You are on page 1of 5

CHECK LIST FOR BTS SITES

1 (5)

SITE ENGINEERING

TELECOM IMPLEMENTATION INSPECTION REPORT


SITE ID: ........................
Visit: .......................

SITE NAME: ................................................Date Of

SITE ADDRESS: ...........Document


number: .........................
Guard Name and contact No.
Date of submission of Report:.
Notation:
S.N
o.

Correctly installed / Acceptable

Not correct

Infrastructure

Check point

Radio Site

GBT

RTT

POLE

ID/OD/POLE/WALL

INDOOR

Shelter

Buildg. Height (Mtrs/floor)

OUTDOOR

WALL

POLE

Equipment Room Floor

Chain Pulley required


4

Space For
Equipments
(Sharing sites)

Space available for BTS

Space Available for TRSM Rack

Floor

Levelled
grounding

Door

Sealing

ID LADDER

ID LADDER INSTALLED

SPACE ON EXISTING LADDER

Lighting

No. of fittings 2
Sockets operational

Operational

Earthing system

No of Pits with Chamber prepared

Antistatic Mat

Antistatic

Locking

Earthpits are interconnected

DG,DG-N,Tower,Shelter are conneted to EP


Earthing Values EP1
Ohms
10

Earthing Bus
Bars

EGB under feeder entry


IGB under feeder entry
EMP BUS BAR

EP2

EP3

Connected to Body Earthpit


Connected to Eqpt Earthpit

CHECK LIST FOR BTS SITES

2 (5)

SITE ENGINEERING

11

PIU/ACDB

PIU/ACDB Installed

POWER TERMINATION AT PIU/ACDB

PIU/ACDB commissioned

12

Mains Incomer

Mains available

Energy Meter Installed

13

DC Power
Availability

DC Power Available

14

DG

DG installed

15

Air-conditioning

Installed

16

WFT

Size of opening made for WFT

MCB available for BTS& TRSM

DG Commissioned

Sealing around AC units

ACs are comm.

No of Openings made

Openings are properly sealed


17

Tower

GBT

RTT

Tower Height

No of Platforms & height

18

Type

19

Cable ladder
(OD)

Tower Painting

Tower Type

Vertical Cable tray installed

Horizontal Cable tray installed

Space available on Vertical/Horizontal tray

20

Cable Ladder
lengths

Length of Vertcal ladder(above HCT till antenna mount)


mtrs.
Length of HCT ladder

21

Lightening
Protection

Lightening Rod

22

Aviation Light

Installation

in mtrs.

LA connected to Earthpit

COMMISSIONED

in

CHECK LIST FOR BTS SITES

3 (5)

SITE ENGINEERING

23

Cable Inlet

24

Antenna Mount

For Power & Signal Cables

GSM antenna mount Installed


Antenna Mount for MW at Far End

25

GSM antenna
Mount hts.(as
per TND)

Height of GSM antennas

26

GSM antenna
Mount hts.
(existing)

Height of GSM antennas

27

MW Antenna
Mount ht.

Height of MW antennas

(as per TND)


28

MW Antenna
Mount ht.
(Existing)

29

GSM antenna
Azimuth(As per
TND)

30

GSM antenna
Azimuth
(existing)

31

MW Antenna
Azimuth(As per
TND)

32

MW Antenna
Azimuth
(Existing)

Height of MW antennas

Antenna Mount for MW at near end

CHECK LIST FOR BTS SITES


SITE ENGINEERING

Problems / Comments (Refer to applicable activity Sl. No.)


_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________

Site Engineer Name & Signature:


Name:...

4 (5)

CHECK LIST FOR BTS SITES

5 (5)

SITE ENGINEERING
Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)

You might also like