You are on page 1of 150

B.O.Q.

1
Item HSR No
1.1

MS-022

DESCRIPTION
Cleaning ordinary Jungle Including
Removing High Growing Plants and Trees
of Girth < 300 mm other than those
designated to remain. by Uprooting or by
Cutting and then uprooting the Stumps or
by Cutting only as Directed (SSCM 1203.2)

1.2

E1-027

Roadway Excavation in Unclassified Soil


Using Machinery Excluding Loading and
Piling (Cutting Measurement)

1.3

DR-014

Cleaning desilting existing side drains


and lead up drains to proper shape and
gradient and transport of excavated
materials from road side up to 100m

1.4 DR-005A Cutting side drains of std. Dimensions in


unclassified soil using machine (Back hoe
J.C.B) including shipping trimming and
leveling bottom manually
1.5
1.6

1.7

1.8

1.9

1.10

1.11

1.12

UNIT QUANTITY

Km

0.75

RATE

###

AMOUNT

5,133.75

Cu.m

130.00

351.00

45,630.00

L.m

200.00

22.00

4,400.00

Cu.m

71.00

Braking Road Surface to 50 mm Depth by


Hand , Screen & Replace Old Aggregate
Sq.m
700.00
M1-012A Dense Draded Aggregate Base (Aggregate
Vase Course) Seprading watering and
Compacting Graded 37.5 mm Aggregate
to Form a Dense Aggregate Base Using
Machinery Including Motor Grader & Roller
Hire Charges. incl. Transport (Loos)
Cu.m
560.00
S1-017 Tack Coat Using Emulsion (CSS-1) @ the
Rate of 0.75 ltr/Sq.m inclusive of Brushing,
Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.1-503.3]
Sq.m 2625.00
A1-010 37.5 mm Aggregate, Single Size Crusher
Production Including Piling , Loading &
transport [SSCM 404.1-406.1 : Table 1701Cu.m 164.00
4
A1-011 19 mm Aggregate, Single Size Crusher
Production Including Piling , Loading&
transport [SSCM 404.1-406.1 ]
Cu.m
16.50
M1-004 Spreading & Compaction 50-19 mm New
Aggregate by Roller Including Watering
Hire, Etc. (Loose Volume) [SSCM 403.3(c)]
m3
180.50
S1-001A Bitumen Surface 1st Coat Using 2ltr/Sq.m
including Blinding with Sand @ the Rate of
125
Sq.m/Cu.m
[SSCM
503.1]
(department Bitumen ) (incl.transport)
Sq.m 2625.00
S1-008A Bitumen Surfacing 2nd/Subsequent Coat
using 1.0ltr/Sq.m including Blinding with
Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)] (incl.transport)
Sq.m 2625.00

461.00

32,731.00

68.00

47,600.00

M1-002

###

###

105.00 275,625.00

4,208.00 690,112.00

4,506.00

74,349.00

### 196,023.00

86.54 227,167.50

67.39 176,898.75

1.13

T1

Transport of Bitumen (empty brl )

Brl

54.00

115.85

6,255.90

1.14

T1

Transport of cut Earth

m3

150.00

336.00

50,400.00

1.15

B0-111

Smooth/road roller (8-10 tons) static

Day

1.00

###

7,425.00

Transport of J.C.B.

Day

0.50

###

10,250.00

1.16

TOTAL

###

Improvement of Danthure Uduwela Road


From 0.00 to 0.75 Edge protecton Rd Shoulder Maintaining
B.O.Q.2

Item
2.1

2.2

2.3

HSR

DESCRIPTION

UNIT

QTY

EW-009 Trimming , Leveling and Compaction of


Original Ground/Subgrade to 100 % STD
Density [SSCM 304.3(c)]
Sq.m ###
ST-046 Mixing & Laying Manually Cement
Concrete
1:2:4
(19
mm)
(Volume
Batching) Using Crusher Run Aggregate
Cu.m ###
(incl. Transport )
ST-064 Supplying & fixing 25mm Thick Planks and
Struts of Class II Timber as Formwork
Rough Finish, in Foundation Etc. Including
Removing (SSCM 1008.3(b))
Sq.m ###
TOTAL

RATE

63.00

AMOUNT

104,580.00

###

###

1,068.00

186,900.00
###

PROVINCIAL ROAD DEVELOPMENT AUTHORITY


CENTRAL PROVINCIAL COUNCIL
ESTIMATE FOR THE EXPENSE NECESSARY TO BE INCURRED FOR :- Improvement of Danthure Uduwela Road
From 0.00-0.75 km
District :- Kandy
E.E.Division :-Kandy
Divisional Secretary Area :ITEM
DESCRIPTION

TOTAL

ITEM

In Rs.

NO
This estimate provides for all labour, Meteria 1
Tools transport expenses necessary for the 2
Improvement of Danthure Uduwela
Road
All works as per the body of this estimate.
Class of road
:3
Platform Width
:- 6.0 m AV
4
Carriage way
:- 3.5 m AV
Length Of Road
:- 2.40 km
5
Transport of metal
:- 40 km
6
Transport of sand

:- 96 km

Transport f Soil

:-

Transport of Bitumen

B.O.Q 1 Item No.1.1 to 1.16


B.O.Q 2 Item No.2.1 to 2.03

4,479,200.90
1,959,880.20
Total

6,439,081.10

Cost of Bitumen (44@16470)


Cost of Bitumen Transport (44@941)
TOTAL COST OF CIVIL WORKS

724,680.00
41,404.00

Item
Item
Item
Item

772,689.73

allow
allow
allow
allow

for
for
for
for

VAT - (12%)
overserages & travelling expences &
Administration charges (5%)
Contingencies - ( sum)

:-

AMOUNT In Rs.

360,258.26
161,886.91

TOTAL ESTIMATED COST

766,084.00
7,205,165.10

1,294,834.90

8,500,000.00

Divisional Office

Chief Engineer's Office

Head Office :-

Prepared by :Name
:- Sgd. N.G.D.Muthunayake
Designation
:- T.O.
Signature
:-

Checked by :Name
:- Sgd.
Designation :Signature
:-

Checked by :Name
:- W.G.Ranaweera
Designation :- T.O.
Signature
:- ..

Checked by :Name
:Designation
:- T.O.
Signature
:-

Recommended & Submitted / Approved :- Compared by:Name


:- Sgd. W.M.I.S.K.Wijekoon
Name
:- K.Waidyarathna
Designation :- Chife Engineer (Kandy)
Designation :- D'Man
Signature
:-.
Signature :-

Recommended &Submitted / Approved :Name


:- Sgd. C.Abeygunasakara
Designation
:- Executive Engineer
Signature
:-

Recommended by:Name
:- R.A.Sirisena
Designation :- Office Engineer
Signature :-
Approved :Name
:- A.M.M.Faleel
Designation :- General Manager (P.R.D.A.)
Signature :-

Designation :- General Manager (P.R.D.A.)

Original / Duplicate
Duplicate
Issued to Mr./Mrs. ....................................................................................................................
Address : ........................................................................................................................................
..............................................................................
Receipt. No. of REFUNDABLE tender deposit : .......................................................................
Receipt. No. of NON REFUNDABLE tender fee : ......................................................................
Improvement of Danthure Uduwela Road
From 0.00 to 0.75 km
B.O.Q.1
Item

DESCRIPTION

Cleaning ordinary Jungle Including Removing


High Growing Plants and Trees of Girth < 300
mm other than those designated to remain. by
Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed (SSCM
1203.2)
1.2 Roadway Excavation in Unclassified Soil Using
Machinery Excluding Loading and Piling (Cutting
Measurement)

UNIT QUANTITY RATE

1.1

Km

Cu.m

Cleaning desilting existing side drains and lead


up drains to proper shape and gradient and
transport of excavated materials from road side
L.m
up to 100m
1.4 Cutting side drains of std. Dimensions in
unclassified soil using machine (Back hoe J.C.B)
including shipping trimming and leveling bottom
Cu.m
manually
1.5 Braking Road Surface to 50 mm Depth by Hand ,
Screen & Replace Old Aggregate
Sq.m

0.75

130.00

1.3

1.6 Dense Draded Aggregate Base (Aggregate Vase


Course) Seprading watering and Compacting
Graded 37.5 mm Aggregate to Form a Dense
Aggregate Base Using Machinery Including Motor
Grader & Roller Hire Charges. incl. Transport
Cu.m
(Loos)
1.7 Tack Coat Using Emulsion (CSS-1) @ the Rate of
0.75 ltr/Sq.m inclusive of Brushing, Cleaning
Road Surface and Cost of Emulsion (Manual)
Sq.m
[SSCM 502.1-503.3]
1.8 37.5 mm Aggregate, Single Size Crusher
Production Including Piling , Loading & transport
[SSCM 404.1-406.1 : Table 1701-4
Cu.m
1.9 19 mm Aggregate, Single Size Crusher
Production Including Piling , Loading& transport
[SSCM 404.1-406.1 ]
Cu.m
Spreading & Compaction 50-19 mm New
1.10
Aggregate by Roller Including Watering Hire, Etc.
(Loose Volume) [SSCM 403.3(c)]
m3
1.11 Bitumen Surface 1st Coat Using 2ltr/Sq.m
including Blinding with Sand @ the Rate of 125
Sq.m/Cu.m [SSCM 503.1] (department Bitumen )
(incl.transport)

Sq.m

200.00

71.00
700.00

560.00

2625.00

164.00

16.50

180.50

2625.00

file:///var/www/apps/conversion/tmp/scratch_2/263531454.xls

AMOUNT

Item

DESCRIPTION

UNIT QUANTITY RATE

1.12 Bitumen Surfacing 2nd/Subsequent Coat using


1.0ltr/Sq.m including Blinding with Sand @ 125
Sq.m/Cu.m
(New
Work) [SSCM
503.1(b)]
(Department Bitumen) (incl.transport)
1.13
1.14
1.15
1.16

Transport of Bitumen (empty brl )


Transport of cut Earth
Smooth/road roller (8-10 tons) static
Transport of J.C.B.
TOTAL

Sq.m
Brl
m3
Day
Day

AMOUNT

2625.00
54.00
150.00
1.00
0.50

Improvement of Danthure Uduwela Road


From 0.00 to 0.75 Edge protecton Rd Shoulder Maintaining
B.O.Q.2

Item

DESCRIPTION

UNIT

2.1 Trimming , Leveling and Compaction of Original


Ground/Subgrade to 100 % STD Density [SSCM Sq.m
2.2 304.3(c)]
Mixing & Laying Manually Cement Concrete 1:2:4
(19 mm) (Volume Batching) Using Crusher Run
Aggregate (incl. Transport )
Cu.m
2.3 Supplying & fixing 25mm Thick Planks and Struts
of Class II Timber as Formwork Rough Finish, in
Foundation Etc. Including Removing (SSCM
1008.3(b))
TOTAL

Sq.m

QTY
1660.00

108.00

175.00

file:///var/www/apps/conversion/tmp/scratch_2/263531454.xls

RATE

AMOUNT

Improvement of Danthure Uduwela Road


From 0.00 to 0.75 km

Summary

Rs

B.O.Q 1 Item No.1.1 to 1.16

B.O.Q 2 Item No.2.1 to 2.03

Tendered amount (Excluding VAT.) in words Rupees ..............................................................


............................................................................................................................................

Signature of Tenderer.............................................................................................................

Seal

Name of Tenderer..................................................................................................................
Address of Tenderer...............................................................................................................

VAT No ....................................................................
(If available)

VAT Amount : in figures Rupees.

VAT Amount in word Rupees ..................................................................................................


...............................................................................................................................................

Witness

1. Signature :...............................................

Name & Address :

2. Signature : .....................................

Name & Address :

file:///var/www/apps/conversion/tmp/scratch_2/263531454.xls

file:///var/www/apps/conversion/tmp/scratch_2/263531454.xls

CENTRAL PROVINCIAL HIGHWAYS DEPARTMENT

ESTIMATE FOR THE EXPENSE NECESSARY TO BE INCURRED FOR :Improvement of Danthure Uduwela Road From 0.00 to 1.00km

District :-

From
E.E.Division :- Kandy

Kandy

Divisional Secretary Area :DESCRIPTION


This estimate provides for all labour, Meterial,
Improvement of Danthure Uduwela Road
From 0.00 to 1.00

ITEM
NO
1
2

ITEM

TOTAL

In Rs.

AMOUNT In Rs.

B.O.Q 1 Item No.1.1 to 1.15

4,479,200.90

B.O.Q 2 Item No.2.1 to 2.10

1,959,880.20

Rreparing for upland quarters


the body of this estimate.
Class of road
:-

6,439,081.10

Total
Platform Width

:-

Carriage way
Length Of Road

::-

Transport of metal
Transport of Asphalt

::

Cost of bitumen (0@16470/=)


Cost of bitumen transport from sapugaskanda to
Office (0@845.85)
Total Civil Cost
3
4
5
6

6,439,081.10

Item allow for overseragas & travelling expences &


Item allow for Administration charges (5.0%)
Item allow for VAT (12%)
Item allow for Contingencies -

321,954.06

772,689.73
68,784.29

7,602,509.18

TOTAL ESTIMATED COST


Divisional Office
Prepared by :Name
:- Sgd. N.G.D. Muthunayaka
Designation :- T.O.
Signature
:Forwarded by :Name
:Designation :Signature
:Recommended &Submitted / Approved :Name
:- Sgd. C.E. Abeygunasekara
Designation :- EE
Signature
:-

1,163,428.08

Chief Engineer's Office

Head Office :-

Checked by :Name
:Designation :Signature :-

Checked by :Name
:Designation :Signature :- ..

Recommended & Submitted / Approved :Name


:- W.M.I.S.K. Wijekoon
Designation :- Chief Engineer - Kandy
Signature :-

Recommended & Submitted / Approved :Name


:- A.M.M Faleel
Designation :- Genaral Manager (prda)
Signature :-

Section 1- Transport
See Section 1 of General Notes for Selection of Mode of Transport
Item No

Description

Unit

T1-001

Transport of Soil beyond 25m and up to and including100 m by Any


Means (including Loading and Unloading)

Cu.m

T1-002

Transport beyond 100m and up to and including0.5km by Any


Means (Excluding Loading)

Cu.m

T1-003A

Transport beyond 0.5km and up to and including 1.0km by Any


Means.(Excluding Loading)

Cu.m

T1-003B

Transport of each 1km beyond 1.0 to 8.0 km by Any Means


(Excluding Loading)

Cu.m

T1-003C

Transport of Each Subsequent 1km beyond 8km by Any Means


(Excluding Loading)

Cu.m

TM-2

Transport of Sand/Soil /Metal up to 2km by Any Means (including


Loading and Unloading)

Cu.m

TM-3

Transport of Sand/Soil /Metal up to 3km by Any Means (including


Loading and Unloading)

Cu.m

TM-4

Transport of Sand/Soil /Metal up to 4km by Any Means (including


Loading and Unloading)

Cu.m

TM-5

Transport of Sand/Soil /Metal up to 5km by Any Means (including


Loading and Unloading)

Cu.m

TM-6

Transport of Sand/Soil /Metal up to 6km by Any Means (including


Loading and Unloading)

Cu.m

TM-7

Transport of Sand/Soil /Metal up to 7km by Any Means (including


Loading and Unloading)

Cu.m

TM-8

Transport of Sand/Soil /Metal up to 8km by Any Means (including


Loading and Unloading)

Cu.m

TM-9

Transport of Sand/Soil /Metal up to 9km by Any Means (including


Loading and Unloading)

Cu.m

TM-10

Transport of Sand/Soil /Metal up to10km by Any Means (including


Loading and Unloading)

Cu.m

TM-11

Transport of Sand/Soil /Metal up to 11km by Any Means (including


Loading and Unloading)

Cu.m

TM-12

Transport of Sand/Soil /Metal up to 12km by Any Means (including


Loading and Unloading)

Cu.m

TM-13

Transport of Sand/Soil /Metal up to 13km by Any Means (including


Loading and Unloading)

Cu.m

TM-14

Transport of Sand/Soil /Metal up to 14km by Any Means (including


Loading and Unloading)

Cu.m

TM-15

Transport of Sand/Soil /Metal up to 15km by Any Means (including


Loading and Unloading)

Cu.m

TM-16

Transport of Sand/Soil /Metal up to 16km by Any Means (including


Loading and Unloading)

Cu.m

TM-17

Transport of Sand/Soil /Metal up to 17km by Any Means (including


Loading and Unloading)

Cu.m

TM-18

Transport of Sand/Soil /Metal up to18km by Any Means (including


Loading and Unloading)

Cu.m

TM-19

Transport of Sand/Soil /Metal up to 19km by Any Means (including


Loading and Unloading)

Cu.m

TM-20

Transport of Sand/Soil /Metal up to 20km by Any Means (including


Loading and Unloading)

Cu.m

TM-21

Transport of Sand/Soil /Metal up to 21km by Any Means (including


Loading and Unloading)

Cu.m

TM-22

Transport of Sand/Soil /Metal up to 22km by Any Means (including


Loading and Unloading)

Cu.m

TM-23

Transport of Sand/Soil /Metal up to 23km by Any Means (including


Loading and Unloading)

Cu.m

TM-24

Transport of Sand/Soil /Metal up to 24km by Any Means (including


Loading and Unloading)

Cu.m

TM-25

Transport of Sand/Soil /Metal up to 25km by Any Means (including


Loading and Unloading)

Cu.m

TM-26

Transport of Sand/Soil /Metal up to 26km by Any Means (including


Loading and Unloading)

Cu.m

TM-27

Transport of Sand/Soil /Metal up to 27km by Any Means (including


Loading and Unloading)

Cu.m

TM-28

Transport of Sand/Soil /Metal up to 28km by Any Means (including


Loading and Unloading)

Cu.m

TM-29

Transport of Sand/Soil /Metal up to 29km by Any Means (including


Loading and Unloading)

Cu.m

TM-30

Transport of Sand/Soil /Metal up to 30km by Any Means (including


Loading and Unloading)

Cu.m

TM-31

Transport of Sand/Soil /Metal up to 31km by Any Means (including


Loading and Unloading)

Cu.m

TM-32

Transport of Sand/Soil /Metal up to 32km by Any Means (including


Loading and Unloading)

Cu.m

TM-33

Transport of Sand/Soil /Metal up to 33km by Any Means (including


Loading and Unloading)

Cu.m

TM-34

Transport of Sand/Soil /Metal up to 34km by Any Means (including


Loading and Unloading)

Cu.m

TM-35

Transport of Sand/Soil /Metal up to 35km by Any Means (including


Loading and Unloading)

Cu.m

TM-36

Transport of Sand/Soil /Metal up to 36km by Any Means (including


Loading and Unloading)

Cu.m

TM-37

Transport of Sand/Soil /Metal up to 37km by Any Means (including


Loading and Unloading)

Cu.m

TM-38

Transport of Sand/Soil /Metal up to 38km by Any Means (including


Loading and Unloading)

Cu.m

TM-39

Transport of Sand/Soil /Metal up to 39km by Any Means (including


Loading and Unloading)

Cu.m

TM-40

Transport of Sand/Soil /Metal up to 40km by Any Means (including


Loading and Unloading)

Cu.m

TM-45

Transport of Sand/Soil /Metal up to 45km by Any Means (including


Loading and Unloading)

Cu.m

TM-50

Transport of Sand/Soil /Metal up to 50km by Any Means (including


Loading and Unloading)

Cu.m

TM-55

Transport of Sand/Soil /Metal up to 55km by Any Means (including


Loading and Unloading)

Cu.m

TM-60

Transport of Sand/Soil /Metal up to 60km by Any Means (including


Loading and Unloading)

Cu.m

TM-65

Transport of Sand/Soil /Metal up to 65km by Any Means (including


Loading and Unloading)

Cu.m

TM-70

Transport of Sand/Soil /Metal up to 70km by Any Means (including


Loading and Unloading)

Cu.m

TM-75

Transport of Sand/Soil /Metal up to 75km by Any Means (including


Loading and Unloading)

Cu.m

TM-80

Transport of Sand/Soil /Metal up to 80km by Any Means (including


Loading and Unloading)

Cu.m

TM-85

Transport of Sand/Soil /Metal up to 85km by Any Means (including


Loading and Unloading)

Cu.m

TM-90

Transport of Sand/Soil /Metal up to 90km by Any Means (including


Loading and Unloading)

Cu.m

TM-95

Transport of Sand/Soil /Metal up to 95km by Any Means (including


Loading and Unloading)

Cu.m

TM-100

Transport of Sand/Soil /Metal up to 100km by Any Means


(including Loading and Unloading)

Cu.m

TM-110

Transport of Sand/Soil /Metal up to 110km by Any Means


(including Loading and Unloading)

Cu.m

TM-120

Transport of Sand/Soil /Metal up to 120km by Any Means


(including Loading and Unloading)

Cu.m

TM-130

Transport of Sand/Soil /Metal up to 130km by Any Means


(including Loading and Unloading)

Cu.m

TM-140

Transport of Sand/Soil /Metal up to 140km by Any Means


(including Loading and Unloading)

Cu.m

TM-150

Transport of Sand/Soil /Metal up to 150km by Any Means


(including Loading and Unloading)

Cu.m

TM-160

Transport of Sand/Soil /Metal up to 160km by Any Means


(including Loading and Unloading)

Cu.m

TB-1

Transport of Barrels of Bitumen up to 1.0km (Excluding Loading


and Unloading)

BrlKm

TB-2

Transport of Barrels of Bitumen up to 1.0km (Excluding Loading


and Unloading)

BrlKm

TB-3

Transport of Barrels of Bitumen up to 3.0km (Excluding Loading


and Unloading)

BrlKm

TB-4

Transport of Barrels of Bitumen up to 4.0km (Excluding Loading


and Unloading)

BrlKm

TB-5

Transport of Barrels of Bitumen up to 5.0km (Excluding Loading


and Unloading)

BrlKm

TB-6

Transport of Barrels of Bitumen up to 6.0km (Excluding Loading


and Unloading)

BrlKm

TB-7

Transport of Barrels of Bitumen up to 7.0km (Excluding Loading


and Unloading)

BrlKm

TB-8

Transport of Barrels of Bitumen up to 8.0km (Excluding Loading


and Unloading)

BrlKm

TB-9

Transport of Barrels of Bitumen up to 9.0km (Excluding Loading


and Unloading)

BrlKm

TB-10

Transport of Barrels of Bitumen up to 10.0km (including Loading


and Unloading)

BrlKm

TB-11

Transport of Barrels of Bitumen up to 11.0km (Including Loading


and Unloading)

BrlKm

TB-12

Transport of Barrels of Bitumen up to 12.0km (Including Loading


and Unloading)

BrlKm

TB-13

Transport of Barrels of Bitumen up to 13.0km (Including Loading


and Unloading)

BrlKm

TB-14

Transport of Barrels of Bitumen up to 14.0km (Including Loading


and Unloading)

BrlKm

TB-15

Transport of Barrels of Bitumen up to 15.0km (Including Loading


and Unloading)

BrlKm

TB-16

Transport of Barrels of Bitumen up to 16.0km (Including Loading


and Unloading)

BrlKm

TB-17

Transport of Barrels of Bitumen up to 17.0km (Including Loading


and Unloading)

BrlKm

TB-18

Transport of Barrels of Bitumen up to 18.0km (Including Loading


and Unloading)

BrlKm

TB-19

Transport of Barrels of Bitumen up to 19.0km (Including Loading


and Unloading)

BrlKm

TB-20

Transport of Barrels of Bitumen up to 20.0km (Including Loading


and Unloading)

BrlKm

TB-21

Transport of Barrels of Bitumen up to 21.0km (Including Loading


and Unloading)

BrlKm

TB-22

Transport of Barrels of Bitumen up to 22.0km (Including Loading


and Unloading)

BrlKm

TB-23

Transport of Barrels of Bitumen up to 23.0km (Including Loading


and Unloading)

BrlKm

TB-24

Transport of Barrels of Bitumen up to 24.0km (Including Loading


and Unloading)

BrlKm

TB-25

Transport of Barrels of Bitumen up to 25.0km (Including Loading


and Unloading)

BrlKm

TB-26

Transport of Barrels of Bitumen up to 26.0km (Including Loading


and Unloading)

BrlKm

TB-27

Transport of Barrels of Bitumen up to 27.0km (Including Loading


and Unloading)

BrlKm

TB-28

Transport of Barrels of Bitumen up to 28.0km (Including Loading


and Unloading)

BrlKm

TB-29

Transport of Barrels of Bitumen up to 29.0km (Including Loading


and Unloading)

BrlKm

TB-30

Transport of Barrels of Bitumen up to 30.0km (Including Loading


and Unloading)

BrlKm

TB-31

Transport of Barrels of Bitumen up to 31.0km (Including Loading


and Unloading)

BrlKm

TB-32

Transport of Barrels of Bitumen up to 32.0km (Including Loading


and Unloading)

BrlKm

TB-33

Transport of Barrels of Bitumen up to 33.0km (Including Loading


and Unloading)

BrlKm

TB-34

Transport of Barrels of Bitumen up to 34.0km (Including Loading


and Unloading)

BrlKm

TB-35

Transport of Barrels of Bitumen up to 35.0km (Including Loading


and Unloading)

BrlKm

TB-36

Transport of Barrels of Bitumen up to 36.0km (Including Loading


and Unloading)

BrlKm

TB-37

Transport of Barrels of Bitumen up to 37.0km (Including Loading


and Unloading)

BrlKm

TB-38

Transport of Barrels of Bitumen up to 38.0km (Including Loading


and Unloading)

BrlKm

TB-39

Transport of Barrels of Bitumen up to 39.0km (Including Loading


and Unloading)

BrlKm

TB-40

Transport of Barrels of Bitumen up to 40.0km (Including Loading


and Unloading)

BrlKm

TB-45

Transport of Barrels of Bitumen up to 45.0km (Including Loading


and Unloading)

BrlKm

TB-50

Transport of Barrels of Bitumen up to 50.0km (Including Loading


and Unloading)

BrlKm

TB-55

Transport of Barrels of Bitumen up to 55.0km (Including Loading


and Unloading)

BrlKm

TB-60

Transport of Barrels of Bitumen up to 60.0km (Including Loading


and Unloading)

BrlKm

TB-65

Transport of Barrels of Bitumen up to 65.0km (Including Loading


and Unloading)

BrlKm

TB-70

Transport of Barrels of Bitumen up to 70.0km (Including Loading


and Unloading)

BrlKm

TB-75

Transport of Barrels of Bitumen up to 75.0km (Including Loading


and Unloading)

BrlKm

TB-80

Transport of Barrels of Bitumen up to 80.0km (Including Loading


and Unloading)

BrlKm

TB-85

Transport of Barrels of Bitumen up to 85.0km (Including Loading


and Unloading)

BrlKm

TB-90

Transport of Barrels of Bitumen up to 90.0km (Including Loading


and Unloading)

BrlKm

TB-95

Transport of Barrels of Bitumen up to 95.0km (Including Loading


and Unloading)

BrlKm

TB-100

Transport of Barrels of Bitumen up to 100.0km (Including Loading


and Unloading)

BrlKm

TB-110

Transport of Barrels of Bitumen up to 110.0km (Including Loading


and Unloading)

BrlKm

TB-120

Transport of Barrels of Bitumen up to 120.0km (Including Loading


and Unloading)

BrlKm

TB-130

Transport of Barrels of Bitumen up to 130.0km (Including Loading


and Unloading)

BrlKm

TB-140

Transport of Barrels of Bitumen up to 140.0km (Including Loading


and Unloading)

BrlKm

TB-150

Transport of Barrels of Bitumen up to 150.0km (Including Loading


and Unloading)

BrlKm

TB-160

Transport of Barrels of Bitumen up to 160.0km (Including Loading


and Unloading)

BrlKm

TEB-1

Transport of Barrels of Bitumen up to 1.0km (Including Loading


and Unloading)

BrlKm

TEB-2

Transport of Barrels of Bitumen up to 1.0km (Including Loading


and Unloading)

BrlKm

TEB-3

Transport of Barrels of Bitumen up to 3.0km (Including Loading


and Unloading)

BrlKm

TEB-4

Transport of Barrels of Bitumen up to 4.0km (Including Loading


and Unloading)

BrlKm

TEB-5

Transport of Barrels of Bitumen up to 5.0km (Including Loading


and Unloading)

BrlKm

TEB-6

Transport of Barrels of Bitumen up to 6.0km (Including Loading


and Unloading)

BrlKm

TEB-7

Transport of Barrels of Bitumen up to 7.0km (Including Loading


and Unloading)

BrlKm

TEB-8

Transport of Barrels of Bitumen up to 8.0km (Including Loading


and Unloading)

BrlKm

TEB-9

Transport of Barrels of Bitumen up to 9.0km (Including Loading


and Unloading)

BrlKm

TEB-10

Transport of Barrels of Bitumen up to 10.0km (Including Loading


and Unloading)

BrlKm

TEB-11

Transport of Barrels of Bitumen up to 11.0km (Including Loading


and Unloading)

BrlKm

TEB-12

Transport of Barrels of Bitumen up to 12.0km Including Loading


and Unloading)

BrlKm

TEB-13

Transport of Barrels of Bitumen up to 13.0km (Including Loading


and Unloading)

BrlKm

TEB-14

Transport of Barrels of Bitumen up to 14.0km (Including Loading


and Unloading)

BrlKm

TEB-15

Transport of Barrels of Bitumen up to 15.0km (Including Loading


and Unloading)

BrlKm

TEB-16

Transport of Barrels of Bitumen up to 16.0km (Including Loading


and Unloading)

BrlKm

TEB-17

Transport of Barrels of Bitumen up to 17.0km (Including Loading


and Unloading)

BrlKm

TEB-18

Transport of Barrels of Bitumen up to 18.0km (Including Loading


and Unloading)

BrlKm

TEB-19

Transport of Barrels of Bitumen up to 19.0km (Including Loading


and Unloading)

BrlKm

TEB-20

Transport of Barrels of Bitumen up to 20.0km (Including Loading


and Unloading)

BrlKm

TEB-21

Transport of Barrels of Bitumen up to 21.0km (Including Loading


and Unloading)

BrlKm

TEB-22

Transport of Barrels of Bitumen up to 22.0km (Including Loading


and Unloading)

BrlKm

TEB-23

Transport of Barrels of Bitumen up to 23.0km (Including Loading


and Unloading)

BrlKm

TEB-24

Transport of Barrels of Bitumen up to 24.0km (Including Loading


and Unloading)

BrlKm

TEB-25

Transport of Barrels of Bitumen up to 25.0km (Including Loading


and Unloading)

BrlKm

TEB-26

Transport of Barrels of Bitumen up to 26.0km (Including Loading


and Unloading)

BrlKm

TEB-27

Transport of Barrels of Bitumen up to 27.0km (Including Loading


and Unloading)

BrlKm

TEB-28

Transport of Barrels of Bitumen up to 28.0km (Including Loading


and Unloading)

BrlKm

TEB-29

Transport of Barrels of Bitumen up to 29.0km (Including Loading


and Unloading)

BrlKm

TEB-30

Transport of Barrels of Bitumen up to 30.0km (Including Loading


and Unloading)

BrlKm

TEB-31

Transport of Barrels of Bitumen up to 31.0km (Including Loading


and Unloading)

BrlKm

TEB-32

Transport of Barrels of Bitumen up to 32.0km (Including Loading


and Unloading)

BrlKm

TEB-33

Transport of Barrels of Bitumen up to 33.0km (Including Loading


and Unloading)

BrlKm

TEB-34

Transport of Barrels of Bitumen up to 34.0km (Including Loading


and Unloading)

BrlKm

TEB-35

Transport of Barrels of Bitumen up to 35.0km (Including Loading


and Unloading)

BrlKm

TEB-36

Transport of Barrels of Bitumen up to 36.0km (Including Loading


and Unloading)

BrlKm

TEB-37

Transport of Barrels of Bitumen up to 37.0km (Including Loading


and Unloading)

BrlKm

TEB-38

Transport of Barrels of Bitumen up to 38.0km (Including Loading


and Unloading)

BrlKm

TEB-39

Transport of Barrels of Bitumen up to 39.0km (Including Loading


and Unloading)

BrlKm

TEB-40

Transport of Barrels of Bitumen up to 40.0km (Including Loading


and Unloading)

BrlKm

TEB-45

Transport of Barrels of Bitumen up to 45.0km (Including Loading


and Unloading)

BrlKm

TEB-50

Transport of Barrels of Bitumen up to 50.0km (Including Loading


and Unloading)

BrlKm

TEB-55

Transport of Barrels of Bitumen up to 55.0km (Including Loading


and Unloading)

BrlKm

TEB-60

Transport of Barrels of Bitumen up to 60.0km (Including Loading


and Unloading)

BrlKm

TEB-65

Transport of Barrels of Bitumen up to 65.0km (Including Loading


and Unloading)

BrlKm

TEB-70

Transport of Barrels of Bitumen up to 70.0km (Including Loading


and Unloading)

BrlKm

TEB-75

Transport of Barrels of Bitumen up to 75.0km (Including Loading


and Unloading)

BrlKm

TEB-80

Transport of Barrels of Bitumen up to 80.0km (Including Loading


and Unloading)

BrlKm

TEB-85

Transport of Barrels of Bitumen up to 85.0km (Including Loading


and Unloading)

BrlKm

TEB-90

Transport of Barrels of Bitumen up to 90.0km (Including Loading


and Unloading)

BrlKm

TEB-95

Transport of Barrels of Bitumen up to 95.0km (Including Loading


and Unloading)

BrlKm

TEB-100

Transport of Barrels of Bitumen up to 100.0km (Including Loading


and Unloading)

BrlKm

TEB-110

Transport of Barrels of Bitumen up to 110.0km (Including Loading


and Unloading)

BrlKm

TEB-120

Transport of Barrels of Bitumen up to 120.0km (Including Loading


and Unloading)

BrlKm

TEB-130

Transport of Barrels of Bitumen up to 130.0km (Including Loading


and Unloading)

BrlKm

TEB-140

Transport of Barrels of Bitumen up to 140.0km (Including Loading


and Unloading)

BrlKm

TEB-150

Transport of Barrels of Bitumen up to 150.0km (Including Loading


and Unloading)

BrlKm

TEB-160

Transport of Barrels of Bitumen up to 160.0km (Including Loading


and Unloading)

BrlKm

TCE-0.5-1

Transport of cement
Unloading)

up to 0- 1.0km

(Including Loading and

TCE-1

Transport of cement
Unloading)

up to

1.0km

(Including Loading and

TCE-2

Transport of cement
Unloading)

up to

2.0km

(Including Loading and

Bags(50kgs)
Bags(50kgs)
Bags(50kgs)

TCE-3

Transport of cement
Unloading)

up to

3.0km

(Including Loading and

TCE-4

Transport of cement
Unloading)

up to

4.0km

(Including Loading and

TCE-5

Transport of cement
Unloading)

up to

5.0km

(Including Loading and

TCE-6

Transport of cement
Unloading)

up to

6.0km

(Including Loading and

TCE-7

Transport of cement
Unloading)

up to

7.0km

(Including Loading and

TCE-8

Transport of cement
Unloading)

up to

8.0km

(Including Loading and

TCE-9

Transport of cement
Unloading)

up to

9.0km

(Including Loading and

TCE-10

Transport of cement
Unloading)

up to

10.0km

(Including Loading and

TCE-11

Transport of cement
Unloading)

up to

11.0km

(Including Loading and

TCE-12

Transport of cement
Unloading)

up to

12.0km

(Including Loading and

TCE-13

Transport of cement
Unloading)

up to

13.0km

(Including Loading and

TCE-14

Transport of cement
Unloading)

up to

14.0km

(Including Loading and

TCE-15

Transport of cement
Unloading)

up to

15.0km

(Including Loading and

TCE-16

Transport of cement
Unloading)

up to

16.0km

(Including Loading and

TCE-17

Transport of cement
Unloading)

up to

17.0km

(Including Loading and

TCE-18

Transport of cement
Unloading)

up to

18.0km

(Including Loading and

TCE-19

Transport of cement
Unloading)

up to

19.0km

(Including Loading and

TCE-20

Transport of cement
Unloading)

up to

20.0km

(Including Loading and

TCE-21

Transport of cement
Unloading)

up to

21.0km

(Including Loading and

TCE-22

Transport of cement
Unloading)

up to

22.0km

(Including Loading and

TCE-23

Transport of cement
Unloading)

up to

23.0km

(Including Loading and

TCE-24

Transport of cement
Unloading)

up to

24.0km

(Including Loading and

TCE-25

Transport of cement
Unloading)

up to

25.0km

(Including Loading and

Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)

TCE-26

Transport of cement
Unloading)

up to

26.0km

(Including Loading and

TCE-27

Transport of cement
Unloading)

up to

27.0km

(Including Loading and

TCE-28

Transport of cement
Unloading)

up to

28.0km

(Including Loading and

TCE-29

Transport of cement
Unloading)

up to

29.0km

(Including Loading and

TCE-30

Transport of cement
Unloading)

up to

1.0km

(Including Loading and

TCE-31

Transport of cement
Unloading)

up to

31.0km

(Including Loading and

TCE-32

Transport of cement
Unloading)

up to

32.0km

(Including Loading and

TCE-33

Transport of cement
Unloading)

up to

33.0km

(Including Loading and

TCE-34

Transport of cement
Unloading)

up to

34.0km

(Including Loading and

TCE-35

Transport of cement
Unloading)

up to

35.0km

(Including Loading and

TCE-36

Transport of cement
Unloading)

up to

36.0km

(Including Loading and

TCE-37

Transport of cement
Unloading)

up to

37.0km

(Including Loading and

TCE-38

Transport of cement
Unloading)

up to

38.0km

(Including Loading and

TCE-39

Transport of cement
Unloading)

up to

39.0km

(Including Loading and

TCE-40

Transport of cement
Unloading)

up to

40.0km

(Including Loading and

TCE-45

Transport of cement
Unloading)

up to

45.0km

(Including Loading and

TCE-50

Transport of cement
Unloading)

up to

50.0km

(Including Loading and

TCE-55

Transport of cement
Unloading)

up to

55.0km

(Including Loading and

TCE-60

Transport of cement
Unloading)

up to

60.0km

(Including Loading and

TCE-65

Transport of cement
Unloading)

up to

65.0km

(Including Loading and

TCE-70

Transport of cement
Unloading)

up to

70.0km

(Including Loading and

TCE-75

Transport of cement
Unloading)

up to

75.0km

(Including Loading and

TCE-80

Transport of cement
Unloading)

up to

80.0km

(Including Loading and

Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)

TCE-85

Transport of cement
Unloading)

up to

85.0km

(Including Loading and

TCE-90

Transport of cement
Unloading)

up to

90.0km

(Including Loading and

TCE-95

Transport of cement
Unloading)

up to

95.0km

(Including Loading and

TCE-100

Transport of cement
Unloading)

up to

100.0km

(Including Loading and

TCE-110

Transport of cement
Unloading)

up to

110.0km

(Including Loading and

TCE-120

Transport of cement
Unloading)

up to

120.0km

(Including Loading and

TCE-130

Transport of cement
Unloading)

up to

130.0km

(Including Loading and

TCE-140

Transport of cement
Unloading)

up to

140.0km

(Including Loading and

TCE-150

Transport of cement
Unloading)

up to

150.0km

(Including Loading and

TCE-160

Transport of cement
Unloading)

up to

160.0km

(Including Loading and

TST0.5-1 Transport of Steel up to .0-1km (Including Loading and Unloading)

Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
50kgs

TST-1

Transport of Steel up to 1km (Including Loading and Unloading)

50kgs

TST-2

Transport of Steel up to 2km (Including Loading and Unloading)

50kgs

TST-3

Transport of Steel up to 3km (Including Loading and Unloading)

50kgs

TST-4

Transport of Steel up to 4km (Including Loading and Unloading)

50kgs

TST-5

Transport of Steel up to 5km (Including Loading and Unloading)

50kgs

TST-6

Transport of Steel up to 6km (Including Loading and Unloading)

50kgs

TST-7

Transport of Steel up to 71km (Including Loading and Unloading)

50kgs

TST-8

Transport of Steel up to 8km (Including Loading and Unloading)

50kgs

TST-9

Transport of Steel up to 9km (Including Loading and Unloading)

50kgs

TST-10 Transport of Steel up to 10km (Including Loading and Unloading)

50kgs

TST-11

50kgs

Transport of Steel up to 11km (Including Loading and Unloading)

TST-12 Transport of Steel up to 12m (Including Loading and Unloading)

50kgs

TST-13 Transport of Steel up to 13m (Including Loading and Unloading)

50kgs

TST-14 Transport of Steel up to 14km (Including Loading and Unloading)

50kgs

TST-15 Transport of Steel up to 15km (Including Loading and Unloading)

50kgs

TST-16 Transport of Steel up to 16km (Including Loading and Unloading)

50kgs

TST-17 Transport of Steel up to 17km (Including Loading and Unloading)

50kgs

TST-18 Transport of Steel up to 18km (Including Loading and Unloading)

50kgs

TST-19 Transport of Steel up to 19km (Including Loading and Unloading)

50kgs

TST-20 Transport of Steel up to 20km (Including Loading and Unloading)

50kgs

TST-21 Transport of Steel up to 21km (Including Loading and Unloading)

50kgs

TST-22 Transport of Steel up to 22km (Including Loading and Unloading)

50kgs

TST-23 Transport of Steel up to 23km (Including Loading and Unloading)

50kgs

TST-24 Transport of Steel up to 24km (Including Loading and Unloading)

50kgs

TST-25 Transport of Steel up to 25km (Including Loading and Unloading)

50kgs

TST-26 Transport of Steel up to 26km (Including Loading and Unloading)

50kgs

TST-27 Transport of Steel up to 27km (Including Loading and Unloading)

50kgs

TST-28 Transport of Steel up to 28km (Including Loading and Unloading)

50kgs

TST-29 Transport of Steel up to 29km (Including Loading and Unloading)

50kgs

TST-30 Transport of Steel up to 30km (Including Loading and Unloading)

50kgs

TST-31 Transport of Steel up to 31km (Including Loading and Unloading)

50kgs

TST-32 Transport of Steel up to 32km (Including Loading and Unloading)

50kgs

TST-33 Transport of Steel up to 33km (Including Loading and Unloading)

50kgs

TST-34 Transport of Steel up to 34km (Including Loading and Unloading)

50kgs

TST-35 Transport of Steel up to 35km (Including Loading and Unloading)

50kgs

TST-36 Transport of Steel up to 36km (Including Loading and Unloading)

50kgs

TST-37 Transport of Steel up to 37km (Including Loading and Unloading)

50kgs

TST-38 Transport of Steel up to 38km (Including Loading and Unloading)

50kgs

TST-39 Transport of Steel up to 39km (Including Loading and Unloading)

50kgs

TST-40 Transport of Steel up to 40km (Including Loading and Unloading)

50kgs

TST-45 Transport of Steel up to 45km (Including Loading and Unloading)

50kgs

TST-50 Transport of Steel up to 50km (Including Loading and Unloading)

50kgs

TST-55 Transport of Steel up to 55km (Including Loading and Unloading)

50kgs

TST-60 Transport of Steel up to 60km (Including Loading and Unloading)

50kgs

TST-65 Transport of Steel up to 65km (Including Loading and Unloading)

50kgs

TST-70 Transport of Steel up to 70km (Including Loading and Unloading)

50kgs

TST-75 Transport of Steel up to 75km (Including Loading and Unloading)

50kgs

TST-80 Transport of Steel up to 80km (Including Loading and Unloading)

50kgs

TST-85 Transport of Steel up to 85km (Including Loading and Unloading)

50kgs

TST-90 Transport of Steel up to 90km (Including Loading and Unloading)

50kgs

TST-95 Transport of Steel up to 95km (Including Loading and Unloading)

50kgs

TST-100 Transport of Steel up to 100km (Including Loading and Unloading)

50kgs

TST-110 Transport of Steel up to 110km (Including Loading and Unloading)

50kgs

TST-120 Transport of Steel up to 120m (Including Loading and Unloading)

50kgs

TST-130 Transport of Steel up to 130km (Including Loading and Unloading)

50kgs

TST-140 Transport of Steel up to 140km (Including Loading and Unloading)

50kgs

TST-150 Transport of Steel up to 150km (Including Loading and Unloading)

50kgs

TST-160 Transport of Steel up to 160km (Including Loading and Unloading)

50kgs

TLH-.5-1

Transport of Hume Pipes 915mm diameter up to 0.5-1km (Including


Loading and Unloading)

Lm.Km

TLH-1

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-2

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-3

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-4

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-5

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-6

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-7

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-8

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-9

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-10

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-11

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-12

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-13

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-14

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-15

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-16

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-17

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-18

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-19

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-20

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-21

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-22

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-23

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-24

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-25

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-26

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-27

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-28

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-29

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-30

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-31

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-32

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-33

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-34

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-35

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-36

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-37

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-38

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-39

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-40

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-45

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-50

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-55

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-60

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-65

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-70

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-75

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-80

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-85

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-90

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-95

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-100

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-110

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-120

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-130

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-140

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-150

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TLH-160

Transport of Hume Pipes 915mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TSH-.5-1

Transport of Hume Pipes 610mm diameter up to 0.5-1km (Including


Loading and Unloading)

Lm.Km

TSH-1

Transport of Hume Pipes 610mm diameter up to1km (Including


Loading and Unloading)

Lm.Km

TSH-2

Transport of Hume Pipes 610mm diameter up to 2km (Including


Loading and Unloading)

Lm.Km

TSH-3

Transport of Hume Pipes 610mm diameter up to 3km (Including


Loading and Unloading)

Lm.Km

TSH-4

Transport of Hume Pipes 610mm diameter up to 4km (Including


Loading and Unloading)

Lm.Km

TSH-5

Transport of Hume Pipes 610mm diameter up to 5km (Including


Loading and Unloading)

Lm.Km

TSH-6

Transport of Hume Pipes 610mm diameter up to6km (Including


Loading and Unloading)

Lm.Km

TSH-7

Transport of Hume Pipes 610mm diameter up to7km (Including


Loading and Unloading)

Lm.Km

TSH-8

Transport of Hume Pipes 610mm diameter up to8km (Including


Loading and Unloading)

Lm.Km

TSH-9

Transport of Hume Pipes 610mm diameter up to9km (Including


Loading and Unloading)

Lm.Km

TSH-10

Transport of Hume Pipes 610mm diameter up to10km (Including


Loading and Unloading)

Lm.Km

TSH-11

Transport of Hume Pipes 610mm diameter up to11km (Including


Loading and Unloading)

Lm.Km

TSH-12

Transport of Hume Pipes 610mm diameter up to12km (Including


Loading and Unloading)

Lm.Km

TSH-13

Transport of Hume Pipes 610mm diameter up to13km (Including


Loading and Unloading)

Lm.Km

TSH-14

Transport of Hume Pipes 610mm diameter up to14km (Including


Loading and Unloading)

Lm.Km

TSH-15

Transport of Hume Pipes 610mm diameter up to15km (Including


Loading and Unloading)

Lm.Km

TSH-16

Transport of Hume Pipes 610mm diameter up to16km (Including


Loading and Unloading)

Lm.Km

TSH-17

Transport of Hume Pipes 610mm diameter up to17km (Including


Loading and Unloading)

Lm.Km

TSH-18

Transport of Hume Pipes 610mm diameter up to18km (Including


Loading and Unloading)

Lm.Km

TSH-19

Transport of Hume Pipes 610mm diameter up to19km (Including


Loading and Unloading)

Lm.Km

TSH-20

Transport of Hume Pipes 610mm diameter up to20km (Including


Loading and Unloading)

Lm.Km

TSH-21

Transport of Hume Pipes 610mm diameter up to21km (Including


Loading and Unloading)

Lm.Km

TSH-22

Transport of Hume Pipes 610mm diameter up to22km (Including


Loading and Unloading)

Lm.Km

TSH-23

Transport of Hume Pipes 610mm diameter up to23km (Including


Loading and Unloading)

Lm.Km

TSH-24

Transport of Hume Pipes 610mm diameter up to24km (Including


Loading and Unloading)

Lm.Km

TSH-25

Transport of Hume Pipes 610mm diameter up to25km (Including


Loading and Unloading)

Lm.Km

TSH-26

Transport of Hume Pipes 610mm diameter up to26km (Including


Loading and Unloading)

Lm.Km

TSH-27

Transport of Hume Pipes 610mm diameter up to27km (Including


Loading and Unloading)

Lm.Km

TSH-28

Transport of Hume Pipes 610mm diameter up to28km (Including


Loading and Unloading)

Lm.Km

TSH-29

Transport of Hume Pipes 610mm diameter up to29km (Including


Loading and Unloading)

Lm.Km

TSH-30

Transport of Hume Pipes 610mm diameter up to30km (Including


Loading and Unloading)

Lm.Km

TSH-31

Transport of Hume Pipes 610mm diameter up to31km (Including


Loading and Unloading)

Lm.Km

TSH-32

Transport of Hume Pipes 610mm diameter up to32km (Including


Loading and Unloading)

Lm.Km

TSH-33

Transport of Hume Pipes 610mm diameter up to33km (Including


Loading and Unloading)

Lm.Km

TSH-34

Transport of Hume Pipes 610mm diameter up to34km (Including


Loading and Unloading)

Lm.Km

TSH-35

Transport of Hume Pipes 610mm diameter up to35km (Including


Loading and Unloading)

Lm.Km

TSH-36

Transport of Hume Pipes 610mm diameter up to36km (Including


Loading and Unloading)

Lm.Km

TSH-37

Transport of Hume Pipes 610mm diameter up to37km (Including


Loading and Unloading)

Lm.Km

TSH-38

Transport of Hume Pipes 610mm diameter up to38km (Including


Loading and Unloading)

Lm.Km

TSH-39

Transport of Hume Pipes 610mm diameter up to39km (Including


Loading and Unloading)

Lm.Km

TSH-40

Transport of Hume Pipes 610mm diameter up to40km (Including


Loading and Unloading)

Lm.Km

TSH-45

Transport of Hume Pipes 610mm diameter up to45km (Including


Loading and Unloading)

Lm.Km

TSH-50

Transport of Hume Pipes 610mm diameter up to45km (Including


Loading and Unloading)

Lm.Km

TSH-55

Transport of Hume Pipes 610mm diameter up to55km (Including


Loading and Unloading)

Lm.Km

TSH-60

Transport of Hume Pipes 610mm diameter up to60km (Including


Loading and Unloading)

Lm.Km

TSH-65

Transport of Hume Pipes 610mm diameter up to65km (Including


Loading and Unloading)

Lm.Km

TSH-70

Transport of Hume Pipes 610mm diameter up to70km (Including


Loading and Unloading)

Lm.Km

TSH-75

Transport of Hume Pipes 610mm diameter up to75km (Including


Loading and Unloading)

Lm.Km

TSH-80

Transport of Hume Pipes 610mm diameter up to80km (Including


Loading and Unloading)

Lm.Km

TSH-85

Transport of Hume Pipes 610mm diameter up to85km (Including


Loading and Unloading)

Lm.Km

TSH-90

Transport of Hume Pipes 610mm diameter up to90km (Including


Loading and Unloading)

Lm.Km

TSH-95

Transport of Hume Pipes 610mm diameter up to95km (Including


Loading and Unloading)

Lm.Km

TSH-100

Transport of Hume Pipes 610mm diameter up to100km (Including


Loading and Unloading)

Lm.Km

TSH-110

Transport of Hume Pipes 610mm diameter up to110km (Including


Loading and Unloading)

Lm.Km

TSH-120

Transport of Hume Pipes 610mm diameter up to120km (Including


Loading and Unloading)

Lm.Km

TSH-130

Transport of Hume Pipes 610mm diameter up to130km (Including


Loading and Unloading)

Lm.Km

TSH-140

Transport of Hume Pipes 610mm diameter up to140km (Including


Loading and Unloading)

Lm.Km

TSH-150

Transport of Hume Pipes 610mm diameter up to150km (Including


Loading and Unloading)

Lm.Km

TSH-160

Transport of Hume Pipes 610mm diameter up to160km (Including


Loading and Unloading)

Lm.Km

T1-006

Transport of Material in Bulk Excluding Loading (for distance less


than or equal 3 kilometers)

Cu.mkm

T1-007A

Transport of Material in Bulk Excluding Loading (from 3km upto


10km Distance )

Cu.mkm

T1-007B

Transport of Material in Bulk Excluding Loading (for Distance more


than 10 Kilometers )

Cu.mkm

T1-009

Transport of Premix in Bulk, Excluding Loading other than at


Mixing Plant

TonKm

T1-010A

Transport of Barrels of Bitumen for First 1.0km of Transport


(Excluding Loading and Unloading)

BrlKm

T1-010B

Transport of Barrels of Bitumen for Each Subsequent 1.0km From


1.0km - 9.0km (Excluding Loading and Unloading)

BrlKm

T1-010C

Transport of Barrels of Bitumen for Each Subsequent 1.0km


Beyond 9.0km (Excluding Loading and Unloading)

BrlKm

T1-010E

Transport of empty Barrels of Bitumen for First 1.0km of


Transport (Excluding Loading and Unloading)

BrlKm

T1-010F

Transport of empty Barrels of Bitumen for Each Subsequent 1.0km


From 1.0km - 8.0km (Excluding Loading and Unloading)

BrlKm

T1-010G

Transport of empty Barrels of Bitumen for Each Subsequent 1.0km


Beyond 8.0km (Excluding Loading and Unloading)

BrlKm

T1-010H Loading empty barrels of Bitumen

Brls

T1-010J Unloading empty barrels of Bitumen

Brls

T1-010K Cutting & straightening empty barrels of Bitumen

Brls

T1-013

Loading Barrels of Bitumen Inclusive of Rolling upto 25m

Brls

T1-014

Unloading Barrels of Bitumen Inclusive of Rolling and Stacking

Brls

Transport of Hume Pipes 152mm diameter for 1st 1.0km of


Transport (Excluding Loading and Unloading)
Transport of Hume Pipes 152mm diameter for Each Subsequent
T1-015B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)
Transport of Hume Pipes 152mm diameter for Each Subsequent

T1-015A

T1-015C 1.0km Beyond 8.0km of Transport (Excluding Loading and


Unloading)
Transport of Hume Pipes 229mm diameter for 1st 1.0km of
T1-018A
Transport (Excluding Loading and Unloading)
Transport of Hume Pipes 229mm diameter for Each Subsequent
T1-018B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm
L.mkm
L.mkm
L.mkm
L.mkm

Transport of Hume Pipes 229mm diameter for Each Subsequent


T1-018C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)
Transport of Hume Pipes 305mm diameter for 1st 1.0km of
T1-021A
Transport (Excluding Loading and Unloading)
Transport of Hume Pipes 305mm diameter for Each Subsequent
T1-021B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)
Transport of Hume Pipes 305mm diameter for Each Subsequent
T1-021C
1.0km Beyond 8.0km of Transport(Excluding Loading and Unloading)
Transport of Hume Pipes 457mm diameter for 1st 1.0km of
Transport(Excluding Loading and Unloading)
Transport of Hume Pipes 457mm diameter for Each Subsequeent
T1-024B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)
Transport of Hume Pipes 457mm diameter for Each Subsequent
T1-024C
1.0km Beyond 8.0km of Transport(Excluding Loading and Unloading)

T1-024A

Transport of Hume Pipes 610mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)
Transport of Hume Pipes 610mm diameter for Each Subsequent
T1-027B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)
Transport of Hume Pipes 610mm diameter for Each Subsequent
T1-027C
1.0km Beyond 8.0km of Transport(Excluding Loading and Unloading)

T1-027A

Transport of Hume Pipes 915mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)
Transport of Hume Pipes 915mm diameter for Each Subsequent
T1-030B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)
Transport of Hume Pipes 915mm diameter for Each Subsequent
T1-030C
1.0km Beyond 8.0km of Transport(Excluding Loading and Unloading)

T1-030A

Transport of Hume Pipes 1220mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)
Transport of Hume Pipes 1220mm diameter for Each Subsequent
T1-033B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)
Transport of Hume Pipes 1220mm diameter for Each Subsequent
T1-033C
1.0km Beyond 8.0km of Transport(Excluding Loading and Unloading)

T1-033A

L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm

T1-036

Loading and Unloading 152mm diameter 2.44m Long Hume Pipes

No

T1-037

Loading and Unloading 229mm diameter 2.44m Long Hume Pipes

No

T1-038

Loading and Unloading 305mm diameter 2.44m Long Hume Pipes

No

T1-039

Loading and Unloading 457mm diameter 2.44m Long Hume Pipes

No

T1-040

Loading and Unloading 610mm diameter 2.44m Long Hume Pipes

No

T1-041

Loading and Unloading 915mm diameter 2.44m Long Hume Pipes

No

T1-042

Loading and Unloading 1220mm diameter 2.44m Long Hume Pipes

No

T1-043

Transport of Recast Kerb Stones (All Types) for Road Works,


Including Loading and Unloading

L.mKm

T1-044

Transport of Recast Kerb Stones


Loading and Unloading

L.mKm

T1-045

Transport of Precast Concrete Handrails, Up Rights and Joints for


Bridge Works, Including Loading and Unloading

L.mKm

T1-046

Transport of Precast Concrete Slabs 450x450x50 mm for Foot


Walks, Including Loading and Unloading

L.mKm

T1-047

Transport of Precast Concrete Standard Boundary Markers


Including Unloading Only

No.km

T1-048

Transport of Emulsion

T1-049

Transport of Gabion Mesh 4x1x1 meters

No km

TRO-25

Transporting Road Roller up to 25 km

No

TRO-30

Transporting Road Roller up to 30 km

No

TRO-35

Transporting Road Roller up to 35 km

No

TRO-40

Transporting Road Roller up to 40 km

No

TRO-45

Transporting Road Roller up to 45 km

No

TRO-50

Transporting Road Roller up to 50 km

No

Additional cost for Transporting Road Roller beyond 25 km

km

T1- 050A

for Bridge Works, Including

100ltr km

T1- 051 Transport of cement 1st km including loading and unloading

1 bags(50kg)

T1- 051A Transport of cement beyond 1.00 km to 9km by any means

1 bags(50kg)

T1- 051B

Transport of cement each Subsequent 1.0km beyond 9.0km by any


1 bags(50kg)
means

T1- 052 Transport of steel 1st km including loading and unloading

50kg

T1- 052A Transport of steel beyond 1.00 km to 9km by any means

50kg

T1- 052B Transport of steel each Subsequent 1.0 km to 9.0 km by any means

50kg

Section 2- Exacavation
Roadway Excavation ( Including Loading ,Unloading and Transport within 25 meters Distance
Unless Otherwise Specified)
Item No Description

Unit

E1-001 Excavation in Loose Soil (Dry) [SSCM 301.2(IV)]


Cu.m
E1-002 Excavation in Loose Soil (Wet) in Slips [SSCM 301.3(0)]
Cu.m
E1-003 Excavation in Ordinary Soil (Cutting Measurement) [SSCM
301.2(V)]

Cu.m

E1-004 Excavation in Ordinary Soil [Vehicle Measurement] [SSCM


301.2(V)]

Cu.m

E1-005 Excavation in Medium Soil (Cutting Measurement) [SSCM


301.2(VI)]

Cu.m

E1-006 Excavation in Medium Soil (vehical Measurement) [SSCM


301.2(VII)]

Cu.m

E1-007 Excavation
301.2(VII)]

Cu.m

in Hard Soil (Cutting

Measurement)

E1-008 Excavation in Hard Soil (Vehicle Measurement)


301.2(VII)]

[SSCM
[SSCM
Cu.m

E1-009 Excavation in Unclassified Soil (Cutting Measurement) [SSCM


301.2 a(1)]

Cu.m

E1-010 Excavation in Soft Rock (Cutting Measurement) [SSCM


301.2(VII)]

Cu.m

E1-010A Excavation in Mud\Marshy Material (Cutting Measurement)


[SSCM 301.2(VII)]

Cu.m

E1-011 Excavation Pit\Trench for Foundation in Ordinary Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
MaterialPit\Trench
Depositedinwithin
25m or inas Medium
Directed.Soil
[SSCM
E1-012 Exc.
Excavation
Foundation
not
301.1-.3]
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Material
Deposited
within 25min or
as Soil
Directed.
[SSCM
E1-013 Exc.
Excavation
Pit\Trench
in Foundation
Hard
not Exceeding
301.1-.3]
1.5m deep, Including Leveling and Ramming Bottom, Exc.
Deposited
within
or as Directed.
[SSCM Soil not
E1-014 Material
Excavation
Pit\Trench
in25m
Foundation
in Unclassified
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Material Pit\Trench
Deposited within
25m or as Directed.
[SSCM not
E1-015 Exc.
Excavation
in Foundation
in Mud/Marsh
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
MaterialSoft
Deposited
25m or as Directed.
[SSCM[SSCM
E1-019 Exc.
Excavation
Rock within
not Exceeding
1.5m depth
301.2(II)]

Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m

E1-021 Piling Available Soil


Cu.m
E1-022 Loading Available Soil to a Tractor or Equivalent
Cu.m
E1-023 Excavating Rock Requiring Blasting, for Roadway for Boulders,
Excluding Dozing Away [SSCM 301.2(III) & 306.1-306.4]

Cu.m

E1-024 Boulders, Sledging Piling etc


Cu.m
E1-025 Rock Requiring Blasting
Cu.m
E1-026 Rock Requiring Blasting and Piling (Bank Measurement)
Cu.m

E1-027 Roadway Excavation in Unclassified Soil Using Machinery


Excluding Loading and Piling (Cutting Measurement)

Cu.m

E1-028 Loading Materials by Machinery in Roadway Excavations


(Cutting Measurement)

Cu.m

E1-029 Trimming / Cambering by Motor Grader (Cutting Measurement)


Cu.m
E1-029A Trimming / Cambering by Motor Grader (Cutting Measurement)
Sq.m
Section 3- Aggregate/Rubble Piling
Aggregate/Rubble Piling Including Loading
Item No

Description

A1-001 Sledging Available Rock 150-225mm Rubble including Piling and


Loading

Unit
Cu.m

A1-002 Blasting etc and Piling 150-225mm Rubble including Loading


Cu.m
A1-002A Blasting Sledging etc. and Piling 150-225mm Rubble using
Compressor and Hand Held Drills including Loading

Cu.m

A1-003 Blasting etc. and Piling 100mm Aggregate including Loading


including Transport

Cu.m

A1-004 Blasting etc and Piling 75mm Aggregate incl/Loading


Cu.m
A1-005 Blasting etc and Piling 50mm Aggregate incl/Loading
Cu.m
A1-006 Blasting etc and Piling 37.5mm Aggregate incl/Loading
Cu.m
A1-007 Blasting etc and Piling 25mm Aggregate incl/Loading
Cu.m
A1-008 Blasting etc and Piling 19mm Aggregate incl/Loading
Cu.m
A1-009 50 mm Aggregate, Single Size Crusher Production Including
Piling and Loading[SSCM 404.1-406.1 : Table 1701-4

Cu.m

A1-010 37.5 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 : Table 1701-4

Cu.m

A1-011 19 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 ]

Cu.m

A1-012 12 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 : Table 1701-4 including
A1-013 Transport
Aggregate 37.5 mm Down Graded (SSCM-Table 1701.5 )
Including Piling and Loading
A1-014 Crusher Fines 6.3 mm Down, Including Piling and Loading for
1.0 cu.m
A1-014A Crusher Fines
cu.m

Cu.m
Cu.m
Cu.m

(DUST), Including Piling and Loading for 1.0


Cu.m

A1-015 Aggregate 19 mm for Seal Coat Treatments as per SSCM Table


1701-8, Including -Do-

Cu.m

A1-016 Aggregate 12.5 mm for Seal Coat Treatments as per SSCM


Table 1701-8, Including -Do-

Cu.m

A1-017 Blended aggregate for Rectification overlay, with 37.5 mm Single


size Aggregate and 19mm &12.5 mm Crushed Aggregated
in the volume
Ratio of 7:2:1: Including Mix. & Loading
A1-018 Mixed
Piling Available
Aggregate
(Piling to pay Separately)

Cu.m
Cu.m

A1-019 Piling Available Rubble


Cu.m
A1-020 Loading Available Aggregate / Rubble
Cu.m
Section 4- Earth Filling & Compacting
Approved Earth Filling and Compaction
Item No Description

Unit

EW-001 Approved Soil (Type I & II Materials) Excavation for Bases &
Shoulder Construction Including Loading and Piling (Loose
[SSCM
601.4]
EW-002 Volume)
Spreading
Piled Approved
Soil (Loose Volume)

Cu.m
Cu.m

EW-003 Approved Soil Spread & Rolled Including Roller Hire Charges,
Fuel & Watering (Loose Volume) [SSCM 601.1 - 4]
EW-003A Approved Soil Spread & Rolled Using Machinery Including Motor
Grader & Roller Hire Charges, fuel & Watering (Loose Volume)
601.1
4]
EW-004 [SSCM
Approved
Soil- Spread
& Rolled in Strips Where Average Width
is less than 1.2 meters for Road Widening including Roller Hire
& Watering
Volume) [SSCM
601.1 - Behind
4]
EW-006 Charges,
Approved fuel
Soil
Spread (Loose
& Compacted
in Places
Abutments and Structures, Shoulders about Sub Bases level
in Service
Trenches,
Using 1/2into150
1 Ton
EW-007 and
Approved
Soil line
Spread
& Compacted
to Vibrating
225 mm Roller
Thick
Including
Watering
(Loose
Volume)
[SSCM
601.1
- 4]
Layers Using Machine Rammer at Narrow Places
(Loose
EW-008 Volume)
Spreading , Leveling and Compacting Manually Using Standard
Cast Iron Stamper or Equivalent and Filling in 150-225 mm
Layers,(Loose
Volume)and
EW-009 Thick
Trimming
Leveling
Compaction
of
Original
Ground/Subgrade to 100 % STD Density [SSCM 304.3(c)]

Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Sq.m

EW-010 Trimming
,
Leveling
and
Compaction
of
Original
Ground/Subgrade to 95 % STD Density [SSCM 304.3(c)]

Sq.m

EW-011 Approved Soil Excavation for Embankment Filling Including


Loading and Piling (Loose Volume) [SSCM 601.1 TO 601.4]

Cu.m

EW-013 Approved Soil (Type I & II Materials) Excavation using


Machinery for Bases & Shoulder Construction Including Loading
Piling (Loose
Volume)
601.1 - 4]using Machinery for
EW-014 and
Approved
Soil (Type
I & [SSCM
II ) Excavation
Embankment
filling Including Loading and Piling (Loose
Volume) [SSCM 601.1 - 4]
EW-015 Grading and Spreading by motor grader

Cu.m
Cu.m
Cu.m

Section 5- Rubble Pitching /Paving


Rubble to be paid Separately
Item No Description

Unit

P1-001

Pitched Paving 225 mm Thick(Excluding cost of rubble)

Sq.m

P1-002

Pitched Paving 150 mm Thick -do -

Sq.m

P1-003

Flat Paving 150 mm Thick - do--

Sq.m

P1-004

Flat Paving 225 mm Thick - do--

Sq.m

Section 6- Aggregate Spreading & Rolling


Aggregate Spreading & Compacting - cost of Water to be Deducted from Rate if not carried Out under
the Relevent Items
Item No

Description

M1-001 Spreading , Watering & Rolling 100 mm Aggregate Including


Hire Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]
M1-001A Spreading , Watering & Rolling 100 mm Aggregate Including
Hire Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]below
Cum
M1-002 11.32
Braking
Road Surface to 50 mm Depth by Hand , Screen &
Replace Old Aggregate

Unit
Cu.m
Cu.m
Sq.m

M1-003 Scarifying Road Surface to 50 mm Depth by roller, Screen, &


Replace Old Aggregate.

Sq.m

M1-004 Spreading & Compaction 50-19 mm New Aggregate by Roller


Including Watering Hire, Etc. (Loose Volume) [SSCM 403.3(c)]

Cu.m

M1-004A Spreading & Compaction 50-19 mm New Aggregate For


Extensive Patching by Roller Including Watering Hire, Etc.
Volume)
[SSCM
403.3(c)]Depth by Hand Screening &
M1-005 (Loose
Breaking
50 mm
Additional
Replacing Old Aggregate
M1-006 Scarifying 50 mm Additional Depth With Roller, Screening &
Replacing Old Aggregate
M1-007 Spreading Watering & Compacting 50-19 mm Aggregate in
Edge Correction using roller Including Hire, Etc. (Loose
) [SSCM
1103.3]
M1-008 Volume
Spreading
watering
& Compacting 50-19 mm Aggregate in Edge

Cu.m
Sq.m
Sq.m
Cu.m

Correction Using Roller Including Hire ,Etc (Loose Volume)


1103.3]
M1-009 [SSCM
Spreading
& Compacting 50-19 mm Aggregate by 8-10 ton
Roller After Applying track Coat in Overlay (Loose Volume) (Tack
Paid Separately)
M1-009A Coat
Spreading
& Compacting 50-19 mm Aggregate by 8-10 ton

Cu.m

Roller After Applying track Coat in Overlay (Loose Volume) (Tack


Coat Paid Separately) below 9.91 cum within km

Cu.m

Cu.m

M1-010 Water Bound Macadam Spreading watering and Compacting


50-25 mm Aggregate and Filling the Voids to refusal with
fines
by watering
and watering
rolling toand
form
a water bound
M1-011 Crusher
Dry Bound
Macadam
Spreading
compacting
50-25
Macadam
Base
Excluding
transport
for
Aggregates
and Fines
fines.
mm Aggregate and filling the voids to refusal with Crusher
Loose
Volume
(SSCM
404.1)
Rolling
with Vibrating
Roller
to Form
a Dry Bound
M1-012A by
Dense
Draded
Aggregate
Base
(Aggregate
VaseMacadam
Course)
base
Excluding
Transport
for
Aggregates
and
Seprading watering and Compacting GradedFines
37.5(Loose
mm
Volume)
[404]
Aggregate
to Form a Dense Aggregate Base Using Machinery
Including Motor Grader & Roller Hire Charges. Transport of
Aggregates to be Paid Separately (Loos)

Cu.m
Cu.m

Cu.m
M1-013 Dense Graded Agg.Base [ABC], Spreading Watering and
Compacting Graded 37.5mm Aggregate to form a Dense
Base
Strips, Av
Widthand
not Rolled
exeeding
1.2m for
Road
M1-013A Aggregate
Graded 37.5
ABCinMaterial
Spread
in Strips,
Average
Widening
excl
Transport
of
Aggregate(Loose
Volume)
[SSCM
Width not Exceeding 1.2m Using Machinery inch Motor Graders
405.1
-.4] including
Transport
and Roller
Hire Charges
Fuel and Watering (Loose Vol) [SSCM

Cu.m
Cu.m

405.1-.4]

Section 7- Road Surface Treament


Sand Transport up to 16 km Included in the Rates, Transport of Emulsion/Bitument to be Paid
Separately.
Item No

Description

S1-001 Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with
Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
S1-001A Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with
Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
(department Bitumen ) Including Transport
S1-002 Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding
with Gravel where Sand is not Available within 16km.
S1-002A Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding
with Gravel where Sand is not Available within 16km.
(Department
Bitumen)Surface Treatment with Hot Bitumen
S1-003 Double
Bituminous
(Manual) including Internal Transport (Binder and Aggregate
505.1-.5
and with
TableHot
505.1]
S1-004 Paid
SingleSeparately)
Bituminous[SSCM
Surface
Treatment
Bitumen (Manual,

Unit
Sq.m

Sq.m
Sq.m
Sq.m
Sq.m

including Internal Transport) (Binder and Aggregate Paid


[SSCM 505.1-.5
Table 505.1]
S1-005 Separately)
Double Bituminous
Surface and
Treatment
with Emulsion (CRS-1)
(Manual including Internal Transport) (Binder and Aggregate
S1-006 Paid
SingleSeparately)
Bituminous Surface Treatment with Emulsion (CRS-1)

Sq.m

(Manual including Internal Transport) (Binder and Aggregate


Separately)
S1-007 Paid
Bitumen
Surfacing Subsequent Coat using 0.75ltr/Sq.m
including Blinding with Sand @ 125 Sq.m/Cu.m [SSCM
503.1(b)]

Sq.m

Sq.m

Sq.m

S1-007A Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m


including Blinding with Sand @ 125 Sq.m/Cu.m [SSCM
Bitumen)
S1-008 503.1(b)]
Bitumen Surfacing (Department
2nd/Subsequent
Coat using 1.0ltr/Sq.m
including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
S1-008A [SSCM
Bitumen503.1(b)]
Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m

Sq.m
Sq.m

including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)


S1-009 [SSCM
Bitumen503.1(b)]
Surfacing Subsequent Coat using 0.75ltr/Sq.m
including Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM
S1-009A 503.1(b)]
Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m

Sq.m

including Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM


Departmental
bitumen.
S1-010 503.1(b)]
Bitumen Surfacing
2nd/Subsequent
Coat using 1.0ltr/Sq.m
including Blinding with Gravel where Sand is not Available within
(New
Work) [SSCM
503.4(c)]
S1-010A 16km
Bitumen
Surfacing
2nd/Subsequent
Coat using 1.0ltr/Sq.m

Sq.m

including Blinding with Gravel where Sand is not Available within


(New Work)
[SSCM 503.4(c)]
Department
bitumen
S1-011 16km
Emulsion/Cold
Bitumen(CRS-1)
Surface
Treatment
Ist Coat with
3.5 ltr/Sq.m Including Blinding with Sand, @ 125 Sq.m/Cu.m
S1-012 (Manual)
Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with

Sq.m

3.5 ltr/Sq.m (Using Trolley, Emulsion) Including Blinding with


@ 125 Sq.m/Cu.m
(Manual)
S1-013 Sand,
Emulsion/Cold
Bitumen(CRS-1)
Surface Treatment Subsequent
Coat with .75 ltr/Sq.m Including Blinding with Sand, @ 125
(Manual)
S1-014 Sq.m/Cu.m
Emulsion/Cold
Bitumen(CRS-1) Surface Treatment Subsequent

Sq.m

Coat with .75 ltr/Sq.m (Using Trolley, Emulsion) Including


with
Sand,
@ 125 Sq.m/Cu.m
S1-015 Blinding
Tack Coat
Using
Emulsion
(CSS-1) @ the Rate of 0.5 ltr/Sq.m
inclusive of Brushing, Cleaning Road Surface and Cost of
[SSCM 502.3]
S1-016 Emulsion
Tack Coat(Manual)
Using Emulsion
(CSS-1) @ the Rate of 0.5 ltr/Sq.m

Sq.m

inclusive of Brushing, Cleaning Road Surface and Cost of


[SSCM 502.3]
S1-017 Emulsion
Tack Coat(Manual)
Using Emulsion
(CSS-1) @ the Rate of 0.75 ltr/Sq.m
inclusive of Brushing, Cleaning Road Surface and Cost of
[SSCM
S1-018 Emulsion
Tack Coat(Manual)
with 30%
Cut502.1-503.3]
Back Bitumen Using 0.5 ltr/Sq.m

ltr

Including Brushing and Cleaning Road Surface (Manual)


S1-018A Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)
bitumen
S1-019 Department
Tack Coat with
30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)
S1-020 Tack Coat with 30% Cut Back Bitumen Using 0.75 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual) [SSCM
S1-021 503.4(d)]
Rolling over Blinding Material Spread over Subsequent Bitumen
Surfacing using diesel Roller (8-10 Tones) [SSCM 503.4(d)]
S1-022 Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1
Ltr/Sq.m Including Blinding with Sand at The Rate of 250
Cleaning
and Moistening
Road
S1-022A Sq.m/Cu.m
Prime Coat and
with Brushing
Emulsion/Cold
Bitumen(CSS-1)
Using
1
Surface
Ltr/Sq.m Part A of Item S1-022
S1-022B Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1
Ltr/Sq.m Part B of Item S1-022
S1-023 Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1
Ltr/Sq.m without Blinding, but Inclusive of Brushing, Cleaning
and Moistening Road Surface

Sq.m

Sq.m

Sq.m

Sq.m

Sq.m

Sq.m
Sq.m
Sq.m
ltr
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m

S1-024 Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
Including Blinding with Sand at the rate of 250 Sq.m/Cu.m and
Cleaning
and Mostening
Surface
S1-025 Brushing,
Prime Coat
With 30%
Cut Back Road
Bitumen
Using 1 Ltr/ Sq.m
without
Blinding but Inclusive Brushing, Cleaning and
Mostening
Road
Surface
S1-026 Sweeping Over Tarred
Surface to Arrest Bleeding.

Sq.m
Sq.m
Sq.m

S1-027 Application of Asphalt Emulsion for Surface Treatment Using


CRS-1 (Using Plant) "Rate per Litre"

ltr

S1-028 Blinding the Bitumen Surfacing with Sand at the rate of 125
Sq.m1 Cu.m Using Material from Stock Pile

Sq.m

S1-029 Single Bituminous Surface Treatment With Emulsion (CRS-1)


Using Plant.(Binder and Aggregate Paid Separately) (Rate to
Transport cost
of Aggregate
to Emulsion(CRS-1)
16KMS) [SSCM
S1-030 Include
Double Bituminous
Surface
Treatment up
with
505.5(b)]
Using Plant. (Binder and Aggregate Paid Separately) (Rate of
of Aggregate
up to Paver
16 KMS)
S1-034 include
Lay andTransport
Compactcost
Asphalt
Premix Usign
(Cost of premix,
Aggregate Transport and premix transport to vbe paid
S1-035 Separately)
Bitumen Surfacing (Sand Sealing -Manual) Using Emulsion
(CRS 1) @ 1 LTR. /SQ.M Including Preparing Surface, Blinding
SandMinor
@ 4 CU.M/500
with
hand
S1-035A with
Patching
Pot Holes SQ.M
Using and
SandPressing
Emulsion
Mix
1:8 Rollers.
Where
(Patching
pot
holes
if
necessary
&
external
transport
to be pay
Necessary, Prior to Sand Sealing.
sep.
S1-036 Sand Sealing with Emulsion CRS-1 at the Rate of 1Ltr,Sq.m
Using Plant.Incd.Brushing,cleaning, Blinding. with Sand@ 125
Rolng.
with
pneumatic.
rollerMacadam
& internal trnsport.[SSCM
S1-037 Sq.mand
Reconstruct
Base
With
Penetration
Using Nominal
504]
Size 50mm Aggregate and 19mm Key Aggregate from Stock
to Accomplish
75mm
on Existing
Pavements[SSCM
406]
S1-038 Piles,
Reconstruct
Base with
Penetration
Macadam
Using Nominal
(Binder,
Aggregate,
Transport
paid
Separately)
Size 37.5 mm Aggregate and 12.5 mm Key Aggregate from
Pilesof, Corrugations,
to a compacted
thickness of
on existing
S1-039 Stock
Correction
Depressions
and55mm
Cambering
road
pavements
[SSCM
406]
cost
of
aggregate
including
transport
to
Surfaces using asphalt Concrete compacted by Vibrating roller
be
paid
separately
Internal
of tack
coat
and Supply
S1-040 Including
Sand sealing
with transport
emulsion (application
crs-2 at the rate
of .8
Ltr/Sq.m
using
of
Asphalt
concrete
to
ve
paid
separately)
plant , and blinding with sand at the rate of 125Sq.m/Cu.m on
(Triple Seal)
Internal
transport
S1-040A D.B.S.T./S.B.S.T.
Sand sealing with emulsion
crs-2 - including
Part A of Item
S1-040
(SSCM 504) binder transport to site to pay separately

Sq.m
Sq.m
M.ton
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
M.ton
Sq.m
Sq.m

Section 8- Road Maintenance


Internal Transport of Hot Bitumen up to 16 km and Sand Transport up to 16 km Included in the
Rates
Item No

Description

MN-001 Patching with Hot Bitumen Using 14 Liters per 1/2 km (SSCM
1102.1-3)

Unit
km

MN-002 Patching With hot Bitumen Using 21 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-003 Patching With hot Bitumen Using 28 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-004 Patching With hot Bitumen Using 35 Ltrs. Per 1/2 K.m.
1/2 K.m

MN-005 Patching With hot Bitumen Using 42 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-006 Patching With hot Bitumen Using 49 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-007 Patching With hot Bitumen Using 56 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-008 Extensive Patching for Every Additional 7 Ltrs. Hot Bitumen
1/2 K.m
MN-009 Patching with Cold Bitumen (CRS-1) Using 14 Ltrs per 1/2 K.m.
km
MN-010 Patching with Cold Bitumen (CRS-1) Using 21 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-011 Patching with Cold Bitumen (CRS-1) Using 28 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-012 Patching with Cold Bitumen (CRS-1) Using 35 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-013 Patching with Cold Bitumen (CRS-1) Using 42 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-014 Patching with Cold Bitumen (CRS-1) Using 49 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-015 Patching with Cold Bitumen (CRS-1) Using 56 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-016 Extensive Patching for Every Additional 7 Ltrs. Cold Bitumen,
CRS-1

1/2 K.m

MN-017 50 mm-19mm Aggregate Roller Patching


Cu.m
MN-018 50 mm - 19mm Aggregate Stamped Patching
Cu.m
Section 9 - Road Side Drainage System
Rate to Include Spreading the Resulting Materials Suitably in the Vicinity Unless
Otherwise Directed.
Item No

Description

Unit

DR-001 Cutting New Side Drains in Ord. Soil


Cu.m
DR-002 Cutting New Side Drains in Med. Soil
Cu.m
DR-003 Cutting New Side Drains in Hard Soil
Cu.m
DR-004 Cutting New Side Drains in Soft Soil
Cu.m
DR-005 Cutting New Side Drains In Unclassified Soil
Cu.m
DR-005A Cutting side drains of std. Dimensions in unclassified soil using
machine (Back hoe J.C.B) including shipping trimming and
leveling bottom manually

Cu.m

DR-006 Cutting New Side Drains in Rock


Cu.m
DR-007 Turfing (Excluding Royalty,
Maintenance) [SSCM 802.3 (a)]

Transport

and

Watering
Sq.m

DR-008 Watering and Maintaining Turf For Three Months Including


Transport of Water

Sq.m

DR-009 Leveling & Trimming Earth


Sq.m
DR-010 Clearing Silt Etc. from Kerbs & Channels (SSCM 12053)
L.m
DR-011 Cutting Scupper Drains on any Soil Other than Rock to and
Average width of 0.75 m with proper Gradient and Ave. Depth of
mm (SSCM
1304.3)
DR-012 100
Clearing
and Desilting
of Culverts (SSCM 1303.3)

L.m
L.m

DR-013 Clearing Choked Culverts (With Head Room > 1m.)


Cu.m
DR-014 Cleaning desilting existing side drains and lead up drains to
proper shape and gradient and transport of excavated materials
roadInlets
side and
up toOutlets
100m of Culverts
DR-015 from
Clearing

L.m
Culverts

Section 10 - Bridges & Culverts


Bridges Culverts and Retaining Walls etc.
Item No

Description

Unit

ST-001 Demolishing Dry Coursed Masonry Including Stacking or


Loading ,(SSCM 202.2)

Cu.m

ST-002 Demolishing Coursed Masonary in cement Mortar Including


Stacking or Loading

Cu.m

ST-003 Demolishing Random Rubble Masonry in cement Mortar


Including Stacking or Loading

Cu.m

ST-004 Random Rubble Masonry, 150-225 mm Rubble in Approved


cement & Sand Mortar 1:6 (IncludingTransport) [SSCM 1006.3]
Cu.m
ST-005 Random Rubble Masonry, 150-225 mm Rubble in Approved
cement & Sand Mortar 1:5 (Excluding Transport of Rubble &
[SSCM
1006.3]
ST-006 Piling)
Random
Rubble
Masonry, in Approved cement & Sand Mortar
1:6 With available Rubble 150-225mm

Cu.m
Cu.m

ST-007 Random Rubble Masonary in approved cement & sand Mortar


1:5 with Available Rubble 150-225 mm.

Cu.m

ST-008 Dry Masonry With available Heavy Rubble or Boulders(SSCM


1006.3)

Cu.m

ST-009 Dry Masonry With Rubble 150-225 mm (Excluding Transport of


Rubble & Piling)

Cu.m

ST-010 Dry Masonry With available Bubble 150-225mm


Cu.m
ST-011 Packing Available Rubble and Aggregate Filter Layers Behind
Masonry Walls.

Cu.m

ST-012 Clay Puddled & Layid Behind Masonry Walls(Excl.Transport of


Clay) [SSCM 705.3]

Cu.m

ST-013 Grouting Coursed Stone Masonry Joints With approved Cement


& Sand Mortar 1:3 (SSCM 804.2(c))

Sq.m

ST-014 Grouting Rubble Paving With Concrete Class C, 1:2:4(19 mm)


(Excl. Transport of Aggr. For Concrete & Piling)

Cu.m

ST-015 Grouting Rubble Paving with approved cement & Sand mortar
(1:3)

Sq.m

ST-016 Forming weep Holes In Masonry Construction (Labour only)


[SSCM 706.3]

No

ST-017 Forming Weep Holes Using P.V.C. Pipes of Int. Dia. Not less
than 100mm Complete with Dripledge and Surround Finish
ST-018 Smooth.
Shoring with 37.5 mm Thick Class II Timber Planks up to 3 m
Depth

L.m
Sq.m

ST-019 Supplying & Fixing class II Timber Struts Etc. For Shoring up to
3m Depth

Sq.m

ST-020 Supplying and Fixing Class II Timber in Shoing up to 3m Depth


(Rate per Area Basis)

Sq.m

ST-021 Lifting Soil For Every 1.5 m Beyond the Initial 1.5m
Cu.m
ST-022 Lifting Wedge Stones For Every 1.5 m Beyond the Initial 1.5m
Cu.m
ST-023 Lifting Rubble or Concrete Every 1.5 m Beyond the Initial 1.5m
Cu.m
ST-024 Lowering Wedged Stones Evety 1.5m Beyond the Initial 1.5 m
Beyond the Initial 1.5 m

Cu.m

ST-025 Lowering Rubble or Concrete Every 1.5m Beyond the Initial 1.5
m

Cu.m

ST-026 PCC Beams(10.5m to 13.5m) Launched into Position


No
ST-027 Rendering 12.5 mm thick in cement sand Motar 1:2 mix (Smooth
Finish)

Sq.m

ST-028 Rendering 19 mm thick in cement sand Motar 1:2 mix (Rough)


Sq.m
ST-029 Rendering 19 mm thick in cement sand Motar 1:2 mix (Smooth
finish)

Sq.m

ST-030 Rendering 12.5 mm thick in cement sand Motar 1:3 mix (Rough)
including Transport

Sq.m

ST-031 Rendering 12.5mm thick in cement sand Motar 1:3 mix (Smooth
finish)

Sq.m

ST-032 Rendering 19 mm thick in cement sand Motar 1:3 mix (Rough)


Sq.m

ST-033 Rendering 19mm thick in cement sand Motar 1:3 mix (Smooth
finish)
ST-034 Mixing & Laying Manually, cement Concrete 1:4:8 (50 mm)
(Volume Batching) Using Crusher run Aggregate (Excl.
of Aggregate
Piling) [SSCM
1001.4] Concrete 1:4:8
ST-035 Transport
Mixing & Laying
Using &Concrete
Mixer,Cement

Sq.m
Cu.m

(50 mm) (Volume Batching) Using Crusher Run Aggregate (excl.


of Aggregate
& Piling)
(SSCM
1001.8
- 9)(50 mm) with
ST-036 Transport
Mixing & Laying
Manually
Cement
Concrete
1:4:8
20% Plums (Volume Batching) Using Crusher Run Aggregate
Aggregate
& Piling)
ST-037 (excl.
MixingTransport
& LayingofUsing
Concrete
Mixer, Cement Concrete 1:4:8

Cu.m

(50 mm) with 20% Plums (Volume Batching) Using Crusher Run
(excl. Transport
Aggregate
& Piling)
ST-038 Aggregate
Mixing & Laying
Manually ofCement
Concrete
1:3:6 (37.5 mm)
with 20% Plums (Volume Batching) Using Crusher Run
(excl. Transport
of Aggregate
Piling) Concrete 1:4:8
ST-039 Aggregate
Mixing & Laying
Using Concrete
Mixer, &
Cement

Cu.m

(37.5 mm) with 20% Plums (Volume Batching) Using Crusher


Aggregate
(excl.
Transport
of Aggregate
ST-040 Run
Mixing
& Laying
Manually
Cement
Concrete& Piling)
1:3:6 (37.5 mm)
(Volume Batching) Using Crusher Run Aggregate (excl.
of Aggregate
Piling)[SSCM
ST-041 Transport
Mixing & Laying
Using &
Concrete
Mixer,1001.4]
Cement Concrete 1:3:6

Cu.m

(37.5 mm) (Volume Batching) Using Crusher Run Aggregate


Aggregate
& Piling)
ST-041A (excl.
MixingTransport
& LayingofUsing
Concrete
Mixer, Cement Concrete 1:3:6
(37.5 mm) with 20% plums Using Crusher Run Aggregate (excl.
Aggregate
& Piling)
ST-042 Transport
Mixing & of
Laying
Manually
Cement Concrete 1:3:6 (19 mm)

Cu.m

(Volume Batching) Using Crusher Run Aggregate (excl.


of Aggregate
Piling) Mixer, Cement Concrete 1:3:6
ST-043 Transport
Mixing & Laying
Using &
Concrete
(19 mm) (Volume Batching) Using Crusher Run Aggregate
AggregateCement
& Piling)Concrete 1:2:4 (37.5 mm)
ST-044 (excl.
MixingTransport
& LayingofManually

Cu.m

(Volume Batching) Using Crusher Run Aggregate (excl.


of Aggregate
Piling) Mixer, Cement Concrete 1:2:4
ST-045 Transport
Mixing & Laying
Using &
Concrete
(37.5 mm) (Volume Batching) Using Crusher Run Aggregate
of Aggregate
& Piling) Concrete 1:2:4 (19 mm)
ST-046 (excl.
MixingTransport
& Laying
Manually Cement

Cu.m

(Volume Batching) Using Crusher Run Aggregate (excl.


of Aggregate
Piling) Mixer, Cement Concrete 1:2:4
ST-047 Transport
Mixing & Laying
Using &
Concrete
(19 mm) (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling) Including Transport

Cu.m

Cu.m

Cu.m

Cu.m

Cu.m

Cu.m

Cu.m

Cu.m
ST-048 Mixing & Laying Using Concrete Mixer (W/Batching), Cement
Concrete for Grade 25 (19 mm) Using Crusher Run Aggregate
Foundation
andUsing
Floors.Concrete
(excl. Transport
of Aggregate &Cement
Piling)
ST-048A In
Mixing
& Laying
Mixer (W/Batching),

Cu.m

Concrete for Grade 25 (70% 37.5 + 30% 19 mm) Using Crusher


Aggregate
(excl.
Transport
of Aggregate
& Piling) Cement
ST-049 Run
Mixing
& Laying
Using
Concrete
Mixer (W/Batching),
Concrete for Grade 30 (19 mm) With Crusher Run Aggregate
Aggregate
& Piling)
ST-050 (excl.
MixingTransport
& LayingofUsing
Concrete
Mixer (W/Batching), Cement

Cu.m

Concrete for Grade 40 (19 mm) With Crusher Run Aggregate


Aggregate
& Piling)
ST-051 (excl.
MixingTransport
& Laying of
Using
Concrete
By Hand

Cu.m

Cu.m

Cu.m
ST-052 Mixing & Laying Using Concrete By Power Driven Concrete
Mixer V/Batching

Cu.m

ST-053 Curing of Concrete Decks, Slabs , Beams, Walls etc. [SSCM


1011.11]

Sq.m.Day

ST-054 Fabricate & Lay M.S Bars as Reinforcement (including


Transport)

kg

ST-055 Fabricate & Lay Tor Steel as Reinforcement (including


Transport)

kg

ST-056 Cutting & Laying Reinforcment Fabric (Excluding Cost of


Reinforcement Fabric)

kg

ST-057 Supplying & fixing 25 mm Thick Planks of Class II Timber as


Shuttering, Including removing [1008.3(b)]

Sq.m

ST-058 Supplying & Fixing Class II Timber Bearers, Joists , Etc.


Including Dismantling in Shuttering (SSCM 1008.3 (a))

Cu.dm

ST-059 100-150 mm Dia. Round Jungle Timber Supplied & Fixed as


Props

L.m

ST-060 150-200 mm Dia. Round Jungle Timber Supplied & Fixed as


Props

L.m

ST-061 Formwork Smooth Finish With Class II Timber For Bridge


Beams, Bridge Deck Under Sides and Sides Including
(SSCM 1008.3(b))
ST-062 Dismantling
Formwork Smooth
Finish With Class II Timber For Bridge
Column Shafts Including Dismantling (SSCM 1008.3(b))
ST-063 Formwork Smooth Finish, Using Plywood (Shutter 15 mm) and
Class II Timber Bearers, Joists and Jungle Timber Props for
Abutments,
walls
Etc.Planks and Struts of Class II
ST-064 Bridge
Supplying
& fixing Wing
25mm
Thick
Timber as Formwork Rough Finish, in Foundation Etc. Including
ST-065 Removing
Formwork (SSCM
Smooth1008.3(b))
Finish for General Purposes, Using 25mm
Thick Planks & Struts of Class II Timber and Round Jungle
100 -152mm
150 mmDia.
Dia.Concrete
Including Pipes
Dismantling
ST-066 Timber
Laying Props
& Jointing
(Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
L.m

ST-067 Lalying & Jointing 229mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-068 Laying & Jointing 305mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-069 Laying & Jointing 457mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-070 Laying & Jointing 610mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-071 Laying & Jointing 915mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-072 Laying & Jointing 12205mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-073 Laying & Jointing 152 mm Dia. Available Concrete Pipes and
Collars

L.m

ST-074 Laying & Jointing 229 mm Dia. Available Concrete Pipes and
Collars

L.m

ST-075 Laying & Jointing 305-450 mm Dia. Available Concrete Pipes


and Collars

L.m

ST-076 Laying & Jointing 610 mm Dia. Available Concrete Pipes and
Collars

L.m

ST-077 Laying & Jointing 915 mm Dia. Available Concrete Pipes and
Collars

L.m

ST-078 Laying & Jointing 1220 mm Dia. Available Concrete Pipes and
Collars

L.m

ST-079 Fixing new Bridge Planks Runners and Stacking old Planks
(Available) [SSCM 1402.2(a)]

No

ST-080 Removing & Re-Setting old Bridge Planks


No
ST-081 Supplying & Fixing new Bridge Planks of Class I Timber
No
ST-082 Supplying & Fixing 31 mm Thick Deck Planks of Class I Timber
No
ST-083 Fixing New Chequered or M.S. Plates on Timber - Decked
Bridge [SSCM 1402.2(d)]

L.m

ST-084 Removing & Refixing Chequered M.S. Plates on Timber-Decked


Bridge

L.m

ST-085 Tightening Bolts & nuts of Chequered of M.S. Plates


L.m
ST-086 Removing & Refixing "U" Clips. [SSCM 1402.2(b)]
L.m
ST-087 Cleaning, Wire Brushing & Painting Steelwork, One Coat
Enamel Paint

Sq.m

ST-088 Cleaning, Wire Brushing & Applying Tar on Steelwork, One Coat
Sq.m
ST-089 Cleaning, with Cotton Waste and Painting Steel Work with
Enamel Paint, One Coat

Sq.m

ST-090 Chipping to Bare Metal etc. & Painting with Anticorrosive Paint,
One Coat

Sq.m

ST-091 Painting with One Coat of Enamel Paint after Cleaning,


Derusting & Application of One Coat Anticorrosive Paint[SSCM
ST-092 1401.3(C)]
Painting with Two Coats of Enamel Paint, after Cleaning,

Sq.m

Degusting & Application of One Coat Anticorrosive Paint

Sq.m

ST-093 Oiling Steel Cables on Suspension Bridges [SSCM 1405.3]


Sq.m
ST-094 Cleaning Booms of Steel Bridges including Scaffolding where
Necessary [SSCM 1401.3]
ST-095 Demolishing Unreinforced Cement Concrete Including Cleaning
of Debris in Foundation and Superstructure in Dry Condition
Under
Water Structures
[SSCM
202.2]
ST-096 Excluding
Demolishing
Reinforced
Concrete and
Debris
Cleared

L.m
Cu.m
Cu.m

ST-097 Demolishing Reinforced Concrete in Very Heavy Structures


Build Up of Grade 30 Above Concrete in Work Such As Bridge
& Deck
Slabs,M.S.
Including
Collecting
ST-098 Beams
Supplying
and Fixing
Dowels
Splicedand
andRemoving
Dove Tailed with
Wedge at One End, 16mm dia, and 1m long, Boring Holes to
0.3m Depth in Fixing

Cu.m
No

ST-099 Supplying and Fixing M.S. Dowels, Spliced and Dove Tailed with
Wedge at One End, 20mm dia, and 1m Long, Boring Holes to
Depth&inFixing
Fixing.M.S.Dowels, Spliced and Dove Tailed with
ST-100 0.3m
Supplying
Wedge at One End, 25mm dia, and 1m Long. Boring Holes to
Depth in Type
Fixing.Road Kerbs(125mmX900mm) Set on19mm
ST-101 0.3m
Lay Standard
thick 1:3 Cement Mortar Layer on 150mm X 275mm 1:2:4(19)
Foundation
av. Kerbs
157mm[Type
X 150mm
Backing
ST-102 Concrete
Lay Standard
PrecastWith
Bridge
Drawing
No T/B/106-

No
No
L.m

Rev 1 of RDA](Cost of Precast Kerbs & Transport to be Paid


ST-103 Separately)
Constructing 150x50mm thick Inset Lower Kerb in Grade
20(14mm) Concrete for Bridges: ( Aggregate Transport to be
Separately)
ST-104 Paid
Laying
450 X 450 X 50 mm Precast Concrete Slabs on Foot

L.m

Walks Including av. 40mm Thick 1:3 Cement Mortar Bedding


Sabs &Sand
Transport
Paid
Separately)
ST-104A (Cost
MixingofCement
Mortar
Using
a Mixer

Sq.m

L.m

Cu.m
ST-105 Laying 450 x 450 x 50 mm Precast Concrete Slabs on Foot
Walks Including av.40mm Thick Sand Bedding (Cost of Precast
Transport
be Paid
Separately)
ST-106 Slabs
Fixing and
Precast
HandtoRailing
and
Uprights Using Grade 25(19)
Concrete Including Formworks for Pockets (Precast Items &
andofAggr.Transport
Separately)[Type
DwgType
No
ST-107 Transport
Construction
RCC Grade paid
25(19mm)
End Pillaster,
T/B/102/B]
1(Agg. Transport to be Paid Separately) [Type Dwg No T/B/1061]
ST-108 Rev
Construction
of RCC Grade 25(19mm) End Pillaster, Type II
(Agg. Transport to be Paid Separately) [Type Dwg No T/B/1061]
ST-109 Rev
Construction
of RCC Grade 25(19mm) End Pillaster, Type III
(Agg. Transport to be Paid Separately) [Type Dwg No T/B/1061]
ST-110 Rev
Construction
of RCC Grade 25(19mm) End Pillaster, Type IV
(Agg. Transport to be Paid Separately) [Type Dwg No T/B/1061] of Grade 20 Concrete Precast pin Kerbs in Grade 20(19)
ST-111 Rev
Laying
Concrete Foundation as Edging (Aggregate transport to be Paid
ST-112 Separately)
Supplying and Fixing 25mm Thick Toung and Groved Planks

Sq.m
L.m
No
No
No
No
L.m

with 50x50mm Struts of Class 1 Timber in Panels as Smooth


DrainsThick Toung and Groved Planks
ST-112A Shuttering
Supplying for
andConcrete
Fixing 25mm
with 50x50mm Struts of Class 1 Timber in Panels as Smooth
for Packing
Concrete 50-200
Drains(for
13.38
ST-113 Shuttering
Supply and
mm
DrySq.m)
Stone lining Behind

Sq.m

Abutments and wind walls (Aggregate Transport to pay


ST-114 separately)
Laying Geotextile on Prepared Surface Supply and Transport to
pay Separately

Cu.m

ST-115 Construction of Gabion Wall Using 4x1x1m Mesh Including


Lacing Wire on Prepared Ground.(Supply and Transport of
Mesh of
to be
Paid Separately);
ST-116 Gabion
Construction
Gabion
wall Using 4x1x0.5 m mesh including
Lacing Wire on Prepared Ground (Supply and Transport of
Mesh of
to be
Paid
Separately)
ST-117 Gabion
Construction
Kerb
Inlet
as per Drawing Type - K1/T1 With
Cover Slabs. Aggregate Transport to pay Separately
ST-118 Additional Labour For Pouring, Compacting and Levelling
Concrete in Screed Under Foundation Slabs
ST-119 Additional Labour For Pouring, Compacting Concrete in
Abutments , Wingwalls, Capping Beams of Piers and Foot walks
of Bridges

use

Sq.m
Cu.m
Cu.m
L.m
Cu.m
Cu.m

ST-120 Additional Labour For Pouring, Compacting and Levelling infiller


Concrete between Bridge Beams including Creed of Bridge
ST-121 Decks.
Leveling Ready mixed Grade Concrete Including Vibration
(Supply of Concrete to be Paid Separately)
ST-122 Supplying and laying Approved Hard Rubber Bearing Pads
75mm x 12mm Over Capping Beams and Under the Approach
ST-123 Slabs
Bituminous Sealing Material Supplied and Laid Under Beam

Cu.m
Cu.m
m.

ends to Prevent Grout leak on to Capping Beam Transport of


Included.
ST-124 Emulsion
230mm Dia.
Polythene Displacers Supplied and Filled with Saw
Dust or Similar Light Material in Deck. Transport of Saw Dust to
Paid Separately
ST-125 be
325mm
Dia Polythene Displacers Supplied and Filled with Saw

L.m

Dust or Similar Light Material in Deck. Transport of Saw Dust to


Paid
Separately to 13.5m) Launching into Position
ST-126 be
PCC
Beams(10.5m

L.m

L.m

No
ST-127 M.S. Angle Iron and Hard Rubber Expansion Joints as Per
Drawing No T/B/107 Rev. 1

L.m

Section 11 - Road Furniture Items


Kilometer Posts and Guard Stones
Item No Description

Unit

RF-001 White Washing, Two Coats to Guide / Guard Stones


No
RF-002 Whitewashing Two Coats K.M. Stones inc. Numbering & Tar
Skirting.

No

RF-003 Painting White Back Ground on Parapets etc. & Stencilling nos.
No
RF-004 Fixing Guard Stones in any Soil
No
RF-005 Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
282.5 KG/Cu.m ] including curing, for "A" and "B" Class Roads

No

RF-006 Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
282.5 KG/Cu.m ] including curing, for "C" and "D" Class Roads

No

RF-007 Fixing Standard Type K.M. Stones in Any Soil


No
RF-008 Fixing new or Refixing Type Guard stones in Cement Concrete
[1:3:6(37.5mm) and Cement 219 KG/Cu.m ] With Min. Cover
mm Depth
RF-009 75mmx
Casting 300
Standard
Type Guard Stones in Concrete [1:2:4(19mm)
& Cement 282.5 KG / Cu.m]
RF-009A Casting Standard Type
Guard Stones in Concrete
[G25(19mm)As per Drawing No T/B/100-Rev 1,For Bridges and
Culvers

No
No
No

RF-009P Casting Standard Type Guard Stones-Part 1of RF-009A


No
RF-009Q Casting Standard Type Guard Stones-Part 2 of RF-009A
No
RF-009R Casting Standard Type Guard Stones-Part 3 of RF-009A
No
RF-010 Rout NumberingWith Reflective Paint on 2 sides
No
RF-011 Casting Standard Boundary Markers in Reinforced Concrete
[1:2:4(19mm)] with Admixtures, Including 14 days Curing and
Loading to Vehicle at Yard (Agg. Transport paid Separately)

No

Section 12 - Notic Boards & Road Signs

[SSCM 810.2 AND 1501.3] - All Paints Should Conform to the Requirements of SLS as Given in
SSCM 1707.
Item No Description
RS-001 Notice & Traffic Sign Boards Etc. Fixed in Concrete
[1:3:6(37.5mm) and Cement 219 KG/Cu.m) (Excluding
Aggregate) 2 Coat Town Name Boards (Inc. Tar
RS-002 Transport
Cleaning &ofWhitewashing
Skirt)
RS-003 Cleaning, Painting one Coat & Relettering Etc. Traffic sign
Boards inc. Paint Post in B/W

Unit
No
No
No

RS-004 Cleaning and painting 1 coat on Notice Board


Sq.m
RS-005 lettering & Numbering Below 50 mm
No
RS-006 Lettering and Numbering 50mm-75mm
No
RS-007 lettering & Numbering 75 mm - 150 mm
No
RS-008 lettering & Numbering 150 mm - 225 mm
No
RS-009 Painting 2 Coats Continuous Center Line,100 mm Wide With
Enamel Paint

L.m

RS-010 Painting 1 Coats Continuous Center Line,100 mm Wide With


Road Marking Paint (White)

L.m

RS-011 Painting 2 Coats Broken Center Line,100 mm Wide With


Enamel Paint

L.m

RS-012 Painting 1 Coats Continuous Center Line (Without Reflective


Studs),100 mm Wide, At 3 meter Intervals With Road Marking
(White)With Empty (Hot Tar) Barrels Including White Wash(
RS-013 Paint
Barricading
ExcludingTransport) and Cost of Barrels
RS-014 Revetment to Banks etc. with Empty Barrels in Horizontal Tiers
with Vertical Batter(1:8) including Transport of Barrels

L.m
No
No

RS-015 Road Marking Continuous Center line 100 mm Width, using


Thermoplastic paint (White) , Inclusive Barricading.
RS-016 Road Marking Standard Pedestrian Crossing,
Thermoplastic paint (White) , Inclusive Barricading.

Sq.m

using
L.m

Section 13 - Miscellaneous

Item No

Description

Unit

MS-001 Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
Transport of Aggregate) (Site Made)

Cu.m

MS-001A Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
Transport of Aggregate) (Site Made) with Department Bitumen

Cu.m

MS-002 Patching Shallow Pot Holes. Depth Less 20mm using hot
bitumen 1.2ltr/Sq.m & 12.5mm chips single size @ 13.75 cu.
m/sq.m
hand tamping
(rat. inc.
cost of
bitumen
&
MS-002A deci
Patching
roadincld.
with premix
after preparing
surface
with
30% cut
mater.)
(Excl.
Transport.
of
Aggregate
&
Bitumen)
back

Sq.m
Cu.m

MS-002B Patching road with premix after preparing surface


Cu.m
MS-003 Patching Shallow Potholes, Depth Less Than 20mm Using 1020% Cutback Bitumen 1.2ltr/Sq.m and 12.5mm Chips, Single
at 13.75
CuDeci
m/Sq.m
tamping (Excl. Tr.
MS-003A Size
Patching
Shallow
Potholes,
Partincluding
1 of Itemhand
No MS-003
Agg, Bitumen )
MS-004 Patching shallow pot holes, depth less than 20mm using
emulsion (Crs1) @ 1.2Ltr/Sq.m & 12.5mm cu.deci m/sqm
tamping
transport
of emulsion
to site
etc.
Rate
MS-005 including
Patching hand
pot holes
of Medium
,depth
of 20-75mm
with
Premix
include
cost
of
emulsion
and
other
materials)
(Excl.
transport
of
(Site Made) using Cutback 10-20% at the Rate of 83.5 Ltr/Cu.m
aggregate)
19mm Down
Aggregate
including
of -Surface,
MS-005A of
Patching
pot holes
of Medium
,depthpreparation
of 20-75mm
Part 1 ofTack
the
Coat(CSS1)
AT
.75Ltr/Sq.m,
Trimming
Sides,
Tamping
etc
Item MS-005
MS-005B Patching pot holes of Medium ,depth of 20-75mm - Part 2 of the
Item MS-005

Sq.m
ltr
Sq.m
Sq.m
Sq.m
Sq.m

MS-005C Patching Potholes of Medium Depth - Part 3 of Item MS-005


Cu.m
MS-006 Patching Potholes using Plant Made Premix Bound Including
Sealing the patching with emulsion (CRS-1) painting @ 7.3
with sand
(Transport
of premix
paidUsing
separately)
MS-007 ltr/m.ton
Patchingcover
Potholes
of Medium
Depth
20-75mm
Graded
Aggregate 19-12.5mm With Hot Bitumen 1.75 ltr/Sq.m and Blot.
1 Cu.m/125
Sq.mThan
and .75ltr/Sq.m
Tack
Coat(CSS-1)
MS-008 Material
PatchingatPotholes
Deeper
75mm Using
Premix
Material
(Site Made) to a Depth of 37.5mm(Over the Prepared Surface
Aggregate
andmore
Gravel
Separately)
MS-009 with
Patching
pot holes
thenPaid
75mm
deep withUsing
water10-20%
bound
Cutback
83.5Ltr/Cu.m
of
19mm
down
Agg,
.75Ltr/Sq.m
Tack
gravel material using 50mm or 12.5 mm single size aggregate
coat
with
useable
old aggregate
and
MS-010 along
Patching
Ruts
and Depressions
Uptoobtain
75mm from
Depthpicking
Using Site
preparation
of
surface
inc.
laying
watering
Spreading
gravel
of
Made Cold Mix (Cut Back) Material With the Surface and Edge
approved
quality
Prepared as Per Specifications .75Ltr/Sq.m Tack Coat

M.ton
Sq.m
Sq.m
Sq.m
Sq.m

MS-010A Patching Ruts and Depressions Part 1 of Item MS-010


Sq.m
MS-011 Patching Ruts and Depressions Upto 75mm Depth Using Plant
Made Cold Mix (Cut Back) Material with .75Ltr/Sq.m tack
Separately)
MS-012 coat(CSS-1)(Premix
Patching Ruts and paid
Depressions
Deeper than 75mm Depth
Using 50mm Down Aggregate, Top 40mm with Plant Made
Mix Ruts
(Cut Back)
Material withDeeper
.75Ltr/Sq.m
tack coat(CSS-1)
MS-012C Cold
Patching
and Depressions
than 75mm
- Part C of
(Premix
paid
Separately)
Item MS-012
MS-013 Patching Ruts and Depressions Upto 75mm Deep with .
75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
at 1.75Ltr/Sq.m,
at 1 Cu.m/125
MS-014 Bitumen
Patching applied
Ruts and
DepressionsBlotting
DeeperMaterial
Than 75mm
with .
Sq.m
(Agg.
paid
separately)
75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
applied
at 1.75Ltr/Sq.m,
Blotting
Material
1 Cu.m/125
MS-015 Bitumen
Correcting
and Strengthening
Edges
of the
Roadatby
Cold mix
Sq.m
(Agg.
paid
separately)
40mm thick, Cutback 10-20%, at the rate of 83.5Ltr/Cu.m on
downand
Aggregate,
Over 50mm
downofAggregate,
Tackmix
coatMS-015B 19mm
Correcting
Strengthening
the Edges
Road by Cold
.75
Ltr/Sq.m(CSS
1)
Part B of the item
MS-016 Correcting and Strengthening Edges of Road by Cutback(1020%) Cold Mix 40mm thick with 83.5Ltr/Cu.m 19mm Down
overStrengthening
.75Ltr/Sq.m Edges
Tack Coat(CSS-1)
overMS-016
50 mm
MS-016B aggregate
Correcting and
Part B of the Item
down over Closely packed 100mm agg. with excavation width
225mm, depth 225mm
MS-017 Patch Sealing with emulsion painting the surface by spray of crs1 @ .75ltr/sq.m squeeing the emulsion and spreading the
materialwith
(Sand)
the ratepainting
of 1 Cu.m/125
Sq.mby Using .
MS-018 blotton
Patch Sealing
hot at
Bitumen
the surface
75ltr/sq.m squeeging the bitumen and spreading the blotton
(Sand)ofatPitted
the rate
of 1 Using
Cu.m/125
of
MS-019 material
Patch Sealing
Surface
Hot Sq.m
Sand (Transport
Bitumen Mix
bitumen
paid
separately)
104Ltr/Cu.m of Sand Spread and Hand Tamped Including
and Cleaning
Surface
Transport
of Bitumen)
MS-019A Brushing
Patch Sealing
of Pitted The
Surface,
Part(Excl
A of Item
MS-019A

Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m

MS-019B Patch Sealing of Pitted Surface, Part B of Item MS-019A


Sq.m
MS-020 Patch Sealing of Pitted Surface With Emulsion Sand Slurry
using CRS 1 or 2 at the Rate of 136.5Ltr/Cum of Sand Mix
Laid, Leveled
Squeeged
Brushing
andSlurry,
Cleaning
MS-020A Properly
Patch Sealing
of Pitted&Surface
withincl.
Sand
Emulsion
Part
A of Item MS-020A
MS-020B Patch Sealing of Pitted Surface, Using Emulsion Sand Slurry,
Part B of Item MS-020A
MS-021 General upkeep of Road sides Including Maintaining the Right of
way in a Neat Condition by Trimming, Weeding & Clearing of the
Sides,
DrainsJungle
, Drainage
Structures,
Scupper
&
MS-022 Road
Cleaning
ordinary
Including
Removing
High Drains
Growing
Cleaning
Minor
Slips
Plants and Trees of Girth < 300 mm other than those designated
remain.medium
by Uprooting
by CuttingRemoving
and then High
uprooting
the
MS-023 to
Cleaning
Jungleor Including
Growing
Stumps
or
by
Cutting
only
as
Directed
(SSCM
1203.2)
Plants and Trees of Girth < 300 mm other than those designated
remain.heavy
by Uprooting
or by Cutting
and then
uprooting
the
MS-024 to
Cleaning
Jungle Including
Removing
all High
Growing
Stumps
or
by
Cutting
only
as
Directed
Plants and Trees of Girth < 300 mm other than those designated
remain.
Uprooting
or by Cutting
and and
then Embankments
uprooting the
MS-025 to
Repairs
to by
Damage
of Shoulders
verges
Stumps
or
by
Cutting
only
as
Directed
slopes including making good depressions,ruts,holes and
Erosion path with approved gravelly soil & compacting the same
with roller(8-10 ton) as Directed(Gravel soil be paid separately if
brought outsid

Sq.m
Sq.m
Sq.m
Km
Km
Km
Km
Cu.m

MS-026 Regarding and Regravelling of shoulders with gravel of


approved Quality , duly compacted with Roller (8-10 ton) as
for and
Repairing
high sides
by heaving
deposits
MS-027 directed
Regarding
Regravelling
of Caused
shoulders
with gravel
of
and
Construction
Debris,
to
Required
levels
by
using
a
grader
approved Quality , duly compacted with Roller (8-10 ton)
as
(120 -140hp)
RepairingCracked
high sides
Caused
by in
heavings
deposits
MS-028 directed
ReplacingforDamaged
Concrete
Slabs
Foot Walks
with
and
Construction
Debris,
to
Required
levels
manually
Gravel
Precast/Cast insitu Concrete 1:2:4(19mm), with 50mm minimum
(loose volume)
including
fixing
in position
with 600
Cement
1.3 mix
MS-029 thickness
Cutting and
Removing
Fallen
Trees upto
mm Mortar
Girth Including
(Excluding
Transport
of
Aggregate)
(SSCM
1204.3)
Cutting into Required number of Pieces Including Disposal as
Piece
lessmm
than
2m(SSCM
MS-030 Directed.
Cutting andminimum
Removing
FallenShall
Treesnot
600be- 900
Girth
1203.2)
Including Cutting into Required number of Pieces Including

km
km
Sq.m
No
No

Directed.
minimum
Piece
Shall not
less thanWalls
MS-031 Disposal
Weeding as
Masonry
Culverts
Small
Bridges
andbe
Retaining
2m(SSCM
1203.2)
(SSCM 1303.3)

Culverts

MS-032 Masonry Random Rubble with Boulders including Collect (SSCM


1006.3(b))

Cu.m

MS-033 Fixing cats Eyes in Tar Macadam Including Breaking road


Surface, Barricade etc. [SSCM 810-.3(c)]

No

MS-034 Reducing High Sides in Ordinary Soil [SSCM 301.3/1201.3(c)]


Cu.m
MS-035 Reducing High Sides in Medium Soil (Including transport 2km)
Cu.m
MS-036 Reducing High Sides in Hard Soil
Cu.m
MS-037 Reducing High Sides in Soft Rock
Cu.m
MS-038 Reducing High Sides in Rock Requiring Blasting
Cu.m
MS-039 White Washing 1 Cote to Parapets of Bridges and Culverts
(SSCM 1403.3(e))

Sq.m

MS-040 White Washing 2 Cotes to Parapets of Bridges and Culverts


Sq.m
MS-041 White Washing 1 Cote to Parapets of Bridges and Culverts after
cleaning Attending to minor Repairs

Sq.m

MS-042 White Washing 2 Cote to Parapets of Bridges and Culverts after


cleaning Attending to minor Repairs

Sq.m

MS-043 Painting with Emulsion 1 Coat to Parapets of Bridges and


Culverts, Guard Stones and KM Posts After Cleaning and
to Minor
Repairs
SSCM
MS-044 Attending
Painting with
Enamel
1 [Coat
to1501.3(a)-(v)]
Parapets of Bridges and
Culverts, Guard Stones and KM Posts After Cleaning and
to Minor
Repairs
[ SSCMto1501.3(a)-(v)]
MS-045 Attending
Painting with
Enamel
2 Coats
Parapets of Bridges and

Sq.m
Sq.m

Culverts, Guard Stones and KM Posts After Cleaning and


to Minor
Repairs2 [ Coat
SSCMto1501.3(a)-(v)]
MS-046 Attending
Painting with
Emulsion
Parapets of Bridges and
Culverts, Guard Stones and KM Posts After Cleaning and
to Minor
Repairs1 [ Coat
SSCMto1501.3(a)-(v)]
MS-047 Attending
Painting with
Emulsion
Parapets of Bridges and

Sq.m

Culverts, Guard Stones and KM Posts Including Preparing


Old Work
SSCM 1501.3(b)-(v)]
MS-048 Surface
Painting ofSub
Coat [Emulsion
to Parapets of Bridges and
Culverts, Guard Stones and KM Posts Including Preparing
Surface [SCM 1501.3(b)-(v)]

Sq.m

Sq.m

Sq.m

MS-049 Painting 1 Coat Emulsion Paint to Parapets of Bridges and


Culverts, Guard Stones and KM Posts Including Preparing
Work [100mm
SSCM 1501.3(b)-(v)]
MS-050 Surface
Cleaningof&New
Painting
wide stripe for skirting to guard
stones. {SSCM 1501.3(b)(v)}

Sq.m
L.m

MS-051 Painting 2 Coats Standard Pedestrian Crossing for Carriageway


[SSCM 810.2(c)]

L.m

MS-052 Painting 1 Coat Standard Pedestrian Crossing for Carriageway


Using Road Marding Paints [SSCM 810.2(c)]

Sq.m

MS-053 Erecting, Barricading in Jungle Timber 75-100 mm Dia, Vertical


Posts at .9m Centers and 1.2 Above Ground including White
1709] for Painting or Tarring Bridges and for
MS-054 Washing.
Temporary[SSCM
Scaffolding
Weeding on Bridges or Retaining wall Including Dismantling
work. [SSCM
1008.3(a)]
MS-055 after
Roughening
Existing
Smooth tarred Metalled Carriageway by
hand for Bonding , Collecting Disposal of all Loose Materials
03.3(b)]
MS-056 [SSCM
Supply of
Diesel for Machineries

L.m
Sq.m
Sq.m
ltr

MS-057 Patching road with Premix (Loose Volume) after Prep, Surface
with Emulsion (CSS-1) at .75 ltr/sq.m at tack Coat Including
and Hand
Stamping.
(Supply of premix
MS-058 internal
PatchingTransport
Road With
Premix
After Preparing
Surface(Loose
With
Volume)
Paid
Separately)
[SSCM
1102.3(b)]
Emulsion (CSS-1) at .75 ltr/sq.m as Tack Coat, Including Internal
andCoats
Stamping
with
Machine
(Supply
Premix Paid
MS-059 Transport
Painting two
Enamel
Paint
on Kerbs,
AfterofCleaning
and
Separately)
[SSCM
1102.3(b)(i)]
Preparing Surface
MS-060 Preparing and Stock Piling Premix at Site Using 12.5 mm
Aggregate and Emulsion (CSS-1) (Excluding Transport of
MS-061 Aggregate)
Breaking Manually Asphalt layer 2"-3" Thick on the Carriageway
for Kerb Laying

Cu.m
M.ton
Sq.m
Cu.m
L.m

Section 14 - Survey & Day Works

Item No

Description

SV-001 Supply of Unskilled Labour-Cleaning Chocked Culverts


SV-002 Supply of Semiskilled Labour
SV-003 Supply of Skilled "A" Grade Labour
SV-004 Supply of Skilled "B" Grade Labour
SV-005 Clearing jungle (Light) to a Width of 1.22 meters for Survey work
SV-006

Clearing jungle (Medium) to a Width of 1.22 meters for Survey


work

Unit
Days
Days
Days
Days
km
km

SV-007

Clearing jungle (Heavy) to a Width of 1.22 meters for Survey


work

SV-008 Supply of Labour for Chaining and Cutting Pages and Pegging
SV-009

Leveling Chaining and Pegging and Establish Bench Marks on


Concrete Rock or Pegs and Checking Back Levels

SV-010 Surveying Including Fixing Pickets & Taking Angles


SV-011 Changing Traverse Lines and Taking off-sets

km
km
km
km
km

f Transport
Rate Rs
170.50
181.50
194.50
30.25
20.30
224.75
255.00
285.25
315.50
345.75
376.00
406.25
426.55
446.85
467.15
487.45
507.75
528.05
548.35
568.65

588.95
609.25
629.55
649.85
670.15
690.45
710.75
731.05
751.35
771.65
791.95
812.25
832.55
852.85
873.15
893.45
913.75
934.05
954.35
974.65
994.95
1015.25
1035.55

1055.85
1157.35
1258.85
1360.35
1461.85
1563.35
1664.85
1766.35
1867.85
1969.35
2070.85
2172.35
2273.85
2476.85
2679.85
2882.85
3085.85
3288.85
3491.85
42.15
48.95
55.75
62.55

69.35
76.15
82.95
89.75
96.55
100.35
104.15
107.95
111.75
115.55
119.35
123.15
126.95
130.75
134.55
138.35
142.15
145.95
149.75
153.55
157.35
161.15
164.95

168.75
172.55
176.35
180.15
183.95
187.75
191.55
195.35
199.15
202.95
206.75
210.55
214.35
233.35
252.35
271.35
290.35
309.35
328.35
347.35
366.35
385.35
404.35

423.35
442.35
480.35
518.35
556.35
594.35
632.35
670.35
9.50
11.90
14.30
16.70
19.10
21.50
23.90
26.30
28.70
32.85
37.00
41.15
45.30
49.45
53.60

57.75
61.90
66.05
70.20
74.35
78.50
82.65
86.80
90.95
95.10
99.25
103.40
107.55
111.70
115.85
120.00
124.15
128.30
132.45
136.60
140.75
144.90
149.05

153.20
157.35
178.10
198.85
219.60
240.35
261.10
281.85
302.60
323.35
344.10
364.85
385.60
406.35
447.85
489.35
530.85
572.35
613.85
655.35
8.80
10.30
11.80

13.30
14.80
16.30
17.80
19.30
20.80
22.00
23.20
24.40
25.60
26.80
28.00
29.20
30.40
31.60
32.80
34.00
35.20
36.40
37.60
38.80
40.00
41.20

42.40
43.60
44.80
46.00
47.20
48.40
49.60
50.80
52.00
53.20
54.40
55.60
56.80
58.00
59.20
65.20
71.20
77.20
83.20
89.20
95.20
101.20
107.20

113.20
119.20
125.20
131.20
143.20
155.20
167.20
179.20
191.20
203.20
12.40
14.80
17.20
19.60
22.00
24.40
26.80
29.20
31.60
33.40
35.20
37.00
38.80

40.60
42.40
44.20
46.00
47.80
49.60
51.40
53.20
55.00
56.80
58.60
60.40
62.20
64.00
65.80
67.60
69.40
71.20
73.00
74.80
76.60
78.40
80.20

82.00
83.80
85.60
87.40
89.20
98.20
107.20
116.20
125.20
134.20
143.20
152.20
161.20
170.20
179.20
188.20
197.20
215.20
233.20
251.20
269.20
287.20
305.20

214.47
234.32
254.17
274.02
293.87
313.72
333.57
353.42
373.27
387.22
401.17
415.12
429.07
443.02
456.97
470.92
484.87
498.82
512.77
526.72
540.67
554.62
568.57

582.52
596.47
610.42
624.37
638.32
652.27
666.22
680.17
694.12
708.07
722.02
735.97
749.92
763.87
777.82
791.77
805.72
819.67
889.42
959.17
1028.92
1098.67
1168.42

1238.17
1307.92
1377.67
1447.42
1517.17
1586.92
1656.67
1796.17
1935.67
2075.17
2214.67
2354.17
2493.67
127.46
140.66
153.86
167.06
180.26
193.46
206.66
219.86
233.06
242.36

251.66
260.96
270.26
279.56
288.86
298.16
307.46
316.76
326.06
335.36
344.66
353.96
363.26
372.56
381.86
391.16
400.46
409.76
419.06
428.36
437.66
446.96
456.26

465.56
474.86
484.16
493.46
502.76
512.06
521.36
530.66
577.16
623.66
670.16
716.66
763.16
809.66
856.16
902.66
949.16
995.66
1042.16
1088.66
1181.66
1274.66
1367.66

1460.66
1553.66
1646.66
101.50
33.75
33.75
28.25
27.00
5.50
3.80
6.80
2.40
4.15
1.90
0.80
59.25
10.60
4.55
20.10
4.40
3.10
22.65
4.95

3.50
30.25
6.60
4.65
45.25
9.95
6.95
60.25
13.20
9.30
90.50
19.85
13.95
194.50
53.25
38.00
32.75
38.00
75.75
126.00
164.00
302.50
605.00

1.90
2.75
4.75
6.95
2.65
1.60
1.70
7425.00
8937.50
10450.00
11962.50
13475.00
14987.50
302.50
8.80
1.50
1.20
12.40
2.40
1.80

in 25 meters Distance
Rate Rs

230.00
285.00
339.50
298.50
449.00
382.00
668.00
568.00
485.00
723.00
559.00
449.00
559.00
778.00
595.00
668.00
887.00
54.75
72.25
970.00
1040.00
1010.00
1570.00

171.50
172.50
31.00
6.20

g
Rate Rs
833.00
1315.00
1860.00
2495.85
1660.00
1990.00
2320.00
2865.00
4070.00
1390.00
2120.00
2525.00
2730.85
2140.00
1605.00
827.00

2070.00
1950.00
2140.00
60.25
120.50
109.50

Rate Rs
646.00
77.75
285.00
231.50
355.50
359.00
337.00
246.50
59.50
54.00
540.00
300.50
300.50
59.25

ving

Rate Rs
147.00
110.00
73.50
97.75

& Rolling

m Rate if not carried Out under


Rate Rs
570.00
939.00
40.50
45.50
787.00
1225.00
24.25
39.50
1160.00
902.00
792.00
1370.00

3945.00
3775.00

2450.00
4085.85
2630.00

ament

ulsion/Bitument to be Paid
Rate Rs
273.00

51.44
271.00
34.75
164.00
84.25
160.00
81.75
113.00

24.65
144.00
40.69
111.50
22.75
142.00
23.80
464.00
458.50
109.00
107.50
72.75
145.50
106.50
70.00
28.75
280.00
99.00
8.95
145.50
143.50
2.15
140.00

134.50
128.50
1.70
134.00
12.00
56.25
117.00
983.00
144.00
10.50
185.00
86.75
121.50
1145.00
134.50
139.00

16 km Included in the
Rate Rs
2390.00
3585.00
4775.00
5970.00

7165.00
8360.00
9555.00
1195.00
2185.00
3280.00
4375.00
5465.00
6560.00
7650.00
8745.00
1095.00
2285.00
1895.00

the Vicinity Unless


Rate Rs
317.50
438.00
558.00
619.00
438.00
364.00

1215.00
68.00
122.50
8.80
5.30
38.75
108.50
449.00
13.30
97.75

s etc.
Rate Rs
1335.00
1555.00
701.00

6262.14
5845.00
4465.00
4795.00
2145.00
2670.00

1740.00
394.50
798.00
204.00
12515.00
355.50
155.00
530.00
422.00
31.25
500.00
219.00
657.00
328.50
438.50
219.00
334.50
408.00
490.00
554.00
358.85
391.00
456.00

520.00
6920.00
6705.00
6140.00
6220.00
6730.00
6805.00
8770.00
8845.00
7410.00

12175.00

11470.71
11425.00
10445.00
13080.00
14735.00
1960.00
2040.00

20.95
218.00
257.00
88.25
558.00
25.00
45.00
55.75
1395.00
1425.00
1330.00
596.00
819.00
1820.00
2615.00
3585.00
4295.00
5595.00
8940.00
13120.00
282.00
313.00
336.50

629.00
1105.00
1615.00
361.50
226.00
72.25
2730.00
534.00
712.00
106.50
77.50
123.50
84.75
85.00
342.00
270.50
344.50
404.50
32.00
1170.00
1655.00
7235.00
435.50

600.00
866.00
1210.00
206.50
142.00
855.00
12270.00
409.50
679.00
32247.00
34836.00
19740.00
21730.00
427.50
463.00
3900.00
1525.00
22.60
2490.00
2620.00
6995.00
335.00
107.00

499.00
783.00
983.00
83.25
75.75
133.00
3620.00
4165.00

es
Rate Rs
25.75
277.50
111.50
77.50
3310.00
2250.00
579.00
431.50
1055.00
2030.00

269.50
1400.00

igns

equirements of SLS as Given in


Rate Rs
741.00
146.50
880.00
148.50
21.40
25.75
32.00
42.75
65.50
70.00
60.00
63.25
92.75
354.50

220.00
512.00

Rate Rs
12540.00
4570.00
217.00
4415.00
3135.00
214.50

221.00
1220.00

584.00
690.00
21.70
1160.00

8.90

810.00

621.00
669.00
917.00

1010.00
619.00
117.50
115.50
253.20
15630.00
18.90
323.50

1980.00
3990.00
5540.00
7095.00
291.00

243.50
368.50
1075.00
271.50
387.50
72.50
536.00
143.00
235.50
345.00
454.50
564.00
1125.00
16.80
28.75
29.50
41.25
106.50
115.50
186.50
178.00
95.00
83.75

90.25
33.00
897.00
1030.00
162.50
60.00
7.35
133.00
3480.00
3505.00
186.00
14620.00
180.00

Rate Rs
605.00
666.00
908.00
726.00
2,310.00
3,390.00

4,620.00
636.00
1,270.00
1,270.00
1,695.00

HIGHWAY SCHEDULE OF RATES-2012


Section 1 - Transport
See Section 1 of General Notes for Selection of Mode of Transport
Item No

Description

Unit

T1-001

Transport of Soil beyond 25m and up to and including100 m by


Any Means (including Loading and Unloading)

Cu.m

T1-002

Transport beyond 100m and up to and including0.5km by Any


Means (Excluding Loading)

Cu.m

T1-003A

Transport beyond 0.5km and up to and including 1.0km by Any


Means.(Excluding Loading)

Cu.m

T1-003B

Transport of each 1km beyond 1.0 to 8.0 km by Any Means


(Excluding Loading)

Cu.m

T1-003C

Transport of Each Subsequent 1km beyond 8km by Any Means


(Excluding Loading)

Cu.m

T1-006

Transport of Material in Bulk Excluding Loading (for distance


less than or equal 3 kilometers)

Cu.mkm

T1-007A

Transport of Material in Bulk Excluding Loading (from 3km upto


10km Distance )

Cu.mkm

T1-007B

Transport of Material in Bulk Excluding Loading (for Distance


more than 10 Kilometers )

Cu.mkm

T1-009

Transport of Premix in Bulk, Excluding Loading other than at


Mixing Plant

TonKm

T1-010A

Transport of Barrels of Bitumen for First 1.0km of Transport


(Excluding Loading and Unloading)

BrlKm

T1-010B

Transport of Barrels of Bitumen for Each Subsequent 1.0km


From 1.0km - 9.0km (Excluding Loading and Unloading)

BrlKm

T1-010C

Transport of Barrels of Bitumen for Each Subsequent 1.0km


Beyond 9.0km (Excluding Loading and Unloading)

BrlKm

T1-010E

Transport of empty Barrels of Bitumen for First 1.0km of


Transport (Excluding Loading and Unloading)

BrlKm

T1-010F

Transport of empty Barrels of Bitumen for Each Subsequent


1.0km From 1.0km - 8.0km (Excluding Loading and Unloading)

BrlKm

T1-010G

Transport of empty Barrels of Bitumen for Each Subsequent


1.0km Beyond 8.0km (Excluding Loading and Unloading)

BrlKm

T1-010H Loading empty barrels of Bitumen

Brls

T1-010J Unloading empty barrels of Bitumen

Brls

T1-010K Cutting & straightening empty barrels of Bitumen

Brls

T1-013
T1-014
T1-015A

Loading Barrels of Bitumen Inclusive of Rolling upto 25m


Unloading Barrels of Bitumen Inclusive of Rolling and Stacking
Transport of Hume Pipes 152mm diameter for 1st 1.0km of
Transport (Excluding Loading and Unloading)

Brls
Brls
L.mkm

Transport of Hume Pipes 152mm diameter for Each Subsequent


T1-015B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 152mm diameter for Each Subsequent


T1-015C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 229mm diameter for 1st 1.0km of


Transport (Excluding Loading and Unloading)

L.mkm

Transport of Hume Pipes 229mm diameter for Each Subsequent


T1-018B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 229mm diameter for Each Subsequent


T1-018C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 305mm diameter for 1st 1.0km of


Transport (Excluding Loading and Unloading)

L.mkm

Transport of Hume Pipes 305mm diameter for Each Subsequent


T1-021B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 305mm diameter for Each Subsequent


T1-021C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 457mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

Transport of Hume Pipes 457mm diameter for Each


T1-024B Subsequeent 1.0km From 1.0 to 8.0km of Transport(Excluding
Loading and Unloading)

L.mkm

Transport of Hume Pipes 457mm diameter for Each Subsequent


T1-024C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 610mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

Transport of Hume Pipes 610mm diameter for Each Subsequent


T1-027B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 610mm diameter for Each Subsequent


T1-027C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 915mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

Transport of Hume Pipes 915mm diameter for Each Subsequent


T1-030B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 915mm diameter for Each Subsequent


T1-030C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

Transport of Hume Pipes 1220mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

T1-018A

T1-021A

T1-024A

T1-027A

T1-030A

T1-033A

Transport of Hume Pipes 1220mm diameter for Each


T1-033B Subsequent 1.0km From 1.0 to 8.0km of Transport(Excluding
Loading and Unloading)

L.mkm

Transport of Hume Pipes 1220mm diameter for Each


T1-033C Subsequent 1.0km Beyond 8.0km of Transport(Excluding Loading
and Unloading)

L.mkm

T1-036
T1-037
T1-038
T1-039
T1-040
T1-041
T1-042

Loading and Unloading 152mm diameter 2.44m Long Hume Pipes


Loading and Unloading 229mm diameter 2.44m Long Hume Pipes
Loading and Unloading 305mm diameter 2.44m Long Hume Pipes
Loading and Unloading 457mm diameter 2.44m Long Hume Pipes
Loading and Unloading 610mm diameter 2.44m Long Hume Pipes
Loading and Unloading 915mm diameter 2.44m Long Hume Pipes
Loading and Unloading 1220mm diameter 2.44m Long Hume Pipes

No
No
No
No
No
No
No

T1-043

Transport of Recast Kerb Stones (All Types) for Road Works,


Including Loading and Unloading

L.mKm

T1-044

Transport of Recast Kerb Stones for Bridge Works, Including


Loading and Unloading

L.mKm

T1-045

Transport of Precast Concrete Handrails, Up Rights and Joints


for Bridge Works, Including Loading and Unloading

L.mKm

T1-046

Transport of Precast Concrete Slabs 450x450x50 mm for Foot


Walks, Including Loading and Unloading

L.mKm

T1-047

Transport of Precast Concrete Standard Boundary Markers


Including Unloading Only

No.km

T1-048

Transport of Emulsion

T1-049

Transport of Gabion Mesh 4x1x1 meters

No km

T1- 050

Transporting Road Roller up to 25 km

No

Additional cost for Transporting Road Roller beyond 25 km

km

T1- 050A
T1- 051

Transport of cement 1st km including loading and unloading

T1- 051A Transport of cement beyond 1.00 km to 9km by any means


T1- 051B
T1- 052

100ltr km

1 bags(50kg)
1 bags(50kg)

Transport of cement each Subsequent 1.0km beyond 9.0km by


1 bags(50kg)
any means
Transport of steel 1st km including loading and unloading

T1- 052A Transport of steel beyond 1.00 km to 9km by any means

50kg
50kg

T1- 052B

Transport of steel each Subsequent 1.0 km to 9.0 km by any


means

50kg

Section 2 - Excavation

Roadway and Foundation Excavation (Including Loading, Unloading, and Transporting within 25 meters Distance
Unless Otherwise Specified)
Description

Item No
E1-001

Unit

Excavation in Loose Soil (Dry) [SSCM 301.2(IV)]

Cu.m

E1-002

Excavation in Loose Soil (Wet) in Slips [SSCM 301.3(0)]

Cu.m

E1-003

Excavation in Ordinary Soil (Cutting Measurement) [SSCM


301.2(V)]

Cu.m

E1-004

Excavation in Ordinary Soil [Vehicle Measurement] [SSCM


301.2(V)]

Cu.m

E1-005

Excavation in Medium Soil (Cutting Measurement) [SSCM


301.2(VI)]

Cu.m

E1-006

Excavation in Medium Soil (vehical Measurement) [SSCM


301.2(VII)]

Cu.m

E1-007

Excavation in
301.2(VII)]

Hard

Soil

(Cutting

Measurement)

[SSCM

Cu.m

E1-008

Excavation in
301.2(VII)]

Hard

Soil

(Vehicle

Measurement)

[SSCM

E1-009

Excavation in Unclassified Soil (Cutting Measurement) [SSCM


301.2 a(1)]

Cu.m

E1-010

Excavation in
301.2(VII)]

Cu.m

Soft

Rock

(Cutting

Measurement)

[SSCM

Cu.m

Excavation in Mud\Marshy Material (Cutting Measurement)


E1-010A [SSCM 301.2(VII)]

Cu.m

E1-011

Excavation Pit\Trench for Foundation in Ordinary Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
301.1-.3]

Cu.m

E1-012

Excavation Pit\Trench in Foundation in Medium Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
301.1-.3]

Cu.m

E1-013

Excavation Pit\Trench in Foundation in Hard Soil not Exceeding


1.5m deep, Including Leveling and Ramming Bottom, Exc.
Material Deposited within 25m or as Directed. [SSCM

Cu.m

E1-014

Excavation Pit\Trench in Foundation in Unclassified Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM

Cu.m

E1-015

Excavation Pit\Trench in Foundation in Mud/Marsh not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM

Cu.m

E1-019

Excavation Soft Rock not Exceeding 1.5m depth [SSCM


301.2(II)]

Cu.m

E1-021

Piling Available Soil

Cu.m

E1-022

Loading Available Soil to a Tractor or Equivalent

Cu.m

E1-023

Excavating Rock Requiring Blasting, for Roadway for Boulders,


Excluding Dozing Away [SSCM 301.2(III) & 306.1-306.4]

Cu.m

E1-024

Boulders, Sledging Piling etc

Cu.m

E1-025

Rock Requiring Blasting

Cu.m

E1-026

Rock Requiring Blasting and Piling (Bank Measurement)

Cu.m

E1-027

Roadway Excavation in Unclassified Soil Using Machinery


Excluding Loading and Piling (Cutting Measurement)

Cu.m

E1-028

Loading Materials by Machinery in Roadway Excavations (Cutting


Measurement)

Cu.m

E1-029

Trimming / Cambering by Motor Grader (Cutting Measurement)

Cu.m

E1-029A Trimming / Cambering by Motor Grader (Cutting Measurement)

Sq.m

Section 3 - Aggregate/Rubble Piling

Aggregate / Rubble Piling Including Loading


Item No

Description

Unit

A1-001

Sledging Available Rock 150-225mm Rubble including Piling and


Loading

Cu.m

A1-002

Blasting etc and Piling 150-225mm Rubble including Loading

Cu.m

Blasting Sledging etc. and Piling 150-225mm Rubble using


A1-002A Compressor and Hand Held Drills including Loading

Cu.m

A1-003

Blasting etc. and Piling 100mm Aggregate including Loading

Cu.m

A1-004

Blasting etc and Piling 75mm Aggregate incl/Loading

Cu.m

A1-005
A1-006

Blasting etc and Piling 50mm Aggregate incl/Loading


Blasting etc and Piling 37.5mm Aggregate incl/Loading

Cu.m
Cu.m

A1-007

Blasting etc and Piling 25mm Aggregate incl/Loading

Cu.m

A1-008

Blasting etc and Piling 19mm Aggregate incl/Loading

Cu.m

A1-009

50 mm Aggregate, Single Size Crusher Production Including


Piling and Loading[SSCM 404.1-406.1 : Table 1701-4

Cu.m

A1-010

37.5 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 : Table 1701-4

Cu.m

A1-011

19 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 ]

Cu.m

A1-012

12 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 : Table 1701-4

Cu.m

A1-013

Aggregate 37.5 mm Down Graded (SSCM-Table 1701.5 )


Including Piling and Loading

Cu.m

A1-014

Crusher Fines 6.3 mm Down, Including Piling and Loading for 1.0
cu.m

Cu.m

Crusher Fines
cu.m

Cu.m

A1-014A

(DUST), Including Piling and Loading

for 1.0

A1-015

Aggregate 19 mm for Seal Coat Treatments as per SSCM Table


1701-8, Including -Do-

Cu.m

A1-016

Aggregate 12.5 mm for Seal Coat Treatments as per SSCM


Table 1701-8, Including -Do-

Cu.m

A1-018
A1-019
A1-020

Piling Available Aggregate

Cu.m

Piling Available Rubble

Cu.m

Loading Available Aggregate / Rubble

Cu.m

Section 4 - Earth Filling & Compaction


Approved Earth Filling and Compaction
Item No

Description

Unit

Approved Soil (Type I & II Materials) Excavation for Bases &


EW-001 Shoulder Construction Including Loading and Piling (Loose
Volume) [SSCM 601.4]

Cu.m

EW-002 Spreading Piled Approved Soil (Loose Volume)

Cu.m

Approved Soil Spread & Rolled Including Roller Hire Charges,


EW-003 Fuel & Watering (Loose Volume) [SSCM 601.1 - 4]

Cu.m

Approved Soil Spread & Rolled Using Machinery Including Motor


EW-003A Grader & Roller Hire Charges, fuel & Watering (Loose Volume)
[SSCM 601.1 - 4]
Approved Soil Spread & Rolled in Strips Where Average Width
is less than 1.2 meters for Road Widening including Roller Hire
EW-004
Charges, fuel & Watering (Loose Volume) [SSCM 601.1 - 4]
Approved Soil Spread & Compacted in Places Behind Abutments
and Structures, Shoulders about Sub Bases level and in Service
EW-006 line Trenches, Using 1/2 to 1 Ton Vibrating Roller Including
Watering (Loose Volume) [SSCM 601.1 - 4]
Approved Soil Spread & Compacted in 150 to 225 mm Thick
EW-007 Layers Using Machine Rammer at Narrow Places (Loose Volume)

Cu.m

Cu.m

Cu.m

Cu.m

Spreading , Leveling and Compacting Manually Using Standard


EW-008 Cast Iron Stamper or Equivalent and Filling in 150-225 mm Thick
Layers (Loose Volume)

Cu.m

Trimming
,
Leveling
and
Compaction
of
Original
EW-009 Ground/Subgrade to 100 % STD Density [SSCM 304.3(c)]

Sq.m

Trimming
,
Leveling
and
Compaction
of
Original
EW-010 Ground/Subgrade to 95 % STD Density [SSCM 304.3(c)]

Sq.m

Approved Soil Excavation for Embankment Filling Including


EW-011 Loading and Piling (Loose Volume) [SSCM 601.1 TO 601.4]

Cu.m

Approved Soil (Type I & II Materials) Excavation using


Machinery for Bases & Shoulder Construction Including Loading
EW-013
and Piling (Loose Volume) [SSCM 601.1 - 4]
Approved Soil (Type I & II ) Excavation using Machinery for
EW-014 Embankment filling Including Loading and Piling (Loose Volume)
[SSCM 601.1 - 4]
EW-015

Grading and Spreading by motor grader

Cu.m

Cu.m

Cu.m

Section 5 - Rubble Pitching/Paving


Rubble to be Paid Separately
Item No

Description

Unit

P1-001

Pitched Paving 225 mm Thick(Excluding cost of rubble)

Sq.m

P1-002

Pitched Paving 150 mm Thick -do -

Sq.m

P1-003
P1-004

Flat Paving 150 mm Thick - do-Flat Paving 225 mm Thick - do--

Sq.m
Sq.m

Section 6 - Aggregate Spreading & Rolling

Aggregate Spreading and Compaction - Cost of Water to be Deducted from Rate if not Carried Out under th
Relevent Items
Item No

Description

Unit

M1-001

Spreading , Watering & Rolling 100 mm Aggregate Including Hire


Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]

Cu.m

Spreading , Watering & Rolling 100 mm Aggregate Including Hire


M1-001A Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]below
11.32 Cum

Cu.m

Braking Road Surface to 50 mm Depth by Hand , Screen &


M1-002 Replace Old Aggregate

Sq.m

Scarifying Road Surface to 50 mm Depth by roller, Screen, &


M1-003 Replace Old Aggregate.

Sq.m

Spreading & Compaction 50-19 mm New Aggregate by Roller


M1-004 Including Watering Hire, Etc. (Loose Volume) [SSCM 403.3(c)]

Cu.m

Spreading & Compaction 50-19 mm New Aggregate For


M1-004A Extensive Patching by Roller Including Watering Hire, Etc.
(Loose Volume) [SSCM 403.3(c)]

Cu.m

Breaking 50 mm Additional Depth by Hand Screening &


M1-005 Replacing Old Aggregate

Sq.m

Scarifying 50 mm Additional Depth With Roller, Screening &


M1-006 Replacing Old Aggregate

Sq.m

Spreading Watering & Compacting 50-19 mm Aggregate in Edge


M1-007 Correction using roller Including Hire, Etc. (Loose Volume )
[SSCM 1103.3]

Cu.m

Spreading watering & Compacting 50-19 mm Aggregate in Edge


M1-008 Correction Using Roller Including Hire ,Etc (Loose Volume)
[SSCM 1103.3]

Cu.m

Spreading & Compacting 50-19 mm Aggregate by 8-10 ton Roller


M1-009 After Applying track Coat in Overlay (Loose Volume) (Tack Coat
Paid Separately)

Cu.m

Spreading & Compacting 50-19 mm Aggregate by 8-10 ton Roller


M1-009A After Applying track Coat in Overlay (Loose Volume) (Tack Coat
Paid Separately) below 9.91 cum within km

Cu.m

M1-010

M1-011

Water Bound Macadam Spreading watering and Compacting 5025 mm Aggregate and Filling the Voids to refusal with Crusher
fines by watering and rolling to form a water bound Macadam
Base Excluding transport for Aggregates and fines. Loose
Volume (SSCM 404.1)
Dry Bound Macadam Spreading watering and compacting 50-25
mm Aggregate and filling the voids to refusal with Crusher Fines
by Rolling with Vibrating Roller to Form a Dry Bound Macadam
base Excluding Transport for Aggregates and Fines (Loose
Volume) [404]

Cu.m

Cu.m

Dense Draded Aggregate Base (Aggregate Vase Course)


Seprading watering and Compacting Graded 37.5 mm Aggregate
M1-012A to Form a Dense Aggregate Base Using Machinery Including
Motor Grader & Roller Hire Charges. Transport of Aggregates
to be Paid Separately (Loos)

Cu.m

Dense Graded Agg.Base [ABC], Spreading Watering and


Compacting Graded 37.5mm Aggregate to form a Dense
Aggregate Base in Strips, Av Width not exeeding 1.2m for Road
Widening excl Transport of Aggregate(Loose Volume) [SSCM
405.1 -.4]

Cu.m

Graded 37.5 ABC Material Spread and Rolled in Strips, Average


Width not Exceeding 1.2m Using Machinery inch Motor Graders
M1-013A and Roller Hire Charges Fuel and Watering (Loose Vol) [SSCM
405.1-.4]

Cu.m

M1-013

Section 7 - Road Surface Treatment


Sand Transport up to 16 km Included in the Rates. Transport of Emulsion/Bitument to be Paid Separately.
Item No

Description

Unit

S1-001

Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with


Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]

Sq.m

Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with


S1-001A Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
(department Bitumen )

Sq.m

Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding


with Gravel where Sand is not Available within 16km.

Sq.m

Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding


S1-002A with Gravel where Sand is not Available within 16km.
(Department Bitumen)

Sq.m

Double Bituminous Surface Treatment with Hot Bitumen


(Manual) including Internal Transport (Binder and Aggregate
Paid Separately) [SSCM 505.1-.5 and Table 505.1]

Sq.m

S1-002

S1-003

S1-004

Single Bituminous Surface Treatment with Hot Bitumen (Manual,


including Internal Transport) (Binder and Aggregate Paid
Separately) [SSCM 505.1-.5 and Table 505.1]

Sq.m

S1-005

Double Bituminous Surface Treatment with Emulsion (CRS-1)


(Manual including Internal Transport) (Binder and Aggregate
Paid Separately)

Sq.m

S1-006

Single Bituminous Surface Treatment with Emulsion (CRS-1)


(Manual including Internal Transport) (Binder and Aggregate
Paid Separately)

Sq.m

S1-007

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


Blinding with Sand @ 125 Sq.m/Cu.m [SSCM 503.1(b)]

Sq.m

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


S1-007A Blinding with Sand @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
(Department Bitumen)

Sq.m

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)]

Sq.m

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


S1-008A including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)]

Sq.m

S1-008

S1-009

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM 503.1(b)]

Sq.m

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


S1-009A Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
Departmental bitumen.

Sq.m

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


including Blinding with Gravel where Sand is not Available within
16km (New Work) [SSCM 503.4(c)]

Sq.m

S1-010

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


including Blinding with Gravel where Sand is not Available within
S1-010A
16km (New Work) [SSCM 503.4(c)] Department bitumen

Sq.m

S1-011

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with


3.5 ltr/Sq.m Including Blinding with Sand, @ 125 Sq.m/Cu.m
(Manual)

Sq.m

S1-012

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with


3.5 ltr/Sq.m (Using Trolley, Emulsion) Including Blinding with
Sand, @ 125 Sq.m/Cu.m (Manual)

Sq.m

S1-013

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Subsequent


Coat with .75 ltr/Sq.m Including Blinding with Sand, @ 125
Sq.m/Cu.m (Manual)

Sq.m

S1-014

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Subsequent


Coat with .75 ltr/Sq.m (Using Trolley, Emulsion) Including
Blinding with Sand, @ 125 Sq.m/Cu.m

Sq.m

S1-015

Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.5 ltr/Sq.m


inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.3]

Sq.m

S1-016

Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.5 ltr/Sq.m


inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.3]

ltr

S1-017

Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.75 ltr/Sq.m


inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.1-503.3]

Sq.m

S1-018

Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)

Sq.m

Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
S1-018A Including Brushing and Cleaning Road Surface (Manual)
Department bitumen

Sq.m

S1-019

Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)

ltr

S1-020

Tack Coat with 30% Cut Back Bitumen Using 0.75 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual) [SSCM
503.4(d)]

Sq.m

S1-021

Rolling over Blinding Material Spread over Subsequent Bitumen


Surfacing using diesel Roller (8-10 Tones) [SSCM 503.4(d)]

Sq.m

S1-022

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


Including Blinding with Sand at The Rate of 250 Sq.m/Cu.m and
Brushing Cleaning and Moistening Road Surface

Sq.m

S1-022A

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


Part A of Item S1-022

Sq.m

S1-022B

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


Part B of Item S1-022

Sq.m

S1-023

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


without Blinding, but Inclusive of Brushing, Cleaning and
Moistening Road Surface

Sq.m

S1-024

Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
Including Blinding with Sand at the rate of 250 Sq.m/Cu.m and
Brushing, Cleaning and Mostening Road Surface

Sq.m

S1-025

Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
without Blinding but Inclusive Brushing, Cleaning and Mostening
Road Surface

Sq.m

S1-026

Sweeping Over Tarred Surface to Arrest Bleeding.

Sq.m

S1-027

Application of Asphalt Emulsion for Surface Treatment Using


CRS-1 (Using Plant) "Rate per Litre"

ltr

S1-028

Blinding the Bitumen Surfacing with Sand at the rate of 125


Sq.m1 Cu.m Using Material from Stock Pile

Sq.m

S1-029

Single Bituminous Surface Treatment With Emulsion (CRS-1)


Using Plant.(Binder and Aggregate Paid Separately) (Rate to
Include Transport cost of Aggregate up to 16KMS) [SSCM
505.5(b)]

Sq.m

S1-030

Double Bituminous Surface Treatment with Emulsion(CRS-1)


Using Plant. (Binder and Aggregate Paid Separately) (Rate of
include Transport cost of Aggregate up to 16 KMS)

Sq.m

S1-034

Lay and Compact Asphalt Premix Usign Paver (Cost of premix,


Aggregate Transport and premix transport to vbe paid
Separately)

M.ton

S1-035

Bitumen Surfacing (Sand Sealing -Manual) Using Emulsion (CRS


1) @ 1 LTR. /SQ.M Including Preparing Surface, Blinding with
Sand @ 4 CU.M/500 SQ.M and Pressing with hand Rollers.
(Patching pot holes if necessary & external transport to be pay
sep.

Sq.m

S1-035A

Patching Minor Pot Holes Using Sand Emulsion Mix 1:8 Where
Necessary, Prior to Sand Sealing.

Sq.m

S1-036

Sand Sealing with Emulsion CRS-1 at the Rate of 1Ltr,Sq.m


Using Plant.Incd.Brushing,cleaning, Blinding. with Sand@ 125
Sq.mand Rolng. with pneumatic. roller & internal trnsport.[SSCM
504]

Sq.m

S1-037

Reconstruct Base With Penetration Macadam Using Nominal


Size 50mm Aggregate and 19mm Key Aggregate from Stock
Piles, to Accomplish 75mm on Existing Pavements[SSCM 406]
(Binder, Aggregate, Transport paid Separately)

Sq.m

S1-038

Reconstruct Base with Penetration Macadam Using Nominal Size


37.5 mm Aggregate and 12.5 mm Key Aggregate from Stock
Piles , to a compacted thickness of 55mm on existing pavements
[SSCM 406] cost of aggregate including transport to be paid
separately

Sq.m

S1-039

Correction of Corrugations, Depressions and Cambering road


Surfaces using asphalt Concrete compacted by Vibrating roller
Including Internal transport (application of tack coat and Supply
of Asphalt concrete to ve paid separately)

M.ton

S1-040

Sand sealing with emulsion crs-2 at the rate of .8 Ltr/Sq.m


using plant , and blinding with sand at the rate of 125Sq.m/Cu.m
on D.B.S.T./S.B.S.T. (Triple Seal) including Internal transport
(SSCM 504) binder transport to site to pay separately

S1-040A Sand sealing with emulsion crs-2 - Part A of Item S1-040

Sq.m

Sq.m

Section 8 - Road Maintenance

Internal Transport of Hot Bitumen up to 16km and Sand Transport up to 16km Included in the Rates.
Item No

Description

Unit

MN-001

Patching with Hot Bitumen Using 14 Liters per 1/2 km (SSCM


1102.1-3)

km

MN-002 Patching With hot Bitumen Using 21 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-003 Patching With hot Bitumen Using 28 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-004 Patching With hot Bitumen Using 35 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-005 Patching With hot Bitumen Using 42 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-006 Patching With hot Bitumen Using 49 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-007 Patching With hot Bitumen Using 56 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-008

Extensive Patching for Every Additional 7 Ltrs. Hot Bitumen

1/2 K.m

MN-009 Patching with Cold Bitumen (CRS-1) Using 14 Ltrs per 1/2 K.m.

km

MN-010 Patching with Cold Bitumen (CRS-1) Using 21 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-011 Patching with Cold Bitumen (CRS-1) Using 28 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-012 Patching with Cold Bitumen (CRS-1) Using 35 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-013 Patching with Cold Bitumen (CRS-1) Using 42 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-014 Patching with Cold Bitumen (CRS-1) Using 49 Ltrs. Per 1/2 K.m.

1/2 K.m

MN-015
MN-016

Patching with Cold Bitumen (CRS-1) Using 56 Ltrs. Per 1/2 K.m.
Extensive Patching for Every Additional 7 Ltrs. Cold Bitumen,
CRS-1

MN-017 50 mm-19mm Aggregate Roller Patching


MN-018

50 mm - 19mm Aggregate Stamped Patching

1/2 K.m
1/2 K.m
Cu.m
Cu.m

Section 9 - Road Side Drainage System


Rate to Include Spreading the Resulting Materials Suitably in the Vicinity Unless Otherwise Directed.
Item No

Description

Unit

Cutting New Side Drains in Ord. Soil

Cu.m

DR-002 Cutting New Side Drains in Med. Soil

Cu.m

DR-003 Cutting New Side Drains in Hard Soil

Cu.m

DR-004 Cutting New Side Drains in Soft Soil

Cu.m

DR-001

DR-005 Cutting New Side Drains In Unclassified Soil

Cu.m

Cutting side drains of std. Dimensions in unclassified soil using


DR-005A machine (Back hoe J.C.B) including shipping trimming and leveling
bottom manually
DR-006 Cutting New Side Drains in Rock
Turfing (Excluding Royalty,
DR-007 Maintenance) [SSCM 802.3 (a)]

Cu.m
Cu.m

Transport

and

Watering

Sq.m

Watering and Maintaining Turf For Three Months Including


DR-008 Transport of Water

Sq.m

DR-009 Leveling & Trimming Earth

Sq.m

DR-010

Clearing Silt Etc. from Kerbs & Channels (SSCM 12053)

L.m

DR-011

Cutting Scupper Drains on any Soil Other than Rock to and


Average width of 0.75 m with proper Gradient and Ave. Depth
of 100 mm (SSCM 1304.3)

L.m

DR-012

Clearing and Desilting of Culverts (SSCM 1303.3)

L.m

DR-013

Clearing Choked Culverts (With Head Room > 1m.)

Cu.m

DR-014

Cleaning desilting existing side drains and lead up drains to


proper shape and gradient and transport of excavated materials
from road side up to 100m

L.m

DR-015

Clearing Inlets and Outlets of Culverts

Culverts

Section 10 - Bridges & Culverts


Bridges Culverts and Retaining Walls etc.
Item No

Description

Unit

ST-001

Demolishing Dry Coursed Masonry Including Stacking or


Loading ,(SSCM 202.2)

Cu.m

Demolishing Coursed Masonary in cement Mortar Including


ST-002 Stacking or Loading

Cu.m

Demolishing Random Rubble Masonry in cement Mortar Including


Stacking or Loading

Cu.m

Random Rubble Masonry, 150-225 mm Rubble in Approved


ST-004 cement & Sand Mortar 1:6 (Excluding Transport of Rubble &
Piling) [SSCM 1006.3]

Cu.m

Random Rubble Masonry, 150-225 mm Rubble in Approved


ST-005 cement & Sand Mortar 1:5 (Excluding Transport of Rubble &
Piling) [SSCM 1006.3]

Cu.m

Random Rubble Masonry, in Approved cement & Sand Mortar 1:6


With available Rubble 150-225mm

Cu.m

ST-003

ST-006

ST-007

Random Rubble Masonary in approved cement & sand Mortar 1:5


with Available Rubble 150-225 mm.

Cu.m

ST-008

Dry Masonry With available Heavy Rubble or Boulders(SSCM


1006.3)

Cu.m

ST-009

Dry Masonry With Rubble 150-225 mm (Excluding Transport of


Rubble & Piling)

Cu.m

ST-010

Dry Masonry With available Bubble 150-225mm

Cu.m

ST-011

Packing Available Rubble and Aggregate Filter Layers Behind


Masonry Walls.

Cu.m

ST-012

Clay Puddled & Layid Behind Masonry Walls(Excl.Transport of


Clay) [SSCM 705.3]

Cu.m

ST-013

Grouting Coursed Stone Masonry Joints With approved Cement


& Sand Mortar 1:3 (SSCM 804.2(c))

Sq.m

ST-014

Grouting Rubble Paving With Concrete Class C, 1:2:4(19 mm)


(Excl. Transport of Aggr. For Concrete & Piling)

Cu.m

ST-015

Grouting Rubble Paving with approved cement & Sand mortar


(1:3)

Sq.m

ST-016

Forming weep Holes In Masonry Construction (Labour only)


[SSCM 706.3]

No

ST-017

Forming Weep Holes Using P.V.C. Pipes of Int. Dia. Not less than
100mm Complete with Dripledge and Surround Finish Smooth.

L.m

ST-018

Shoring with 37.5 mm Thick Class II Timber Planks up to 3 m


Depth

Sq.m

ST-019

Supplying & Fixing class II Timber Struts Etc. For Shoring up to


3m Depth

Sq.m

Supplying and Fixing Class II Timber in Shoing up to 3m Depth


ST-020 (Rate per Area Basis)

Sq.m

Lifting Soil For Every 1.5 m Beyond the Initial 1.5m

Cu.m

ST-022 Lifting Wedge Stones For Every 1.5 m Beyond the Initial 1.5m

Cu.m

ST-023 Lifting Rubble or Concrete Every 1.5 m Beyond the Initial 1.5m

Cu.m

ST-021

Lowering Wedged Stones Evety 1.5m Beyond the Initial 1.5 m


Beyond the Initial 1.5 m

Cu.m

ST-025 Lowering Rubble or Concrete Every 1.5m Beyond the Initial 1.5 m

Cu.m

ST-024

ST-026 PCC Beams(10.5m to 13.5m) Launched into Position


ST-027

Rendering 12.5 mm thick in cement sand Motar 1:2 mix (Smooth


Finish)

ST-028 Rendering 19 mm thick in cement sand Motar 1:2 mix (Rough)

No
Sq.m
Sq.m

ST-029

Rendering 19 mm thick in cement sand Motar 1:2 mix (Smooth


finish)

ST-030 Rendering 12.5 mm thick in cement sand Motar 1:3 mix (Rough)
ST-031

Rendering 12.5mm thick in cement sand Motar 1:3 mix (Smooth


finish)

ST-032 Rendering 19 mm thick in cement sand Motar 1:3 mix (Rough)

Sq.m
Sq.m
Sq.m
Sq.m

Rendering 19mm thick in cement sand Motar 1:3 mix (Smooth


finish)

Sq.m

Mixing & Laying Manually, cement Concrete 1:4:8 (50 mm)


ST-034 (Volume Batching) Using Crusher run Aggregate (Excl. Transport
of Aggregate & Piling) [SSCM 1001.4]

Cu.m

Mixing & Laying Using Concrete Mixer,Cement Concrete 1:4:8


ST-035 (50 mm) (Volume Batching) Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling) (SSCM 1001.8 - 9)

Cu.m

Mixing & Laying Manually Cement Concrete 1:4:8 (50 mm) with
ST-036 20% Plums (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:4:8


ST-037 (50 mm) with 20% Plums (Volume Batching) Using Crusher Run
Aggregate (excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Manually Cement Concrete 1:3:6 (37.5 mm) with
ST-038 20% Plums (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:4:8


ST-039 (37.5 mm) with 20% Plums (Volume Batching) Using Crusher Run
Aggregate (excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Manually Cement Concrete 1:3:6 (37.5 mm)


ST-040 (Volume Batching) Using Crusher Run Aggregate (excl. Transport
of Aggregate & Piling)[SSCM 1001.4]

Cu.m

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:3:6


(37.5 mm) (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:3:6


ST-041A (37.5 mm) with 20% plums Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Manually Cement Concrete 1:2:4 (19 mm)


ST-046 (Volume Batching) Using Crusher Run Aggregate (excl. Transport
of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:2:4


ST-047 (19 mm) (Volume Batching) Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling)

Cu.m

ST-033

ST-041

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


Concrete for Grade 25 (19 mm) Using Crusher Run Aggregate
ST-048
In Foundation and Floors. (excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


Concrete for Grade 25 (70% 37.5 + 30% 19 mm) Using Crusher
ST-048A
Run Aggregate (excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


ST-049 Concrete for Grade 30 (19 mm) With Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


ST-050 Concrete for Grade 40 (19 mm) With Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

ST-051

Mixing & Laying Using Concrete By Hand

Cu.m

ST-052

Mixing & Laying Using Concrete By Power Driven Concrete Mixer


V/Batching

Cu.m

ST-053

Curing of Concrete Decks, Slabs , Beams, Walls etc. [SSCM


1011.11]

Sq.m.Day

ST-054 Fabricate & Lay M.S Bars as Reinforcement (Excl. Transport)

kg

ST-055 Fabricate & Lay Tor Steel as Reinforcement (Excl. Transport)

kg

ST-056

Cutting & Laying Reinforcment Fabric (Excluding Cost of


Reinforcement Fabric)

kg

Supplying & fixing 25 mm Thick Planks of Class II Timber as


ST-057 Shuttering, Including removing [1008.3(b)]

Sq.m

Supplying & Fixing Class II Timber Bearers, Joists , Etc.


Including Dismantling in Shuttering (SSCM 1008.3 (a))

Cu.dm

ST-058
ST-059
ST-060

100-150 mm Dia. Round Jungle Timber Supplied & Fixed as Props


150-200 mm Dia. Round Jungle Timber Supplied & Fixed as Props

L.m
L.m

Formwork Smooth Finish With Class II Timber For Bridge


Beams, Bridge Deck Under Sides and Sides Including
Dismantling (SSCM 1008.3(b))

Sq.m

Formwork Smooth Finish With Class II Timber For Bridge


ST-062 Column Shafts Including Dismantling (SSCM 1008.3(b))

Sq.m

Formwork Smooth Finish, Using Plywood (Shutter 15 mm) and


ST-063 Class II Timber Bearers, Joists and Jungle Timber Props for
Bridge Abutments, Wing walls Etc.

Sq.m

Supplying & fixing 25mm Thick Planks and Struts of Class II


ST-064 Timber as Formwork Rough Finish, in Foundation Etc. Including
Removing (SSCM 1008.3(b))

Sq.m

Formwork Smooth Finish for General Purposes, Using 25mm


ST-065 Thick Planks & Struts of Class II Timber and Round Jungle
Timber Props 100 - 150 mm Dia. Including Dismantling

Sq.m

ST-061

Laying & Jointing 152mm Dia. Concrete Pipes (Transport and


ST-066 Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-067

Lalying & Jointing 229mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-068

Laying & Jointing 305mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-069

Laying & Jointing 457mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

Laying & Jointing 610mm Dia. Concrete Pipes (Transport and


ST-070 Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-071

Laying & Jointing 915mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-072

Laying & Jointing 12205mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

ST-073

Laying & Jointing 152 mm Dia. Available Concrete Pipes and


Collars

L.m

ST-074

Laying & Jointing 229 mm Dia. Available Concrete Pipes and


Collars

L.m

ST-075

Laying & Jointing 305-450 mm Dia. Available Concrete Pipes and


Collars

L.m

ST-076

Laying & Jointing 610 mm Dia. Available Concrete Pipes and


Collars

L.m

ST-077

Laying & Jointing 915 mm Dia. Available Concrete Pipes and


Collars

L.m

ST-078

Laying & Jointing 1220 mm Dia. Available Concrete Pipes and


Collars

L.m

ST-079

Fixing new Bridge Planks Runners and Stacking old Planks


(Available) [SSCM 1402.2(a)]

No

ST-080 Removing & Re-Setting old Bridge Planks


ST-081

Supplying & Fixing new Bridge Planks of Class I Timber

ST-082 Supplying & Fixing 31 mm Thick Deck Planks of Class I Timber

No
No
No

ST-083

Fixing New Chequered or M.S. Plates on Timber - Decked Bridge


[SSCM 1402.2(d)]

L.m

ST-084

Removing & Refixing Chequered M.S. Plates on Timber-Decked


Bridge

L.m

ST-085 Tightening Bolts & nuts of Chequered of M.S. Plates

L.m

ST-086 Removing & Refixing "U" Clips. [SSCM 1402.2(b)]

L.m

ST-087
ST-088
ST-089

Cleaning, Wire Brushing & Painting Steelwork, One Coat Enamel


Paint
Cleaning, Wire Brushing & Applying Tar on Steelwork, One Coat
Cleaning, with Cotton Waste and Painting Steel Work with
Enamel Paint, One Coat

Sq.m
Sq.m
Sq.m

ST-090

Chipping to Bare Metal etc. & Painting with Anticorrosive Paint,


One Coat

Sq.m

Painting with One Coat of Enamel Paint after Cleaning, Derusting


& Application of One Coat Anticorrosive Paint[SSCM 1401.3(C)]

Sq.m

Painting with Two Coats of Enamel Paint, after Cleaning,


ST-092 Degusting & Application of One Coat Anticorrosive Paint

Sq.m

ST-093 Oiling Steel Cables on Suspension Bridges [SSCM 1405.3]

Sq.m

ST-091

Cleaning Booms of Steel Bridges including Scaffolding where


Necessary [SSCM 1401.3]

L.m

Demolishing Unreinforced Cement Concrete Including Cleaning


ST-095 of Debris in Foundation and Superstructure in Dry Condition
Excluding Under Water Structures [SSCM 202.2]

Cu.m

ST-096 Demolishing Reinforced Concrete and Debris Cleared

Cu.m

Demolishing Reinforced Concrete in Very Heavy Structures


ST-097 Build Up of Grade 30 Above Concrete in Work Such As Bridge
Beams & Deck Slabs, Including Collecting and Removing

Cu.m

Supplying and Fixing M.S. Dowels Spliced and Dove Tailed with
ST-098 Wedge at One End, 16mm dia, and 1m long, Boring Holes to 0.3m
Depth in Fixing

No

Supplying and Fixing M.S. Dowels, Spliced and Dove Tailed with
ST-099 Wedge at One End, 20mm dia, and 1m Long, Boring Holes to
0.3m Depth in Fixing.

No

ST-100

Supplying & Fixing M.S.Dowels, Spliced and Dove Tailed with


Wedge at One End, 25mm dia, and 1m Long. Boring Holes to 0.3m
Depth in Fixing.

No

ST-101

Lay Standard Type Road Kerbs(125mmX900mm) Set on19mm


thick 1:3 Cement Mortar Layer on 150mm X 275mm 1:2:4(19)
Concrete Foundation With av. 157mm X 150mm Backing

L.m

ST-102

Lay Standard Precast Bridge Kerbs [Type Drawing No T/B/106Rev 1 of RDA](Cost of Precast Kerbs & Transport to be Paid
Separately)

L.m

ST-103

Constructing 150x50mm thick Inset Lower Kerb in Grade


20(14mm) Concrete for Bridges: ( Aggregate Transport to be
Paid Separately)

L.m

ST-104

Laying 450 X 450 X 50 mm Precast Concrete Slabs on Foot


Walks Including av. 40mm Thick 1:3 Cement Mortar Bedding
(Cost of Sabs & Transport Paid Separately)

Sq.m

ST-094

ST-104A Mixing Cement Sand Mortar Using a Mixer


ST-105

Laying 450 x 450 x 50 mm Precast Concrete Slabs on Foot


Walks Including av.40mm Thick Sand Bedding (Cost of Precast
Slabs and Transport to be Paid Separately)

Cu.m
Sq.m

ST-106

ST-107

Fixing Precast Hand Railing and Uprights Using Grade 25(19)


Concrete Including Formworks for Pockets (Precast Items &
Transport and Aggr.Transport paid Separately)[Type Dwg No
T/B/102/B]
Construction of RCC Grade 25(19mm) End Pillaster, Type 1(Agg.
Transport to be Paid Separately) [Type Dwg No T/B/106-Rev 1]

L.m

No

ST-108

Construction of RCC Grade 25(19mm) End Pillaster, Type II


(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]

No

ST-109

Construction of RCC Grade 25(19mm) End Pillaster, Type III


(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]

No

ST-110

Construction of RCC Grade 25(19mm) End Pillaster, Type IV


(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]

No

ST-111

Laying of Grade 20 Concrete Precast pin Kerbs in Grade 20(19)


Concrete Foundation as Edging (Aggregate transport to be Paid
Separately)

L.m

ST-112

Supplying and Fixing 25mm Thick Toung and Groved Planks with
50x50mm Struts of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains

Sq.m

Supplying and Fixing 25mm Thick Toung and Groved Planks with
ST-112A 50x50mm Struts of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains(for 13.38 Sq.m)

use

ST-113

Supply and Packing 50-200 mm Dry Stone lining Behind


Abutments and wind walls (Aggregate Transport to pay
separately)

Cu.m

ST-114

Laying Geotextile on Prepared Surface Supply and Transport to


pay Separately

Sq.m

ST-115

Construction of Gabion Wall Using 4x1x1m Mesh Including


Lacing Wire on Prepared Ground.(Supply and Transport of
Gabion Mesh to be Paid Separately);

Cu.m

ST-116

Construction of Gabion wall Using 4x1x0.5 m mesh including


Lacing Wire on Prepared Ground (Supply and Transport of
Gabion Mesh to be Paid Separately)

Cu.m

ST-117

Construction of Kerb Inlet as per Drawing Type - K1/T1 With


Cover Slabs. Aggregate Transport to pay Separately

L.m

ST-118

Additional Labour For Pouring, Compacting


Concrete in Screed Under Foundation Slabs

Cu.m

ST-119

Additional Labour For Pouring, Compacting Concrete in


Abutments , Wingwalls, Capping Beams of Piers and Foot walks
of Bridges

and

Levelling

Cu.m

ST-120

Additional Labour For Pouring, Compacting and Levelling infiller


Concrete between Bridge Beams including Creed of Bridge
Decks.

Cu.m

ST-121

Leveling Ready mixed Grade Concrete Including Vibration


(Supply of Concrete to be Paid Separately)

Cu.m

ST-122

Supplying and laying Approved Hard Rubber Bearing Pads 75mm


x 12mm Over Capping Beams and Under the Approach Slabs

m.

ST-123

Bituminous Sealing Material Supplied and Laid Under Beam ends


to Prevent Grout leak on to Capping Beam Transport of Emulsion
Included.

L.m

ST-124

230mm Dia. Polythene Displacers Supplied and Filled with Saw


Dust or Similar Light Material in Deck. Transport of Saw Dust
to be Paid Separately

L.m

ST-125

325mm Dia Polythene Displacers Supplied and Filled with Saw


Dust or Similar Light Material in Deck. Transport of Saw Dust
to be Paid Separately

L.m

ST-126
ST-127

PCC Beams(10.5m to 13.5m) Launching into Position


M.S. Angle Iron and Hard Rubber Expansion Joints as Per
Drawing No T/B/107 Rev. 1

No
L.m

Section 11 - Road Furniture Items


Kilometer Posts and Guard Stones
Item No Description

Unit

RF-001

White Washing, Two Coats to Guide / Guard Stones

No

RF-002

Whitewashing Two Coats K.M. Stones inc. Numbering & Tar


Skirting.

No

RF-003 Painting White Back Ground on Parapets etc. & Stencilling nos.

No

RF-004 Fixing Guard Stones in any Soil

No

Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
RF-005 282.5 KG/Cu.m ] including curing, for "A" and "B" Class Roads

No

Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
RF-006 282.5 KG/Cu.m ] including curing, for "C" and "D" Class Roads

No

RF-007 Fixing Standard Type K.M. Stones in Any Soil

No

Fixing new or Refixing Type Guard stones in Cement Concrete


RF-008 [1:3:6(37.5mm) and Cement 219 KG/Cu.m ] With Min. Cover
75mmx 300 mm Depth

No

Casting Standard Type Guard Stones in Concrete [1:2:4(19mm)


& Cement 282.5 KG / Cu.m]

No

Casting Standard Type


Guard Stones in Concrete
RF-009A [G25(19mm)As per Drawing No T/B/100-Rev 1,For Bridges and
Culvers

No

RF-009

RF-010

Rout NumberingWith Reflective Paint on 2 sides

No

RF-011

Casting Standard Boundary Markers in Reinforced Concrete


[1:2:4(19mm)] with Admixtures, Including 14 days Curing and
Loading to Vehicle at Yard (Agg. Transport paid Separately)

No

Section 12 - Notic Boards & Road Signs


[SSCM 810.2 AND 1501.3] - All Paints Should Conform to the Requirements of SLS as Given in SSCM 1707.
Item No Description

Unit

Notice & Traffic Sign Boards Etc. Fixed in Concrete


[1:3:6(37.5mm) and Cement 219 KG/Cu.m) (Excluding Transport
of Aggregate)

No

Cleaning & Whitewashing 2 Coat Town Name Boards (Inc. Tar


RS-002 Skirt)

No

Cleaning, Painting one Coat & Relettering Etc. Traffic sign


Boards inc. Paint Post in B/W

No

RS-001

RS-003

RS-004 Cleaning and painting 1 coat on Notice Board

Sq.m

RS-005 lettering & Numbering Below 50 mm

No

RS-006 Lettering and Numbering 50mm-75mm

No

RS-007 lettering & Numbering 75 mm - 150 mm

No

RS-008 lettering & Numbering 150 mm - 225 mm

No

RS-009

Painting 2 Coats Continuous Center Line,100 mm Wide With


Enamel Paint

L.m

RS-010

Painting 1 Coats Continuous Center Line,100 mm Wide With Road


Marking Paint (White)

L.m

RS-011

Painting 2 Coats Broken Center Line,100 mm Wide With Enamel


Paint

L.m

RS-012

Painting 1 Coats Continuous Center Line (Without Reflective


Studs),100 mm Wide, At 3 meter Intervals With Road Marking
Paint (White)

L.m

RS-013

Barricading With Empty (Hot Tar) Barrels Including White


Wash( ExcludingTransport) and Cost of Barrels

No

RS-014

Revetment to Banks etc. with Empty Barrels in Horizontal Tiers


with Vertical Batter(1:8) including Transport of Barrels

No

RS-015

Road Marking Continuous Center line 100 mm Width, using


Thermoplastic paint (White) , Inclusive Barricading.

RS-016

Road
Marking
Standard
Pedestrian
Crossing,
Thermoplastic paint (White) , Inclusive Barricading.

using

Sq.m
L.m

Section 13 - Miscellaneous
Item No Description

Unit

MS-001

Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.


Transport of Aggregate) (Site Made)

Cu.m

MS-001A

Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.


Transport of Aggregate) (Site Made) with Department Bitumen

Cu.m

Patching Shallow Pot Holes. Depth Less 20mm using hot bitumen
1.2ltr/Sq.m & 12.5mm chips single size @ 13.75 cu. deci m/sq.m
MS-002
incld. hand tamping (rat. inc. cost of bitumen & mater.) (Excl.
Transport. of Aggregate & Bitumen)

Sq.m

Patching road with premix after preparing surface with 30% cut
back

Cu.m

MS-002A
MS-002B

Patching road with premix after preparing surface

Patching Shallow Potholes, Depth Less Than 20mm Using 10-20%


Cutback Bitumen 1.2ltr/Sq.m and 12.5mm Chips, Single Size at
MS-003
13.75 CuDeci m/Sq.m including hand tamping (Excl. Tr. Agg,
Bitumen )
Patching shallow pot holes, depth less than 20mm using emulsion
(Crs1) @ 1.2Ltr/Sq.m & 12.5mm cu.deci m/sqm including hand
MS-004 tamping transport of emulsion to site etc. Rate include cost of
emulsion and other materials) (Excl. transport of aggregate)
Patching pot holes of Medium ,depth of 20-75mm with Premix
(Site Made) using Cutback 10-20% at the Rate of 83.5 Ltr/Cu.m
MS-005 of 19mm Down Aggregate including preparation of Surface, Tack
Coat(CSS1) AT .75Ltr/Sq.m, Trimming Sides, Tamping etc

Cu.m

Sq.m

Sq.m

Sq.m

Patching Potholes of Medium Depth 20-75mm Using Graded


MS-007 Aggregate 19-12.5mm With Hot Bitumen 1.75 ltr/Sq.m and Blot.
Material at 1 Cu.m/125 Sq.m and .75ltr/Sq.m Tack Coat(CSS-1)

Sq.m

Patching Potholes Deeper Than 75mm Using Premix Material


(Site Made) to a Depth of 37.5mm(Over the Prepared Surface
MS-008 with Aggregate and Gravel Paid Separately) Using 10-20%
Cutback 83.5Ltr/Cu.m of 19mm down Agg, .75Ltr/Sq.m Tack
coat

Sq.m

Patching pot holes more then 75mm deep with water bound
gravel material using 50mm or 12.5 mm single size aggregate
MS-009 along with useable old aggregate obtain from picking and
preparation of surface inc. laying watering Spreading gravel of
approved quality

Sq.m

Patching Ruts and Depressions Upto 75mm Depth Using Site


MS-010 Made Cold Mix (Cut Back) Material With the Surface and Edge
Prepared as Per Specifications .75Ltr/Sq.m Tack Coat

Sq.m

MS-010A Patching Ruts and Depressions Part 1 of Item MS-010

Sq.m

Patching Ruts and Depressions Deeper than 75mm Depth Using


50mm Down Aggregate, Top 40mm with Plant Made Cold Mix
MS-012 (Cut Back) Material with .75Ltr/Sq.m tack coat(CSS-1)(Premix
paid Separately)

Sq.m

Patching Ruts and Depressions Upto 75mm Deep with .


75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
MS-013
Bitumen applied at 1.75Ltr/Sq.m, Blotting Material at 1 Cu.m/125
Sq.m (Agg. paid separately)

Sq.m

Patching Ruts and Depressions Deeper Than 75mm with .


75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
MS-014
Bitumen applied at 1.75Ltr/Sq.m, Blotting Material at 1 Cu.m/125
Sq.m (Agg. paid separately)

Sq.m

Correcting and Strengthening Edges of the Road by Cold mix


40mm thick, Cutback 10-20%, at the rate of 83.5Ltr/Cu.m on
MS-015
19mm down Aggregate, Over 50mm down Aggregate, Tack coat .
75 Ltr/Sq.m(CSS 1)

Sq.m

Correcting and Strengthening Edges of Road by Cutback(1020%) Cold Mix 40mm thick with 83.5Ltr/Cu.m 19mm Down
MS-016 aggregate over .75Ltr/Sq.m Tack Coat(CSS-1) over 50 mm down
over Closely packed 100mm agg. with excavation width 225mm,
depth 225mm

Sq.m

MS-016B

Correcting and Strengthening Edges Part B of the Item MS-016

Sq.m

Patch Sealing with emulsion painting the surface by spray of


MS-017 crs-1 @ .75ltr/sq.m squeeing the emulsion and spreading the
blotton material (Sand) at the rate of 1 Cu.m/125 Sq.m

Sq.m

Patch Sealing with hot Bitumen painting the surface by Using .


75ltr/sq.m squeeging the bitumen and spreading the blotton
MS-018 material (Sand) at the rate of 1 Cu.m/125 Sq.m (Transport of
bitumen paid separately)

Sq.m

Patch Sealing of Pitted Surface Using Hot Sand Bitumen Mix


104Ltr/Cu.m of Sand Spread and Hand Tamped Including
MS-019
Brushing and Cleaning The Surface (Excl Transport of Bitumen)

Sq.m

MS-019A

Patch Sealing of Pitted Surface, Part A of Item MS-019A

Sq.m

MS-019B Patch Sealing of Pitted Surface, Part B of Item MS-019A

Sq.m

Patch Sealing of Pitted Surface With Emulsion Sand Slurry


MS-020 using CRS 1 or 2 at the Rate of 136.5Ltr/Cum of Sand Mix
Properly Laid, Leveled & Squeeged incl. Brushing and Cleaning

Sq.m

General upkeep of Road sides Including Maintaining the Right of


way in a Neat Condition by Trimming, Weeding & Clearing of the
MS-021 Road Sides, Drains , Drainage Structures, Scupper Drains &
Cleaning Minor Slips

Km

Cleaning ordinary Jungle Including Removing High Growing Plants


and Trees of Girth < 300 mm other than those designated to
MS-022 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed (SSCM 1203.2)

Km

Cleaning medium Jungle Including Removing High Growing Plants


and Trees of Girth < 300 mm other than those designated to
MS-023 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed

Km

Cleaning heavy Jungle Including Removing all High Growing Plants


and Trees of Girth < 300 mm other than those designated to
MS-024 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed

Km

Repairs to Damage of Shoulders verges and Embankments slopes


including making good depressions,ruts,holes and Erosion path
MS-025 with approved gravelly soil & compacting the same with roller(810 ton) as Directed(Gravel soil be paid separately if brought
outsid

Cu.m

Regarding and Regravelling of shoulders with gravel of approved


Quality , duly compacted with Roller (8-10 ton) as directed for
MS-026 Repairing high sides Caused by heaving deposits and
Construction Debris, to Required levels by using a grader (120
-140hp)

km

Regarding and Regravelling of shoulders with gravel of approved


Quality , duly compacted with Roller (8-10 ton) as directed for
MS-027 Repairing high sides Caused by heavings deposits and
Construction Debris, to Required levels manually Gravel (loose
volume)

km

Replacing Damaged Cracked Concrete Slabs in Foot Walks with


Precast/Cast insitu Concrete 1:2:4(19mm), with 50mm minimum
MS-028 thickness including fixing in position with Cement Mortar 1.3 mix
(Excluding Transport of Aggregate) (SSCM 1204.3)

Sq.m

Cutting and Removing Fallen Trees upto 600 mm Girth Including


Cutting into Required number of Pieces Including Disposal as
MS-029
Directed. minimum Piece Shall not be less than 2m(SSCM
1203.2)

No

Cutting and Removing Fallen Trees 600 - 900 mm Girth Including


Cutting into Required number of Pieces Including Disposal as
MS-030 Directed. minimum Piece Shall not be less than 2m(SSCM
1203.2)

No

MS-031

Weeding Masonry Culverts Small Bridges and Retaining Walls


(SSCM 1303.3)

Masonry Random Rubble with Boulders including Collect (SSCM


MS-032 1006.3(b))
Fixing cats Eyes in Tar Macadam Including Breaking road
MS-033 Surface, Barricade etc. [SSCM 810-.3(c)]
MS-034 Reducing High Sides in Ordinary Soil [SSCM 301.3/1201.3(c)]
MS-035
MS-036
MS-037
MS-038

Reducing High Sides in Medium Soil


Reducing High Sides in Hard Soil
Reducing High Sides in Soft Rock
Reducing High Sides in Rock Requiring Blasting

White Washing 1 Cote to Parapets of Bridges and Culverts


MS-039 (SSCM 1403.3(e))
MS-040

White Washing 2 Cotes to Parapets of Bridges and Culverts

Culverts
Cu.m

No
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Sq.m
Sq.m

White Washing 1 Cote to Parapets of Bridges and Culverts after


MS-041 cleaning Attending to minor Repairs

Sq.m

White Washing 2 Cote to Parapets of Bridges and Culverts


after cleaning Attending to minor Repairs

Sq.m

Painting with Emulsion 1 Coat to Parapets of Bridges and


MS-043 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

Painting with Enamel 1 Coat to Parapets of Bridges and Culverts,


MS-044 Guard Stones and KM Posts After Cleaning and Attending to
Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

Painting with Enamel 2 Coats to Parapets of Bridges and


MS-045 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

MS-042

Painting with Emulsion 2 Coat to Parapets of Bridges and


MS-046 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

Painting with Emulsion 1 Coat to Parapets of Bridges and


MS-047 Culverts, Guard Stones and KM Posts Including Preparing
Surface of Old Work [ SSCM 1501.3(b)-(v)]

Sq.m

Painting Sub Coat Emulsion to Parapets of Bridges and Culverts,


MS-048 Guard Stones and KM Posts Including Preparing Surface [SCM
1501.3(b)-(v)]

Sq.m

Painting 1 Coat Emulsion Paint to Parapets of Bridges and


MS-049 Culverts, Guard Stones and KM Posts Including Preparing
Surface of New Work [ SSCM 1501.3(b)-(v)]

Sq.m

MS-050

Cleaning & Painting 100mm wide stripe for skirting to guard


stones. {SSCM 1501.3(b)(v)}

L.m

MS-051

Painting 2 Coats Standard Pedestrian Crossing for Carriageway


[SSCM 810.2(c)]

L.m

MS-052

Painting 1 Coat Standard Pedestrian Crossing for Carriageway


Using Road Marding Paints [SSCM 810.2(c)]

Sq.m

Erecting, Barricading in Jungle Timber 75-100 mm Dia, Vertical


MS-053 Posts at .9m Centers and 1.2 Above Ground including White
Washing. [SSCM 1709]

L.m

Temporary Scaffolding for Painting or Tarring Bridges and for


MS-054 Weeding on Bridges or Retaining wall Including Dismantling
after work. [SSCM 1008.3(a)]

Sq.m

Roughening Existing Smooth tarred Metalled Carriageway by


MS-055 hand for Bonding , Collecting Disposal of all Loose Materials
[SSCM 03.3(b)]

Sq.m

MS-056 Supply of Diesel for Machineries

ltr

Patching road with Premix (Loose Volume) after Prep, Surface


with Emulsion (CSS-1) at .75 ltr/sq.m at tack Coat Including
MS-057 internal Transport and Hand Stamping. (Supply of premix (Loose
Volume) Paid Separately) [SSCM 1102.3(b)]

Cu.m

Patching Road With Premix After Preparing Surface With


Emulsion (CSS-1) at .75 ltr/sq.m as Tack Coat, Including
MS-058 Internal Transport and Stamping with Machine (Supply of
Premix Paid Separately) [SSCM 1102.3(b)(i)]

M.ton

Painting two Coats Enamel Paint on Kerbs, After Cleaning and


Preparing Surface

Sq.m

Preparing and Stock Piling Premix at Site Using 12.5 mm


MS-060 Aggregate and Emulsion (CSS-1) (Excluding Transport of
Aggregate)

Cu.m

Breaking Manually Asphalt layer 2"-3" Thick on the Carriageway


MS-061 for Kerb Laying

L.m

MS-059

Section 14 - Survey & Day Works


Description

Item No
SV-001

Supply of Unskilled Labour

Unit
Days

SV-002 Supply of Semiskilled Labour

Days

SV-003 Supply of Skilled "A" Grade Labour

Days

SV-004 Supply of Skilled "B" Grade Labour

Days

SV-005

Clearing jungle (Light) to a Width of 1.22 meters for Survey


work

km

SV-006

Clearing jungle (Medium) to a Width of 1.22 meters for Survey


work

km

SV-007

Clearing jungle (Heavy) to a Width of 1.22 meters for Survey


work

km

SV-008 Supply of Labour for Chaining and Cutting Pages and Pegging

km

Leveling Chaining and Pegging and Establish Bench Marks on


SV-009 Concrete Rock or Pegs and Checking Back Levels

km

SV-010
SV-011

Surveying Including Fixing Pickets & Taking Angles


Changing Traverse Lines and Taking off-sets

km
km

port
Rate Rs

Rate Rs

238.50

#REF!

290.50

#REF!

311.00

#REF!

48.50

#REF!

32.50

#REF!

101.50

#REF!

33.75

#REF!

33.75

#REF!

33.75

#REF!

43.00

#REF!

8.50

#REF!

5.85

#REF!

10.75

#REF!

3.75

#REF!

6.10

#REF!

2.65

#REF!

1.15

#REF!

78.75

#REF!

14.80

#REF!

6.35

#REF!

32.00

#REF!

Rate Rs
132.3
110.7
118.7
18.5
12.4
72.6
24.2
24.2
24.2
16.8
3.6
2.5

8.2
8.5
12.5

6.75

#REF!

2.9
4.75

#REF!

2.1
35.75

#REF!

7.60

#REF!

14.1

3.3
5.30

#REF!

2.3
47.75

#REF!

10.10

#REF!

18.8

4.4
7.10

#REF!

3.1
71.75

#REF!

15.20

#REF!

28.2

6.6
10.65

#REF!

4.7
95.75

#REF!

20.25

#REF!

37.6

8.8
14.20

#REF!

6.3
143.50

#REF!

30.25

#REF!

56.4

13.2
21.25

#REF!

9.4
306.00

#REF!

123.3

80.00

#REF!

37.1
56.75

#REF!

26.6
45.75

#REF!

53.25

#REF!

106.00

#REF!

176.00

#REF!

229.50

#REF!

423.50

#REF!

847.00

#REF!

0.75

#REF!

1.15

#REF!

2.00

#REF!

2.95

#REF!

1.05

#REF!

1.55

#REF!

0.9

0.65

#REF!

0.6 fuel

7,425.00
302.50

7425.00
302.50

8.80

8.78

1.50

1.52

1.20

1.21

12.40

12.41

2.40

2.42

25.3
29.6
58.7
97.6
127.2
234.7
469.5
1
1.4

2
2.4
1.3

6,750.00
275
7.98
1.38
1.1
11.28
2.2

salary
100

0thers
150

150

1.80

1.82

within 25 meters Distance


Rate Rs

Rate Rs

317.50

#REF!

394.50

#REF!

471.00

#REF!

414.50

#REF!

625.00

#REF!

531.00

#REF!

931.00

#REF!

792.00

#REF!

676.00

#REF!

1,010.00

#REF!

778.00

#REF!

625.00

#REF!

778.00

#REF!

1,085.00

#REF!

1.65

829.00

#REF!

931.00

#REF!

1,240.00

#REF!

76.75

#REF!

101.00

#REF!

1,075.00

#REF!

1,645.00

#REF!

2,340.00

#REF!

3,150.00

#REF!

176.50

#REF!

174.00

#REF!

31.50

#REF!

6.30

#REF!

Rate Rs

Rate Rs

1,380.00

#REF!

2,670.00

#REF!

2,215.00

#REF!

2,840.00

#REF!

3,145.00

#REF!

3,605.00

#REF!

4,065.00

#REF!

704.8
1,039.70

1,054.80
1,139.30
1,309.40
1,564.40
1,819.50

4,835.00

#REF!

2,244.60

6,520.00

#REF!

3,179.80

2,055.00

#REF!

1,270.50
2,160.00

#REF!

1,308.90
2,810.00

#REF!

1,615.10
2,205.00

#REF!

2,240.00

#REF!

1,154.40

1,270.50
1,945.00

#REF!

1,295.00

#REF!

2,965.00

#REF!

940.2
641.3

1,793.70
2,390.00

#REF!

1,368.70
98.50

#REF!

197.00

#REF!

153.50

#REF!

Rate Rs

898.00

50.6
101.2
85

Rate Rs

#REF!

502.9
105.00

#REF!

317.00

#REF!

61.3

197.1

231.50

#REF!

118.9
389.50

#REF!

234.7

395.00

#REF!

224.5
372.50

#REF!

285.2
345.00

#REF!

191.3
61.00

#REF!

23.4
55.50

#REF!

21.3
749.00

#REF!

358.4
349.00

#REF!

254.1
349.00

#REF!

254.1
59.50

#REF!

Rate Rs

39.5

Rate Rs

240.50

#REF!

180.00

#REF!

123.4
92.5

120.00

#REF!

160.00

#REF!

61.7
82

ot Carried Out under the

Rate Rs

Rate Rs

687.00

#REF!

1,070.00

#REF!

368.8

566.5
57.75

#REF!

54.50

#REF!

995.00

#REF!

33.4

29.5

520.1
1,545.00

#REF!

808.5
35.00

#REF!

19.3
46.00

#REF!

1,345.00

#REF!

24.4

697.7
1,080.00

#REF!

560.8
966.00

#REF!

493.6
1,590.00

#REF!

806.1

4,525.00

#REF!

2,310.90

4,265.00

#REF!

2,186.70

2,555.00

#REF!

1,414.30

3,320.00

#REF!

1,823.90

2,745.00

#REF!

1,515.80

to be Paid Separately.
Rate Rs

Rate Rs

260.50

#REF!

50.00

#REF!

111.5

29.6
262.00

#REF!

51.50

#REF!

110.9

29
200.50

#REF!

109.7

103.50

#REF!

54.7
196.50

#REF!

106.7
101.00

#REF!

54.7
111.00

#REF!

50
32.25

#REF!

19.3
138.50

#REF!

61.2
33.50

#REF!

20.2
112.50

#REF!

49.7
33.50

#REF!

18.7
140.00

#REF!

60.6

35.00

#REF!

19.7
452.50

#REF!

129.3
445.50

#REF!

125
107.50

#REF!

34.5

106.00

#REF!

33.1
72.25

#REF!

22.7
144.50

#REF!

45.4
104.00

#REF!

31.7
71.25

#REF!

34.25

#REF!

33.4

19
284.50

#REF!

97.25

#REF!

135.1

45
9.20

#REF!

4.8
142.00

#REF!

44.6
138.50

#REF!

3.35

#REF!

136.50

#REF!

43
1.7

40.8
130.50

#REF!

61
124.50

#REF!

56.8
2.40

#REF!

126.00

#REF!

1.3
37.7

13.10

#REF!

54.00

#REF!

8.2

29.2
113.00

#REF!

62.85
1,120.00

#REF!

690

143.00

#REF!

44.6
14.55

#REF!

177.50

#REF!

6.2

53.2

110.00

#REF!

57.5

154.00

#REF!

80.7

1,510.00

#REF!

713.6

132.50

#REF!

62.75
135.00

#REF!

47.2

luded in the Rates.


Rate Rs

Rate Rs

2,550.00

#REF!

3,825.00

#REF!

5,095.00

#REF!

6,370.00

#REF!

7,645.00

#REF!

8,920.00

#REF!

10,195.00

#REF!

1,275.00

#REF!

2,275.00

#REF!

3,415.00

#REF!

4,555.00

#REF!

5,690.00

#REF!

1,886.10

6,830.00

#REF!

2,263.30

7,970.00

#REF!

5,281.00

9,110.00

#REF!

1,140.00

#REF!

2,910.00

#REF!

2,985.00

#REF!

Rate Rs
1,146.70
1,720.10
2,293.40
2,866.80
3,440.20
4,013.50
4,586.90
573.4
754.4
1,131.60
1,508.80

3,017.70
377.2
1,492.60
1,564.60

Otherwise Directed.
Rate Rs

Rate Rs

492.50

#REF!

280.5

690.00

#REF!

381.7

887.00

#REF!

483

986.00

#REF!

Rate Rs

533.6

690.00

#REF!

438.00

#REF!

381.7

222.9
2,655.00

#REF!

97.00

#REF!

179.00

#REF!

12.15

#REF!

7.35

#REF!

62.75

#REF!

964

52.9

91.1
6.9
4.1

32.6
150.00

#REF!

625.00

#REF!

18.45

#REF!

84.7
349.8

10.4
135.00

#REF!

Rate Rs

Rate Rs

1,930.00

#REF!

2,235.00

#REF!

1,095.00

#REF!

7,130.00

#REF!

76.3

1,052.70

1,222.70
575

4,002.00
7,425.00

#REF!

4,203.50
5,970.00

#REF!

3,048.70

6,265.00

#REF!

3,595.00

#REF!

3,805.00

#REF!

2,915.00

#REF!

548.00

#REF!

1,110.00

#REF!

278.00

#REF!

1,430.00

#REF!

464.00

#REF!

268.50

#REF!

638.00

#REF!

3,203.50
1,653.30
2,030.00
1,322.60
307.3
621.6
149.5
828.7
249.7
120.9

373.2
565.00

#REF!

46.00

#REF!

679.00

#REF!

370.1
25.4

433.2
307.00

#REF!

920.00

#REF!

510.1

460.00

#REF!

255.1

614.00

#REF!

307.00

#REF!

414.50

#REF!

533.00

#REF!

635.00

#REF!

170

340.1
170
232.8
290
349

713.00

#REF!

431.50

#REF!

518.00

#REF!

604.00

#REF!

682.00

#REF!

8,365.00

#REF!

391.4
232.6
280.5
329.1
371.5

4,939.80
7,635.00

#REF!

4,961.00
8,055.00

#REF!

4,552.80
7,730.00

#REF!

4,107.00
8,575.00

#REF!

4,914.20
8,250.00

#REF!

4,765.70
9,460.00

#REF!

5,830.90
9,135.00

#REF!

5,683.15
8,095.00

#REF!

4,835.80
10,880.00

#REF!

6,705.10
10,765.00

#REF!

6,672.10

11,800.00

#REF!

7,356.90

10,700.00

#REF!

6,713.40
13,265.00

#REF!

8,370.60
14,770.00

#REF!

9,375.00
3,155.00

#REF!

2,835.00

#REF!

30.75

#REF!

207.00

#REF!

121.4

207.00

#REF!

121.4

148.50

#REF!

751.00

#REF!

37.00

#REF!

64.00

#REF!

74.75

#REF!

1,980.00

#REF!

1,620.80
1,474.60
13.6

70.9

481.4
20.8
35.8
46

1,175.70
2,020.00

#REF!

1,870.00

#REF!

1,113.00

995.75
838.00

#REF!

496.9
1,185.00

#REF!

690

1,980.00

#REF!

2,590.00

#REF!

2,940.00

#REF!

4,170.00

#REF!

5,565.00

#REF!

9,540.00

#REF!

14,055.00

#REF!

433.00

#REF!

472.00

#REF!

510.00

#REF!

968.00

#REF!

1,625.00

#REF!

2,360.00

#REF!

558.00

#REF!

349.00

#REF!

175.8

82.50

#REF!

53.5

3,355.00

#REF!

2,036.70

823.00

#REF!

1,100.00

#REF!

162.50

#REF!

124.00

#REF!

167.00

#REF!

116.50

#REF!

118.00

#REF!

1,186.70
1,289.30
1,418.00
2,009.00

2,926.75
4,916.90
7,931.50
230.9
252.1
277.3
503.3
898.7
1,162.40
281.3

415.1
553.4
90.4
59.6
90.4
59.6
60.7

537.00

#REF!

404.50

#REF!

273.9

204.6
510.00

#REF!

549.00

#REF!

46.00

#REF!

1,785.00

#REF!

289.4
149.7
23.6

939.9
2,620.00

#REF!

8,345.00

#REF!

1,340.40

4,526.30
574.00

#REF!

287.7
735.00

#REF!

379
1,005.00

#REF!

529.8
1,500.00

#REF!

881.2
297.50

#REF!

157.8
178.00

#REF!

101.9
990.00

#REF!

586
11,520.00

#REF!

572.00

#REF!

7,668.80

310

921.00

#REF!

503.4
32,044.00

#REF!

18,999.50
35,330.00

#REF!

21,021.60
19,400.00

#REF!

12,217.90
21,000.00

#REF!

13,161.30
514.00

#REF!

301.4
463.00

#REF!

447.5
4,630.00

#REF!

2,906.60
3,300.00

#REF!

1,088.80
36.75

#REF!

6,790.00

#REF!

18.4

1,948.30
6,970.00

#REF!

2,069.00
7,440.00

#REF!

560.00

#REF!

185.00

#REF!

4,399.50
274.8

83.3

799.00

#REF!

388.5
1,190.00

#REF!

1,005.00

#REF!

610.2

659.7
102.50

#REF!

44.6
89.75

#REF!

67
158.00

#REF!

117.7
4,510.00

#REF!

5,595.00

#REF!

Rate Rs

Rate Rs

2,351.30
3,004.70

40.25

#REF!

419.50

#REF!

164.00

#REF!

87.2

108.50

#REF!

60.2

3,865.00

#REF!

23
224.65

2228..8
2,600.00

#REF!

1,498.00
829.00

#REF!

491.00

#REF!

454.6

295.8

1,300.00

#REF!

2,200.00

#REF!

764.8

1,316.60
448.50

#REF!

1,580.00

#REF!

213.7

885.2

s Given in SSCM 1707.


Rate Rs
911.00

Rate Rs
#REF!

521.3
229.50

#REF!

1,370.00

#REF!

219.00

#REF!

114.2

37.25

#REF!

16.8

44.75

#REF!

20.1

56.00

#REF!

25.2

74.75

#REF!

33.5

91.50

#REF!

83.75

#REF!

84.75

#REF!

82.50

#REF!

138.1
672.3

50.3

51.6
46.6

48
239.50

#REF!

537.00

#REF!

101.7

280.8

260.50

#REF!

584.00

#REF!

132.7

317

Rate Rs

Rate Rs

13,045.00

#REF!

5,945.00

#REF!

237.00

#REF!

6,438.20
3,673.90

104.8
5,800.00

#REF!

4,645.00

#REF!

236.00

#REF!

2213.2
2107.75

108.4

248.50

#REF!

89.1

1,355.00

#REF!

643.5
667.00

#REF!

306.5

776.00

#REF!

361.5

33.75

#REF!

17.8
1,270.00

#REF!

596
12.45

#REF!

970.00

#REF!

6.9

461.8

741.00

#REF!

1414.3

820.00

#REF!

381.9

1,135.00

#REF!

549.6

1,280.00

#REF!

628.1
1,005.00

#REF!

121.50

#REF!

520.8

41.7

114.50

#REF!

51.5

255.50

#REF!

117.5

15,080.00

#REF!

29.25

#REF!

331.00

#REF!

6,803.60
15.4

112.6

2,775.00

#REF!

1,539.00

5,890.00

#REF!

3,179.70

8,060.00

#REF!

4,382.70

10,230.00

#REF!

5,585.80

340.50

#REF!

183.9

248.50

#REF!

148.2

424.00

#REF!

255.8

1,355.00

#REF!

776.3

380.00

#REF!

210.5

543.00

#REF!

300.8
123.50

#REF!

857.00

#REF!

224.50

#REF!

60.9

389.1

115
323.00

#REF!

476.50

#REF!

630.00

#REF!

783.00

#REF!

2,295.00

#REF!

27.00

#REF!

184.6
269.7
354.7
439.7
1,121.90

14.9
45.50

#REF!

72.75

#REF!

91.50

#REF!

178.00

#REF!

25.4

24.3
35.5

80.2
194.00

#REF!

86.8
304.00

#REF!

140

284.50

#REF!

133.4
139.00

#REF!

71.6
122.50

#REF!

63.3
129.50

#REF!

67.4
50.00

#REF!

1,330.00

#REF!

1,115.00

#REF!

255.50

#REF!

26.3
661.4
694

136.2
90.25

#REF!

45.65
12.00

#REF!

6.2
102.00

#REF!

4,745.00

#REF!

60.7

2,080.00

4,620.00

#REF!

2,169.80
282.00

#REF!

14,830.00

#REF!

139.3

5,173.60
296.00

#REF!

150.8

Rate Rs

Rate Rs

Rate Rs

847.00

#REF!

469.5

1,090.00

#REF!

559

1,575.00

#REF!

707.8

1,450.00

#REF!

636.5

3,235.00

#REF!

5,545.00

#REF!

6,470.00

#REF!

1,040.00

#REF!

2,080.00

#REF!

2,080.00

#REF!

2,775.00

#REF!

1,793.40
2,391.10
3,586.70
533.9

1,067.70
1,067.70
1,423.60