beban puncak Juni 2014 tercatat sebagai yang tertinggi dibanding rekor tertinggi padabula

rekor beban puncak tertinggi di April 2014 sebesar 22.974 MW (terjadi pada tanggal 24 Ap

rekor tertinggi padabulan April dan Mei, yakni 23.420 Megawatt (MW) yang terjadi pada Senin, 9 Juni pukul 18.
rjadi pada tanggal 24 April jam 18.00 WIB) dan rekor beban puncak tertinggi bulan lalu sebesar 23.208 MW (ter

a Senin, 9 Juni pukul 18.00 WIB


sebesar 23.208 MW (terjadi pada 6 Mei jam 18.00 WIB)

COAL FIRED POWER PLANT EXPERIENCED


ALSTOM
Belchatow, Poland 858 MW
using an ultra supercritical steam cycle
RDK8, Karlsruhe, Germany, - 220 MW

Manjung, Malaysia 2,100 MW (3 x 700 MW)


Built in 2002
Maritza East 1, Bulgaria 300 MW

COAL FIRED POWER PLANT EXPERIENCED


DAEWOO

POSCO

Jorf Lasfar Power Plant, 2010


2 x 350

Angamos Coal fired Power


Plant, Chile, 2011
2 x 260 unit
Campiche Coal fired Power, Plant, Chile 2013
270 MW
Nueva Ventanas coal fired power plant, 2009
270 MW

ower, Plant, Chile 2013

fired power plant, 2009

PARTNER COMPARISON
Partner

Skoda Praha

210 MW Pljevlja
power plant,
Montenegro (2013)
Experience

Ansaldo
Ansaldo STS

Ansaldo Energia

Freight
Railways & Mass Transit

a 600 MW gas
plant in Egypt

2011

3000 MW power
plant in Vietnam
2007

Negara

Ceko

Italia

TYPE

EPC

EPC

Doosan
Muandra, India
4000 MW
2013

Korea
EPC

PLTU Lontar 3
Kapasitas

Awarded
investasi
jenis batubara
Teknologi

:
:
:
:

3 x 315 MW
unit 1 COD Dec 2011
unit 2 COD 2012
unit 3 COD 2013
Dongfang Electric Corporation & PT Dalle Energy
USD 588 Juta + Rp 2 T
= Rp 7 Triliun
Batubara Loreng/kalori rendah
Supercritical
(digunakan untuk batubara kalori rendah sehingga
meningkatkan efektifitas pembakaran 20%)

2005 AnsaldoCaldaie Boilers India Pvt. Ltd. is established in Chennai. The Company, 85%
manufactures and supplies Utility Boilers and Heat Recovery Steam Generators in India.

2006 A milestone: HRSG # 100 awarded (250 MWe Horizontal Rizziconi Combined Cyc

successes for Ansaldo Caldaie in the supply 250 MW Class HRSGs installed in 400 MW Com
Santa Barbara, Vado Ligure, Escatron.

2008 Contract award for 2650 MW oil and gas fired boilers for Abu Qir Power Plant, Egy

MW Units for El Tebbin Power Plant in 2007, Ansaldo Caldaie enlarges its track record in Egy

2009 Shuaibah (Saudi Arabia) and Torrevaldaliga North (Italy) units start successfully com

2012With the contract awards for 2 HRSGs for Bahna 400 MW Combined Cycle Power Pl
Ansaldo Caldaie confirms its leadership on Egypts market

nnai. The Company, 85% owned by Ansaldo Caldaie, designs,


m Generators in India.

Rizziconi Combined Cycle Power Plant, Italy). The award follows a number of other
nstalled in 400 MW Combined Cycle Power Plants such as Rosignano, Sparanise,

Abu Qir Power Plant, Egypt. With this award, which follows the contract for 2350
ges its track record in Egypt.

its start successfully commercial operation

Combined Cycle Power Plant and 1650 MW oil/gas fired boiler for Suez Power Plant,