Procedia Computer Science 35 (2014) 1586 1595
a
University of Zielona Gora, Licealna 9, Zielona Gora 65-216, Poland
Wrocaw University of Technology, Institute of Computer Engineering, Control and Robotics,
Wybrzee Wyspiaskiego 27, Wrocaw 50-370, Poland
Abstract
The paper investigates the use of intelligent systems to identify the factors that significantly influence the duration of new
product development. These factors are identified on the basis of an internal database of a production enterprise and further used
to estimate the duration of phases in product development projects. In the paper, some models and methodologies of the
knowledge discovery process are compared and a method of knowledge acquisition from an internal database is proposed. The
presented approach is dedicated to industrial enterprises that develop modifications of previous products and are interested in
obtaining more precise estimates for project planning and scheduling. The example contains four stages of the knowledge
discovery process including data selection, data transformation, data mining, and interpretation of patterns. The example also
presents a performance comparison of intelligent systems in the context of variable reduction and preprocessing. Among data
mining techniques, artificial neural networks and the fuzzy neural system are chosen to seek relationships between the duration of
project phase and other data stored in the information system of an enterprise.
2014
2014 The
The Authors.
Authors.Published
Publishedby
byElsevier
ElsevierB.V.
B.V. This is an open access article under the CC BY-NC-ND license
(http://creativecommons.org/licenses/by-nc-nd/3.0/).
Peer-review
under responsibility of KES International.
Peer-review under responsibility of KES International.
Keywords: data mining; knowledge acquisition; pattern recognition; fuzzy neural system; artificial neural networks; business intelligence systems
1877-0509 2014 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license
(http://creativecommons.org/licenses/by-nc-nd/3.0/).
Peer-review under responsibility of KES International.
doi:10.1016/j.procs.2014.08.242
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1587
1. Introduction
Present information and communication technologies have become one of the most important factors, conditions
and opportunities of the company development. These technologies enable the collection, presentation, transfer,
access and use of an enormous amount of data. The data is a potential source of information that, in connection with
management skills and experience, may support development of a new product. The advancement of information
technology in business management processes has increased interest in the use of integrated information systems,
such as an Enterprise Resource Planning (ERP) system. ERP systems operate, collect and store data connected with
the daily activities of enterprises (e.g. client orders) as well as information concerning previous product
development projects1. However, ERP software does not include data mining techniques that can discover the
complex and potentially useful relationships contained within an ERP database, and support planning and
scheduling of product development projects.
New product development (NPD) is a crucial process in maintaining a companys competitive position2. Because
of its inherent features, NPD is a relatively risky activity3, as market competition and product technology
advancement are often intense4. It is reported that more than half of the 20% of successful cases fail to return
investment costs and become profitable, with more cost and time than expected having been consumed to achieve
the project goals5,6. The main reasons why most companies have failed in the development of new products concerns
an increase of time and costs in the phases of NPD due to their sequential processes and difficulties in constructing
reasonable development schedules and resource distribution plans6. These reasons indicate a need for the
development of an intelligent system that uses a database of past product development projects to estimate the
duration of project phase and improve the quality of planning and scheduling.
The traditional approaches to project scheduling are the well-known CPM (Critical Path Method) and PERT
(Program Evaluation and Review Technique). The hypothesis made in CPM is that activity durations are
deterministic and known is rarely satisfied in real life where tasks are often uncertain and variable7. The inherent
uncertainty and imprecision in project scheduling has motivated the proposal of several fuzzy set theory based
extensions of activity network scheduling techniques9-11. Considerable research effort has also been recently focused
on the application of constraint programming frameworks in the context of project scheduling12-14. The abovementioned approaches are based on the durations of project activities, neglecting their estimation from the source
data. This provides the motivation to develop an intelligent system that is able to evaluate the duration of project
phase, and as a result, support planning and scheduling of new product development.
As real world data is inherently nonlinear, traditional linear tools may suffer from significant biases in data
mining15. Therefore, this paper considers intelligent systems (neural networks and hybrid fuzzy neural system) for
modeling complex data mining problems. These systems are able to solve problems that have imprecise patterns or
data containing incomplete and noisy information with a large number of variables. The goal of this paper is to
present the use of intelligent systems to identify the relationships in an ERP database between the ERP attributes
(e.g. duration of delivery, number of subcontractors or team members) and the duration of a project phase. The
sought relationships can lead to more relevant estimates and, as a consequence, improve project planning and
scheduling. It is unrealistic to expect very accurate estimations because of the inherent uncertainty in product
development projects and the complex and dynamic interaction of factors that influence their development.
However, even a small improvement in the estimation quality can have a positive influence on planning project
schedule, cost, and resource allocation. The novelty of this research can be considered in the context of identifying
the impact of variable reduction and preprocessing on estimation quality in the context of different data mining
techniques (artificial neural networks, fuzzy neural system, linear regression). Moreover, the proposed approach
uses the firms experiences concerning past projects which are stored in the ERP database.
The remaining sections of this paper are organised as follows: Section 2 presents a model of knowledge
discovery in databases. A method using intelligent systems for data mining in the context of an ERP database is
shown in Section 3. An example of the proposed approach, which includes a comparison between intelligent
systems and traditional linear tools for estimating the duration of project phase, is illustrated in Section 4. Finally,
some concluding remarks are contained in Section 5.
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1588
Fayyad et al.
Cabena et al.
Cios et al.
CRISP-DM
Business
Objectives
Determination
Understanding the
Data
Business
Understanding
Problem specification
Resourcing
Understanding the
Data
Problem specification
Data
Understanding Data cleaning
Preparation of the
data
Data
Preparation
Pre-processing
DM
Data Preparation
KDD Roadmap
Data cleaning
DM
DM
Modeling
Domain
Knowledge
Elicitation
Evaluation of the
Discovered
Knowledge
Evaluation
Assimilation of
Knowledge
Using the
Discovered
Knowledge
Deployment
Consolidating Discovered
Knowledge
Evaluation
Interpretation
Exploitation
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1589
The steps of the KDD process in the above-presented models can be generalized into four further considered
subprocesses: data selection, data transformation / preprocessing, data mining, and interpretation / evaluation of
patterns. An ERP database contains hundreds of attributes and an enormous amount of data that can be irrelevant to
the mining task or redundant. Fundamental pursuits of data analysis are data and dimensionality reduction22.
Variable selection is intended to select the optimal subset of predictors, which allows improvements to be made to
interpretability and model predictive ability, neglects insignificant effects thereby reducing noise, and speeds up
modeling time. Variable selection aims at constructing the simplest possible model that predicts well and/or explains
the relationships in the data. It is noteworthy that a variable selection method should take into account the nature of
the problem because automatic variable selection is not guaranteed to be consistent with the assumed goals. The
variable selection problem is most familiar in the linear regression context, where attention is restricted to normal
linear models23. Among the best known dimension reduction methods are Mallows Cp, Akaike (AIC) and Bayesian
Information Criterion (BIC), Principal Component Analysis, Factor Analysis and Projection Pursuit22-25.
Knowledge acquisition requires some data mining techniques that can cope with the description of relationships
among data and that can solve a problem, in the considered case connected with estimation. Blind application of
data mining methods can lead to the discovery of meaningless and invalid patterns19. The proposed method for
project duration estimation includes two data mining techniques: neural networks and fuzzy sets.
3. Method of project duration estimation with the use of intelligent systems
New product development requires planning and scheduling of project activities to ensure their controlling, and
finally to meet the project requirements. Planning and scheduling of projects uses the estimators of the duration of
project activities, their sequence, amount of required resources, etc. The quality of these estimators depends on the
type of new product as well as the techniques used for forecasting. A high quality of forecasts is rather difficult to
obtain for products that are technological breakthroughs, i.e. that are new to the world and will create their own
market. In turn, for modified products that are new to the company but not to the market, there is the possibility to
use data from previous product development projects. Modifications of existing products are very often used in
industrial companies and the development of this type of new product is further considered.
The presented method is dedicated to industrial enterprises that use an ERP system to support their business
processes, including development of new products. The phases of product development depend on the
characteristics of the product and the company in which it is designed. However, some common phases can be
distinguished, for example planning, concept development, system-level design, detail design, testing and
refinement, and production ramp-up6. These phases can also be considered in the context of concept initiation,
program approval, prototype, pilot, and launch. To obtain a project schedule, the specification of resource
availability and duration of project phase is required26,27. These parameters can be defined by experts or estimated
with the use of an ERP database28,29. The first approach is suitable for projects that have a unique form, e.g.
innovations and construction projects. In turn, if a company develops modifications of previous products, then it is
possible to recognize the patterns from an ERP database and to use them for the improvement of estimation quality
of project planning and scheduling. The procedure of the proposed method is presented in Fig. 1.
The presented four stages refer to the steps of the KDD process such as data selection, preprocessing, data
mining, and use of the discovered patterns. In order to identify the impact of dimension reduction and preprocessing
on estimation quality among different data mining techniques, the four cases have been distinguished: the data
before variable selection and feature selection (I), before variable selection and after feature selection (II), after
variable selection and before feature selection (III), and after variable and feature selection (IV). Variable selection
has been conducted according to two criteria: AIC and BIC. In turn, feature selection has been performed with the
use of principal component analysis (PCA) that is the best, in the mean-square error sense, linear dimension
reduction technique23.
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1590
Acquiring the
data from the
ERP database
- Variable 1
- ...
- Variable n
Case I
Dimension
reduction,
preprocessing
- Variable 1
- ...
- Variable n-j
Neural networks
Estimators for
planning and
scheduling
Fuzzy neural
system
- Variable 1
- ...
- Variable n-i-k
- Variable 1
- ...
- Variable n-i
Case II
Case IV
Case III
Feature
selection
Variable and
feature selection
Variable
selection
An ERP system database comprises an enormous number of attributes that can be considered as potential
variables for identifying the duration of developed products. Fuzzy logic and artificial neural networks are
complementary technologies and powerful design techniques that can be used in the identification of patterns from
within a large database and noisy data.
Artificial neural networks (ANNs) are an important class of tools for quantitative modeling. Today, neural
networks are treated as a standard data mining tool and used for many data mining tasks such as pattern recognition,
time series analysis, prediction, and clustering. Neural networks are computing models for information processing
and are particularly useful for identifying the fundamental relationship among a set of variables or patterns in the
data. Several important characteristics of neural networks make them suitable and valuable for data mining. For
instance, ANNs do not require several unrealistic a priori assumptions about the underlying data generating process
and specific model structures, the mathematical property of the neural network in accurately approximating or
representing various complex relationships has been well established, ANNs are nonlinear models, and ANNs are
able to solve problems that have imprecise patterns or data containing incomplete and noisy information with a large
number of variables. ANNs with their nonlinear and nonparametric nature are more effective for modeling complex
data mining problems15.
The fuzzy neural system has the advantages of both neural networks (e.g. learning abilities, optimization abilities
and connectionist structures) and fuzzy systems (simplicity of incorporating expert knowledge). As a result, it is
possible to bring the low-level learning and computational power of neural networks into fuzzy systems and also
high-level human-like IF-THEN thinking and reasoning of fuzzy systems into neural networks. The fuzzy neural
method is rather a way to create a fuzzy model from data by some kind of learning method that is motivated by
learning procedures used in neural networks. This substantially reduces development time and cost while improving
the accuracy of the resulting fuzzy model. Being able to utilize a neural learning algorithm implies that a fuzzy
system with linguistic information in its rule base can be updated or adapted using numerical information to gain an
even greater advantage over a neural network that cannot make use of linguistic information and behaves as a black
box30. The combination of fuzzy systems and neural networks has recently become a popular approach in
engineering fields for solving problems in control, identification, prediction, pattern recognition, etc31,32. One wellknown structure is the adaptive neuro-fuzzy inference system (ANFIS), which has been used in the study.
4. Example of project duration assessment with the use of intelligent systems
The example refers to four steps of knowledge discovery: data selection, preprocessing data, data mining, and
interpretation. The example also includes the comparison of results for project duration assessment in two
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1591
perspectives: before and after data selection, as well as before and after preprocessing. The input variables of the
prototyping phase in the product development project are presented in Table 2. These variables derive from an
enterprises internal database (ERP system) and concern departments such as purchasing, materials management,
production, research and development (R&D) and project management. The development of a product prototype
includes many processes that require, for instance, the purchase of materials from the suppliers, storage of materials,
and usage of materials in production.
Table 2. Input variables for product prototype phase
Purchasing
Value of material
purchase
Number of materials
in warehouses
Number of
suppliers selling
required materials
Number of supplier
withdrawal notices
Number of
subcontractors
Number of warehouse
transfers
Time of machine
inspection
Delivery duration
Number of
machines
Number of materials
needed in the project phase
Number of work
orders
Delay of delivery
R&D
Project Management
The first step of the knowledge discovery process concerns data selection and has been divided into two phases.
First, the expert chooses the variables according to his/her experience from the enterprises internal databases. In the
considered example these variables are presented in Table 2. Then, the number of variables can be reduced with the
use of Akaike information criterion and forward inclusion method. The data set has been reduced from 24 input
variables to 6 (number of subcontractors NoS, delivery duration DD, number of work orders NoWO,
percentage of existing parts used in new products EPinNP, number of unique tasks in the project phase NoUT,
number of team members NoTM).
Data preprocessing is the second step of the knowledge discovery process and helps artificial neural networks
and a fuzzy neural system obtain more accurate results. The considered example includes data from 33 previous
product development projects (P1-P33). The collected data has a numerical format, but sometimes different units,
for example, purchasing is in monetary unit, delivery duration in days, and existing parts used in new products in
percent. As a result, the data requires transformation to make the use of data mining techniques more effective. In
the presented example, the principal component analysis has been used for preprocessing.
The third step of the knowledge discovery process regards the use of data mining techniques. Among the
available intelligence systems two have been chosen: artificial neural networks and the adaptive neuro-fuzzy
inference system (ANFIS). In order to eliminate the overtraining of ANNs and ANFIS (too strict function
adjustment to data) and to increase the estimation quality, the data set has been divided into learning (P1-P25) and
testing sets (P26-P33). The results have been obtained in the Matlab software and presented in Table 3 as the root
mean square errors (RMSE) for the testing set. The results for the intelligence systems are compared with the
average and linear model. The performance comparison includes four cases that refer to the data before and after the
use of variable selection and feature selection (see Fig. 1).
The results presented in Table 3 indicate that the least error in the testing set for the duration of project prototype
phase was generated with the use of ANNs trained according to the Levenberg-Marquardt algorithm (LM).
Surprisingly, the least RMSE is for the entire set of data, i.e. before data selection, and after data preprocessing (case
II), which can indicate existing complex and hidden patterns in the entire data set. The ANNs trained according to
gradient descent momentum and an adaptive learning rate (GDX) algorithm generated worse results than ANFIS.
This demonstrated the importance of proper choice of learning algorithm for ANNs and the need of result
comparison for different intelligent systems that have ambiguous learning procedures. It is noteworthy that RMSE
1592
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
generated with the use of intelligent systems are smaller than RMSE for the average and linear models. The
comparison of different forecasting models is especially recommended in the case of significant variance for the
dependant variable (in the considered case for the duration of a project phase).
Table 3. Comparison of RMSE for different models
Case II
Case III
Case IV
ANN - LM
Model
23.005
1.537
13.009
2.607
ANN - GDX
30.505
3.093
30.388
6.460
Case I
11.217
5.468
4.284
16.777
7.570
3.491
3.086
Linear model
43.480
16.425
10.886
7.515
Average
30.596
In studies, a multilayer feed-forward neural network has been applied by the use of the back-propagation
algorithm, and optimisation weights according to the LM and GDX algorithms. The neural network structure has
been determined in an experimental way, by the comparison of learning and testing sets for the different number of
layers and hidden neurons. RMSE have been calculated as the average of 20 iterations for each structure of neural
network with a number to the extent of 20 hidden neurons. Figure 2 presents the comparison of RMSE for different
numbers of hidden neurons for networks trained according to the LM algorithm, and in the context of learning and
testing sets for four cases respectively. For instance, the minimal value of testing set RMSE has been obtained in
case I for 13 hidden neurons in one hidden layer (the top left side of Fig. 2).
Fig. 2. RMSE and number of hidden neurons for the considered cases (I-IV)
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1593
Also the use of a fuzzy neural system requires the declaration of a few parameters concerning the learning phase
e.g. a membership function type of fuzzy sets (e.g. triangular, Gaussian function), method of defuzzification and
weights optimisation, and stop criterion (e.g. error value or the number of iteration). After the declaration of fuzzy
neural structure, the system is learnt according to, for example, the back-propagation algorithm, and consequently,
the shape of membership function is determined. The rules are generated according to the shape of membership
functions, and can be presented for the decision maker in descriptive form. After learning phase, the testing data is
led to input to the system to compare the error between different models (see Table 3). The ANFIS trained according
to grid partition method for the entire set of variables (case I) had to be terminated because of generating enormous
number of rules. ANFIS trained with the use of subtractive clustering generated 21 rules for case I. In turn the
number of rules for case II-IV equal 729 and 14 for grid partition method and subtractive clustering, respectively.
The membership functions and rules are a basis for evaluating the duration of an actual product development
project. Let us assume that for the actual project the following values are considered: number of subcontractors 5,
average delivery duration 21 days, number of work orders 4, number of team members 5, number of unique
tasks in the project phase 4, and percentage of existing parts used in new products 0.205. Figure 3 presents the
memberships functions for 12 rules that determine the planned duration of project phase at 120 days.
Fig. 3. Estimation of project duration with the use of fuzzy neural system
The presented analysis can be broadened into multidimensional analysis to support the decision-maker in
determining optimal values of some parameters. For instance, the decision-maker wants to investigate the impact of
the number of team members (from 5 to 6) and the number of subcontractors (from 5 to 6) on the planned duration
of a project phase. Table 4 presents the results for these constraints that indicate a decline of the duration of project
phase with an increase in the number of subcontractors or/and team members.
Table 4. What-if analysis for project duration (in days)
Number of
subcontractors
120
98.3
95.9
87.5
1594
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
The above-presented study is conducted for each phase of the product development project and the obtained
estimates can be used for further evaluation, for instance, in the project scheduling, cost planning, and cash flow
projections.
5. Conclusions
The enormous amount of data and attributes in an ERP database require attention to be paid to the proper choice
of variable reduction and data mining methods. In the paper, various data mining and knowledge discovery models
and methodologies have been compared and generalized into four steps: data selection, data transformation, data
mining, and using patterns. Among the data mining techniques, two have been chosen artificial neural networks
and the fuzzy neural system. These techniques have been applied to estimating relationships between the duration of
the previous product development projects and the selected attributes from an ERP database. The results indicate
better estimation quality for intelligent systems than statistical models, and that variable selection and preprocessing
significantly influences on the obtained results. The experiments also show the importance of careful choice of
parameters of intelligent systems, for instance, the structure and learning algorithm of ANN, and the need for result
comparison for different forecasting models.
The advantages of the use of intelligence systems include the search of complex and potentially useful
relationships into an ERP database and their use in the estimation of project duration. More exact identification of
project duration enables more precision of project planning and scheduling, as well as the improvement of cost
planning. This approach is especially useful for production enterprises that have a database of previous product
development projects. The application of the proposed approach encounters some difficulties, among other things,
with the collection of sufficient amounts of data from past similar projects. Moreover, the lack of uniform rules for
building the structure of neural networks and fuzzy neural systems may cause an acceptance problem for the
decision-makers. However, the presented approach seems to have promising properties for acquiring information
from an ERP system. Further research focuses on the development of the proposed method of project duration
estimation towards the choice of an optimal set of new products for development.
References
1. Relich M. Knowledge acquisition for new product development with the use of an ERP database. In: Proceedings of the Federated Conference
on Computer Science and Information Systems; 2013. p. 1285-1290.
2. Chin KS, Tang DW, Yang JB, Wong SY, Wang H. Assessing new product development project risk by Bayesian network with a systematic
probability generation methodology. Expert Systems with Applications 2009; 36:9879-9890.
3. Kahraman C, Buyukozkan G, Ates NY. A two phase multi-attribute decision-making approach for new product introduction. Information
Sciences 2007; 177(7):1567-1582.
4. McCarthy IP, Tsinopoulos C, Allen P, Rose-Anderssen C. New product development as a complex adaptive system of decisions. Journal of
Product Innovation Management 2006; 23(5): 437-456.
5. Cooper LP. A research agenda to reduce risk in new product development through knowledge management: a practitioner perspective. Journal
of Engineering and Technology Management 2003; 20(1):117-140.
6. Park S, Kim J, Choi HG. A risk management system framework for new product development. In: International Conference on Economics and
Finance Research, IPEDR 4, IACSIT Press; 2011. p. 51-56.
7. Zammori FA., Braglia M, Frosolini M. A fuzzy multi-criteria approach for critical path definition. International Journal of Project
Management 2009; 27:278-291.
8. Bonnal P, Gaurc K, Lacoste G. Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management
2004; 130:114-123.
9. Long LD, Ohsato A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of
Project Management 2008; 26:688-698.
10. Fortin J, Zielinski P, Dubois D, Fargier F. Criticality analysis of activity networks under interval uncertainty. Journal of Scheduling 2010;
13:609-627.
11. Maravas A, Pantouvakis JP. A fuzzy repetitive scheduling method for projects with repeating activities. Journal of Construction Engineering
and Management 2011; 137:561-564.
12. Sitek P, Wikarek J. A hybrid method for modeling and solving constrained search problems. In: Proceedings of the Federated Conference on
Computer Science and Information Systems; 2013. p. 385-392.
Marcin Relich and Wojciech Muszynski / Procedia Computer Science 35 (2014) 1586 1595
1595
13. Relich M. A declarative approach to new product development in the automotive industry. In: Environmental Issues in Automotive Industry.
Berlin Heidelberg: Springer; 2014. p. 23-45.
14. Bach I, Bocewicz G, Banaszak Z, Muszyski W. Knowledge based and CP-driven approach applied to multi product small-size production
flow. Control & Cybernetics 2010; 39(1):69-95.
15. Zhang GP. Neural Networks For Data Mining. In: Data mining and knowledge discovery handbook. 2nd ed. Springer; 2010.
16. Han J, Kamber M. Data mining. Concepts and techniques. 2nd ed. San Francisco: Morgan Kaufmann Publishers; 2006.
17. Cios KJ., Pedrycz W, Swiniarski RW, Kurgan LA. Data mining: a knowledge discovery approach. New York: Springer; 2007.
18. Li T, Ruan D. An extended process model of knowledge discovery in database. Journal of Enterprise Information Management 2007;
20(2):169-177.
19. Fayyad U, Piatetsky-Shapiro G, Smith P. From data mining to knowledge discovery in databases. American Association for Artificial
Intelligence; Fall 1996. p. 37-54.
20. Cabena P, Hadjinian P, Stadler R, Verhees J, Zanasi A. Discovering data mining: from concepts to implementation. Prentice Hall; 1998.
21. Marban O, Mariscal G, Segovia J. A data mining & knowledge discovery process model. In: Data Mining and Knowledge Discovery in Real
Life Applications, Vienna: I-Tech; 2009.
22. Pedrycz W. Data and dimensionality reduction in data analysis and system modeling. In: Encyclopedia of Complexity and Systems Science,
Springer; 2009. p. 1775-1789.
23. Chizi B, Maimon O. Dimension reduction and feature selection. In: Data Mining and Knowledge Discovery Handbook. 2nd ed. Springer;
2010.
24. Guyon I., Elisseeff A. An introduction to variable and feature selection. Journal of Machine Learning Research 2003; 3:1157-1182.
25. Li T, Ruan D. An extended process model of knowledge discovery in database. Journal of Enterprise Information Management 2007;
20(2):169-177.
26. Bach I, Bocewicz G, Banaszak Z. Constraint programming approach to time-window and multiresource-constrained projects portfolio
prototyping. In: New Frontiers in Applied Artificial Intelligence. Berlin Heidelberg: Springer; 2008. p. 767-776.
27. Bocewicz G, Nielsen I, Banaszak Z. Automated guided vehicles fleet match-up scheduling with production flow constraints. Engineering
Applications of Artificial Intelligence 2014; 30:49-62.
28. Relich M, Jakabova M. A decision support tool for project portfolio management with imprecise data. In: Proceedings of the 10th
International Conference on Strategic Management and its Support by Information Systems; 2013. p. 164-172.
29. Sitek P, Wikarek J. A hybrid approach to modeling and optimization for supply chain management with multimodal transport. In:
Proceedings of the 18th International Conference on Methods and Models in Automation and Robotics (MMAR); 2013. p. 777-782.
30. Azar AT. Adaptive neuro-fuzzy systems. In: Fuzzy systems. InTech; 2010.
31. Cheng MY, Tsai HC, Sudjono E. Evolutionary fuzzy hybrid neural network for project cash flow control. Engineering Applications of
Artificial Intelligence 2010; 23:604-613.
32. Chien SC, Wang TY, Lin SL. Application of neuro-fuzzy networks to forecast innovation performance. Expert Systems with Applications
2010; 37:1086-1095.