BPHB/SIPSB
MONTHLY PROGRESS REPORT
CONTRACT NO:SPMU/05/2013
THE CONSTRUCTION AND COMPLETION OF PROPOSED
SAMALAJU PORT DEVELOPMENT PROJECT AT SAMALAJU,
BINTULU, SARAWAK, MALAYSIA
ON-SHORE FACILITIES PACKAGE FOR PHASE 1 WORKS
ENGINEERING CONSULTANT
KTA ( Sarawak ) Sdn Bhd
Lot 8650-8653, Section 64,
Jalan Simpang Tiga
93300 Kuching
Sarawak
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
TABLE OF CONTENTS
1. PROJECT DESCRIPTION
2. SCOPE OF PROJECT
3. CONTRACT PARTICULARS
4. PROGRESS SUMMARY
4.1.
4.2.
Physical Progress
4.2.1.
4.3.
4.3.1.
APPENDICES:
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Progress Photos
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
1.
PROJECT DESCRIPTION
The project involved the construction and completion of proposed
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
2.
SCOPE OF PROJECT
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
3.
CONTRACT PARTICULARS
Contract Title
Contract No.
: SPMU/05/2013
Client
Engineering Consultant
Main Contractor
: RM 122,284,883.19
Possession of Site
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
4.
PROGRESS SUMMARY
4.1
: 24 Months
Week Elapsed
8 weeks
ii)
Months Elapsed
2 months
4.2
8.33 %
PHYSICAL PROGRESS
CUMMULATIVE
PROGRESS
Previous Month
(%)
31st December
2013 ( % )
SCHEDULE
0.00
0.83
ACTUAL
0.80
0.87
Actual Variance
(%)
0.04
4.2.1
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
CONTRACT NO: SPMU/05/2013
4.2.1 Physical Work Progress Summary
5.4
6.0
7.0
8.0
9.0
10.0
111,246,584.38
WT. AVE.
1.0
1.1
1.2
5.3
111,246,584.38
previous
=
=
=
=
Wt %
previous
ACTUAL:
(%)
present
to date
Wt %
STATUS
( + = ahead )
( - = delay )
1.039
15.005
0.00%
0.00%
0.00%
0.00%
1.34%
5.33%
0.01%
0.80%
0.00%
5.33%
1.29%
0.38%
1.29%
5.71%
0.01%
0.86%
0.00%
0.06%
0.470
0.00%
0.00%
4.10%
0.02%
0.00%
0.00%
0.00%
0.00%
-0.02%
0.343
17.653
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.125
3.758
0.398
0.169
0.169
0.562
1.175
0.152
1.912
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.284
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
12.625
23.564
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.187
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.826
2.175
5.925
2.435
0.033
0.016
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.87%
0.04%
100.00
0.83%
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
4.3
FINANCIAL PROGRESS
CUMMULATIVE
PROGRESS
Previous Month
(%)
31st December
2013 ( % )
SCHEDULE
1.53
3.22
ACTUAL
2.26
3.26
Actual Variance
(%)
0.04
The total Financial Cumulative progress for the month is 0.04 % ahead
of the project schedule.
4.3.1
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
CONTRACT NO: SPMU/05/2013
4.3.1 Financial Work Progress Summary
122,284,883.19
122,284,883.19
WT. AVE.
1.1
1.2
1.3
0.62
0.01
2.45
previous
100.00%
49.18%
25.00%
1.4
Procurement of Materials
Record of Works
Shop Drawings and As-built Documentations
Clearing Up of Site
Mobilisation and Demobilisation
Total (General)
Total (Physical)
Grand Total (Financial)
5.13
4.11%
4.25%
0.02
0.02
0.02
0.32
8.58
91.42
100.00
4.11%
0.00%
0.00%
25.00%
17.79%
0.00%
1.53%
4.25%
0.00%
0.00%
25.83%
10.88%
0.83%
1.70%
1.5
1.6
1.7
1.8
=
=
=
=
ACTUAL:
(%)
present
to date
0.00%
100.00%
1.65%
50.83%
25.83%
50.83%
Wt %
0.62%
0.01%
1.24%
previous
100.00%
49.18%
25.00%
8.36%
0.43%
4.11%
4.25%
8.36%
0.00%
0.00%
50.83%
28.68%
0.83%
3.22%
0.00%
0.00%
0.00%
0.16%
2.46%
0.76%
3.22%
4.11%
0.00%
0.00%
25.00%
17.79%
0.80%
2.26%
4.25%
0.00%
0.00%
25.83%
10.88%
0.07%
1.00%
Wt %
0.62%
0.01%
1.24%
STATUS
( + = ahead )
( - = delay )
0.00%
0.00%
0.00%
8.36%
0.43%
0.00%
8.36%
0.00%
0.00%
50.83%
28.68%
0.87%
3.26%
0.00%
0.00%
0.00%
0.16%
2.46%
0.80%
3.26%
0.00%
0.00%
0.00%
0.00%
0.00%
0.04%
0.04%
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix A
A Locality Plan
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix B
On-shore Facilities Layout Plan
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix C
Contractor's Master Work Programme
The Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak - Onshore Facilities Package for Phase 1 Works
ID
Task Name
Duration
Start
Finish
2014
O
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
626 days
Fri 01/11/13
Sat 31/10/15
0 days
129 days
103 days
103 days
129 days
553 days
553 days
273 days
30 days
100 days
100 days
100 days
200 days
363 days
30 days
120 days
120 days
120 days
220 days
493 days
45 days
150 days
150 days
150 days
260 days
540 days
540 days
40 days
396 days
396 days
396 days
500 days
500 days
33 days
278 days
278 days
278 days
467 days
467 days
35 days
360 days
360 days
360 days
432 days
252 days
Fri 01/11/13
Fri 01/11/13
Fri 01/11/13
Fri 01/11/13
Fri 01/11/13
Fri 06/12/13
Fri 06/12/13
Fri 06/12/13
Fri 06/12/13
Sat 01/03/14
Sat 01/03/14
Sat 01/03/14
Sat 01/03/14
Fri 10/01/14
Fri 10/01/14
Thu 26/06/14
Thu 26/06/14
Thu 26/06/14
Thu 26/06/14
Fri 14/02/14
Fri 14/02/14
Thu 13/11/14
Thu 13/11/14
Thu 13/11/14
Thu 13/11/14
Fri 06/12/13
Fri 06/12/13
Fri 06/12/13
Wed 22/01/14
Wed 22/01/14
Wed 22/01/14
Wed 22/01/14
Wed 22/01/14
Wed 22/01/14
Sat 01/03/14
Sat 01/03/14
Sat 01/03/14
Sat 01/03/14
Sat 01/03/14
Sat 01/03/14
Fri 11/04/14
Fri 11/04/14
Fri 11/04/14
Fri 11/04/14
Fri 06/12/13
Fri 01/11/13
Mon 31/03/14
Fri 28/02/14
Fri 28/02/14
Mon 31/03/14
Fri 11/09/15
Fri 11/09/15
Mon 20/10/14
Thu 09/01/14
Wed 25/06/14
Wed 25/06/14
Wed 25/06/14
Mon 20/10/14
Mon 09/03/15
Thu 13/02/14
Wed 12/11/14
Wed 12/11/14
Wed 12/11/14
Mon 09/03/15
Fri 11/09/15
Mon 07/04/14
Wed 06/05/15
Wed 06/05/15
Wed 06/05/15
Fri 11/09/15
Thu 27/08/15
Thu 27/08/15
Tue 21/01/14
Tue 28/04/15
Tue 28/04/15
Tue 28/04/15
Thu 27/08/15
Thu 27/08/15
Fri 28/02/14
Mon 19/01/15
Mon 19/01/15
Mon 19/01/15
Thu 27/08/15
Thu 27/08/15
Thu 10/04/14
Thu 04/06/15
Thu 04/06/15
Thu 04/06/15
Thu 27/08/15
Thu 25/09/14
72 days
144 days
144 days
144 days
180 days
Fri 06/12/13
Fri 28/02/14
Fri 28/02/14
Fri 28/02/14
Fri 28/02/14
Thu 27/02/14
Thu 14/08/14
Thu 14/08/14
Thu 14/08/14
Thu 25/09/14
2015
J
26 days
120 days
160 days
43 days
56 days
56 days
30 days
30 days
56 days
84 days
Critical
Slack
Rolled Up Critical
Inactive Summary
Start-only
Critical Split
Slippage
External Tasks
Manual Task
Finish-only
Task
Summary
External Milestone
Duration-only
Progress
Split
Project Summary
Inactive Task
Deadline
Milestone
Rolled Up Critical
Inactive Milestone
Manual Summary
Page 1
The Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak - Onshore Facilities Package for Phase 1 Works
ID
Task Name
Duration
Start
Finish
2014
O
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
Drainage Work
Surface Drain
Pipe Culverts
RC Box Culverts
Sediment Tank
Sediment Tank C1
Sediment Tank A1 & B1
Transfer Pump Room
Fence and Gate
Building Work
Warehouse Type 1 (Enclosed)
Piling Works
Work Below Lower Floor Finishes
Frame
Upper Floor
Roof
Wall and Partitions
External Wall
Internal Wall And Partition
Doors and Windows
Finishes
Floor Finishes
Wall Finishes
Ceiling Finishes
Miscellaneous Work
Sanitary Wares and Fittings
Built-in Furniture
Warehouse Type 2 (Open)
Piling Works
Work Below Lower Floor Finishes
Frame
Roof
External Wall
Doors
Finishes
Floor Finishes
Wall Finishes
CUB 1
Piling Works
Work Below Lower Floor Finishes
Frame
Roof
Wall
External Wall
Internal Wall
Doors and Windows
Finishes
Floor Finishes
Wall Finishes
Miscellaneous Work
CUB 2
Work Below Lower Floor Finishes
Frame
464 days
380 days
200 days
306 days
268 days
90 days
178 days
90 days
28 days
496 days
315 days
45 days
40 days
30 days
40 days
40 days
60 days
60 days
60 days
60 days
30 days
30 days
30 days
30 days
60 days
30 days
30 days
205 days
45 days
40 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
175 days
30 days
40 days
15 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
150 days
40 days
20 days
Wed 07/05/14
Wed 06/08/14
Wed 06/08/14
Wed 07/05/14
Wed 06/08/14
Wed 06/08/14
Wed 19/11/14
Mon 15/06/15
Mon 28/09/15
Tue 01/04/14
Wed 29/10/14
Wed 29/10/14
Sat 20/12/14
Thu 05/02/15
Thu 12/03/15
Tue 28/04/15
Sat 13/06/15
Sat 13/06/15
Sat 13/06/15
Sat 13/06/15
Sat 22/08/15
Sat 22/08/15
Sat 22/08/15
Sat 22/08/15
Sat 22/08/15
Sat 22/08/15
Sat 26/09/15
Sat 20/12/14
Sat 20/12/14
Wed 11/02/15
Mon 30/03/15
Mon 04/05/15
Mon 08/06/15
Mon 08/06/15
Mon 13/07/15
Mon 13/07/15
Mon 13/07/15
Mon 09/06/14
Mon 09/06/14
Mon 14/07/14
Fri 29/08/14
Tue 16/09/14
Tue 21/10/14
Tue 21/10/14
Tue 21/10/14
Tue 21/10/14
Tue 25/11/14
Tue 25/11/14
Tue 25/11/14
Tue 25/11/14
Tue 30/12/14
Tue 30/12/14
Sat 14/02/15
2015
J
Thu 29/10/15
Thu 22/10/15
Thu 26/03/15
Tue 28/04/15
Sat 13/06/15
Tue 18/11/14
Sat 13/06/15
Sat 26/09/15
Thu 29/10/15
Fri 30/10/15
Fri 30/10/15
Fri 19/12/14
Wed 04/02/15
Wed 11/03/15
Mon 27/04/15
Fri 12/06/15
Fri 21/08/15
Fri 21/08/15
Fri 21/08/15
Fri 21/08/15
Fri 25/09/15
Fri 25/09/15
Fri 25/09/15
Fri 25/09/15
Fri 30/10/15
Fri 25/09/15
Fri 30/10/15
Sat 15/08/15
Tue 10/02/15
Sat 28/03/15
Sat 02/05/15
Sat 06/06/15
Sat 11/07/15
Sat 11/07/15
Sat 15/08/15
Sat 15/08/15
Sat 15/08/15
Mon 29/12/14
Sat 12/07/14
Thu 28/08/14
Mon 15/09/14
Mon 20/10/14
Mon 24/11/14
Mon 24/11/14
Mon 24/11/14
Mon 24/11/14
Mon 29/12/14
Mon 29/12/14
Mon 29/12/14
Mon 29/12/14
Mon 22/06/15
Fri 13/02/15
Mon 09/03/15
N
D
2 days
38 days
30 days
2 days
2 days
1 day
30 days
30 days
30 days
Critical
Slack
Rolled Up Critical
Inactive Summary
Start-only
Critical Split
Slippage
External Tasks
Manual Task
Finish-only
Task
Summary
External Milestone
Duration-only
Progress
Split
Project Summary
Inactive Task
Deadline
Milestone
Rolled Up Critical
Inactive Milestone
Manual Summary
Page 2
The Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak - Onshore Facilities Package for Phase 1 Works
ID
Task Name
Duration
Start
Finish
2014
O
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
Roof
Wall
External Wall
Internal Wall
Doors and Windows
Finishes
Floor Finishes
Wall Finishes
Miscellaneous Work
CUB 3
Work Below Lower Floor Finishes
Frame
Roof
Wall
External Wall
Internal Wall
Doors and Windows
Finishes
Floor Finishes
Wall Finishes
Miscellaneous Work
CUB 4
Piling Works
Work Below Lower Floor Finishes
Frame
Roof
Wall
External Wall
Internal Wall
Doors and Windows
Finishes
Floor Finishes
Wall Finishes
Miscellaneous Work
Check Point Building
Work Below Lower Floor Finishes
Frame
Upper Floor
Roof
Wall and Partitions
External Wall
Internal Wall and Partition
Staircase
Doors and Windows
Finishes
Floor Finishes
Wall Finishes
Ceiling Finishes
Miscellaneous Work
Weigh Bridge (2 Nos.)
Weight Bridge Structure
Hot-dip Galvanished Steelworks
Drainage Works
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
150 days
40 days
20 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
230 days
30 days
40 days
20 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
190 days
45 days
25 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
30 days
29 days
110 days
50 days
30 days
30 days
Tue 10/03/15
Tue 14/04/15
Tue 14/04/15
Tue 14/04/15
Tue 14/04/15
Tue 19/05/15
Tue 19/05/15
Tue 19/05/15
Tue 19/05/15
Tue 14/04/15
Tue 14/04/15
Sat 30/05/15
Tue 23/06/15
Tue 28/07/15
Tue 28/07/15
Tue 28/07/15
Tue 28/07/15
Tue 01/09/15
Tue 01/09/15
Tue 01/09/15
Tue 01/09/15
Mon 14/07/14
Mon 14/07/14
Wed 15/10/14
Mon 01/12/14
Wed 24/12/14
Wed 28/01/15
Wed 28/01/15
Wed 28/01/15
Wed 28/01/15
Wed 04/03/15
Wed 04/03/15
Wed 04/03/15
Wed 04/03/15
Tue 01/04/14
Tue 01/04/14
Fri 23/05/14
Sat 21/06/14
Sat 26/07/14
Sat 30/08/14
Sat 30/08/14
Sat 30/08/14
Sat 30/08/14
Sat 30/08/14
Sat 04/10/14
Sat 04/10/14
Sat 04/10/14
Sat 04/10/14
Mon 06/10/14
Sat 08/11/14
Sat 08/11/14
Tue 06/01/15
Tue 10/02/15
2015
J
Mon 13/04/15
Mon 18/05/15
Mon 18/05/15
Mon 18/05/15
Mon 18/05/15
Mon 22/06/15
Mon 22/06/15
Mon 22/06/15
Mon 22/06/15
Mon 05/10/15
Fri 29/05/15
Mon 22/06/15
Mon 27/07/15
Mon 31/08/15
Mon 31/08/15
Mon 31/08/15
Mon 31/08/15
Mon 05/10/15
Mon 05/10/15
Mon 05/10/15
Mon 05/10/15
Tue 07/04/15
Sat 16/08/14
Sat 29/11/14
Tue 23/12/14
Tue 27/01/15
Tue 03/03/15
Tue 03/03/15
Tue 03/03/15
Tue 03/03/15
Tue 07/04/15
Tue 07/04/15
Tue 07/04/15
Tue 07/04/15
Fri 07/11/14
Thu 22/05/14
Fri 20/06/14
Fri 25/07/14
Fri 29/08/14
Fri 03/10/14
Fri 03/10/14
Fri 03/10/14
Fri 03/10/14
Fri 03/10/14
Fri 07/11/14
Fri 07/11/14
Fri 07/11/14
Fri 07/11/14
Fri 07/11/14
Mon 16/03/15
Mon 05/01/15
Mon 09/02/15
Mon 16/03/15
1 day
1 day
23 days
23 days
30 days
30 days
30 days
30 days
5 days
5 days
5 days
21 days
Critical
Slack
Rolled Up Critical
Inactive Summary
Start-only
Critical Split
Slippage
External Tasks
Manual Task
Finish-only
Task
Summary
External Milestone
Duration-only
Progress
Split
Project Summary
Inactive Task
Deadline
Milestone
Rolled Up Critical
Inactive Milestone
Manual Summary
Page 3
The Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak - Onshore Facilities Package for Phase 1 Works
ID
Task Name
Duration
Start
Finish
2014
O
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
Water Reticulation
External Water Reticulation
0.5ML RC Elevated Water Tank
Elevated Water Tank Pipework
Inlet pipework to Elevated Water Tank
Outlet pipework
Overflow pipeworks
Scour pipework
Civil Engineering Works
Access Road Road (Road 1,2,3 and 3a)
Flexible Pavement
Subgrade
Subbase
Roadbase
Asphaltic concrete binder course
Asphaltic concrete wearing course
Furniture
Traffic Signage
Pavement Marking
Road Kerb
Traffic Signal System
Modification works at existing main road
Platforming
Zone 1
Flexible Pavement
Subgrade
Subbase
Roadbase
Asphaltic concrete binder course
Asphaltic concrete wearing course
Zone 2
Flexible Pavement
Subgrade
Subbase
Roadbase
Asphaltic concrete binder course
Asphaltic concrete wearing course
Conveyor Belt Corridor and Gravel-Surfaced Service
Road
Flexible Pavement
Subgrade
Subbase
Security Fencing
Miscellaneous Work
Reinforced Concrete Fire Fighting Tank
High Masts
Manholes
Barrier Post (500 Nos.)
Other Foundations
Mechanical Works
Air conditioning & Mechanical Ventilation Services
Fire Protection Services
Plumbing Services
395 days
286 days
200 days
150 days
150 days
150 days
150 days
150 days
380 days
205 days
190 days
30 days
50 days
50 days
30 days
30 days
125 days
45 days
30 days
125 days
45 days
45 days
245 days
160 days
160 days
20 days
35 days
35 days
30 days
40 days
140 days
140 days
20 days
30 days
30 days
30 days
30 days
120 days
Sat 26/07/14
Mon 01/12/14
Sat 26/07/14
Tue 17/03/15
Tue 17/03/15
Tue 17/03/15
Tue 17/03/15
Tue 17/03/15
Fri 15/08/14
Sat 07/03/15
Sat 07/03/15
Sat 07/03/15
Sat 11/04/15
Tue 09/06/15
Thu 06/08/15
Thu 10/09/15
Tue 09/06/15
Thu 10/09/15
Mon 28/09/15
Tue 09/06/15
Thu 10/09/15
Thu 10/09/15
Tue 20/01/15
Wed 29/04/15
Wed 29/04/15
Wed 29/04/15
Fri 22/05/15
Thu 02/07/15
Wed 12/08/15
Wed 16/09/15
Tue 20/01/15
Tue 20/01/15
Tue 20/01/15
Thu 12/02/15
Thu 19/03/15
Thu 23/04/15
Thu 28/05/15
Fri 15/08/14
120 days
60 days
60 days
155 days
383 days
104 days
370 days
370 days
74 days
370 days
295 days
295 days
295 days
295 days
2015
J
Thu 29/10/15
Thu 29/10/15
Mon 16/03/15
Mon 07/09/15
Mon 07/09/15
Mon 07/09/15
Mon 07/09/15
Mon 07/09/15
Sat 31/10/15
Sat 31/10/15
Wed 14/10/15
Fri 10/04/15
Mon 08/06/15
Wed 05/08/15
Wed 09/09/15
Wed 14/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Sat 31/10/15
Thu 21/05/15
Wed 01/07/15
Tue 11/08/15
Tue 15/09/15
Sat 31/10/15
Wed 01/07/15
Wed 01/07/15
Wed 11/02/15
Wed 18/03/15
Wed 22/04/15
Wed 27/05/15
Wed 01/07/15
Thu 01/01/15
N
D
2 days
2 days
21 days
21 days
5 days
5 days
30 days
18 days
5 days
18 days
5 days
5 days
Critical
Slack
Rolled Up Critical
Inactive Summary
Start-only
Critical Split
Slippage
External Tasks
Manual Task
Finish-only
Task
Summary
External Milestone
Duration-only
Progress
Split
Project Summary
Inactive Task
Deadline
Milestone
Rolled Up Critical
Inactive Milestone
Manual Summary
Page 4
The Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak - Onshore Facilities Package for Phase 1 Works
ID
Task Name
Duration
Start
Finish
2014
O
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
Electrical Works
CUB 1
CUB 2
CUB 3
CUB 4
Warehouse 1 (enclosed)
Warehouse 2 (open)
On-shore Infrastructure Works
Check Point Building
Boom Gate Control System, CCTV System and
Intercom System
Weigh Bridge System
Telephone Works
Checkpoint Building
Warehouse 1
ICT Structured Cabling System
Checkpoint Building
Warehouse 1
Testing and Commissioning 1
Partial Handover (Road CB)
Partial Handover (Platform Zone 2 )
Testing and Commissioning 2
Final Handover
299 days
60 days
30 days
45 days
60 days
50 days
50 days
105 days
30 days
105 days
Sat 08/11/14
Tue 25/11/14
Tue 19/05/15
Tue 01/09/15
Tue 23/06/15
Sat 22/08/15
Mon 13/07/15
Tue 23/06/15
Sat 08/11/14
Tue 23/06/15
2015
J
Thu 22/10/15
Mon 02/02/15
Mon 22/06/15
Thu 22/10/15
Mon 31/08/15
Mon 19/10/15
Tue 08/09/15
Thu 22/10/15
Fri 12/12/14
Thu 22/10/15
N
1 day
30 days
1 day
31 days
4 days
39 days
1 day
1 day
21 days
29 days
Critical
Slack
Rolled Up Critical
Inactive Summary
Start-only
Critical Split
Slippage
External Tasks
Manual Task
Finish-only
Task
Summary
External Milestone
Duration-only
Progress
Split
Project Summary
Inactive Task
Deadline
Milestone
Rolled Up Critical
Inactive Milestone
Manual Summary
Page 5
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix D
Contractor Site Organization Chart
ORGANIZATION CHART
KACC PROJECT EXCO
Ir. Hj. SAFUANI BIN ABDUL HAMID
Ar. LAWRENCE KONG LEE LUANG
MR. ARNEL R. ASCOTIA
MR. JONATHAN HO
CONTRACT MANAGER
MR. YUSMAN JUMAT
FINANCE MANAGER
MDM. TIE SIEW HUONG
QA/QC MANAGER
MR. CHONG CHEE HIAN
QUANTITY SURVEYOR
MR. ADE ZAPRIL JOHAR MARZUKI
ADMIN EXECUTIVE
MDM. SHARIFAH DEWI WAN OTHMAN
ACCOUNT EXECUTIVE
MDM. HAZLYNNDA KONG ABDULLAH
Site
KACC PROJECT SITE OFFICE
SITE AGENT
MR. JOSEPH LING HEW YONG
PROJECT ENGINEER
MR. BRYAN RODY DOMINIC
ADMIN CLERK
TBA
PROJECT MANAGER
MR. LEE KIE CHIONG
QUANTITY SURVEYOR
MR. ROLAN O. BETON
ASST. QUANTITY SURVEYOR
MR. MOHAMMAD FATHULLAH B.
RADUAN
STORE KEEPER
MR. DICKSON TONG KOH
MR SAIPUL ALIUDIN
CLERK
MDM. MIMI Ak. JAING
CHIEF MECHANIC
TBA
MECHANIC 12 PERSONS
PROJECT ENGINEER
MR. AWANG FIRDAUS B. AWANG AEMERAN
ADMIN CLERK
MDM. JOCELLE AHORRO
DIALOJA
SITE ENGINEER
MR. TING KUANG MING
SAFETY OFFICER
MR. VICTOR MENGGONG
M&E COORDINATOR
MR. LAU CHI KIH
M&E ENGINEER
MR. LUWEI Ak. JOSEPH
ASST. M&E ENGINEER
MR. AZAHARIE B. OTHMAN
LAB TECHNICIAN
TBA
ASST. LAB TECHNICIAN
MR. DESMOND Ak.
JEMPAU
LAB HELPER
-4 PERSONS
SURVEYOR
MR. RAMDHAN B.
MANSHUR
ASST. SURVEYOR
MR. HASDY MORSHIDI
MR. MUT Ak. MALEH
CHAINMEN
-6 PERSONS
M&E SUPERVISOR
MR. DAVID WONG
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix E
Physical & Financial S-Curves
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
CONTRACT NO: SPMU/05/2013
PERCENTAGE ( % )
70.0
60.0
50.0
40.0
30.0
MWP. REV.1
20.0
ACTUAL
10.0
Nov
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
0.00
0.83
1.25
2.17
3.29
4.47
6.00
7.60
9.36
12.39
15.02
17.85
21.55
25.78
30.35
37.20
45.61
54.19
66.65
77.57
82.81
89.24
95.39
100.00
CUMMULATIVE ACTUAL
0.80
0.87
DIFFERENCE
0.80
0.04
0.00
0.83
0.41
0.92
1.13
1.18
1.53
1.60
1.77
3.02
2.63
2.83
3.70
4.23
4.57
6.85
8.41
8.58
12.46
10.92
5.23
6.44
6.15
4.61
MONTHLY ACTUAL
0.80
0.07
DIFFERENCE
0.80
-0.76
Aug
Mar
Jun
Feb
Apr
Oct
Sep
Jul
May
Mar
Feb
Jan
Dec
Nov
Jan
Aug
Dec
Jun
Nov
Apr
Oct
Sep
Jul
May
Mar
Feb
Jan
Nov
Dec
0.0
DURATION
YEAR
2013
MONTH
2014
2015
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
2 Earthwork
2.1 Access Road (Road 1,2,3 and 3a)
2.1.1 Site clearing
0.01
0.02
0.02
0.02
0.00
21.14
46.34
69.11
94.31
100.00
0.07
0.01
0.00
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.00
0.00
7.18
14.12
21.30
28.24
35.42
42.59
49.54
56.71
63.66
70.83
78.01
84.49
91.67
98.61
100.00
A
2.1.2 Roadway Excavation
20.27
0.34
S
A
A
2.1.3 Embankment
0.51
0.00
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.03
0.04
0.04
0.01
0.00
7.18
14.12
21.30
28.24
35.42
42.59
49.54
56.71
63.66
70.83
78.01
84.49
91.67
98.61
100.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
7.18
14.12
21.30
28.24
35.42
42.59
49.54
56.71
63.66
70.83
78.01
84.49
91.67
98.61
100.00
A
A
2.1.4 Unsuitable Material
0.10
S
A
A
2.1.5 Turfing
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.54
10.89
16.43
21.79
27.32
32.86
38.21
43.75
49.11
54.64
60.18
65.18
70.71
76.07
81.61
86.96
92.50
98.04
100.00
A
A
Access Road (Road 1,2,3 and 3a)
0.01
0.02
0.02
0.09
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.06
0.07
0.07
0.01
0.00
0.00
0.00
0.00
1.34
2.94
4.39
12.66
19.49
26.16
32.62
39.30
45.97
52.43
59.11
65.57
72.25
78.92
84.95
91.63
98.09
99.50
99.65
99.80
99.95
100.00
1.04
0.01
A
2.2 Platforming (Zone 1, Zone 2 and Zone 3)
2.2.1 Site clearing
1.29
1.14
S
A
A
2.2.2 Roadway Excavation
0.80
0.09
0.09
0.09
0.09
70.00
77.50
85.00
92.50
100.00
0.80
0.06
70.00
75.00
8.61
0.17
0.48
0.53
0.52
0.53
0.52
0.53
0.53
0.52
0.53
0.52
0.53
0.53
0.48
0.53
0.52
0.53
0.07
2.00
7.62
13.83
19.84
26.05
32.06
38.28
44.49
50.50
56.71
62.73
68.94
75.15
80.76
86.97
92.99
99.20
100.00
A
A
2.2.3 Embankment
1.48
0.03
0.08
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.08
0.09
0.09
0.09
0.01
2.00
7.62
13.83
19.84
26.05
32.06
38.28
44.49
50.50
56.71
62.73
68.94
75.15
80.76
86.97
92.99
99.20
100.00
0.07
0.21
0.23
0.22
0.23
0.22
0.23
0.23
0.22
0.23
0.22
0.23
0.23
0.21
0.23
0.22
0.23
0.03
2.00
7.62
13.83
19.84
26.05
32.06
38.28
44.49
50.50
56.71
62.73
68.94
75.15
80.76
86.97
92.99
99.20
100.00
A
A
2.2.4 Unsuitable Material
3.74
S
A
A
2.2.5 Turfing
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.72
6.52
11.84
16.98
22.30
27.44
32.76
38.08
43.22
48.54
53.69
59.01
64.32
69.13
74.44
79.59
84.91
90.05
95.37
100.00
A
A
Platforming (Zone 1, Zone 2 and Zone 3)
15.00
S
A
A
2.3 Conveyor Belt Corridor and Gravel-Surfaced Service Road
2.3.1 Site clearing
0.06
0.36
0.86
0.95
0.92
0.86
0.83
0.86
0.86
0.83
0.86
0.83
0.86
0.86
0.78
0.86
0.83
0.86
0.11
0.00
0.00
7.75
13.51
19.82
25.94
31.68
37.23
42.96
48.70
54.25
59.99
65.54
71.28
77.02
82.20
87.93
93.49
99.22
99.98
99.99
100.00
0.02
0.02
0.02
0.02
0.01
0.02
0.02
0.02
0.00
0.06
5.33
5.71
0.02
0.02
0.02
30.95
67.86
100.00
0.00
A
2.3.2 Roadway Excavation
0.80
5.33
0.80
0.00
0.28
0.00
0.00
0.05
0.05
0.05
0.05
0.05
0.02
0.00
0.60
19.05
36.90
55.36
73.21
91.67
100.00
A
A
2.3.3 Embankment
0.07
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.60
19.05
36.90
55.36
73.21
91.67
100.00
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.60
19.05
36.90
55.36
73.21
91.67
100.00
A
A
2.3.4 Unsuitable Material
0.06
S
A
A
2.3.5 Turfing
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.48
15.24
29.52
44.29
58.57
73.33
88.10
100.00
A
A
Conveyor Belt Corridor and Gravel-Surfaced Service Road
0.02
0.02
0.02
0.08
0.07
0.08
0.07
0.08
0.03
0.00
4.10
8.98
13.75
29.72
45.17
61.13
76.58
92.55
99.86
100.00
0.47
0.00
0.01
0.01
0.02
0.02
0.02
0.02
0.02
0.02
0.02
A
2.4 Miscellaneous Work
2.4.1 Traffic management and control
0.00
0.26
Oct
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
2015
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
Jul
Aug
Sep
Oct
A
A
2.4.2 Environmental Protection
0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
A
A
2.4.3 Protection of existing Lead Light for Navigation Aids System
0.01
S
A
A
Miscellaneous Work
0.34
0.01
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
A
A
Earthwork
16.86
S
A
A
3 Drainage Work
3.1 Surface Drain
0.83
0.41
0.92
1.13
1.08
1.03
0.99
1.03
0.99
0.92
0.95
0.92
0.95
0.95
0.86
0.95
0.92
0.90
0.12
0.00
0.00
0.00
4.94
7.39
12.85
19.55
25.97
32.06
37.95
44.04
49.89
55.35
60.99
66.46
72.10
77.74
82.84
88.48
93.94
99.26
99.96
99.98
100.00
100.00
0.80
0.07
4.75
5.16
8.68
0.51
0.59
0.61
0.59
0.61
0.61
0.55
0.61
0.59
0.61
0.59
0.61
0.61
0.59
0.43
5.87
12.64
19.64
26.41
33.41
40.41
46.73
53.72
60.50
67.49
74.27
81.26
88.26
95.03
100.00
A
A
3.2 Pipe Culverts
0.17
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
11.16
24.03
37.34
50.21
63.52
76.82
88.84
100.00
A
A
3.3 RC Box Culverts
5.77
0.40
0.48
0.50
0.50
0.48
0.50
0.48
0.50
0.50
0.45
0.50
0.45
7.00
15.41
24.09
32.77
41.18
49.86
58.26
66.95
75.63
83.47
92.16
100.00
A
A
3.4 Sediment Tank
3.4.1 Sediment Tank C1
0.93
0.23
0.27
0.28
0.16
24.76
53.33
82.86
100.00
A
A
3.4.2 Sediment Tank A1 & B1
1.87
0.11
0.28
0.28
0.25
0.28
0.27
0.28
0.12
5.80
20.77
35.75
49.28
64.25
78.74
93.72
100.00
A
A
Sediment Tank
2.80
0.23
0.27
0.28
0.27
0.28
0.28
0.25
0.28
0.27
0.28
0.12
8.25
17.78
27.62
37.20
47.18
57.17
66.18
76.17
85.83
95.81
100.00
A
A
3.5 Transfer Pump Room
0.03
0.00
0.01
0.01
0.01
15.38
45.19
75.00
100.00
A
A
3.6 Fence and Gate
0.21
0.02
0.19
9.38
100.00
A
A
Drainage Work
17.65
0.40
0.48
0.50
1.26
1.36
1.41
1.36
1.41
1.41
1.27
1.41
1.31
0.89
0.71
0.62
0.62
0.61
0.62
2.29
5.03
7.87
15.01
22.72
30.69
38.41
46.40
54.39
61.60
69.57
77.00
82.03
86.04
89.53
93.02
96.49
100.00
A
A
4 Building Work
4.1 Warehouse Type 1 (Enclosed)
4.1.1 Piling Works
0.85
0.05
0.49
0.31
5.77
63.46
100.00
A
A
4.1.2 Work Below Lower Floor Finishes
1.14
0.30
0.74
0.10
26.09
91.30
100.00
A
A
4.1.3 Frame
0.67
0.46
0.21
68.57
100.00
A
A
4.1.4 Upper Floor
0.02
0.01
0.01
42.55
100.00
A
A
4.1.5 Roof
S
S
A
1.48
0.11
1.14
0.22
7.50
85.00
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
4.1.6 Wall and Partitions
4.1.6.1 External Wall
0.21
0.06
0.10
0.06
25.71
70.00
100.00
A
A
4.1.6.2 Internal Wall And Partition
0.01
0.00
0.00
0.00
25.71
70.00
100.00
A
A
4.1.6.3 Doors and Windows
0.36
0.09
0.16
0.11
25.71
70.00
100.00
A
A
Wall and Partitions
0.58
0.15
0.26
0.18
25.71
70.00
100.00
A
A
4.1.7 Finishes
4.1.7.1 Floor Finishes
0.30
0.09
0.22
28.57
100.00
A
A
4.1.7.2 Wall Finishes
0.06
0.02
0.04
28.57
100.00
A
A
4.1.7.3 Ceiling Finishes
0.00
0.00
0.00
28.57
100.00
A
A
Finishes
0.36
0.10
0.26
28.57
100.00
A
A
4.1.8 Miscellaneous Work
4.1.8.1 Sanitary Wares and Fittings
0.01
0.00
0.00
28.57
100.00
A
A
4.1.8.2 Built-in Furniture
0.01
0.00
0.00
14.29
100.00
A
A
Miscellaneous Work
0.01
0.00
0.01
0.00
16.02
62.34
100.00
A
A
Warehouse Type 1 (Enclosed)
5.12
0.05
0.49
0.61
0.74
0.56
0.22
0.12
1.14
0.37
0.26
0.28
0.26
0.00
0.96
10.58
22.49
37.01
47.95
52.26
54.66
76.98
84.23
89.27
94.75
99.91
100.00
A
A
4.2 Warehouse Type 2 (Open)
4.2.1 Piling Works
0.70
0.16
0.41
0.13
22.64
81.13
100.00
A
A
4.2.2 Work Below Lower Floor Finishes
0.92
0.36
0.56
39.13
100.00
A
A
4.2.3 Frame
0.56
0.02
0.51
0.04
3.23
93.55
100.00
A
A
4.2.4 Roof
1.28
0.00
1.05
0.23
0.00
82.35
100.00
A
A
4.2.5 External Wall
0.00
0.00
0.00
67.65
100.00
A
A
4.2.6 Doors
S
S
A
A
4.2.7 Finishes
0.04
0.03
0.01
67.65
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
4.2.7.1 Floor Finishes
Weightage %
S
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
0.25
Jul
Aug
0.14
0.11
55.88
100.00
A
A
4.2.7.1 Wall Finishes
0.00
0.00
0.00
55.88
100.00
A
A
Finishes
0.26
0.14
0.11
55.88
100.00
A
A
Warehouse Type 2 (Open)
3.76
0.16
0.41
0.49
0.58
0.51
1.09
0.25
0.16
0.11
4.21
15.08
28.17
43.55
57.11
86.09
92.83
96.99
100.00
A
A
4.3 CUB 1
4.3.1 Piling Works
0.07
0.05
0.02
64.71
100.00
A
A
4.3.2 Work Below Lower Floor Finishes
0.11
0.04
0.07
39.13
100.00
A
A
4.3.3 Frame
0.03
0.00
0.02
16.67
100.00
A
A
4.3.4 Roof
0.04
0.02
0.03
42.86
100.00
A
A
4.3.5 Wall and Partitions
4.3.5.1 External Wall
0.02
0.01
0.01
31.43
100.00
A
A
4.3.5.2 Internal Wall
0.01
0.00
0.01
31.43
100.00
A
A
4.3.5.3 Doors and Windows
0.06
0.02
0.04
31.43
100.00
A
A
Wall and Partitions
0.08
0.03
0.06
31.43
100.00
A
A
4.3.6 Finishes
4.3.6.1 Floor Finishes
0.00
0.00
0.00
17.14
100.00
A
A
4.3.6.2 Wall Finishes
0.02
0.00
0.02
17.14
100.00
A
A
Finishes
0.02
0.00
0.02
17.14
100.00
A
A
4.3.7 Miscellaneous Work
0.04
0.01
0.04
17.14
100.00
A
A
CUB 1
0.40
0.05
0.07
0.07
0.04
0.05
0.07
0.06
11.48
28.30
45.84
56.34
69.23
86.14
100.00
A
A
4.4 CUB 2
4.4.1 Work Below Lower Floor Finishes
0.06
0.00
0.04
0.02
4.35
71.74
100.00
A
A
4.4.2 Frame
S
S
0.01
0.01
0.00
66.67
100.00
Sep
Oct
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
4.4.3 Roof
0.03
0.02
0.01
62.86
100.00
A
A
4.4.4 Wall and Partitions
4.4.4.1 External Wall
0.01
0.00
0.00
50.00
100.00
A
A
4.4.4.2 Internal Wall
0.00
0.00
0.00
50.00
100.00
A
A
4.4.4.3 Doors and Windows
0.03
0.01
0.01
50.00
100.00
A
A
Wall and Partitions
0.04
0.02
0.02
50.00
100.00
A
A
4.4.5 Finishes
4.4.5.1 Floor Finishes
0.00
0.00
0.00
35.29
100.00
A
A
4.4.5.2 Wall Finishes
0.01
0.00
0.01
35.29
100.00
A
A
Finishes
0.01
0.00
0.01
35.29
100.00
A
A
4.4.6 Miscellaneous Work
0.02
0.01
0.01
35.29
100.00
A
A
CUB 2
0.17
0.00
0.04
0.02
0.02
0.03
0.03
0.02
1.45
23.85
38.48
50.39
68.13
87.30
100.00
A
A
4.5 CUB 3
4.5.1 Work Below Lower Floor Finishes
0.06
0.02
0.04
36.96
100.00
A
A
4.5.2 Frame
0.01
0.00
0.01
8.33
100.00
A
A
4.5.3 Roof
0.03
0.01
0.02
22.86
100.00
A
A
4.5.4 Wall and Partitions
4.5.4.1 External Wall
0.01
0.00
0.01
11.43
100.00
A
A
4.5.4.2 Internal Wall
0.00
0.00
0.00
11.43
100.00
A
A
4.5.4.3 Doors and Windows
0.03
0.00
0.02
11.43
100.00
A
A
Wall and Partitions
0.04
0.00
0.04
11.43
100.00
A
A
4.5.5 Finishes
4.5.5.1 Floor Finishes
S
S
A
0.00
0.00
0.00
85.71
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
0.01
0.00
85.71
100.00
A
4.5.5.2 Wall Finishes
0.01
S
A
A
Finishes
0.01
0.01
0.00
85.71
100.00
A
A
4.5.6 Miscellaneous Work
0.02
0.02
0.00
85.71
100.00
A
A
CUB 3
0.17
0.02
0.04
0.02
0.02
0.04
0.03
0.00
12.29
33.90
44.48
58.68
80.37
97.20
100.00
A
A
4.6 CUB 4
4.6.1 Piling Works
0.10
0.05
0.05
48.39
100.00
A
A
4.6.2 Work Below Lower Floor Finishes
0.15
0.05
0.09
36.96
100.00
A
A
4.6.3 Frame
0.04
0.04
100.00
A
A
4.6.4 Roof
0.07
0.02
0.06
22.86
100.00
A
A
4.6.5 Wall and Partitions
4.6.5.1 External Wall
0.03
0.00
0.02
0.00
8.33
91.67
100.00
A
A
4.6.5.2 Internal Wall
0.01
0.00
0.01
0.00
8.33
91.67
100.00
A
A
4.6.5.3 Doors and Windows
0.08
0.01
0.07
0.01
8.33
91.67
100.00
A
A
Wall and Partitions
0.12
0.01
0.10
0.01
8.33
91.67
100.00
A
A
4.6.6 Finishes
4.6.6.1 Floor Finishes
0.01
0.00
0.00
80.00
100.00
A
A
4.6.6.2 Wall Finishes
0.03
0.02
0.01
80.00
100.00
A
A
Finishes
0.03
0.03
0.01
80.00
100.00
A
A
4.6.7 Miscellaneous Work
0.04
0.03
0.01
80.00
100.00
A
A
CUB 4
0.56
S
A
A
4.7 Check Point Building
4.7.1 Work Below Lower Floor Finishes
0.16
0.09
0.07
57.69
100.00
A
A
4.7.2 Frame
0.10
0.03
0.07
0.05
0.05
0.00
0.05
0.09
0.06
0.07
0.10
0.07
0.02
8.78
18.16
18.16
27.76
44.14
54.39
66.34
84.41
97.24
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
31.03
100.00
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
4.7.3 Upper Floor
0.01
0.00
0.01
28.57
100.00
A
A
4.7.4 Roof
0.59
0.10
0.49
17.14
100.00
A
A
4.7.5 Wall and Partitions
4.7.5.1 External Wall
0.02
S
0.00
0.02
0.00
5.71
91.43
100.00
A
A
4.7.5.2 Internal Wall and Partition
0.00
0.00
0.00
0.00
5.71
91.43
100.00
A
A
4.7.5.3 Staircase
0.02
0.00
0.02
0.00
5.71
91.43
100.00
A
A
4.7.5.4 Doors and Windows
0.11
0.01
0.09
0.01
5.71
91.43
100.00
A
A
Wall and Partitions
0.16
0.01
0.14
0.01
5.71
91.43
100.00
A
A
4.7.6 Finishes
4.7.6.1 Floor Finishes
0.01
0.01
0.00
80.00
100.00
A
A
4.7.6.2 Wall Finishes
0.03
0.02
0.01
80.00
100.00
A
A
4.7.6.3 Ceiling Finishes
0.10
0.08
0.02
80.00
100.00
A
A
Finishes
0.14
0.11
0.03
80.00
100.00
A
A
4.7.6.4 Miscellaneous Work
0.01
0.00
0.00
78.79
100.00
A
A
Check Point Building
1.17
0.09
0.10
0.07
0.11
0.50
0.14
0.13
0.03
7.91
16.40
22.56
31.68
74.32
86.13
97.46
100.00
A
A
4.8 Weigh Bridge (2 Nos.)
4.8.1 Weight Bridge Structure
0.11
0.04
0.06
0.01
38.98
91.53
100.00
A
A
4.8.2 Hot-dip Galvanished Steelworks
0.02
0.01
0.00
74.29
100.00
A
A
4.8.3 Drainage Works
0.02
0.01
0.01
54.29
100.00
A
A
Weigh Bridge (2 Nos.)
0.15
0.04
0.06
0.02
0.02
0.01
29.22
68.60
82.53
93.22
100.00
A
A
Building Work
S
S
A
A
11.51
0.09
0.10
0.12
0.22
0.62
0.18
0.29
0.73
0.94
1.28
1.19
0.90
0.70
2.30
0.66
0.44
0.43
0.29
0.01
0.81
1.67
2.70
4.64
10.06
11.63
14.13
20.44
28.64
39.75
50.14
57.97
64.04
84.05
89.82
93.63
97.37
99.92
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
5 Water Reticulation
5.1 External Water Reticulation
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
1.09
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
0.10
0.10
0.09
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
9.31
18.62
27.03
36.34
45.35
54.65
63.66
72.97
82.28
91.29
100.00
A
A
5.2 0.5ML RC Elevated Water Tank
0.59
0.02
0.08
0.08
0.08
0.08
0.08
0.08
0.07
0.04
2.56
15.81
28.63
41.88
54.70
67.95
81.20
93.16
100.00
A
A
5.3 Elevated Water Tank Pipework
5.3.1 Inlet pipework to Elevated Water Tank
0.12
0.01
0.02
0.02
0.02
0.02
0.02
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
5.3.2 Outlet pipework
0.05
0.00
0.01
0.01
0.01
0.01
0.01
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
5.3.3 Overflow pipeworks
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
5.3.4 Scour pipework
0.05
0.00
0.01
0.01
0.01
0.01
0.01
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
Elevated Water Tank Pipework
0.23
0.02
0.04
0.04
0.04
0.04
0.04
0.01
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
Water Reticulation
1.91
0.02
0.08
0.08
0.08
0.08
0.18
0.18
0.16
0.16
0.14
0.14
0.14
0.14
0.14
0.11
0.10
0.79
4.89
8.85
12.94
16.90
26.32
35.74
44.24
52.70
59.90
67.33
74.52
81.96
89.39
95.02
100.00
A
A
6 Civil Engineering Works
6.1 Access Road Road (Road 1,2,3 and 3a)
6.1.1 Flexible Pavement
6.1.1.1 Subgrade
0.03
0.02
0.01
71.43
100.00
A
A
6.1.1.2 Subbase
0.73
0.24
0.39
0.10
32.76
86.21
100.00
A
A
6.1.1.3 Roadbase
0.84
0.32
0.45
0.07
37.93
91.38
100.00
A
A
6.1.1.4 Asphaltic concrete binder course
1.01
0.75
0.26
74.29
100.00
A
A
6.1.1.5 Asphaltic concrete wearing course
1.01
0.61
0.41
60.00
100.00
A
A
Flexible Pavement
3.62
0.02
0.25
0.39
0.42
0.45
0.82
0.87
0.41
0.54
7.36
18.12
29.67
42.02
64.81
88.80
100.00
A
A
6.1.2 Furniture
6.1.2.1 Traffic Signage
0.01
0.00
0.00
40.38
100.00
A
A
6.1.2.2 Pavement Marking
0.02
0.00
0.02
8.82
100.00
A
A
6.1.2.3 Road Kerb
0.20
0.03
0.04
0.04
0.04
0.04
15.17
36.55
57.93
78.62
100.00
A
A
6.1.2.4 Traffic Signal System
S
S
A
A
0.32
0.13
0.19
40.38
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
6.1.2.5 Modification works at existing main road
Weightage %
S
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
0.13
Sep
Oct
0.05
0.07
40.38
100.00
A
A
Furniture
0.67
0.03
0.04
0.04
0.22
0.33
4.47
10.77
17.07
50.58
100.00
A
A
Access Road Road (Road 1,2,3 and 3a)
4.28
0.02
0.25
0.39
0.45
0.49
0.87
1.09
0.73
0.46
6.21
15.30
25.75
37.16
57.38
82.85
100.00
A
A
6.2 Platforming
6.2.1 Zone 1
6.2.1.1 Flexible Pavement
6.2.1.1.1 Subgrade
0.11
0.01
0.10
8.70
100.00
A
A
6.2.1.1.2 Subbase
2.82
0.69
2.06
0.07
24.39
97.56
100.00
A
A
6.2.1.1.3 Roadbase
2.51
1.84
0.67
73.17
100.00
A
A
6.2.1.1.4 Asphaltic concrete binder course
3.76
2.15
1.61
57.14
100.00
A
A
6.2.1.1.5 Asphaltic concrete wearing course
3.43
1.12
2.31
32.61
100.00
A
A
Zone 1
12.63
0.01
0.79
2.06
1.91
2.82
2.73
2.31
0.07
6.29
22.62
37.72
60.06
81.68
100.00
A
A
6.2.2 Zone 2
6.2.2.1 Flexible Pavement
6.2.2.1.1 Subgrade
0.20
0.10
0.10
52.17
100.00
A
A
6.2.2.1.2 Subbase
5.26
2.70
2.56
51.35
100.00
A
A
6.2.2.1.3 Roadbase
4.69
1.74
2.95
37.14
100.00
A
A
6.2.2.1.4 Asphaltic concrete binder course
7.01
1.60
5.41
22.86
100.00
A
A
6.2.2.1.5 Asphaltic concrete wearing course
6.41
0.57
5.65
0.19
8.82
97.06
100.00
A
A
Zone 2
23.56
0.10
2.80
4.30
4.55
5.97
5.65
0.19
0.44
12.31
30.55
49.86
75.21
99.20
100.00
0.10
2.80
4.30
4.56
6.76
7.71
2.10
2.82
2.73
2.31
0.29
8.01
19.89
32.49
51.17
72.48
78.27
86.07
93.61
100.00
A
A
Platforming
36.19
S
A
A
6.3 Conveyor Belt Corridor and Gravel-Surfaced Service Road
6.3.1 Flexible Pavement
6.3.1.1 Subgrade
S
S
S
0.03
0.01
0.01
0.01
24.29
67.14
100.00
A
A
6.3.1.2 Subbase
S
S
A
0.16
0.02
0.07
0.07
0.00
11.43
54.29
98.57
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
0.01
0.01
0.03
0.07
0.07
0.00
3.28
9.08
23.41
60.47
98.76
100.00
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
Conveyor Belt Corridor and Gravel-Surfaced Service Road
0.19
S
A
A
6.4 Security Fencing
0.83
0.01
0.14
0.14
0.14
0.14
0.14
0.12
1.10
18.23
34.81
51.93
69.06
85.64
100.00
A
A
Civil Engineering Works
41.49
0.01
0.01
0.03
0.07
0.07
0.11
2.80
4.32
4.82
7.29
8.30
2.73
3.83
3.96
3.17
0.01
0.04
0.11
0.27
0.44
0.70
7.44
17.85
29.46
47.03
67.03
73.60
82.83
92.37
100.00
A
A
7 Miscellaneous Work
7.1 Reinforced Concrete Fire Fighting Tank
0.88
0.22
0.22
0.22
0.22
24.59
49.18
74.59
100.00
A
A
7.2 High Masts
0.70
0.04
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.02
6.03
12.99
20.19
27.15
34.34
41.53
48.03
55.22
62.18
69.37
76.33
83.53
90.72
97.68
100.00
A
A
7.3 Manholes
0.33
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.01
6.03
12.99
20.19
27.15
34.34
41.53
48.03
55.22
62.18
69.37
76.33
83.53
90.72
97.68
100.00
A
A
7.4 Barrier Post (500 Nos.)
0.13
0.04
0.04
0.04
35.63
70.11
100.00
A
A
7.5 Other Foundations
0.14
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
6.03
12.99
20.19
27.15
34.34
41.53
48.03
55.22
62.18
69.37
76.33
83.53
90.72
97.68
100.00
A
A
Miscellaneous Work
2.18
0.07
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.30
0.30
0.31
0.35
0.12
0.06
3.23
6.96
10.81
14.54
18.40
22.25
25.73
29.58
33.31
47.17
60.90
75.09
91.33
97.04
100.00
A
A
8 Mechanical Works
8.1 Air conditioning & Mechanical Ventilation Services
0.63
0.04
0.06
0.06
0.05
0.06
0.05
0.06
0.05
0.06
0.06
0.05
0.03
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
8.2 Fire Protection Services
4.94
0.33
0.45
0.45
0.40
0.45
0.43
0.45
0.43
0.45
0.45
0.43
0.24
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
8.3 Plumbing Services
0.36
0.02
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
Mechanical Works
5.92
0.40
0.53
0.53
0.48
0.53
0.52
0.53
0.52
0.53
0.53
0.52
0.29
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
9 Electrical Works
9.1 CUB 1
0.03
0.00
0.01
0.01
0.00
8.57
52.86
97.14
100.00
A
A
9.2 CUB 2
0.03
0.01
0.02
35.29
100.00
A
A
9.3 CUB 3
0.03
0.01
0.01
58.49
100.00
A
A
9.4 CUB 4
0.03
0.00
0.01
0.01
11.43
55.71
100.00
A
A
9.5 Warehouse 1 (enclosed)
0.19
0.03
0.10
0.06
16.95
67.80
100.00
A
A
9.6 Warehouse 2 (open)
S
S
0.15
0.05
0.08
0.02
32.76
86.21
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Physical Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
9.7 On-shore Infrastructure Works
1.36
0.09
0.34
0.34
0.33
0.24
6.56
31.97
57.38
81.97
100.00
A
A
9.8 Check Point Building
0.10
0.07
0.04
65.71
100.00
A
A
9.9 Boom Gate Control System, CCTV System and Intercom System
0.22
0.01
0.06
0.06
0.06
0.04
6.56
31.97
57.38
81.97
100.00
A
A
9.10 Weigh Bridge System
0.30
0.05
0.10
0.10
0.05
16.13
48.39
81.72
100.00
A
A
Electrical Works
2.43
0.07
0.05
0.01
0.00
0.05
0.10
0.11
0.18
0.46
0.53
0.52
0.36
2.87
4.90
5.48
5.52
7.48
11.41
15.92
23.38
42.40
64.00
85.36
100.00
A
A
10 Telephone Works
10.1 Checkpoint Building
0.01
0.00
0.01
0.00
27.14
71.43
100.00
A
A
10.2 Warehouse 1
0.02
0.00
0.01
0.01
15.87
63.49
100.00
A
A
Telephone Works
0.03
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
12.19
32.07
44.89
44.89
44.89
44.89
44.89
44.89
53.64
79.88
100.00
A
A
11 ICT Structured Cabling System
11.1 Checkpoint Building
0.01
0.00
0.00
0.00
0.00
11.43
55.71
98.57
100.00
A
A
11.2 Warehouse 1
0.01
0.00
0.00
0.00
15.87
63.49
100.00
A
A
ICT Structured Cabling System
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.59
32.13
56.84
57.66
57.66
57.66
64.38
84.54
100.00
A
A
100.00
Grand Toral
Monthly Progress
Cumulative Progress
0.83
0.41
0.92
1.13
1.18
1.53
1.60
1.77
3.02
2.63
2.83
3.70
4.23
4.57
6.85
8.41
8.58
12.46
10.92
5.23
6.44
6.15
4.61
0.00
0.83
0.41
0.92
1.13
1.18
1.53
1.60
1.77
3.02
2.63
2.83
3.70
4.23
4.57
6.85
8.41
8.58
12.46
10.92
5.23
6.44
6.15
4.61
0.80
0.00
0.07
1.25
2.17
3.29
4.47
6.00
7.60
9.36
12.39
15.02
17.85
21.55
25.78
30.35
37.20
45.61
54.19
66.65
77.57
82.81
89.24
95.39
100.00
0.00
0.83
0.80
0.87
(%)
0.80
0.04
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
CONTRACT NO: SPMU/05/2013
PERCENTAGE ( % )
70.0
60.0
50.0
40.0
30.0
MWP. REV.1
20.0
ACTUAL
10.0
Nov
Oct
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
Dec
Nov
Oct
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
Nov
Dec
0.0
DURATION
YEAR
2013
MONTH
2014
2015
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
1.53
3.22
4.54
6.22
7.48
8.76
10.38
12.05
13.89
16.87
19.49
22.30
25.90
29.98
34.37
40.83
48.74
56.80
68.41
78.61
83.61
89.72
95.56
100.00
CUMMULATIVE ACTUAL
2.26
3.26
DIFFERENCE
0.73
0.04
1.53
1.70
1.31
1.69
1.25
1.29
1.62
1.67
1.83
2.98
2.62
2.81
3.60
4.08
4.39
6.46
7.91
8.06
11.61
10.20
5.00
6.11
5.84
4.44
MONTHLY ACTUAL
2.26
1.00
DIFFERENCE
0.73
-0.70
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
1 General
1.1 Guarantee and Insurance
0.62
100.00
0.62
100.00
0.01
0.01
0.00
0.00
0.00
49.18
50.83
76.67
100.00
0.01
0.00
49.18
50.83
A
1.3 Contractor's Site Facilities
0.61
0.63
0.63
0.57
2.45
25.00
50.83
76.67
100.00
0.61
0.63
25.00
50.83
A
1.4 Procurement of Materials
0.22
0.22
0.20
0.22
0.21
0.22
0.21
0.22
0.22
0.21
0.22
0.21
0.22
0.22
0.20
0.22
0.21
0.22
0.21
0.22
0.22
0.21
0.22
5.13
4.11
8.36
12.60
16.44
20.68
24.79
29.04
33.15
37.40
41.64
45.75
50.00
54.11
58.36
62.60
66.44
70.68
74.79
79.04
83.15
87.40
91.64
95.75
100.00
0.21
0.22
4.11
8.36
A
1.5 Record of Works
0.02
0.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.11
8.36
12.60
16.44
20.68
24.79
29.04
33.15
37.40
41.64
45.75
50.00
54.11
58.36
62.60
66.44
70.68
74.79
79.04
83.15
87.40
91.64
95.75
100.00
0.00
0.00
4.11
8.36
A
1.6 Shop Drawings and As-built Documentations
0.62
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.18
10.54
15.72
21.07
26.42
31.61
36.96
42.14
47.50
52.85
57.69
63.04
68.22
73.58
78.76
84.11
89.46
94.65
100.00
A
A
1.7 Clearing Up of Site
0.02
0.01
0.01
0.01
33.70
66.30
100.00
A
A
1.8 Mobilisation and Demobilisation
0.08
0.08
0.08
0.07
25.00
50.83
76.67
100.00
0.32
0.08
0.08
25.00
50.83
A
General
1.53
0.93
0.94
0.85
0.22
0.21
0.22
0.21
0.22
0.22
0.21
0.22
0.21
0.22
0.22
0.20
0.22
0.21
0.22
0.21
0.22
0.23
0.22
0.23
8.58
17.79
28.68
39.59
49.45
51.99
54.47
57.03
59.51
62.07
64.63
67.10
69.66
72.14
74.70
77.26
79.57
82.13
84.61
87.17
89.65
92.20
94.83
97.37
100.00
1.53
0.93
17.79
28.68
2 Earthwork
2.1 Access Road (Road 1,2,3 and 3a)
2.1.1 Site clearing
0.01
0.02
0.01
0.02
0.00
21.14
46.34
69.11
94.31
100.00
0.06
0.01
A
2.1.2 Roadway Excavation
20.27
0.31
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.00
7.18
14.12
21.30
28.24
35.42
42.59
49.54
56.71
63.66
70.83
78.01
84.49
91.67
98.61
100.00
A
A
2.1.3 Embankment
0.46
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.01
7.18
14.12
21.30
28.24
35.42
42.59
49.54
56.71
63.66
70.83
78.01
84.49
91.67
98.61
100.00
A
A
2.1.4 Unsuitable Material
0.09
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
7.18
14.12
21.30
28.24
35.42
42.59
49.54
56.71
63.66
70.83
78.01
84.49
91.67
98.61
100.00
A
A
2.1.5 Turfing
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.54
10.89
16.43
21.79
27.32
32.86
38.21
43.75
49.11
54.64
60.18
65.18
70.71
76.07
81.61
86.96
92.50
98.04
100.00
A
A
Access Road (Road 1,2,3 and 3a)
0.01
0.02
0.01
0.08
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.01
0.00
0.00
0.00
0.00
1.34
2.94
4.39
12.66
19.49
26.16
32.62
39.30
45.97
52.43
59.11
65.57
72.25
78.92
84.95
91.63
98.09
99.50
99.65
99.80
99.95
100.00
0.95
0.01
1.29
1.04
S
A
A
2.2.2 Roadway Excavation
7.87
0.73
0.08
0.08
0.08
0.08
70.00
77.50
85.00
92.50
100.00
0.16
0.44
0.49
0.47
0.49
0.47
0.49
0.49
0.47
0.49
0.47
0.49
0.49
0.44
0.49
0.47
0.49
0.06
2.00
7.62
13.83
19.84
26.05
32.06
38.28
44.49
50.50
56.71
62.73
68.94
75.15
80.76
86.97
92.99
99.20
100.00
0.73
0.05
70.00
75.00
A
A
2.2.3 Embankment
S
S
A
1.35
0.03
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.01
2.00
7.62
13.83
19.84
26.05
32.06
38.28
44.49
50.50
56.71
62.73
68.94
75.15
80.76
86.97
92.99
99.20
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
2015
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
0.07
0.19
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.19
0.21
0.21
0.21
0.03
2.00
7.62
13.83
19.84
26.05
32.06
38.28
44.49
50.50
56.71
62.73
68.94
75.15
80.76
86.97
92.99
99.20
100.00
Jul
Aug
Sep
Oct
A
2.2.4 Unsuitable Material
3.42
S
A
A
2.2.5 Turfing
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.72
6.52
11.84
16.98
22.30
27.44
32.76
38.08
43.22
48.54
53.69
59.01
64.32
69.13
74.44
79.59
84.91
90.05
95.37
100.00
A
A
Platforming (Zone 1, Zone 2 and Zone 3)
13.72
S
A
0.73
5.33
0.73
0.33
0.79
0.87
0.84
0.79
0.76
0.79
0.79
0.76
0.79
0.76
0.79
0.79
0.71
0.79
0.76
0.79
0.10
0.00
0.00
5.33
7.75
13.51
19.82
25.94
31.68
37.23
42.96
48.70
54.25
59.99
65.54
71.28
77.02
82.20
87.93
93.49
99.22
99.98
99.99
100.00
0.05
5.71
0.06
0.02
0.02
0.02
30.95
67.86
100.00
0.00
A
2.3.2 Roadway Excavation
0.00
0.26
0.00
0.05
0.05
0.05
0.05
0.05
0.02
0.60
19.05
36.90
55.36
73.21
91.67
100.00
A
A
2.3.3 Embankment
0.06
0.00
0.01
0.01
0.01
0.01
0.01
0.00
0.60
19.05
36.90
55.36
73.21
91.67
100.00
A
A
2.3.4 Unsuitable Material
0.05
0.00
0.01
0.01
0.01
0.01
0.01
0.00
0.60
19.05
36.90
55.36
73.21
91.67
100.00
A
A
2.3.5 Turfing
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.48
15.24
29.52
44.29
58.57
73.33
88.10
100.00
A
A
Conveyor Belt Corridor and Gravel-Surfaced Service Road
0.02
0.02
0.02
0.07
0.07
0.07
0.07
0.07
0.03
0.00
4.10
8.98
13.75
29.72
45.17
61.13
76.58
92.55
99.86
100.00
0.43
0.00
0.00
0.24
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
A
A
2.4.2 Environmental Protection
0.07
S
A
A
2.4.3 Protection of existing Lead Light for Navigation Aids System
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
0.01
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.00
2.98
8.53
14.68
20.63
26.79
32.74
38.89
45.04
50.99
57.14
63.10
69.25
75.40
80.95
87.10
93.06
99.21
100.00
A
A
Miscellaneous Work
0.31
S
A
A
Earthwork
15.41
S
A
A
0.76
0.38
0.84
1.03
0.99
0.94
0.91
0.94
0.90
0.84
0.87
0.84
0.87
0.87
0.79
0.87
0.84
0.82
0.11
0.00
0.00
0.00
4.94
7.39
12.85
19.55
25.97
32.06
37.95
44.04
49.89
55.35
60.99
66.46
72.10
77.74
82.84
88.48
93.94
99.26
99.96
99.98
100.00
100.00
0.73
0.06
4.75
5.16
3 Drainage Work
3.1 Surface Drain
7.94
0.47
0.54
0.56
0.54
0.56
0.56
0.50
0.56
0.54
0.56
0.54
0.56
0.56
0.54
0.39
5.87
12.64
19.64
26.41
33.41
40.41
46.73
53.72
60.50
67.49
74.27
81.26
88.26
95.03
100.00
A
A
3.2 Pipe Culverts
0.15
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
11.16
24.03
37.34
50.21
63.52
76.82
88.84
100.00
A
A
3.3 RC Box Culverts
5.27
0.37
0.44
0.46
0.46
0.44
0.46
0.44
0.46
0.46
0.41
0.46
0.41
7.00
15.41
24.09
32.77
41.18
49.86
58.26
66.95
75.63
83.47
92.16
100.00
A
A
3.4 Sediment Tank
3.4.1 Sediment Tank C1
S
S
0.85
0.21
0.24
0.25
0.15
24.76
53.33
82.86
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
3.4.2 Sediment Tank A1 & B1
1.71
0.10
0.26
0.26
0.23
0.26
0.25
0.26
0.11
5.80
20.77
35.75
49.28
64.25
78.74
93.72
100.00
A
A
Sediment Tank
2.56
0.21
0.24
0.25
0.25
0.26
0.26
0.23
0.26
0.25
0.26
0.11
8.25
17.78
27.62
37.20
47.18
57.17
66.18
76.17
85.83
95.81
100.00
A
A
3.5 Transfer Pump Room
0.02
0.00
0.01
0.01
0.01
15.38
45.19
75.00
100.00
A
A
3.6 Fence and Gate
0.19
0.02
0.17
9.38
100.00
A
A
Drainage Work
16.14
0.37
0.44
0.46
1.15
1.24
1.29
1.25
1.29
1.29
1.16
1.29
1.20
0.81
0.65
0.56
0.56
0.56
0.57
2.29
5.03
7.87
15.01
22.72
30.69
38.41
46.40
54.39
61.60
69.57
77.00
82.03
86.04
89.53
93.02
96.49
100.00
A
A
4 Building Work
4.1 Warehouse Type 1 (Enclosed)
4.1.1 Piling Works
0.78
0.05
0.45
0.29
5.77
63.46
100.00
A
A
4.1.2 Work Below Lower Floor Finishes
1.04
0.27
0.68
0.09
26.09
91.30
100.00
A
A
4.1.3 Frame
0.61
0.42
0.19
68.57
100.00
A
A
4.1.4 Upper Floor
0.02
0.01
0.01
42.55
100.00
A
A
4.1.5 Roof
1.35
0.10
1.05
0.20
7.50
85.00
100.00
A
A
4.1.6 Wall and Partitions
4.1.6.1 External Wall
0.20
0.05
0.09
0.06
25.71
70.00
100.00
A
A
4.1.6.2 Internal Wall And Partition
0.01
0.00
0.00
0.00
25.71
70.00
100.00
A
A
4.1.6.3 Doors and Windows
0.33
0.09
0.15
0.10
25.71
70.00
100.00
A
A
Wall and Partitions
0.53
0.14
0.24
0.16
25.71
70.00
100.00
A
A
4.1.7 Finishes
4.1.7.1 Floor Finishes
0.28
0.08
0.20
28.57
100.00
A
A
4.1.7.2 Wall Finishes
0.05
0.01
0.04
28.57
100.00
A
A
4.1.7.3 Ceiling Finishes
0.00
0.00
0.00
28.57
100.00
0.09
0.24
A
A
Finishes
0.33
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
28.57
100.00
Oct
A
A
4.1.8 Miscellaneous Work
4.1.8.1 Sanitary Wares and Fittings
0.01
0.00
0.00
28.57
100.00
A
A
4.1.8.2 Built-in Furniture
0.00
0.00
0.00
14.29
100.00
A
A
Miscellaneous Work
0.01
0.00
0.01
0.00
16.02
62.34
100.00
A
A
Warehouse Type 1 (Enclosed)
4.68
0.05
0.45
0.56
0.68
0.51
0.20
0.11
1.05
0.34
0.24
0.26
0.24
0.00
0.96
10.58
22.49
37.01
47.95
52.26
54.66
76.98
84.23
89.27
94.75
99.91
100.00
A
A
4.2 Warehouse Type 2 (Open)
4.2.1 Piling Works
0.64
0.14
0.37
0.12
22.64
81.13
100.00
A
A
4.2.2 Work Below Lower Floor Finishes
0.84
0.33
0.51
39.13
100.00
A
A
4.2.3 Frame
0.52
0.02
0.47
0.03
3.23
93.55
100.00
A
A
4.2.4 Roof
1.17
0.96
0.21
82.35
100.00
A
A
4.2.5 External Wall
0.00
0.00
0.00
67.65
100.00
A
A
4.2.6 Doors
0.03
0.02
0.01
67.65
100.00
A
A
4.2.7 Finishes
4.2.7.1 Floor Finishes
0.23
0.13
0.10
55.88
100.00
A
A
4.2.7.1 Wall Finishes
0.00
0.00
0.00
55.88
100.00
A
A
Finishes
0.23
0.13
0.10
55.88
100.00
A
A
Warehouse Type 2 (Open)
3.44
S
A
A
4.3 CUB 1
4.3.1 Piling Works
0.06
0.04
0.02
64.71
100.00
A
A
4.3.2 Work Below Lower Floor Finishes
0.10
0.04
0.06
39.13
100.00
A
A
4.3.3 Frame
S
S
A
A
0.02
0.00
0.02
16.67
100.00
0.14
0.37
0.45
0.53
0.47
1.00
0.23
0.14
0.10
4.21
15.08
28.17
43.55
57.11
86.09
92.83
96.99
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
4.3.4 Roof
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
0.04
Sep
Oct
0.02
0.02
42.86
100.00
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
A
A
4.3.5 Wall and Partitions
4.3.5.1 External Wall
0.01
0.00
0.01
31.43
100.00
A
A
4.3.5.2 Internal Wall
0.01
0.00
0.01
31.43
100.00
A
A
4.3.5.3 Doors and Windows
0.05
0.02
0.04
31.43
100.00
A
A
Wall and Partitions
0.07
0.02
0.05
31.43
100.00
A
A
4.3.6 Finishes
4.3.6.1 Floor Finishes
0.00
0.00
0.00
17.14
100.00
A
A
4.3.6.2 Wall Finishes
0.02
0.00
0.02
17.14
100.00
A
A
Finishes
0.02
0.00
0.02
17.14
100.00
A
A
4.3.7 Miscellaneous Work
0.04
0.01
0.03
17.14
100.00
A
A
CUB 1
0.36
0.04
0.06
0.06
0.04
0.05
0.06
0.05
11.48
28.30
45.84
56.34
69.23
86.14
100.00
A
A
4.4 CUB 2
4.4.1 Work Below Lower Floor Finishes
0.05
0.00
0.03
0.01
4.35
71.74
100.00
A
A
4.4.2 Frame
0.01
0.01
0.00
66.67
100.00
A
A
4.4.3 Roof
0.02
0.01
0.01
62.86
100.00
A
A
4.4.4 Wall and Partitions
4.4.4.1 External Wall
0.01
0.00
0.00
50.00
100.00
A
A
4.4.4.2 Internal Wall
0.00
0.00
0.00
50.00
100.00
A
A
4.4.4.3 Doors and Windows
0.03
0.01
0.01
50.00
100.00
A
A
Wall and Partitions
0.04
0.02
0.02
50.00
100.00
A
A
4.4.5 Finishes
4.4.5.1 Floor Finishes
S
S
0.00
0.00
0.00
35.29
100.00
Jul
Aug
Sep
Oct
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
4.4.5.2 Wall Finishes
0.01
0.00
0.01
35.29
100.00
A
A
Finishes
0.01
0.00
0.01
35.29
100.00
A
A
4.4.6 Miscellaneous Work
0.02
0.01
0.01
35.29
100.00
A
A
CUB 2
0.15
0.00
0.03
0.02
0.02
0.03
0.03
0.02
1.45
23.85
38.48
50.39
68.13
87.30
100.00
A
A
4.5 CUB 3
4.5.1 Work Below Lower Floor Finishes
0.05
0.02
0.03
36.96
100.00
A
A
4.5.2 Frame
0.01
0.00
0.01
8.33
100.00
A
A
4.5.3 Roof
0.02
0.01
0.02
22.86
100.00
A
A
4.5.4 Wall and Partitions
4.5.4.1 External Wall
0.01
0.00
0.01
11.43
100.00
A
A
4.5.4.2 Internal Wall
0.00
0.00
0.00
11.43
100.00
A
A
4.5.4.3 Doors and Windows
0.03
0.00
0.02
11.43
100.00
A
A
Wall and Partitions
0.04
0.00
0.03
11.43
100.00
A
A
4.5.5 Finishes
4.5.5.1 Floor Finishes
0.00
0.00
0.00
85.71
100.00
A
A
4.5.5.2 Wall Finishes
0.01
0.01
0.00
85.71
100.00
A
A
Finishes
0.01
0.01
0.00
85.71
100.00
A
A
4.5.6 Miscellaneous Work
0.02
0.02
0.00
85.71
100.00
A
A
CUB 3
0.15
S
A
A
4.6 CUB 4
4.6.1 Piling Works
0.09
0.05
0.05
48.39
100.00
A
A
4.6.2 Work Below Lower Floor Finishes
0.13
0.05
0.08
0.02
0.03
0.02
0.02
0.03
0.03
0.00
12.29
33.90
44.48
58.68
80.37
97.20
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
36.96
100.00
Dec
Jan
Feb
Mar
Apr
A
A
4.6.3 Frame
0.04
0.04
100.00
A
A
4.6.4 Roof
0.07
0.02
0.05
22.86
100.00
A
A
4.6.5 Wall and Partitions
4.6.5.1 External Wall
0.02
0.00
0.02
0.00
8.33
91.67
100.00
A
A
4.6.5.2 Internal Wall
0.01
0.00
0.01
0.00
8.33
91.67
100.00
A
A
4.6.5.3 Doors and Windows
0.08
0.01
0.06
0.01
8.33
91.67
100.00
A
A
Wall and Partitions
0.11
0.01
0.09
0.01
8.33
91.67
100.00
A
A
4.6.6 Finishes
4.6.6.1 Floor Finishes
0.01
0.00
0.00
80.00
100.00
A
A
4.6.6.2 Wall Finishes
0.03
0.02
0.01
80.00
100.00
A
A
Finishes
0.03
0.03
0.01
80.00
100.00
A
A
4.6.7 Miscellaneous Work
0.04
0.03
0.01
80.00
100.00
A
A
CUB 4
0.51
0.05
0.05
0.00
0.05
0.08
0.05
0.06
0.09
0.07
0.01
8.78
18.16
18.16
27.76
44.14
54.39
66.34
84.41
97.24
100.00
A
A
4.7 Check Point Building
4.7.1 Work Below Lower Floor Finishes
0.15
0.08
0.06
57.69
100.00
A
A
4.7.2 Frame
0.09
0.03
0.06
31.03
100.00
A
A
4.7.3 Upper Floor
0.01
0.00
0.00
28.57
100.00
A
A
4.7.4 Roof
0.54
0.09
0.45
17.14
100.00
A
A
4.7.5 Wall and Partitions
4.7.5.1 External Wall
0.02
S
0.00
0.02
0.00
5.71
91.43
100.00
A
A
4.7.5.2 Internal Wall and Partition
S
S
A
A
0.00
0.00
0.00
0.00
5.71
91.43
100.00
May
Jun
Jul
Aug
Sep
Oct
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
4.7.5.3 Staircase
Weightage %
S
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
0.02
Aug
Sep
Oct
0.00
0.02
0.00
5.71
91.43
100.00
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
4.7.5.4 Doors and Windows
0.10
0.01
0.09
0.01
5.71
91.43
100.00
A
A
Wall and Partitions
0.15
0.01
0.13
0.01
5.71
91.43
100.00
A
A
4.7.6 Finishes
4.7.6.1 Floor Finishes
0.01
0.01
0.00
80.00
100.00
A
A
4.7.6.2 Wall Finishes
0.03
0.02
0.01
80.00
100.00
A
A
4.7.6.3 Ceiling Finishes
0.09
0.08
0.02
80.00
100.00
A
A
Finishes
0.13
0.10
0.03
80.00
100.00
A
A
4.7.6.4 Miscellaneous Work
0.01
0.00
0.00
78.79
100.00
A
A
Check Point Building
1.07
0.08
0.09
0.07
0.10
0.46
0.13
0.12
0.03
7.91
16.40
22.56
31.68
74.32
86.13
97.46
100.00
A
A
4.8 Weigh Bridge (2 Nos.)
4.8.1 Weight Bridge Structure
0.10
0.04
0.05
0.01
38.98
91.53
100.00
A
A
4.8.2 Hot-dip Galvanished Steelworks
0.01
0.01
0.00
74.29
100.00
A
A
4.8.3 Drainage Works
0.02
0.01
0.01
54.29
100.00
A
A
Weigh Bridge (2 Nos.)
0.14
0.04
0.05
0.02
0.01
0.01
29.22
68.60
82.53
93.22
100.00
A
A
Building Work
10.52
0.08
0.09
0.11
0.20
0.57
0.16
0.26
0.66
0.86
1.17
1.09
0.82
0.64
2.10
0.61
0.40
0.39
0.27
0.01
0.81
1.67
2.70
4.64
10.06
11.63
14.13
20.44
28.64
39.75
50.14
57.97
64.04
84.05
89.82
93.63
97.37
99.92
100.00
A
A
5 Water Reticulation
5.1 External Water Reticulation
1.00
0.09
0.09
0.08
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
9.31
18.62
27.03
36.34
45.35
54.65
63.66
72.97
82.28
91.29
100.00
A
A
5.2 0.5ML RC Elevated Water Tank
0.54
0.01
0.07
0.07
0.07
0.07
0.07
0.07
0.06
0.04
2.56
15.81
28.63
41.88
54.70
67.95
81.20
93.16
100.00
A
A
5.3 Elevated Water Tank Pipework
5.3.1 Inlet pipework to Elevated Water Tank
0.11
0.01
0.02
0.02
0.02
0.02
0.02
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
5.3.2 Outlet pipework
S
S
A
0.05
0.00
0.01
0.01
0.01
0.01
0.01
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
Oct
A
5.3.3 Overflow pipeworks
0.01
S
A
A
5.3.4 Scour pipework
0.04
0.00
0.01
0.01
0.01
0.01
0.01
0.00
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
Elevated Water Tank Pipework
0.21
0.02
0.04
0.04
0.04
0.04
0.04
0.01
8.57
25.71
43.43
60.57
78.29
96.00
100.00
A
A
Water Reticulation
1.75
0.01
0.07
0.07
0.07
0.07
0.16
0.16
0.15
0.15
0.13
0.13
0.13
0.13
0.13
0.10
0.09
0.79
4.89
8.85
12.94
16.90
26.32
35.74
44.24
52.70
59.90
67.33
74.52
81.96
89.39
95.02
100.00
A
A
6 Civil Engineering Works
6.1 Access Road Road (Road 1,2,3 and 3a)
6.1.1 Flexible Pavement
6.1.1.1 Subgrade
0.03
0.02
0.01
71.43
100.00
A
A
6.1.1.2 Subbase
0.67
0.22
0.36
0.09
32.76
86.21
100.00
A
A
6.1.1.3 Roadbase
0.76
0.29
0.41
0.07
37.93
91.38
100.00
A
A
6.1.1.4 Asphaltic concrete binder course
0.93
0.69
0.24
74.29
100.00
A
A
6.1.1.5 Asphaltic concrete wearing course
0.93
0.56
0.37
60.00
100.00
A
A
Flexible Pavement
3.31
0.02
0.23
0.36
0.38
0.41
0.75
0.79
0.37
0.54
7.36
18.12
29.67
42.02
64.81
88.80
100.00
A
A
6.1.2 Furniture
6.1.2.1 Traffic Signage
0.01
0.00
0.00
40.38
100.00
A
A
6.1.2.2 Pavement Marking
0.02
0.00
0.02
8.82
100.00
A
A
6.1.2.3 Road Kerb
0.18
0.03
0.04
0.04
0.04
0.04
15.17
36.55
57.93
78.62
100.00
A
A
6.1.2.4 Traffic Signal System
0.29
0.12
0.17
40.38
100.00
A
A
6.1.2.5 Modification works at existing main road
0.11
0.05
0.07
40.38
100.00
A
A
Furniture
0.61
0.03
0.04
0.04
0.20
0.30
4.47
10.77
17.07
50.58
100.00
A
A
Access Road Road (Road 1,2,3 and 3a)
S
S
A
A
6.2 Platforming
6.2.1 Zone 1
3.92
0.02
0.23
0.36
0.41
0.45
0.79
1.00
0.67
0.46
6.21
15.30
25.75
37.16
57.38
82.85
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
0.01
0.09
8.70
100.00
Jun
Jul
Aug
Sep
Oct
0.10
S
A
A
6.2.1.1.2 Subbase
2.57
0.63
1.88
0.06
24.39
97.56
100.00
A
A
6.2.1.1.3 Roadbase
2.30
1.68
0.62
73.17
100.00
A
A
6.2.1.1.4 Asphaltic concrete binder course
3.43
1.96
1.47
57.14
100.00
A
A
6.2.1.1.5 Asphaltic concrete wearing course
3.14
1.02
2.11
32.61
100.00
A
A
Zone 1
11.54
0.01
0.72
1.88
1.74
2.58
2.49
2.11
0.07
6.29
22.62
37.72
60.06
81.68
100.00
A
A
6.2.2 Zone 2
6.2.2.1 Flexible Pavement
6.2.2.1.1 Subgrade
0.18
0.10
0.09
52.17
100.00
A
A
6.2.2.1.2 Subbase
4.81
2.47
2.34
51.35
100.00
A
A
6.2.2.1.3 Roadbase
4.29
1.59
2.69
37.14
100.00
A
A
6.2.2.1.4 Asphaltic concrete binder course
6.41
1.47
4.94
22.86
100.00
A
A
6.2.2.1.5 Asphaltic concrete wearing course
5.86
0.52
5.17
0.17
8.82
97.06
100.00
A
A
Zone 2
21.54
0.10
2.56
3.93
4.16
5.46
5.17
0.17
0.44
12.31
30.55
49.86
75.21
99.20
100.00
0.10
2.56
3.93
4.17
6.18
7.05
1.92
2.58
2.49
2.11
0.29
8.01
19.89
32.49
51.17
72.48
78.27
86.07
93.61
100.00
A
A
Platforming
33.08
S
A
A
6.3 Conveyor Belt Corridor and Gravel-Surfaced Service Road
6.3.1 Flexible Pavement
6.3.1.1 Subgrade
S
S
S
0.02
0.01
0.01
0.01
24.29
67.14
100.00
A
A
6.3.1.2 Subbase
0.15
0.02
0.06
0.07
0.00
11.43
54.29
98.57
100.00
A
A
Conveyor Belt Corridor and Gravel-Surfaced Service Road
0.17
0.01
0.01
0.02
0.06
0.07
0.00
3.28
9.08
23.41
60.47
98.76
100.00
A
A
6.4 Security Fencing
0.76
0.01
0.13
0.13
0.13
0.13
0.13
0.11
1.10
18.23
34.81
51.93
69.06
85.64
100.00
A
A
Civil Engineering Works
S
S
37.93
0.01
0.01
0.02
0.06
0.07
0.10
2.56
3.95
4.40
6.66
7.59
2.49
3.50
3.62
2.89
0.01
0.04
0.11
0.27
0.44
0.70
7.44
17.85
29.46
47.03
67.03
73.60
82.83
92.37
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
7 Miscellaneous Work
7.1 Reinforced Concrete Fire Fighting Tank
0.81
0.20
0.20
0.21
0.21
24.59
49.18
74.59
100.00
A
A
7.2 High Masts
0.64
0.04
0.04
0.05
0.04
0.05
0.05
0.04
0.05
0.04
0.05
0.04
0.05
0.05
0.04
0.01
6.03
12.99
20.19
27.15
34.34
41.53
48.03
55.22
62.18
69.37
76.33
83.53
90.72
97.68
100.00
A
A
7.3 Manholes
0.30
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.01
6.03
12.99
20.19
27.15
34.34
41.53
48.03
55.22
62.18
69.37
76.33
83.53
90.72
97.68
100.00
A
A
7.4 Barrier Post (500 Nos.)
0.11
0.04
0.04
0.03
35.63
70.11
100.00
A
A
7.5 Other Foundations
0.13
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
6.03
12.99
20.19
27.15
34.34
41.53
48.03
55.22
62.18
69.37
76.33
83.53
90.72
97.68
100.00
A
A
Miscellaneous Work
1.99
0.06
0.07
0.08
0.07
0.08
0.08
0.07
0.08
0.07
0.28
0.27
0.28
0.32
0.11
0.06
3.23
6.96
10.81
14.54
18.40
22.25
25.73
29.58
33.31
47.17
60.90
75.09
91.33
97.04
100.00
A
A
8 Mechanical Works
8.1 Air conditioning & Mechanical Ventilation Services
0.57
0.04
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.03
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
8.2 Fire Protection Services
4.52
0.30
0.41
0.41
0.37
0.41
0.39
0.41
0.39
0.41
0.41
0.39
0.22
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
8.3 Plumbing Services
0.33
0.02
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
Mechanical Works
5.42
0.36
0.49
0.49
0.44
0.49
0.47
0.49
0.47
0.49
0.49
0.47
0.27
6.69
15.70
24.71
32.85
41.86
50.58
59.59
68.31
77.33
86.34
95.06
100.00
A
A
9 Electrical Works
9.1 CUB 1
0.03
0.00
0.01
0.01
0.00
8.57
52.86
97.14
100.00
A
A
9.2 CUB 2
0.03
0.01
0.02
35.29
100.00
A
A
9.3 CUB 3
0.02
0.01
0.01
58.49
100.00
A
A
9.4 CUB 4
0.03
0.00
0.01
0.01
11.43
55.71
100.00
A
A
9.5 Warehouse 1 (enclosed)
0.17
0.03
0.09
0.06
16.95
67.80
100.00
A
A
9.6 Warehouse 2 (open)
0.14
0.04
0.07
0.02
32.76
86.21
100.00
A
A
9.7 On-shore Infrastructure Works
1.24
S
A
A
9.8 Check Point Building
S
S
0.09
0.06
0.03
65.71
100.00
0.08
0.31
0.31
0.30
0.22
6.56
31.97
57.38
81.97
100.00
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Financial Breakdown
Item Description
Weightage %
2013
Nov
2014
Dec
Jan
Feb
Mar
Apr
May
Jun
2015
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
A
A
9.9 Boom Gate Control System, CCTV System and Intercom System
0.21
0.01
0.05
0.05
0.05
0.04
6.56
31.97
57.38
81.97
100.00
A
A
9.10 Weigh Bridge System
0.27
0.04
0.09
0.09
0.05
16.13
48.39
81.72
100.00
A
A
Electrical Works
2.23
0.06
0.05
0.01
0.00
0.04
0.09
0.10
0.17
0.42
0.48
0.48
0.33
2.87
4.90
5.48
5.52
7.48
11.41
15.92
23.38
42.40
64.00
85.36
100.00
A
A
10 Telephone Works
10.1 Checkpoint Building
0.01
0.00
0.01
0.00
27.14
71.43
100.00
A
A
10.2 Warehouse 1
0.02
0.00
0.01
0.01
15.87
63.49
100.00
A
A
Telephone Works
0.03
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
12.19
32.07
44.89
44.89
44.89
44.89
44.89
44.89
53.64
79.88
100.00
A
A
11 ICT Structured Cabling System
11.1 Checkpoint Building
0.01
0.00
0.00
0.00
0.00
11.43
55.71
98.57
100.00
A
A
11.2 Warehouse 1
0.01
0.00
0.00
0.00
15.87
63.49
100.00
A
A
ICT Structured Cabling System
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.59
32.13
56.84
57.66
57.66
57.66
64.38
84.54
100.00
A
A
100.00
Grand Toral
Monthly Progress
Cumulative Progress
1.70
1.31
1.69
1.25
1.29
1.62
1.67
1.83
2.98
2.62
2.81
3.60
4.08
4.39
6.46
7.91
8.06
11.61
10.20
5.00
6.11
5.84
4.44
1.53
1.70
1.31
1.69
1.25
1.29
1.62
1.67
1.83
2.98
2.62
2.81
3.60
4.08
4.39
6.46
7.91
8.06
11.61
10.20
5.00
6.11
5.84
4.44
2.26
1.53
1.00
4.54
6.22
7.48
8.76
10.38
12.05
13.89
16.87
19.49
22.30
25.90
29.98
34.37
40.83
48.74
56.80
68.41
78.61
83.61
89.72
95.56
100.00
1.53
3.22
2.26
3.26
(%)
0.73
0.04
Nov
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix F
Contractors Manpower on Site
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Contract No.: SPMU/05/2013
ATTACHMENT F - MANPOWER SUMMARY
MANPOWER ON SITE
ITEM
DESCRIPTION
NO.
DATE
10
11
12
13
14
SUN
15
16
17
18
19
20
21
SUN
22
23
24
SUN
25
26
27
28
HOL
29
31
30
31
SUN
SITE AGENT
PROJECT MANAGER
PROJECT ENGINEER
SITE ENGINEER
QUANTITY SURVEYOR
SURVEYOR
10
ASST. SURVEYOR
11
CHAINMEN
10
12
13
14
ADMIN CLERK
15
STORE KEEPER
2
-
16
STORE CLERK
17
DIESEL RECORDER
18
LAB TECHNICIAN
19
20
LAB HELPER
21
22
MECHANIC
23
WELDER
24
WATCHMAN
25
TRANSPORT
26
LORRY DRIVER
10
10
11
11
11
11
11
10
10
10
27
EXCAVATOR OPERATOR
10
10
10
10
10
10
10
11
11
11
11
11
11
28
BULLDOZER OPERATOR
29
ROLLER OPERATOR
30
GRADER OPERATOR
31
SHOVEL OPERATOR
32
33
BACKHOE OPERATOR
34
35
CRANE OPERATOR
36
37
GENERAL WORKERS
12
12
12
12
12
12
12
12
12
12
12
12
13
13
13
13
13
13
13
13
13
13
15
15
15
15
15
42
43
48
54
56
57
58
59
54
54
37
38
44
47
59
64
64
61
61
60
55
55
59
59
62
32
32
30
30
Total:
COMMENTS
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix G
Contractor's Machinery on Site
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Contract No.: SPMU/05/2013
ATTACHMENT G - MACHINERY SUMMARY
ITEM
DESCRIPTION
NO.
1.00 CATEGORY: EXCAVATOR
1.10 KOBELCO SK 200
1 G731
2 G870
3 G1121
4 G1139
5 G801
DATE
Sun / Hol.
SUN
10
11
12
13
14
SUN
15
16
17
18
19
20
21
SUN
22
23
24
SUN
25
26
27
28
HOL
29
31
30
31
SUN
W
W
W
W
W
W
W
W
S/B
S/B
S/B
S/B
W
W
W
W
S/B
S/B
S/B
S/B
W
W
W
W
W
W
W
W
B
W
W
W
B
W
W
W
B
W
W
W
B
I
I
I
B
W
W
W
B
W
W
W
B
W
W
W
B
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S/B
S/B
S/B
S/B
W
W
W
W
W
W
W
W
I
I
I
I
A
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A
A
W
W
W
I
I
W
W
W
I
I
S/B
S/B
S/B
W
W
W
W
W
S/B
S/B
S/B
S/B
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
I
I
I
I
B
W
I
I
I
B
W
I
I
I
B
W
I
I
I
B
W
I
I
I
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
W
W
W
W
B
I
W
I
W
B
I
W
I
W
B
I
W
I
W
B
I
S/B
I
S/B
S/B
I
W
I
W
W
I
W
I
W
W
S/B
I
S/B
I
I
S/B
I
S/B
I
I
W
I
W
I
I
S/B
I
S/B
I
I
S/B
S/B
W
A
W
W
W
W
W
W
W
W
W
W
W
W
I
W
I
W
I
W
I
I
I
W
I
W
S/B
I
S/B
I
W
I
S/B
I
W
A
A
A
A
A
W
I
B
I
I
I
S/B
I
B
W
I
W
W
I
B
S/B
I
S/B
S/B
I
B
W
I
W
W
I
B
W
I
W
W
I
I
W
I
W
W
I
I
W
I
W
W
I
I
W
I
W
W
I
I
I
I
I
I
I
I
W
I
W
W
I
I
W
I
W
W
I
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
W
W
W
I
W
I
B
W
W
I
W
I
B
W
W
I
W
I
B
W
W
I
S/B
I
B
S/B
S/B
I
W
I
B
W
W
I
W
I
W
W
W
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A
A
I
B
W
B
S/B
B
W
B
W
B
W
B
W
B
W
B
I
B
I
B
I
B
I
B
I
B
A
B
B
W
B
B
W
B
B
W
I
B
W
I
B
W
B
B
W
B
B
W
B
B
W
B
B
W
B
B
S/B
B
B
W
B
B
W
B
B
I
B
B
I
B
B
I
B
B
I
W
W
W
W
W
W
A
S/B
S/B
S/B
S/B
S/B
S/B
I
W
W
W
W
W
W
S/B
S/B
S/B
S/B
S/B
S/B
S/B
W
S/B
S/B
W
S/B
W
S/B
W
W
W
W
W
W
W
B
W
W
W
W
W
W
B
W
W
W
W
W
W
B
W
W
W
W
W
W
B
I
I
I
I
I
I
B
W
I
I
W
I
W
B
W
I
I
W
I
W
B
W
I
I
W
I
W
B
W
I
I
W
I
W
W
W
B
I
W
W
W
W
W
B
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
B
W
W
W
W
W
W
B
W
W
W
W
W
W
B
W
W
W
W
W
W
B
W
W
W
W
W
W
B
W
W
W
W
W
W
B
B
S/B
S/B
S/B
S/B
S/B
B
B
W
W
W
W
S/B
B
B
W
W
W
W
S/B
B
B
I
I
I
I
I
B
B
I
I
I
I
I
B
B
I
I
I
I
I
B
B
I
I
I
I
I
B
B
W
W
W
W
W
W
COMMENTS
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju, Bintulu, Sarawak
Onshore Facilities Package for Phase 1 Works
Contract No.: SPMU/05/2013
ATTACHMENT G - MACHINERY SUMMARY
ITEM
NO.
DESCRIPTION
DATE
Sun / Hol.
SUN
10
11
12
13
14
SUN
4.00 MOTORGRADER
1 D95
5.00 CATEGORY: ROLLER
5.10 HAMM ROLLER
1 G1083
2 G941
3 G1166
15
16
17
18
19
20
21
SUN
22
23
24
SUN
25
26
27
28
HOL
29
31
30
31
SUN
S/B
S/B
S/B
W
A
A
W
W
I
W
W
I
W
W
I
S/B
W
I
S/B
W
I
S/B
W
I
S/B
W
I
S/B
W
I
W
W
I
S/B
S/B
I
W
W
I
W
W
I
I
I
I
I
I
I
I
I
I
I
I
I
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
B
W
W
B
W
W
B
W
W
B
W
W
B
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
B
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
KEY :
[ ] = Sunday/Public holiday
W = Working
I = Idling
D = Demobilised from Site
S = Subcontractor Plant
COMMENTS
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
Appendix H
Progress Photos
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works
The Construction and Completion of Proposed Samalaju Port Development Project at Samalaju,
Bintulu, Sarawak, Malaysia
On-Shore Facilities Package for Phase 1 Works