Project :

Project Runway

Subject :

Response to DPWH Queries

Client :

Travellers Inc.

Prepared by :

Paul Padrinao

Item No

Document

Page No / Item #

Item

Interim Report from AIT

Page 5 of 22

Seismic Load

For Revsion

DPWH Comments

Sy2 Response
2/20/2015

for brige structure : use AASHTO

SY2 / AIT to provide response on Feb. 25, 2015

Done

Interim Report from AIT

Page 6 of 22

Wind Load

3
4

Interim Report from AIT


Interim Report from AIT

Page 7 of 22
Page 13 of 22

Earthquake Load
Structural Geometry

Use AASHTO
to verify and must be SI units (kph)
Use AASHTO
Identify Pile no.

SY2 / AIT to provide response on Feb. 25, 2015


for compliance (250Kph)
SY2 / AIT to provide response on Feb. 25, 2015

Done: Wind load calculated as per AASHTO


Done: Wind speed modified to 250 kph
Done

Interim Report from AIT

Page 14 of 22

Interim Report from AIT

Page 15 of 22

Foundation Calculation Table 4-1 : Load on Pile

What are the soil/boring parameters on bored pile design?

please see attached geotechnical report

Foundation Calculation Table 4-2 : Pile Capacity and D / C


Ratio

calculation for pile capacity

Interim Report from AIT

Page 16 of 22

Foundation Calculation Table 4-3 : Foundation Design

please see attached geotechnical report

8
9
10

Design Criteria
Structural Design Final Report
Structural Design Final Report

Pages 1,2, & 3


Page 7 of 38
Page 8 of 38

Codes and Reference Documents


Design Load
Earthquake Load (EQ)

11

Structural Design Final Report

Page 31 of 38

Design Resiult of Piers Combination Summary

12

Structural Plan

from DMCI : Elevation


showing iconic brige and
NaiaX

13

Structural Plan

S-TRW1-01

14

Structural Plan

S-TRW1-05

15

BOD Ref. No. 000361

Consider geotechnical data in the design of the bored pile foundation at the main structure

16

BOD Ref. No. 000361

Submit analysis for the determination of ultimate pile capacity of bored pile

please see attached geotechnical report

17

BOD Ref. No. 000361

Indicate on plan the requirement of PDA and PIT for bored piles

DMCI to issue key plan and PDA/PIT Results

18

BOD Ref. No. 000361

Boring data and its location should be indicated on plan

EELHI to provide copy of the bore log / please see


attached geotechnical report
SY2 / AIT to provide response on Feb. 25, 2015

To be provided next week

Maximum Design Loads for Buildings and


Structures : ASCE 7-05
ASCE 7-05
125 m/s
UBC 97

For Pile Cap

As per table the depth is 350cm but in the drawing the depth is
300cm, which will govern
Use AASHTO Specifications, Use SI Units
See attached comments

AIT Response
2/25/2015

300cm depth governs


SY2 / AIT to provide response on Feb. 25, 2015
SY2 / AIT to provide response on Feb. 25, 2015
SY2 / AIT to provide response on Feb. 25, 2015

Done
Done
Done

refer to AIT final report dated 04 Feb 2015 pages 29-32


4798mm clearance height

should be at least 5.3m per AASHTO requirements

5.00m will govern as per BOD Ref. No. 000361 item # 8.

Construction Notes

1. Foundation is designed based on


allowable pile capacities prepared by Dr.
Salvador Reyes

Support with Bore Hole Data

EELHI to provide copy of the bore log / please see


attached geotechnical report

Schedule of Bored Pile

Allow. Pile Capacity (KN)

Use Ultimate Pile Capacity

ultimate capacity is used ; please see attached


geotechnical report
please see attached geotechnical report

19

BOD Ref. No. 000361

Provide connection of helical rings to substructure at both supports on the plan, specifically the type of bearing to be used. Consider high-damping rubber bearings, subject to
verification as to structural design and its applicability

20

BOD Ref. No. 000361

Structural model and complete design calculations of the iconic bridge should be submitted for verification of results. Also, submit summary of design forces used in design
calculations.

SY2 / AIT to provide response on Feb. 25, 2015

SAP200 model is provided. Maximum DC ratio in of the


primary ring, Top chords and end frame has been provided
in the design report. For secondary rings and Braces and
ties, please refer from the model.

21

BOD Ref. No. 000361

Seismic design of the main structure should be in accordance with AASHTO 2002 Specifications instead of UBC 1997 as indicated in the report

SY2 / AIT to provide response on Feb. 25, 2015

The response spectrum curve is created for PGA of 0.5g as


per UBC-97. The results has been verified with the AASHTO
2012

22

BOD Ref. No. 000361

Minimum Vertical Cleaance between soffit of the iconic roof and naiax should be 5.00m instead of 4.70m as indicated on the plan

for compliance

23

BOD Ref. No. 000361

Submit copy of letter of no obligation from the building official concerned and copy of MOA between Naia T3 and Travellers International Hotel Group

response c/o EELHI

24

BOD Ref. No. 000361

10

Other comments are indicated in pencil on the plan and report

refer to AIT final report dated 04 Feb 2015