You are on page 1of 4

(http://m.bisnis.

com/en)

Front Page (http://m.bisnis.com/en) Current Issues (http://m.bisnis.com/en/current-issues) Market


& Corporate (http://m.bisnis.com/en/market-and-corporate) Economy
(http://m.bisnis.com/en/economy) Business (http://m.bisnis.com/en/business ) Consumer
(http://m.bisnis.com/en/consumer) Infocommercial (http://m.bisnis.com/en/infocommercial) Index
(http://m.bisnis.com/en/index) All Channel (http://m.bisnis.com/en/channels) Indonesia Version
(http://m.bisnis.com/)
Tuesday, March 04 2014
Monday, February 24 2014, 4:10 AM

Six Toll Roads Construction in Early 2015


Dimas Novita Sari, Elok Ani Riani

Share: Twitter (http://twitter.com/share?


text=Six+Toll+Roads+Construction+in+Early+2015&url=http://m.bisnis.com/en/read/20140224/94/25033/sixtoll-roads-construction-in-early2015&via=bisniscom) | Facebook
(http://www.facebook.com/sharer.php?
u=http%3A%2F%2Fm.bisnis.com%2Fen%2Fread%2F20140224%2F94%2F25033%2Fsixtoll-roads-construction-in-early-2015&t=Six Toll
Roads Construction in Early 2015) | Follow Us
(https://twitter.com/intent/user?
screen_name=Bisniscom) | Mail

JAKARTAPT Jakarta Tollroad Development (JTD) estimated the physical construction of six toll
roads project in Jakarta can only be done as quickly as possible in early 2015, since this year is
a political year.
JTD Head of Communication Division Ngurah Wirawan said the decision was made by capital
city situation that will be preoccupied with a political agenda.

The point in an investment, we have to look at the project sustainability. We dont want the
project stop in the middle and would lead to greater losses, such as congestion and others, he
told Bisnis, Sunday (2/23).
In addition, the company also still needs time to finalize financial closing by the lender. Currently,
JTD still exploring credit agreement with a banks syndicate led by Bank Mandiri.
He said some of the credit agreement terms and conditions are being discussed until to be
signed in September.
So the signing of the toll road concession agreements (PPJT) is next month, while waiting land
acquisition, thus construction begins at the beginning of next year, he said.
Meanwhile the drawdown will take place when the construction process begins, while during the
preparation for the construction, management will allocate equity capital base of the project.
Still according to the original plan, the first phase, the company will build the first two priority
segments of Semanan-Sunter and Sunter-Pulo Gebang to be done simultaneously.
So we will build Semanan-Sunter first. It takes investment IDR8 trillion. Now we are ready to
allocate IDR1 trillion from shareholders, he said.
As reported, Jakarta region-owned enterprise (BUMD), the toll Road Company as well as
construction SOEs joins the JTD. BUMD that have a 78% stake JTD are PT Jakarta Propertindo,
PT Jaya Konstruksi Mangala Pratama Tbk., PT Pembangunan Jaya Ancol Tbk., PT Jaya Real
Property Tbk., And PT Jaya Land.
And then PT Wijaya Karya Tbk, PT Citra Marga Nusaphala Persada Tbk, PT Pembangunan
Perumahan Tbk, PT Hutama Karta and PT Adhi Karya Tbk controlled 22%.
Still Be Prepared
On the other hand, Head of Toll Road Regulatory Agency (BPJT) Ahmad Ghani Ghazaly said
currently concession agreement was set to accommodate an agreement between the
government and business entities related to projects totaling IDR41, 2 trillion.
In addition, JTD credit agreement with banks syndicate also continues to be studied in order to
convince banks syndicate to provide loans. "The drawdown foundation has not met, he said.
Nevertheless, he is optimistic projects that had been rejected by Jakarta Governor Joko Widodo
can run smoothly, although this time the monorail project was having problems.
Earlier, Governor Joko Widodo said highway construction will commence after the construction
of the MRT and monorail done.
The project is still running. All licenses relating to the province is already done. Now only
waiting the permission of the Minister of Public Works, he explained.
The toll road project along 69.77 km is divided into six sections namely Semanan-Sunter 20.23
km, Sunter-Pulo Gebang 9.44 km, and Duri Pulo-Kp Malay 12.65 km. Then Ulujami-Tanah
Abang 8.7 km, Kemayoran-Kp 9.60 miles Malay, Pasar Minggu-Casablanca 9.15 km.

Editor : Taufik Wisastra

Share: Twitter (http://twitter.com/share?


text=Six+Toll+Roads+Construction+in+Early+2015&url=http://m.bisnis.com/en/read/20140224/94/25033/sixtoll-roads-construction-in-early2015&via=bisniscom) | Facebook
(http://www.facebook.com/sharer.php?
u=http%3A%2F%2Fm.bisnis.com%2Fen%2Fread%2F20140224%2F94%2F25033%2Fsixtoll-roads-construction-in-early-2015&t=Six Toll
Roads Construction in Early 2015) | Follow Us
(https://twitter.com/intent/user?
screen_name=Bisniscom) | Mail
Sponsored links

RELATED
Five Infrastructure Projects in Batam Inaugurated
(http://m.bisnis.com/en/read/20140304/94/25415/five-infrastructure-projects-in-batam-inaugurated)
Private Sectors Should Not Take Responsibility on Infrastructure
(http://m.bisnis.com/en/read/20140304/94/25389/private-sectors-should-not-take-responsibility-oninfrastructure)
Infrastructure Availability Spurs Productivity, says Djoko Kirmanto
(http://m.bisnis.com/en/read/20140303/94/25375/infrastructure-availability-spurs-productivity-saysdjoko-kirmanto)

POPULAR
Mini Papaya to be Leading Commodity in Balikpapan
(http://m.bisnis.com/en/read/20140202/98/24143/mini-papaya-to-be-leading-commodity-in-balikpapan)
Citilink Applies Passenger Service Charge On Ticket
(http://m.bisnis.com/en/read/20140202/97/24144/citilink-applies-passenger-service-charge-on-ticket)
Pelindo IV, Paser Govt develop a new port (http://m.bisnis.com/en/read/20140202/97/24148/pelindoiv-paser-govt-develop-a-new-port)

EDITOR'S CHOICE
E-Commerce Bill Will be Passed (http://m.bisnis.com/en/read/20140304/100/25383/e-commerce-billwill-be-passed)
Ministry of Public Works pessimistic about land acquisition completion
(http://m.bisnis.com/en/read/20140304/94/25384/ministry-of-public-works-pessimistic-about-landacquisition-completion)
Indonesia Books 2.31% Lower Industrial Product Export
(http://m.bisnis.com/en/read/20140304/95/25386/indonesia-books-2.31-lower-industrial-productexport)

Front Page (http://m.bisnis.com/en) Current Issues (http://m.bisnis.com/en/current-issues) Market


& Corporate (http://m.bisnis.com/en/market-and-corporate) Economy
(http://m.bisnis.com/en/economy) Business (http://m.bisnis.com/en/business ) Consumer
(http://m.bisnis.com/en/consumer) Infocommercial (http://m.bisnis.com/en/infocommercial) Index
(http://m.bisnis.com/en/index) All Channel (http://m.bisnis.com/en/channels)
Up Other News (http://m.bisnis.com/en/index) Indonesia Version (http://m.bisnis.com/)
Sponsored links

Copyright 2014 Bisnis Indonesia Group.


View Full Site (http://business.bisnis.com/?rever=mo)
Page rendered in 0.8721 seconds.

You might also like