Client :
Contractor :
Welder's Name :
Project Area :
Consultant /TPIA :
Location :
Welder ID No.:
W.O.No.:
Observed Parameter
( Elec. Box ,TCof Elec.,Base Plate & MTC)
TC No. of Base Metal:
TC No. of Electrode Mf.:
Name of the Manufacturer :
Trade name
:
Product code
:
Electrode Spec.
:
AWS Classification
:
Electrode size
:
Electrode Batch No.
:
Date of Mfg.
:
Date of Expiry
:
Specified Amperes range by Mf.:
Specified Voltages range by Mf.:
Polarity
:
Test Position
:
Base Plate size
:
Root opening
:
Back Plate size
:
Angle of bevel
:
Included angle
:
Pre- Heat Temp.
:
Inter Pass Temp.
:
No.of Layers for complete the weld :
No.of passes for complete the each layer:
Calibration Certificate of welding Machine :
Calibration Certificate of Tongue Tester :
Consultant /TPIA :
Location :
Welder ID No.:
W.O.No.:
Observed Parameter
( Elec. Box ,TCof Elec.,Base Plate & MTC)
TC No. of Base Metal:
TC No. of Electrode Mf.:
Name of the Manufacturer :
Trade name
:
Product code
:
Electrode Spec.
:
AWS Classification
:
Electrode size
:
Electrode Batch No.
:
Date of Mfg.
:
Date of Expiry
:
Specified Amperes range by Mf.:
Specified Voltages range by Mf.:
Polarity
:
Test Position
:
Base Plate size
:
Root opening
:
Back Plate size
:
Angle of bevel
:
Included angle
:
Pre- Heat Temp.
:
Inter Pass Temp.
:
No.of Layers for complete the weld :
No.of passes for complete the each layer:
Calibration Certificate of welding Machine :
Calibration Certificate of Tongue Tester :
Current
Voltage
Pre Heat &
Pass per
Int.PassTemp
layer
Amper per pass
Average Volt.per pass
Average
1
PHT ..
1 2 3
I...., II .....
I, II .
2
IPT
1 2 3
I...., II .....
I, II .
3
IPT
1 2 3
I...., II .....
I, II .
4
IPT
1 2 3
I...., II .....
I, II .
5
IPT
1 2 3
I...., II .....
I, II .
6
IPT
1 2 3
I...., II .....
I, II .
7
IPT
1 2 3
I...., II .....
I, II .
8
IPT
1 2 3
I...., II .....
I, II .
Note :- 1- A welded Test assembly more than 5deg of the plan is Discarded
2-Straighteningof welded test assembly is prohibited
3-Test plate Identification -Hard Stamped on the surface of test plate by the TPIA as..
Contractor QA/QC
TPI - ICS
MGL-QA
Sign :
Sign :
Sign :
Name :
Name :
Name :
Date :
Date :
Date :
Nos. of
Layer
Remark if any
Page 1 of 2
TPIA :
Name of the Lab
W.O.No.:
Electrode Speceification
Accepted
Not Accept
Note:-RT sould be taken without back Plate & RT Film sould be reveiwed buy TPI as per SFA 5.1 / SFA 5.5
2-Required Specimen
Req. Quqntity
Offered Quantity
Specimen Identification
Remark
Certificate No.
Calib. Date
Expiry Date
Remark
Gauge Dia
(D)
6.40 0.13
12.70 0.25
Gauge length
(G)
25.40 0.13
50.80 0.13
Length Section
(C)
32
57
Dia of Sep.
( B)
9.5
19
Radious
F minimum
4.8
9.5
Remark
Observed
Length
Width
Thickness
Depth of Notch
Notch angle
Notch Rad.
55.0 +0 -2.5
10.0 0.025
10 0.025
20.025
45 1
0.2550.025
Observed
Contractor QA/QC
TPI - ICS
Client-QA/QC
Sign
Sign
Sign :
Name
Name :
Name :
Remark
Date
Date
Date :
Page 2 of 2
TPIA :
Name of the Lab
Project Area :
Electrode Mf.
Electrode Class & Size
W.O.No.:
Electrode Speceification
Electrode Batch No.
Classification
Aging Temp.
Holding time
Cooling
Temp.
5.1
E6010 , E7015,
E7016, E7018
95 to 105C
48 2 hours
Air Cooling
Amb.temp.
5.5
E7010G, E7010P1
95 to 105C
48 2 hours
Air Cooling
Amb.temp.
Required
Remark
Observed
Required
Tensile
Strength
414MPa
Classification
E6010
E7015, E7016,
E7018
E7010G
E7010P1
482MPa
480 MPa
480 MPa
Yield Strength
Elongation
at 0.2% Offset in percentage
313MPa
22
399MPa
390 MPa
415MPa
22
22
22
Singe value
Minimum
Soaking
Temp.
Remark
Observed
Classification
5.1
5.5
5.5
E6010 , E7015,
E7016 , E7018
E7010G
E7010P1
Required
Observed
Avrage Value
Minimum
27Jule
27Jule
20 Jule
30C
Not specified
20 Jule
30C
12345-
Note - A Both the highest and lowest test values obtained shall be disregarded in computing the average.
Remark
Contractor QA/QC
TPI - ICS
Client-QA/QC
Soaking
Time
5 minuts
5 minuts
Remark
Sign
:
Name :
Date :
Sign
:
Name :
Date :
Sign :
Name :
Date :