You are on page 1of 2

Member present SPD/AL/JKS/PC/NSD

SN

Field Concern

Action concluded

Hyd malfunctioninng -control


valve/Release & releif valve

Magnetic stainer to be put at


Suction line
Release& release valve quality

Further Actions planed

Resp

Trgt date

Remarks

Sample procured, new design under development

R&D

10.12.14

Proto will be ready by 17.11.14

To study setup and implement the same, either on


vendor end or QA

QA

17.11.14

IT was concluded that testing facility at vendor end and


at QA shall be same

CRE 1200 kg to be implemented

UNDER IMPLEMENTATION

Matl/QA

2W Feb'14

NG Models are being made with CRE only

CA guide seal leak-post


modified

Design needs improvement in SC


tractors

ECN Implementation

Matl/QA

10-12/11.14

Only Modified CA Guide to be assemble with immediate


effect

Diff hsg breather leak /


ineffective breathing action

Integrated breather to be used existing breather is in effective

New breather under trails, prelimnary trial is OK

R&D

2w Dec'14

3dec 10 pcs

QA

contineous
process

Cutt off no - QAD-5518648

Hub brg - power steering 30206 breakage

Matl/QA

20.11.14

5
6

Pre loading process to be


standarized
Wheel thrown away after brg
breakage- spacer size to be
increased
Control valve mtg face Sq ness /

RV assy - control valve mtg stud


O ring dim & material / groove
leak
beproblem
checkedat assy
Hyd pump adopter leak from O depth/widh
CFT to studyto
the

To ensure the pre loading process as per SOP


Dim 53 changed to dim 40 mm to protect wheel comes
out - to be revisited - to be implemented
Analysis of failure was studied, porousity problem
apeared
Hyd Adopter design modified

ring

line

Power steering hard < 1000


rpm with tendom pump

Tendom pump flow 8.5 cc / rev &


AX series pump flow 9.0cc/rev Drawing of M/s Bosch approved Tendom pump with 10.9 CC to be explored

Radiator( high value) - conseq CFT observation is shaft of water Failed sample with proposed action sent to Xinchai on
failure a) water pump shaft
pump breakage subsequent to 14.8.14 - corrective action awaited
broken b) coolant resorvoir mtg
bearing failure - brg is of
Spare parts stock to be purchased from Allena only
at radiator breakage
inadequate strength
Radiator to be protected by
providing net gril till
improvement from Xinchai in
water pump get implemented

Proposal along with proto photo re sent to RD by PCtrial to be done

Coolant bottle mtg location to be


New location drg & proto ready by month end- trial by
changed

Plannet carrier (NRB 2016 fails


& conseq teeth damage )

NRB failure understodd due to


procurement from unauthorised
source
NRB 2016 to replaced with
Sintred bush

To ensure procurement of NRB 2016 from quality source


NRB to replace with cintred bush - further study to be
done

Failed items to be analysed metallurgically - report to


Spider kit strengthening to be
share & spectroscopic analysis to be done
explored -CFT analysed the failure

PDF created with pdfFactory trial version www.pdffactory.com

QA/R&D

implemented after consumption of stock 125


tractor
New design concept drawn, trial by 2w Dec'14

Mat/QA

18.11.14

Action taken details with cutt off nos awaited

Mat/R&D

4w Nov'14

Comprehensive action by Nov 14

PC

3.9.14

Spareparts

3.9.14

RD

6.9.14

Modifed sample expected in Nov 14 from


Xinchai
Drawing already approved

5 saples received, but not approved yet,


pending with R&D

RD

5.11.14

Matl

NA

Action already taken by quality source of


bearing

RD

NA

Dropped yet as action taken as above

QA

3.9.14

Ok

SN
10

Field Concern

Action concluded

Resp

Trgt date

Spider kit failures - pre mature


wearing of shaft

explored -CFT analysed the failure


Oil starvation observed - Scoop to be added for better
on 6.8.14
lubrication of Spider kit -ECN to be released

Further Actions planed

RD

17.11.14

Surface finish & cylindericity of


BP shaft to be improved

QA

3.9.14

ECN released - QA to submit report

11

Brake pedal Misaligned

Brake pedal being received in pair paired brake pedal to be painted & fitment in set

12

Sealing screw ( drain plug - Gb) ERN -209 /31.7.13 released

13

Battery Side shifting in AX


series

K- series & NG series already have Battery Side shifting in AX series to be done -ECN to
side batterry
release by 18th Aug -Implementation

14

Power steering tank leakfrom


breather

In effective breathing

15

Trumpet hsg - break from


Flange

16

Oil pressure switch

Low flange thickness & weaker


strengthening ribbs wrt to
compititors
Not working - post modified
failure

Sealing tape to be used

OK , if oil level is upto bottom marks - either marks to be


changed or bottle to be changed

Remarks

Done
Matl

Done

Implemented

QA

10.12.14

Intermediate action with low oil level

Wall thickness increased from 20mm to 23+1 mm sample received

Mal/QA

21.11.14

Price increase by 2kg per piece

Data for post modifed failure given - to be analysed

QA

Other issues
1

Trcebility of major items wrt


chassis no

To elliminate possibility of items


List of major 20 items provided - traceability to be work
mix up or claims agaisnt differrnt
out
chassis no

R&D /QA

Sticker on tractors how to


operate tractor on different
implement

to facilitate the customer to use


appropiate gear & engine rpm our eng rpm range is from 18002300 rpm

R&D /QA

mktg given the sample to R&D - to be work upon

NSD / 31.10.14