You are on page 1of 4

LS-09

LS-10
LS-11
LS-12
LS-13
LS-14
LS-15
LS-16
LS-17
LS-18
LS-19
LS-20
LS-21
LS-22
LS-23
LS-24
LS-25
LS-26
LS-27
LS-28
LS-29
LS-30
LS-31
LS-32
LS-33
LS-34

H/Bad

Gujrat

Sialkot

G/Wala

Chakwal

Jhelum

Attock

R/Pindi

N/Sahib

Kitchen Expenses (tea, meat, milt fuel fat & appliances) Ch. 3 Item 16 (i)
Lantern, Patromax lamp depreciation and K. oil consumption Ch. 3 Item 16 (i)
Medical Charges
Kitchen Utensil, cost of repair and replacement etc. Ch. 3 Item 16 (i)
Construction of Temporary Island (Ch. 6 Item 7 (i)
Carriage of material to site of work (Boring Material) (Ch. 6 Item 7 (i)
Hire charges of plant (Ch. 6 Item 8 (a) & (b)
Hire charges of assembling bunch cable wire cutter stressing, jack Hydraulic
pump, conce, fixer grout injecting pump relievable observation and supply of
recorded data of stresses. (Ch. 6 Item 20)
Repair of plate for the down struts spacers (Ch. 6 Item 21)
Hire charges of wire cutter stressing, Jack, Hydraulic pump relievable cone,
observation and supply of recorded data of stress. (Ch. 6 Item 21)
Fixture (Ch. 9 Item 18)
Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii)
Nail & Screws bolt and brackets (Ch. 12 Item 24 (a)
Accessories for fixing of Eave Board (Ch. 12 Item 28 (b)
Cost of Putty and Nails (Ch. 12 Item 44 a)
Electricity Charges (Ch. 12 Item 51)
Hold Fast (Ch. 12 Item. 57 b)
Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16)
Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch. 18 Item 10)
Excavation and fixing (Ch. 18 Item 18 (iv) a)
Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a)
Painting and lettering (Ch. 18 Item 18 (iv) a)
Fixing manhole frame & cover including carriage to site (Ch. 21 Item. 15)
Rental Charges of T&P (Ch. 21 Item. 19 a i)
Carriage from store to site of work for reverse rotary drilling reg complete set
and generator set etc. (Ch. 23 Item 5 (a) i)
Mix. Expenditure (Ch. 23 Item 5 (a) i)
Taking and preserving box 2 lbs sample of strata. (Ch. 23 Item 7)
23 Item 7)
Sealing the water sample and providing necessary packing etc.(Ch. 23 Item 7)
Handling charges (Ch. 23 Item 7)
C. Oil (Ch. 23 item 17 i & ii)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 3" (Ch. 23 Table 19 C)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 4" (Ch. 23 Table 19 C)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 5" (Ch. 23 Table 19 C)

S/Pura

LS-01
LS-02
LS-03
LS-04
LS-05
LS-06
LS-07
LS-08

Unit

Kasur

MATERIAL

Okara

S. No.

Lahore

INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2010 (July to September)

300

300

300

300

300

300

300

300

300

300

300

300

300

40

40

40

40

40

40

40

40

40

40

40

40

40

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

500

500

500

500

500

500

500

500

500

500

500

500

500

800

800

800

800

800

800

800

800

800

800

800

800

800

500

500

500

500

500

500

500

500

500

500

500

500

500

400

400

400

400

400

400

400

400

400

400

400

400

400

200

200

200

200

200

200

200

200

200

200

200

200

200

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

12

12

12

12

12

12

12

12

12

12

12

12

12

16

16

16

16

16

16

16

16

16

16

16

16

16

40

40

40

40

40

40

40

40

40

40

40

40

40

12

12

12

12

12

12

12

12

12

12

12

12

12

200

200

200

200

200

200

200

200

200

200

200

200

200

22

22

22

22

22

22

22

22

22

22

22

22

22

40

40

40

40

40

40

40

40

40

40

40

40

40

80

80

80

80

80

80

80

80

80

80

80

80

80

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

600

600

600

600

600

600

600

600

600

600

600

600

600

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

40

40

40

40

40

40

40

40

40

40

40

40

40

20

20

20

20

20

20

20

20

20

20

20

20

20

30

30

30

30

30

30

30

30

30

30

30

30

30

20

20

20

20

20

20

20

20

20

20

20

20

20

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

Page 1 of 4

R.Y.Khan

B/Nagar

Lodhran

B/Pur

K/Wal

Vehari

P/Pattan

Sahiwal

R/Pur

D.G.Khan

Layyah

M/Garh

Multan

Bhakkar

M/Wali

Khushab

S/Godha

T.Tsing

Jhung

Chiniot

F/Bad

Chiniot

N/Wal

M.B.Din

INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2010 (July to September)

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

12000

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

400

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

16

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

47.2

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

40

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

0.84

Page 2 of 4

S. No.
LS-01
LS-02
LS-03
LS-04
LS-05
LS-06
LS-07

LS-08
LS-09
LS-10
LS-11
LS-12
LS-13
LS-14
LS-15
LS-16
LS-17
LS-18
LS-19
LS-20
LS-21
LS-22
LS-23
LS-24
LS-25
LS-26
LS-27
LS-28
LS-29
LS-30
LS-31
LS-32
LS-33
LS-34

LS-35 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 6" (Ch. 23 Table 19 C)
LS-36 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 8" (Ch. 23 Table 19 C)
LS-37 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 10" (Ch. 23 Table 19 C)
LS-38 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 12" (Ch. 23 Table 19 C)
LS-39 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 15" (Ch. 23 Table 19 C)
LS-40 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 18" (Ch. 23 Table 19 C)
LS-41 Soldering etc. (Ch. 24 Item 5 i)
LS-42 Locking arrangement (Ch. 24 Item 44 i)
LS-43 Extra labour for shuttering (Ch. 24 Item 44 i)
LS-44 Testing Fee (Ch. 24 Item 75 a & b)
LS-45 Leatheride Paper (Ch. 24 Item 76 i)
LS-46 Carriage from stone to site (Ch. 24 Item 42 a)
LS-47 Carriage to site of work (Ch. 25 Item 41 a)
LS-48 Carriage to site of work (Ch. 25 Item 41 b)
LS-49 Electric charges with electrode (Ch. 24 Item 42 a)
LS-50 Sewing charges (Labour) (Ch. 26 Item 4)
LS-51 Cost of Polish & Nails (Ch. 26 Item 20)
LS-52 Rope, rags, etc. (Ch. 26 Item 22)
LS-53 Filling cement bags with coal (Ch. 26 Item 27)
LS-54 Cotton Waste, Grease & Packing etc. (Ch. 26 Item 35 b)
LS-55 Accessories, repair and replacement portion (Ch. 26 Item 35 b)
LS-56 Spraying Machine (Ch. 26 Item 42)

H/Bad

Gujrat

Sialkot

G/Wala

Chakwal

Jhelum

Attock

R/Pindi

N/Sahib

S/Pura

Unit

Kasur

MATERIAL

Okara

S. No.

Lahore

INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2010 (July to September)

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

60

60

60

60

60

60

60

60

60

60

60

60

60

10

10

10

10

10

10

10

10

10

10

10

10

10

120

120

120

120

120

120

120

120

120

120

120

120

120

10

10

10

10

10

10

10

10

10

10

10

10

10

80

80

80

80

80

80

80

80

80

80

80

80

80

25

25

25

25

25

25

25

25

25

25

25

25

25

20

20

20

20

20

20

20

20

20

20

20

20

20

120

120

120

120

120

120

120

120

120

120

120

120

120

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

55

55

55

55

55

55

55

55

55

55

55

55

55

Page 3 of 4

R.Y.Khan

B/Nagar

Lodhran

B/Pur

K/Wal

Vehari

P/Pattan

Sahiwal

R/Pur

D.G.Khan

Layyah

M/Garh

Multan

Bhakkar

M/Wali

Khushab

S/Godha

T.Tsing

Jhung

Chiniot

F/Bad

Chiniot

N/Wal

M.B.Din

INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2010 (July to September)

S. No.

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

25

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

Page 4 of 4

LS-35
LS-36
LS-37
LS-38
LS-39
LS-40
LS-41
LS-42
LS-43
LS-44
LS-45
LS-46
LS-47
LS-48
LS-49
LS-50
LS-51
LS-52
LS-53
LS-54
LS-55
LS-56

You might also like