HOJA DE SUSTENTO DE METRADOS - MODULO DE AULA

BAOS / ALMACEN

N
1.0
1.1
1.2
2.0
2.1
3.0
3.1
3.2

3.3
4.0
4.1

4.2

4.3

DESCRIPCION
Obras Provicionales
Almacen
Cartel de Obra
Trabajos Preliminares
Limpieza de Terreno
Movimiento de Tierras
Nivelacion del Terreno
Escabacion de Zanjas
- Para Cimiento
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Eliminacion de Material excedente
Obras Concreto Simple
Cimiento Corrido
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Sobre Cimiento
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Encofrado Sobre Cimiento
Eje: A-A, D-D

UNID

VECES

unid
unid

1
1

m2
m2
m3
m3

m3

LARGO

ANCHO

ALTO

11.2

8.29

11.2

8.29

2
2
2
2
1

7.2
1.9
3.14
3.14
13.152

0.6
0.4
0.6
0.4
1.25

0.8
0.8
0.8
0.8

2
2
2
2

7.2
1.9
3.14
3.14

0.6
0.4
0.6
0.4

0.8
0.8
0.8
0.8

2
2
2
2

6.73
1.89
3.8
3.8

0.15
0.15
0.15
0.15

0.3
0.3
0.3
0.3

6.73

m3

m3

m2
0.3

4.4

5.0
5.1
5.1.1
5.1.2
5.1.3
5.1.4
5.2
5.2.1

5.2.2

5.2.3

5.2.4

Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Falso Piso
Piso 1
Piso 2
Piso 3
Piso 4
Piso 5
Piso 6
Concreto Armado
Columnas
Concreto
Encofrado de Columnas
Acero
Estribos
Vigas
Concreto
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Encofrado
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Acero
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Estribos
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6

4
4
4

1.89
3.8
3.8

0.3
0.3
0.3

1
1
4
1
1
1

2.27
2.31
1.11
1.39
1.39
1.39

2.63
2.63
1.07
0.98
1.35
1.21

4
4
16
76

0.25
1.24
1.02
0.25

0.25

3.25
3.25
3.75

2
2
4

6.68
2.00
3.80

0.15
0.15
0.15

0.20
0.20
0.20

6
6
10
Kg
8
8
16
kg
60
40
120

6.68
1.89
3.80

0.20
0.20
0.20

6.68
1.89
3.80

0.20
0.20
0.20

m2

m3
m2
Kg
Kg
m3

m2

0.80
0.80
0.80

6.0
6.1

6.2
6.2.1
6.2.2
6.2.3

7.0
7.1

7.2

7.3

Cobertura
Ladrillos
Eje: D-D
Eje: A-A
Eje: 1-1
Eje: 6-6
Eje: B-B, C-C
Eje: 4, 5
Eje 3-3 , 5-5
Losa Aligerada
Concreto
Ladrillos
Encofrado
Eje: A-A, D-D
Eje 1-1, 6-6
Base
Revoques enlucidos y molduras
Tarrajeo Interior
Eje: D-D
Eje: A-A
Eje: 1-1, 3-3, 5-5
Eje: 5-5
Eje: B-B, C-C
Eje : 6-6
Eje: 2, 4
Tarrajeo Exterior
Eje: A-A
Eje: D-D
Eje: 1-1
Eje: 6-6
Vigas
Eje: A-A, D-D
Eje: B, C

m2

m3
m2
m2

1
1
1
1
2
2
2

6.78
4.17
3.89
2.10
1.89
1.07
3.88

1
1

7.18
7.18

0.25

2
2
3

4.30
7.18
2.30

0.25
0.25
3.80

m2
1
1
4
1
4
1
4
m2
1
1
1
1

2.40
2.40
2.40
2.40
2.40
2.40
2.40
4.30
4.30

6.13
3.77
3.89
3.49
1.90
2.10
1.07

2.40
2.40
2.40
2.40
2.40
2.40
2.40

4.17
6.78
3.89
2.48

2.40
2.40
2.40
2.40

6.68
2.00

0.20
0.20

m2
1
1

7.4
8.0
9.0
10.0
10.1

11.0
11.1

11.2

11.3

12.0
12.1
12.2
12.13
12.14
13.0

Eje: 1-1, 3-3, 5-5, 6 -6


Columnas
Cielo Razo
Piso
Carpinteria de Madera
Puertas
Puertas 1
Puertas 2
Puertas 3
Pintura
Tarrajeo Interior
Eje: D-D
Eje: A-A
Eje: 1-1, 3-3, 5-5
Eje: 5-5
Eje: B-B, C-C
Eje : 6-6
Eje: 2, 4
Tarrajeo Exterior
Eje: A-A
Eje: D-D
Eje: 1-1
Eje: 6-6
Barniz para Puerta
Puertas 1
Puertas 2
Puertas 3
Instalaciones Electricas
Salidas de Techo (Centro de Luz)
Salidas Para Alumbrado
Salida para Tomacorriente
Salida para Interruptor
Tuberias

m2
m2
m2

1
4
3
3

3.80
0.25
2.30
2.30

0.20
3.25
3.4
3.4

2
3
4

0.94
0.70
0.60

2.10
2.10
2.10

6.13
3.77
3.89
3.49
1.90
2.10
1.07

2.40
2.40
2.40
2.40
2.40
2.40
2.40

4.17
6.78
3.89
2.48

2.40
2.40
2.40
2.40

0.94
0.70
0.60

2.10
2.10
2.10

m2

m2
1
1
4
1
4
1
4
m2
1
1
1
1
m2
2
3
4
Pto
Pto
Pto
Pto

5.00
13.00
5.00
5.00

13.1

14.0
14.1

ALIM. CAB. TW 2-1X2.5mm2, TUBO


20mm PVC-P
TG A LUMINARIA
ENTRE LUMIN
TG A LUMINARIA
ENTRE LUM
LUM A INT
ENTRE LUM
BAJ INTERRP
ENTRE LUMN DE CIRCULACION
BAJ INTERRP
ENTRE LUMN
ENTRE LUMN
ENTRE LUMIN
BAJ INTERRP
DE TD A CAJAS DE PASE
A COMEDOR
DE CAJA A CAJA DE PASE
A CAJA DE PASE DE BAO
A CAJA DE PASE TANQUE ELEVADO
Accesorios
Sanitarios
Water
Lavadero
Urinario

ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML

1.00
1.00
1.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

unid
unid
unid

6.00
4.00
1.00

4.90
7.40
3.04
3.40
2.70
3.40
2.30
2.80
3.50
3.80
3.50
1.60
1.50
6.30
7.30
19.00
25.00
6.00

Sub Total

TOTAL

1
1

1
1

92.848

92.848

92.848

92.848

3.46
0.61
1.51
1.00

13.152
6.91
1.22
3.01
2.01
16.44

3.46
0.61
1.51
1.00
0.30
0.09
0.17
0.17
2.02

13.152
6.91
1.22
3.01
2.01
1.46
0.61
0.17
0.34
0.34
19.46
8.08

Para este formato se han considerado 9 campo: Item, Partida, Unidad, Ancho, Alto,
Sub Total y Total
- Item: Asignacin de cada tarea y sub tarea a realizar en la obra
- Partida: Nombre de las tareas y sub tareas
- Unidad: Unidad de medicin de cada partida
- Veces: Nmero de veces a una dicha tarea
- Ancho: Ancho de lo que se est metrando
- Largo: Largo de lo que se est metrando
- Alto: Alto de lo que se est metrando
- Sub Total: Es la multiplicacin del ancho x largo x altura
- Total: Es la Multiplicacin del Sub Total por el nmero de veces
Ejemplo:
Excavacin de Zanjas para cimiento
Eje A A, D -D
Se ha considerado metrado:
Veces: 2
Ancho: 0.6 m
Alto: 0.8 m
Largo: 7.2 m
Por lo tanto
- Sub Total = 7.2 x 0.6 x 0.8
- Total= SubTotal x Veces
El archivo Excel seria
H16 = G16*F16*E16
I1 6= =H16*D16

0.57
1.14
1.14
5.97
6.08
1.19
1.36
1.88
1.68

0.20
4.03
3.83

0.20
0.06
0.11
1.34
0.38
0.76
1.34
0.38
0.76
48.00
32.00
96.00

2.27
4.56
4.56
21.72
5.97
6.08
4.75
1.36
1.88
1.68
97.13
0.81
16.12
61.20
19.00
0.98
0.40
0.12
0.46
17.88
8.02
2.27
7.60
25.87
10.69
3.02
12.16
44.00
12.00
8.00
24.00

16.27
10.01
9.34
5.04
4.54
2.57
9.31
7.72
30.87
1.08
1.80
8.74

14.71
9.05
9.34
8.38
4.56
5.04
2.57
10.01
16.27
9.34
5.95
1.34
0.4

2,866.03
634.61
390.31
364.10
196.56
353.81
200.30
726.34
602.04
310.28
202.38
2.15
3.59
26.22
103.03
14.71
9.05
37.34
8.38
18.24
5.04
10.27
41.57
10.01
16.27
9.34
5.95
2.50
1.34
0.4

0.76
0.81
7.82
7.82

0.76
3.25
23.46
23.46

1.97
1.47
1.26

13.40
3.95
4.41
5.04

14.71
9.05
9.34
8.38
4.56
5.04
2.57
10.01
16.27
9.34
5.95
1.97
1.47
1.26

103.03
14.71
9.05
37.34
8.38
18.24
5.04
10.27
41.57
10.01
16.27
9.34
5.95
13.40
3.95
4.41
5.04
5.00
13.00
5.00
5.00

4.90
7.40
3.04
3.40
2.70
3.40
2.30
2.80
3.50
3.80
3.50
1.60
1.50
6.30
7.30
19.00
25.00
6.00

6.00
4.00
1.00

artida, Unidad, Ancho, Alto, Largo,

ea a realizar en la obra
sub tareas
cada partida
dicha tarea
metrando
metrando
metrando
ho x largo x altura
r el nmero de veces

imiento

ado:

0.8
es

ITEM
1.0
1.1
1.2
2.0
2.1
3.0
3.1
3.2

3.3
4.0
4.1

4.2

4.3

4.4

5.0
5.1
5.1.1
5.1.2

PARTIDA
Obras Provicionales
Almacen
Cartel de Obra
Trabajos Preliminares
Limpieza de Terreno
Movimiento de Tierras
Nivelacion del Terreno
Escabacion de Zanjas
- Para Cimiento
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Eliminacion de Material excedente
Obras Concreto Simple
Cimiento Corrido
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Sobre Cimiento
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Encofrado Sobre Cimiento
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 4-4
Eje: 2-2, 3-3
Falso Piso
Piso 1
Piso 2
Piso 3
Piso 4
Piso 5
Piso 6
Concreto Armado
Columnas
Concreto
Encofrado de Columnas

UNIDAD

METRADO

unid
unid
m2
m2
m3
m3

m3
m3

m3

m2

m2

m3
m2

92.848

5.1.3
5.1.4
5.2
5.2.1

5.2.2

5.2.3

5.2.4

6.0
6.1

6.2
6.2.1
6.2.2
6.2.3

7.0
7.1

7.2

Acero
Estribos
Vigas
Concreto
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Encofrado
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Acero
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Estribos
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Cobertura
Ladrillos
Eje: D-D
Eje: A-A
Eje: 1-1
Eje: 6-6
Eje: B-B, C-C
Eje: 4, 5
Eje 3-3 , 5-5
Losa Aligerada
Concreto
Ladrillos
Encofrado
Eje: A-A, D-D
Eje 1-1, 6-6
Base
Revoques enlucidos y molduras
Tarrajeo Interior
Eje: D-D
Eje: A-A
Eje: 1-1, 3-3, 5-5
Eje: 5-5
Eje: B-B, C-C
Eje : 6-6
Eje: 2, 4
Tarrajeo Exterior

Kg
Kg
m3

m2

m2

m3
m2
m2

7.3

7.4
8.0
9.0
10.0
10.1

11.0
11.1

11.2

11.3

12.0
12.1
12.2
12.13
12.14
13.0
13.1

Eje: A-A
Eje: D-D
Eje: 1-1
Eje: 6-6
Vigas
Eje: A-A, D-D
Eje: B, C
Eje: 1-1, 3-3, 5-5, 6 -6
Columnas
Cielo Razo
Piso
Carpinteria de Madera
Puertas
Puertas 1
Puertas 2
Puertas 3
Pintura
Tarrajeo Interior
Eje: D-D
Eje: A-A
Eje: 1-1, 3-3, 5-5
Eje: 5-5
Eje: B-B, C-C
Eje : 6-6
Eje: 2, 4
Tarrajeo Exterior
Eje: A-A
Eje: D-D
Eje: 1-1
Eje: 6-6
Barniz para Puerta
Puertas 1
Puertas 2
Puertas 3
Instalaciones Electricas
Salidas de Techo (Centro de Luz)
Salidas Para Alumbrado
Salida para Tomacorriente
Salida para Interruptor
Tuberias
ALIM. CAB. TW 2-1X2.5mm2, TUBO
20mm PVC-P
TG A LUMINARIA
ENTRE LUMIN
TG A LUMINARIA

m2

m2
m2
m2
m2

Pto
Pto
Pto
Pto

ML
ML
ML

14.0
14.1

ENTRE LUM
LUM A INT
ENTRE LUM
BAJ INTERRP
ENTRE LUMN DE CIRCULACION
BAJ INTERRP
ENTRE LUMN
ENTRE LUMN
ENTRE LUMIN
BAJ INTERRP
DE TD A CAJAS DE PASE
A COMEDOR
DE CAJA A CAJA DE PASE
A CAJA DE PASE DE BAO
A CAJA DE PASE TANQUE ELEVADO
Accesorios
Sanitarios
Water
Lavadero
Urinario

ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML

unid
unid
unid

COSTO
PARCIAL
TOTAL

TOTAL

928.48
10

928.48

Para este formato se han conside


- Item: Asignacin de cada tarea y sub t
- Partida: Nombre de las tarea
- Unidad: Unidad de medicin d
- Metrado: Es el resultado obtenido en el Camp
- Costo: dividido e
Total: Resultado de dividir Parci
Parcial: Es el costo por
- Total: Es la sumatoria de los C

Ejemplo:
Limpieza de Terren
Se ha considerado
Metrado: 92.848 m
Costo Parcial: 10
Costo Total = 92.848
Total: + Costo Tota
En Excel seria:
F9 = D9*E9
G8= F9

ara este formato se han considerado 5 campos:


signacin de cada tarea y sub tarea a realizar en la obra
- Partida: Nombre de las tareas y sub tareas
- Unidad: Unidad de medicin de cada partida
resultado obtenido en el Campo Total de la tabla de Metrados
- Costo: dividido en
Total: Resultado de dividir Parcial por Metrado
Parcial: Es el costo por unidad
- Total: Es la sumatoria de los Costos Totales
Ejemplo:
Limpieza de Terreno
Se ha considerado:
Metrado: 92.848 m2
Costo Parcial: 10
Costo Total = 92.848 * 10
Total: + Costo Total
En Excel seria:
F9 = D9*E9
G8= F9