
Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 15 - at Tg Jiu meeting with road engineer to clarify the supporting documents/
Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 15 / Preparing the Monthly Report - August 2014, scan, copies, forwarding letter / Daily
Site Journal / Daily Activity Program
5r3 - Preparing IPS 15 - at Tg Jiu meeting with QS in order to hand over and to present the content of IPS /
Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity Program
Daily Measurents - Cantilevels, Culverts, Earthworks / Daily Site Journal / Daily Activity Program

5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
IPC 07 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site
Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program

IPC 07 - Went to Tg Jiu at engineer office for final preparations, scan, copies of the IPC in order to e sent
to Employer / Daily Site Journal - Daily Activity Program
IPS 16 - Starting prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify,
earthworks and culverts / Daily Site Journal - Daily Activity Program
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program

OBS.

IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program

IPC 07 - Went to Tg Jiu at engineer office for final preparations, scan, copies of the IPC in order to e sent
to Employer / Daily Site Journal - Daily Activity Program
IPS 16 - Starting prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify,
earthworks and culverts / Daily Site Journal - Daily Activity Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Octombrie / October / Octubre


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA M


Octombrie / October / Octubre
Hour

Day

Date

Days
Worked

Arr

Dep

Break

Cumul

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

10

9.00

18.30

14,00-15,00

8.00

Sa

11

9.00

18.30

14,00-15,00

8.00

Su

12

Mo

13

9.00

18.30

14,00-15,00

8.00

Tu

14

9.00

18.30

14,00-15,00

8.00

We

15

9.00

18.30

14,00-15,00

8.00

Th

16

9.00

18.30

14,00-15,00

8.00

Fr

17

9.00

18.30

14,00-15,00

8.00

Sa

18

Su

19

Mo

20

9.00

18.30

14,00-15,00

8.00

Tu

21

9.00

18.30

14,00-15,00

8.00

We

22

9.00

18.30

14,00-15,00

8.00

Th

23

9.00

18.30

14,00-15,00

8.00

Fr

24

9.00

18.30

14,00-15,00

8.00

Sa

25

Su

26

Mo

27

9.00

18.30

14,00-15,00

8.00

Tu

28

9.00

18.30

14,00-15,00

8.00

We

29

9.00

18.30

14,00-15,00

8.00

Th

30

9.00

18.30

14,00-15,00

8.00

Fr

31

9.00

18.30

14,00-15,00

8.00

TOTAL

24

192.00
Summary of Days Worked To Date

Contract
TOTAL

Previous

440
Employee's Signature

Crlig Constantin-Florin
Date:
10/29/2014

This Month

24
General Manager
Carlos Galido

Cumul

464

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013

THLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Octombrie / October / Octubre
Work Description

5r3 - Preparing IPS 16 - at Tg Jiu meeting with road engineer to clarify the supporting documents/
Preparing the Monthly Report - September 2014 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 / Preparing the Monthly Report - September 2014, scan, copies, forwarding letter /
Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 / Preparing the Monthly Report - September 2014, scan, copies, forwarding letter /
Daily Site Journal / Daily Activity Program

5r3 - Preparing IPS 16 - Daily Measurements - culvers / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - contilevels / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - earthworks / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - slope protection / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
Preparing Table - cost for General Items - Variation Order 01.v1 / Daily Site Journal - Daily Activity Program
Preparing Table - cost for General Items - Variation Order 01.v2 / Daily Site Journal - Daily Activity Program
IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program
IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program

IPS 16 - Daily Measurements/ Preparing Table - quantitier for H4B - Variation Order 02.v1 / Daily Site
Journal - Daily Activity Program
IPS 16 - Daily Measurements/ Preparing Table - quantitier for H4B - Variation Order 02.v2 / Daily Site
Journal - Daily Activity Program
IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program

OBS.

IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program


IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program

IPC 07 - Went to Tg Jiu at QS office to talk about the status of and to clarify issues, if any / Daily Site
Journal - Daily Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Noiembrie / November / Noviembre


2014

MONTHLY TIME SHEET / HOJA DE ASISTENCIA M


Noiembrie / November / Noviembre
Hour

Day

Date

Days
Worked

Arr

Dep

Break

Cumul

Sa

9.00

18.30

14,00-15,00

8.00

Su

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

Fr

9.00

18.30

14,00-15,00

8.00

Sa

9.00

18.30

14,00-15,00

8.00

Su

Mo

10

9.00

18.30

14,00-15,00

8.00

Tu

11

9.00

18.30

14,00-15,00

8.00

We

12

9.00

18.30

14,00-15,00

8.00

Th

13

9.00

18.30

14,00-15,00

8.00

Fr

14

9.00

18.30

14,00-15,00

8.00

Sa

15

9.00

18.30

14,00-15,00

8.00

Su

16

Mo

17

9.00

18.30

14,00-15,00

8.00

Tu

18

9.00

18.30

14,00-15,00

8.00

We

19

9.00

18.30

14,00-15,00

8.00

Th

20

9.00

18.30

14,00-15,00

8.00

Fr

21

9.00

18.30

14,00-15,00

8.00

Sa

22

9.00

18.30

14,00-15,00

8.00

Su

23

Mo

24

9.00

18.30

14,00-15,00

8.00

Tu

25

9.00

18.30

14,00-15,00

8.00

We

26

9.00

18.30

14,00-15,00

8.00

Th

27

9.00

18.30

14,00-15,00

8.00

Fr

28

9.00

18.30

14,00-15,00

8.00

Sa

29

9.00

18.30

14,00-15,00

8.00

Su

30

TOTAL

25

200.00
Summary of Days Worked To Date

Contract
TOTAL

Previous

464
Employee's Signature

Crlig Constantin-Florin
Date:
12/1/2014

This Month

25
General Manager
Carlos Galido

Cumul

489

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013

THLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL


Noiembrie / November / Noviembre
Work Description

5r3 - Preparing IPC 08 at Petrosani with Hyder's QS

5r3 - IPC 08 - At Tg Jiu - final preparations for sending the IPC to Employer / Daily site Jurnal / Daily
Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - in preparation for IPS 17
5r3 - Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal / Daily Activity
Program / Summary of payments - PAVEMENT-BALLAST-CRUSHED STONE-AB2-MILLING- in
preparation for IPS 17
5r3 - Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal / Daily Activity
Program / Summary of payments - CONSOLIDATIONS-SLOPE PROTECTION - BARRIERS - TORRENT
BARRIER start CANTILEVERS - in preparation for IPS 17
5r3 - Went on Site - Meeting with mr. Chesnoiu - talking problems regarding cantilevel papers / Bringing
Papers / VO-3 preparation of quantities tables / Daily site Jurnal / Daily Activity Program /
5r3 - Went on Site - Measuring concrete guard rails demolition and retaing wall demolitions on culverts /
Final review and preparation of the VO3 quantities table - Slope Protection / Record papers of cantilevels /
Daily site Jurnal / Daily Activity Program /
5r3 - Office paper work - Records of Cantilevers / Daily site Jurnal / Daily Activity Program /
5r3 - Photo Monthly Report / Daily site Jurnal / Daily Activity Program /
5r3 - Went on Site - Measuring concrete guard rails demolition and retaing wall demolitions on culverts /
Record of prepared papers for cantilevels / Daily site Jurnal / Daily Activity Program /
5r3 - Went of Site to Arrange a Meeting Between Topo Dep and Mr. Chesnoiu to clarify the issue of milling
for certification / Discutition over the Barriers for Torrents in order to clarify the papers for payment (it
results that the papers are not clear for this type of works ) / also discutions to clarify RNC 38 and 32 discutions are on deadlock, since the solution for RNC 32 is a new solution and it has no approval, no
notification prepared by Contractor => dificulty in chargeing/cobrar the works / Record papers of cantilevels
/ Daily site Jurnal / Daily Activity Program /
5r3 - Went on Tg. Jiu at Engineer Office to meet mr. Chesnoiu to clarrify the problems with the
Cantilevers / Picking up papers for Certification / Record papers of cantilevels / Daily site Jurnal / Daily
Activity Program /
Went on site to measure the Cantilevers 118+376 and 118+485 for clarifications regarding the IPS /
Record of demolition of concrete guard rails and existing retaining walls on Culverts / Daily Site Journal /
Daily Activity Program.
Record of Milling / Reevaluatioan of total quantities on slope protection an preparation of the financial
impact on this issue / Daily Site Journal / Daily Activity Program /
Montly Report - oct 2014

5r3 - Monthly Report - oct 2014 / Record of received papers / Preparing summary on New Jersey (as
material on site) issue / Preparing an Economical Impact Table with Issues On IPC 09 / Daily site Jurnal /
Daily Activity Program /
5r3 - Record of received papers - printing and went on Tg Jiu tu Engineer Office to present them and
register them / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity
Program /

OBS.

5r3 - Record of received papers - printing / Tracking the way papers are prepared for the Certification /
Daily Site Journal / Daily Activity Program /
5r3 - Record of received papers - printing and went on Tg Jiu tu Engineer Office to present them and
register them / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity
Program /
5r3 - Record of received papers - printing and went on Tg Jiu tu Engineer's QS Office to present them and
register them / Went on Road Engineer office to receive supporting documents and also to clarify the issue
with the tables for the variations on milling and on AB2 that is going to replace the BAD / Tracking the way
papers are prepared for the Certification / Daily Site Journal / Daily Activity Program /
5r3 - Record of supporting documents in order to be prepared whan the quality documents are about to
have the final signatures / Also - record of cantilevels for comparation beetwen the figures from production
and the certified figures / Daily Site Journal / Daily Activity Program /

5r3 - Record of supporting documents in order to be prepared whan the quality documents are about to
have the final signatures / Also - record of cantilevels for comparation beetwen the figures from production
and the certified figures / Daily Site Journal / Daily Activity Program /
IPC 09 - preparation on Tg Jiu (last day / postoned for tommorow)
Final preparations on supporting documents along with Quality Department and Topo department / IPC 09
- preparation on Tg Jiu (last day - finishing on midnight) / On the road to Bucharest to be there in the
morning for scanning documents befor handing over.
On Bucharest to hand over the IPC 09 (IPS17) / Went on COPISA office to scan de documents before
handing over
Starting preparations for the next IPS / Copy and folder the IPC 09 / Record of the unpaied items of
partialy unpaied items / Recover and record the datas from the last week Daily Site Journal
Coming Up-to-date with the daily site journal /

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Decembrie / December / Diciembre


2014

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Decembrie / December / Diciembre

Day

Date

Hour

Days
Worked

Arr

Dep

Break

Work Description

Cumul

Mo

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements - in order to have the IPS prepared until wendsday / Daily site
Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD
25 -

Tu

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements - in order to have the IPS prepared until wendsday / Daily site
Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD
25 - Sending documents to mr. Chesnoiu by e-mail to TImisoara for works approval

We

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Daily site Jurnal / Daily Activity Program / Summary of payments EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - Sending and receiving documents to/from mr.
Chesnoiu by e-mail to/from TImisoara for/of works approval

Th

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements - in order to have the IPS prepared until wendsday / Daily site
Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD
25 - Receiving documents from mr. Chesnoiu by e-mail from TImisoara of works approval

Fr

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - Receiving
documents from mr. Chesnoiu by e-mail from TImisoara of works approval

Sa

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - Receiving
documents from mr. Chesnoiu by e-mail from TImisoara of works approval

Su

Mo

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - / Went on Tg
Jiu to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / Making
copyes, scan for IPS

Tu

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / Making
copyes, scan for IPS

We

10

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / Making
copyes, scan for IPS

Th

11

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / went on
QS Engineer office to hand over the Certificate and to discuss a plan of work in order to finish the IPC until Monday
or Thusday as late. / Making copyes, scan for IPS

Fr

12

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - / Went on Tg
Jiu to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / /
Making copyes, scan for IPS

Sa

13

9.00

18.30

14,00-15,00

8.00

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / / Making
copyes, scan for IPS

Su

14

5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over supporting documents / Making copyes, scan for IPS / Preparing along with
the QS Engineer the IPC to be finished and closed in order to be on Employer's desc until tommorow / went on the
road to Bucharest at Employer's office.

Mo

15

9.00

18.30

14,00-15,00

8.00

Tu

16

9.00

18.30

14,00-15,00

8.00

We

17

9.00

18.30

14,00-15,00

8.00

Th

18

9.00

18.30

14,00-15,00

8.00

Fr

19

9.00

18.30

14,00-15,00

8.00

Sa

20

9.00

18.30

14,00-15,00

8.00

Su

21

Mo

22

9.00

18.30

14,00-15,00

8.00

Tu

23

9.00

18.30

14,00-15,00

8.00

We

24

10.00

15.00

5.00

Th

25

10.00

15.00

5.00

9.00

18.30

14,00-15,00

8.00
8.00

Fr

26

Sa

27

Su

28

Mo

29

Tu

30

9.00

18.30

14,00-15,00

We

31

10.00

15.00

TOTAL

25

5.00

5r3 - IPS 18/ IPC 10 - at COPISA'S office - Bucharest to prepare copies and scan the IPC after havind mr's MunnMace and Diaconu signatures in Filiasi and Craiova / Handing over the IPS 18 and the IPC 10 at the Employer /
Following the events in order to be sure that the invoice is going to be prepared as soon after Employer's approval /
Daily site Journal / Daily activity program
On the way back from Bucharest to Petrosani / Daily Site Journal / Daily Activity Program
5r3 - IPC 10 - Making copie and Record the document in the Archive / Daily site Journal / Daily activity program /
Scanning the Supporting Documents received on Monday from the Road Engineer / Handing over the documents to
Q department / Analisys over BAD25m payments and repaming Quantities to be paied / Preparing for the
November Monthly Report
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Handing over the
Monthly Report - November 2014 at Tg Jiu Engineed Office / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
First day of Chrismans
Second day of Chrismans
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
Analisys on bridges items not included in the Original Bill Of Quantities / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS
Analisys on bridges items not included in the Original Bill Of Quantities / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS
Analisys on bridges items not included in the Original Bill Of Quantities / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS / Monthly Report - December 204

191.00
Summary of Days Worked To Date

Contract
TOTAL

Previous

This Month

Cumul

489

25

514

Employee's Signature

Crlig Constantin-Florin
Date:
12/18/2014

General Manager
Carlos Galido

Project Manager

Antonio Jose Seve Martin

OBS.

Month/Mes:
Year/Ao:

Ianuarie / January / Enero


2015

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Ianuarie / January / Enero

Day

Date

Days
Worked

Arr

Dep

Hour
Break

Work Description

Cumul

Mo

9.00

18.30

14,00-15,00

8.00

Tu

9.00

18.30

14,00-15,00

8.00

We

9.00

18.30

14,00-15,00

8.00

Th

9.00

18.30

14,00-15,00

8.00

9.00

18.30

14,00-15,00

8.00

8.00

5r3 - IPS 19 - preparations, daily measurements / Daily site Jurnal / Daily Activity
Program / Summary of payments / Monthly Report dec 2014
5r3 - IPS 19 - preparations, daily measurements / Daily site Jurnal / Daily Activity
Program / Summary of payments / Monthly Report dec 2014
5r3 - IPS 19 - preparations, daily measurements / Daily site Jurnal / Daily Activity
Program / Summary of payments / Monthly Photo Report dec 2014
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
Summary of payments
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
Summary of payments

Fr

Sa

10

Su

11

Mo

12

9.00

18.30

14,00-15,00

Tu

13

9.00

18.30

14,00-15,00

We

14

9.00

18.30

14,00-15,00

Th

15

9.00

18.30

14,00-15,00

Fr

16

9.00

18.30

14,00-15,00

Sa

17

9.00

18.30

14,00-15,00

Su

18

Mo

19

9.00

18.30

14,00-15,00

Tu

20

9.00

18.30

14,00-15,00

We

21

9.00

18.30

14,00-15,00

Th

22

9.00

18.30

14,00-15,00

Fr

23

9.00

18.30

14,00-15,00

Sa

24

9.00

18.30

14,00-15,00

Su

25

Mo

26

9.00

18.30

14,00-15,00

8.00

LOT 6 - Preparing documents in accordance with M. Pirnuta meeting for VO13 /


5r3 - Daily Measurement culverts / Daily Site Journal / Daily Activity Program

Tu

27

9.00

18.30

14,00-15,00

8.00

LOT 6 - Preparing documents in accordance with M. Pirnuta meeting for VO13 /


5r3 - Daily Measurement Bridges / Daily Site Journal / Daily Activity Program

We

28

9.00

18.30

14,00-15,00

8.00

5r3 - Meeting in Tg Jiu at engineer Office - Quantity - Quality Departments / Daily


site Jurnal / Daily Activity Program / Summary of payments

Th

29

9.00

18.30

14,00-15,00

8.00

LOT 6 - Preparing documents in accordance with M. Pirnuta meeting for VO13 /


5r3 - Daily Measurement culverts / Daily Site Journal / Daily Activity Program

Fr

30

9.00

18.30

14,00-15,00

8.00

Sa

31

9.00

18.30

14,00-15,00

Su

TOTAL

23
Summary of Days Worked To Date

Contract
TOTAL

Previous

514
Employee's Signature

Crlig Constantin-Florin
Date:
2/2/2015

This Month

23
General Manager
Carlos Galido

5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
Summary of payments
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
8.00
Summary of payments
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
8.00
Summary of payments
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00 clarifications for VO13 /
5r3 - Daily Measurement AB2 / Daily Site Journal / Daily Activity Program
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00 clarifications for VO13 /
5r3 - Daily Measurement BAD / Daily Site Journal / Daily Activity Program
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00
clarifications for VO13

LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking


8.00 clarifications for VO13 /
5r3 - Daily Measurement cantilevers / Daily Site Journal / Daily Activity Program
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00 clarifications for VO13 /
5r3 - Daily Measurement ballast / Daily Site Journal / Daily Activity Program
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
8.00
Summary of payments
8.00 Bucharest - Meeting wih M. Pirnuta
Way back from Meeting wih M. Pirnuta / Preparing summay of the Meeting and
8.00
plan for solving the issues
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
8.00
Summary of payments

LOT 6 - Preparing documents in accordance with M. Pirnuta meeting for VO13 /


5r3 - Daily Measurement culverts / Daily Site Journal / Daily Activity Program
5r3 - Analisys over all the items of the contract / paiments and remaining
8.00
payments / Preparing for the January Monthly Report
184.00
Cumul

537
Project Manager

Antonio Jose Seve Martin

OBS.

Month/Mes:
Year/Ao:

Februarie / February / Febrero


2015

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Februarie / February / Febrero

Su

Mo

9.00

18.30

14,00-15,00

Tu

9.00

18.30

14,00-15,00

We

9.00

18.30

14,00-15,00

Th

9.00

18.30

14,00-15,00

Fr

9.00

18.30

14,00-15,00

Sa

Su

Mo

9.00

18.30

14,00-15,00

Tu

10

9.00

18.30

14,00-15,00

We

11

9.00

18.30

14,00-15,00

Th

12

9.00

18.30

14,00-15,00

8.00

Fr

13

9.00

18.30

14,00-15,00

LOT 6 - visit of Dragos Enasescu - VO9 explanations over the quantities tabels
8.00 prepared by Oscar / 5r3 - review of VO1 - GI engineer;s draft / VO 3 reinforcement / Daily Site Journal / Daily Activity Program

Sa

14

0.5

12.00

16.00

4.00

Su

15

Mo

16

9.00

18.30

14,00-15,00

8.00

Tu

17

9.00

18.30

14,00-15,00

We

18

9.00

18.30

14,00-15,00

Th

19

9.00

18.30

14,00-15,00

8.00

Fr

20

9.00

18.30

14,00-15,00

8.00

Sa

21

0.5

12.00

16.00

Su

22

Mo

23

9.00

18.30

14,00-15,00

8.00

Tu

24

9.00

18.30

14,00-15,00

8.00

We

25

9.00

18.30

14,00-15,00

8.00

Th

26

9.00

18.30

14,00-15,00

8.00

Fr

27

9.00

18.30

14,00-15,00

8.00

Sa

28

0.5

12.00

16.00

4.00

TOTAL

21.5

5r3 - Preparing IPS 19 / Preparing the Monthly Report - January 2015 / Daily Site
Journal / Daily Activity Program
5r3 - Preparing IPS 19 - at Tg Jiu meeting with road engineer to clarify the
8.00 supporting documents/ Preparing the Monthly Report - January 2015 / Daily Site
Journal / Daily Activity Program
8.00

5r3 - Preparing IPS 19 - at Tg Jiu meeting with Hyder;S QS, weekly meeting on
8.00 IPS's Issues / the supporting documents / Preparing the Monthly Report - January
2015 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 19 / Preparing the Monthly Report - January 2015, scan,
8.00
copies, forwarding letter / Daily Site Journal / Daily Activity Program
5r3 - Preparing tables for VO 1 / Daily Measurements / Daily Site Journal / Daily
8.00
Activity Program

VO 2 - guardrails / Cantilevels / Bridges - variations / Daily Site Journal / Daily


Activity Program
went on tg jiu - daily site journal - diaconu;s signature / Daily Site Journal / Daily
8.00
Activity Program / Daily Measurements
went on tg jiu - meeting with Hyder;s QS, Meeting with Road Engineer to hand
8.00 over Quality Documents and to Receive Quality Documents / Daily Site Journal /
Daily Activity Program
8.00

LOT 6 - vo list for Antonio / 5r3 - review of VO1 - GI engineer;s draft / VO2 - guard
rails - review of Engineer;s draft / Daily Site Journal / Daily Activity Program

VO 3 - reinforcement

VO 3 - reinforcement / Cantilevels / Bridges - variations / Daily Site Journal / Daily


Activity Program
VO 1 - economical impact in respons to Employer letter regarding VO1 - draft sent
8.00
by the Engineer / Daily Site Journal / Daily Activity Program
5r3 - meeting on Tg. Jiu along with Dan Dutescu, talkings about quality documents
8.00
and IPC on going / daily site journal / daily activity journal
5r3 - meeting on Tg Jiu with Hyder's QS - VO 2 / GUARD RAILS - ON
CANTILEVERS AND BRIDGES / daily activity journal / daily site journal

5r3 - daily measurements - cantilevers / earthworks / culverts / daily activity journal


/ daily site journal
5r3 - daily measurements - cantilevers / earthworks / culverts / daily activity journal
4.00
/ daily site journal

5r3 - VO - overpassed quantities on bridges / daily activity journal / daily site


journal
5r3 - VO - overpassed quantities on bridges / daily activity journal / daily site
journal
5r3 - meeting on Tg Jiu with Hyder's QS - IPS 19 / VO - GUARD RAILS / daily
activity journal / daily site journal
5r3 - meeting on Tg Jiu - the weeklly meeting / meeting with engineer;s bridge
inspector / vo - bridges / daily activity journal / daily site journal
5r3 - vo bridges - 107+740 and 115+500 - preparations of revised BoQ / daily
activity journal / daily site journal
5r3 - vo bridges - 118+225 and 120+150 - preparations of revised BoQ / daily
activity journal / daily site journal

172.00

Summary of Days Worked To Date


Contract
TOTAL

Previous

537
Employee's Signature

Crlig Constantin-Florin
Date:
2/3/2015

This Month

Cumul

21.5

558.5

General Manager
Carlos Galido

Project Manager

Antonio Jose Seve Martin

Month/Mes:
Year/Ao:

Martie / March / Martzo


2015

Name of Company: S.C. INTEGRAL DESIGN S.R.L.


Employee's Name: Crlig Constantin - Florin
Title: QUANTITY SURVEYOR (5R3)
Contract Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUAL
Martie / March / Martzo

Mo

9.00

18.30

14,00-15,00

5r3 - vo bridges - 121+080 - preparations of revised BoQ / prepare table


8.00 with AB2 on culverts for tomorrow Antonio;s meeting with HMM /daily
activity journal / daily site journal

Tu

9.00

18.30

14,00-15,00

8.00

5r3 - TG. JIU visit at QS Engineer office and Road Inspector Engineer
office on asphalt and ballast issue / daily activity journal / daily site journal

We

9.00

18.30

14,00-15,00

5r3 - TG. JIU at Road Engineer and Bridge Engineer Office to pick up
documents for IPC 11 - they had not returned the documents signed as
agreed and ask for more papers - the issus is on Quality Office to be
8.00
clariffiend / also at QS Engineer office to discuss and close the Quantity
for VO - guard rainls - change of legislation / daily activity journal / daily
site journal

Th

9.00

18.30

14,00-15,00

8.00

5r3 - vo bridges - 125+320 - preparations of revised BoQ / LOT 6 - print


Quantities Calculation Notes of Caransebes Maintenance Center received from Dragos Enasescu /
/ daily activity journal / daily site
journal

Fr

9.00

18.30

14,00-15,00

5r3 - Went on Tg Jiu to hand the Bridge Engineer the Technical


Description of the Bridge Injections, also it was held a meeting with
8.00 Engineer's Road Engineer and Resident Engineer on the issue of present
and future Certifications / 5r3 - meeting with Engineer's / Daily Site
Journal / Daily Activity Program

Sa

9.00

18.30

14,00-15,00

5r3 - Monthly report - february 2015 / Photo Report - February 2015 /


8.00 Preparing table of quantities for Balast, Crushed Stone and Drainage
Material on Cantilevers

Su

Mo

9.00

18.30

14,00-15,00

5r3 - Went on Tg Jiu to hand the Bridge Engineer the papers for Bridge
8.00 Injections also handed to Road Inspector the papers for AB2 / Working
with Engineers QS on IPC 11 / Daily Site Journal / Daily Activity Program

Tu

10

9.00

18.30

14,00-15,00

5r3 - Went on Tg Jiu to hand the Bridge Engineer the papers for Bridge
Injections also took over papers signed for certification AB2 / Get in
8.00 touch with Adrian Vechiu to find a final version of the Technical
Description for Bridges Injections / Working with Engineers QS on IPC 11
/ Daily Site Journal / Daily Activity Program

We

11

9.00

18.30

14,00-15,00

5r3 - Went on Tg Jiu to hand the Bridge Engineer the papers for Bridge
8.00 Injections also took over papers signed for certification AB2 / Working
with Engineers QS on IPC 11 / Daily Site Journal / Daily Activity Program

Th

12

9.00

18.30

14,00-15,00

9.00

18.30

14,00-15,00

5r3 - Went on Tg Jiu to Engineer QS office to send the IPC 11 to


8.00 Bucharest - also discution with bridge Engineer to sign the Injectons
PVLA;s / Daily Site Journal / Daily Activity Program
5r3 - IPC 11 Analisys - Comparitions / Daily Site Journal / Daily Activity
8.00
Program

Fr

13

Sa

14

Su

15

Mo

16

9.00

18.30

14,00-15,00

5r3 - Preparing accounts list for Drainage Works / VO 4 - Utilities Telecom


8.00 and Water/Sewage - Econnomical Impact + Correspondence / Daily Site
Journal / Daily Activity Program

Tu

17

9.00

18.30

14,00-15,00

5r3 - Preparing accounts list for Erthwork / VO 4 - Utilities Telecom


8.00 Econnomical Impact + Correspondence / Daily Site Journal / Daily Activity
Program

We

18

9.00

18.30

14,00-15,00

8.00

Th

19

9.00

18.30

14,00-15,00

Fr

20

9.00

18.30

14,00-15,00

8.00 5r3 - Meeting on Tg Jiu / Daily Site Journal / Daily Activity Program
5r3 - Look over vo2 - guardrails / list of payments on IPC 11 / Daily Site
8.00
Journal / Daily Activity Program

Sa

21

9.00
9.00
9.00
9.00
9.00
12.00

18.30
18.30
18.30
18.30
18.30
16.00

14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
0

Su

22

Mo

23

Tu

24

We

25

Th

26

Fr

27

Sa

28

TOTAL

16

5r3 - Preparing accounts list for Bridges / VO 5 - Utilities Water / Sewage


+ Correspondence / Daily Site Journal / Daily Activity Program

128.00

Summary of Days Worked To Date


Contract
TOTAL

Previous

558
Employee's Signature

Crlig Constantin-Florin
Date:
2/3/2015

This Month

16
General Manager
Carlos Galido

Cumul

574
Project Manager

Antonio Jose Seve Martin

You might also like