ITEM NO.
A.
B.
C.
WORK DESCRIPTION
M.H./ UNIT
HIGH
4.00
4.70
6.16
4.70
2.00
2.35
3.08
2.35
1.60
1.88
2.46
1.88
SQ.M.
SQ.M.
3.34
6.66
1.67
3.33
1.34
2.66
SQ.M.
SQ.M.
SQ.M.
17.20
22.00
1.00
9.00
11.00
0.60
6.88
8.80
0.40
FORMWORKS FABRICATION
SQ.M.
2.15
1.08
0.86
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
0.50
2.58
2.06
1.70
0.25
1.29
1.03
0.85
0.20
1.03
0.82
0.68
1.67
2.16
0.83
1.08
0.67
0.86
7.00
5.60
3.50
2.80
2.80
2.24
PC
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
2.00
0.29
0.30
0.53
1.94
0.85
0.70
1.60
0.43
0.27
0.53
0.91
1.00
0.14
0.36
0.27
0.97
0.43
0.35
0.80
0.21
0.13
0.27
0.46
0.80
0.11
0.29
0.21
0.77
0.34
0.28
0.64
0.17
0.11
0.10
0.36
PC
S.F.
2.00
0.83
1.00
0.42
0.80
0.33
SQ.M.
SQ.M.
B.F.
B.F.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
2.66
2.00
0.26
0.36
1.00
14.00
9.00
7.00
1.33
1.00
0.13
0.18
0.50
7.00
4.50
3.50
1.06
0.90
0.10
0.14
0.40
5.60
3.60
2.80
PC.
PC.
0.80
4.00
0.40
2.00
0.32
1.60
SQ.M.
SQ.M.
SQ.M.
SQ.M.
9.26
6.24
9.26
6.34
4.63
3.12
4.63
3.12
3.70
2.50
3.70
2.50
STRIPPING OF FORMS
E.
AVERAGE
WALL ON GROUND
WALL ABOVE 10'
BEAMS
COLUMNS
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
STRIP OF FORMS
FLOOR SLAB AT GRADE STRIP OF FORMS
WORK DESCRIPTION
M.H./ UNIT
FIXED WOODEN
ALUMINUM FRAME WINDOWS
SLIDING GLASS DOOR
HOLLOW METAL DOOR
ROLLING DOORS
FIXED WINDOW
DOOR LOCKSET
DOOR JAMB FABRICATION
DOOR JAMB INSTALLATION
CYCLONE WIRE INSTALLATION
F.
G.
AVERAGE
HIGH
SQ.M.
EACH
EACH
EACH
EACH
S.F.
SET
B.F.
B.F.
SQ.M.
6.76
20.00
24.00
20.00
50.00
0.63
3.20
0.44
0.66
6.24
3.38
10.00
12.00
10.00
25.00
0.31
1.60
0.22
0.33
3.12
2.70
8.00
9.60
8.00
20.00
0.25
1.28
0.18
0.26
2.50
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
3.34
2.86
4.00
10.00
21.06
8.70
6.00
9.00
8.00
1.00
6.00
4.00
2.40
3.60
17.00
2.28
1.43
1.67
1.43
2.00
5.00
10.53
4.35
3.00
4.50
4.00
0.50
3.00
2.00
1.20
1.80
9.50
1.14
0.72
1.34
1.34
1.60
4.00
8.42
3.48
2.40
3.60
3.20
0.40
3.40
1.60
0.96
1.44
6.80
0.91
0.57
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
3.20
2.66
4.00
10.66
11.94
1.60
1.33
2.00
5.33
5.97
1.28
1.06
1.60
4.26
4.78
TINSMITHING WORK
CORR GI SHEETS:
LIFTING
INSTALLATION
INSTALLATION OF ASBESTOS ROOFING
INSTALLATION OF ALUMINUM GI SHEET
COPPER CLADDING ROOF DECK
FAB, GI GUTTER
GI SHEET ROOFING
FAB OF GI GUTTER
FAB. GI DOWNSPOUT
GUTTER CUT & SHAPE
INST. OF GUTTER
DOWNSPOUT CUT AND SHAPE
DOWNSPOUT INSTALLATION
CORR. GI ROOFING
CORR ALUMINUM ROOFING
BUILT UP ROOFING 4 PLY
PROTECTED METAL
CORR. ASBESTOS INST., LIFTING & HAULING
LEADERS & GUTTERS
SQ.M.
SQ.M.
SHT.
SHT.
L.M.
SHT.
SHT.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
2.16
6.12
2.00
1.60
1.01
6.94
1.64
1.05
1.94
0.32
1.78
0.59
0.27
3.60
3.60
17.00
4.00
3.40
1.20
1.08
3.06
1.00
9.80
0.51
3.47
0.82
0.53
0.97
0.16
9.00
0.30
0.13
1.80
1.80
8.50
2.00
1.70
0.60
0.86
2.45
0.80
0.64
0.40
2.78
0.66
0.42
1.78
0.13
0.71
0.24
0.11
1.44
1.44
6.80
1.60
1.36
0.48
CU.M.
CU.M.
10.00
50.00
5.00
25.00
4.00
20.00
Page 2 of 6
WORK DESCRIPTION
M.H./ UNIT
EARTH WORKS
MACHINE EXCAVATION:
SAND
SAND AND MARL
MARL
GRANULAR BACKFILL
GRANULAR SOIL BACKFILL
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND
EXCAVATION OF SAND &MARL
EXCAVATION OF MARL
BACKFILL OF SAND
BACKFILL OF SAND &MARL
BACKFILL OF MARL
FLOOR SLAB & GRADE:
GRADING MANUAL
EXCAVATION AND BACKFILL
FINE GRADING & FINISHING
GRADING MANUAL
FINISHING SOIL SURFACE
DIKES
ROAD WORKS
BASE COURSE
CURBS & GUTTER
4" THK ROAD
6" THK ROAD
8" THK ROAD
TROWEL FINISH
SPECIAL TOPPING
4" STONE OR SHELL ROAD
6" STONE OR SHELL ROAD
8" STONE OR SHELL ROAD
ACID PROOFING
ASPHALT PAVING:
FINE GRADING & FINISHING
PLACE BASE COURSE
ASPHALT
ACID BLOCK OR PAVING BLOCK:
FIND GRADING
INSTALL BRICK
CRUSH STONE OR SHELL SURFACING
FINE GRADING
PLACE SPREAD AND COMPACT STONE TO 4"
OVER 9" THK
Page 3 of 6
AVERAGE
HIGH
SQ.M.
SQ.M.
2.00
2.86
1.00
1.43
0.80
1.14
KGS
KGS
KGS
CU.M.
CU.M.
0.14
0.16
0.20
32.00
3.60
0.07
0.08
0.10
16.00
1.80
0.06
0.06
0.08
12.80
1.44
CU.M.
CU.M.
CU.M.
SQ.M.
14.00
28.00
54.00
5.60
7.00
14.00
27.00
2.80
5.60
11.20
21.60
2.24
CU.M.
KGS
KGS
42.00
1.06
0.66
21.00
0.53
0.33
16.80
0.42
0.26
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
1.20
1.60
2.20
2.40
3.00
0.60
0.80
1.10
1.20
1.50
0.48
0.64
0.88
0.96
1.20
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
8.00
13.00
21.00
11.00
16.00
24.00
4.00
6.50
10.50
5.50
8.00
12.00
3.20
5.20
8.40
4.40
6.40
9.60
SQ.M.
CU.M.
2.60
36.00
1.30
18.00
1.04
14.40
SQ.M.
SQ.M.
CU.M.
0.90
1.10
2.40
0.45
0.55
1.20
0.36
0.44
0.96
SQ.M.
CU.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
CU.M.
0.24
3.60
2.60
2.80
3.00
0.64
2.40
0.64
0.84
1.04
1.20
0.12
1.80
1.30
1.40
1.50
0.32
1.20
0.32
0.42
0.52
0.60
0.10
1.44
1.04
1.12
1.20
0.26
0.96
0.26
0.34
0.42
0.48
SQ.M.
SQ.M.
SQ.M.
0.84
0.40
0.40
0.42
0.20
0.20
0.34
0.16
0.16
SQ.M.
SQ.M.
0.84
8.40
0.42
4.20
0.34
3.36
SQ.M.
SQ.M.
SQ.M.
0.64
0.84
1.04
0.32
0.42
0.52
0.26
0.34
0.42
WORK DESCRIPTION
M.H./ UNIT
TANK CUSHION
SAND CUSHION
APHALT RETAINER RING
NON GRANULAR BACKFILL
EXCAVATION MANUAL:
COMMON EARTH
LOAN OF SAND
CLAY OR HEAVY SOIL ROCK
ROCK
MECHANICAL EXCAVATION
COMMON EARTH
ROCK W/ JACKHAMMER
BACKFILLING
COMMON MANUAL
GRAVEL FILL MANUAL
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH
2 TO 3
3 TO 4
4 TO 5
PLACING BINDER GRAVEL
ESCOMBRO BACKFILLING
SPREADING, TAMPING AND GRADING
MECHANICAL COMPACTION, PLATE COMPACTION
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12"
CLEARING UNDERGROWTH AND SHRUBS
DISPOSAL OF SOIL
MAULING OF SOIL
GRAVEL FILL
EXCAVATION CRANE AND CLAMPSHELL
WITH 8-MEN AND 2 CARPENTERS
AVERAGE
HIGH
CU.M.
SQ.M.
CU.M.
1.40
0.40
4.00
0.70
0.20
2.00
0.56
0.16
1.60
CU.M.
CU.M.
CU.M.
CU.M.
16.00
2.62
3.28
5.26
8.00
1.31
1.64
2.63
6.40
1.05
1.31
2.10
CU.M.
CU.M.
13.34
33.34
6.67
16.67
5.34
13.34
CU.M.
CU.M.
1.64
10.00
0.82
5.00
0.66
4.00
L.M.
L.M.
L.M.
L.M.
CU.M.
CU.M.
SQ.M.
CU.M.
2.50
3.34
5.00
6.66
0.21
0.42
0.96
0.11
1.25
1.67
2.5
3.33
0.11
0.21
0.48
0.06
1
2.34
2
2.66
0.08
0.17
0.38
0.04
SQ.M.
SQ.M.
CU.M.
CU.M.
CU.M.
0.1
0.06
3.38
2.00
4.14
0.05
0.03
1.69
1.00
2.07
0.04
0.02
1.35
0.8
1.66
CU.M.
2.14
1.07
0.86
1.32
1.32
1.48
1.64
1.97
2.16
2.3
2.64
0.66
0.66
0.74
0.82
0.98
1.08
1.15
1.32
0.53
0.53
0.59
0.66
0.70
0.86
0.92
1.06
4.38
6.58
9.84
13.14
19.7
20.62
24.1
27.38
30.68
32.86
36.14
41.08
2.19
3.29
4.92
6.57
9.85
10.31
12.05
13.69
15.34
16.43
18.07
20.54
1.75
2.63
3.94
5.26
7.98
8.25
9.64
10.95
12.27
13.14
14.46
16.43
0.38
1.48
1.64
1.96
0.19
0.74
0.82
0.98
0.15
0.59
0.66
0.78
K.
TRADE: UNDERGROUND PIPING AND PLUMBING WORKS
1.00 LAYING ASBESTOS PIPES:
1//2
L.M.
3/4"
L.M.
1 1/4"
L.M.
1 1/2 TO 2"
L.M.
2 1/2"
L.M.
3"
L.M.
3 1/2"
L.M.
4"
L.M.
2.00 CAST IRON PIPE
2"
L.M.
4"
L.M.
6"
L.M.
8"
L.M.
10"
L.M.
12"
L.M.
14"
L.M.
16"
L.M.
18"
L.M.
20"
L.M.
24"
L.M.
30"
L.M.
3.00 LAYING PVC PIPE
1/2 TO 3/4"
L.M.
1 TO 1 1/4"
L.M.
1 1/2 TO 2"
L.M.
2 1/2"
L.M.
Page 4 of 6
WORK DESCRIPTION
M.H./ UNIT
3"
4"
5"
6"
4.00 LAYING RCP 8 MEN (1 TEAM)
24"
36"
48"
6-18"
LAVATORY
WATER CLOSET
URINAL UTILITY STALL
URINAL PEDESTRAL TYPE
SHOWER AND INSTALL
5 MAN GROUP SHOWER
BAH TUBS
SLOPE SINK
HOT WATER HEATER
16 PERSON WASH SINK
DRINKING FOUNTAIN
EYE WASH
MISC. FIXTURES
PARTITIONS
LAYING OF 24" RCP
LAYING OF 36" RCP
LAYING OF 48" RCP
L.
AVERAGE
L.M.
L.M.
L.M.
L.M.
2.16
2.62
3.28
4.92
L.M.
L.M.
L.M.
L.M.
9.00
12.8
21.34
2.66
1.08
1.31
1.64
2.46
HIGH
0.86
1.05
1.31
1.97
4.00
6.40
10.67
1.33
3.20
5.12
8.54
1.06
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
PIPE
PIPE
PIPE
16.00
24.00
48.00
32.00
20.00
72.00
48.00
28.00
28.00
52.00
26.00
16.00
4.00
16.00
8.00
12.80
21.32
8.00
12.00
24.00
16.00
10.00
36.00
24.00
14.00
14.00
26.00
13.00
9.00
2.00
8.00
4.00
6.40
10.66
6.40
9.60
19.20
12.80
8.00
28.80
19.20
11.20
11.20
20.80
10.40
6.40
1.60
6.40
3.20
5.12
8.53
S.M.
S.M.
S.M.
S.M.
5.00
24.00
10.00
10.00
2.50
12.00
5.00
5.00
2.00
9.60
4.00
4.00
S.M.
S.M.
34.00
60.00
17.00
30.00
13.60
24.00
FLG.
S.M.
L.M.
EACH
EACH
EACH
EACH
L.M.
L.M.
8.00
1.60
5.40
3.00
16.00
12.00
8.00
7.40
3.00
4.00
0.80
2.70
1.50
8.00
6.00
4.00
3.70
1.50
3.20
0.64
2.16
1.20
6.40
4.80
3.20
2.96
1.20
EACH
S.M.
1.00
2.40
0.50
1.20
0.40
0.96
S.M.
S.M.
S.M.
S.M.
S.M.
S.M.
28.00
12.00
140.00
1.20
1.40
5.40
14.00
6.00
70.00
0.60
0.70
2.70
11.20
4.80
56.00
0.48
0.56
2.16
S.M.
PC.
2.40
1.60
1.20
0.80
0.96
0.64
TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS
TRADE:FIRE PROOFING
INSTALL STUDS
INSTALL MESH
POURED
FORMING
STRIP FORMS
POUR CONCRETE
CURING/PATCHING
FINISHING
TROWEL, PLASTERED
PNEUMATIC APPLICATION
GUNITE
APPLY FINEBRICK OR BLOCK
Page 5 of 6
WORK DESCRIPTION
M.H./ UNIT
O.
P.
Q.
AVERAGE
HIGH
S.M.
S.M.
5.00
6.00
2.50
3.00
2.00
2.40
EACH
EACH
EACH
10.00
30.00
10.00
5.00
15.00
5.00
4.00
12.00
4.00
EACH
EACH
EACH
20.00
20.00
10.00
10.00
10.00
5.00
8.00
8.00
4.00
EACH
EACH
2.00
10.00
1.00
5.00
80.00
4.00
L.M.
L.M.
L.M.
L.M.
2.40
6.00
0.60
0.60
1.20
3.00
0.30
0.30
0.96
2.40
0.24
0.24
TON
S.M.
S.M.
20.00
1.10
0.64
1.00
0.55
0.32
9.00
44.00
26.00
TON
S.M.
TON
16.00
0.86
60.00
8.00
30.00
6.40
0.34
24.00
L.M.
S.M.
S.M.
EACH
EACH
EACH
EACH
L.M.
EACH
EACH
L.M.
7.00
12.00
36.00
48.00
24.00
10.00
16.00
14.00
48.00
16.00
7.00
3.50
6.00
18.00
24.00
12.00
5.00
8.00
7.30
24.00
8.00
3.50
2.80
4.80
14.40
19.20
9.60
4.00
6.40
5.84
19.20
6.40
2.80
MISCELLANEOUS
WATER STOP INSTALLATION
CAULKING SLAB JOINT
ASPHALTING
GROUTNG AND TOOL PLASTERING
WATER PROOFING RUBBERIZED
COPPER CLADDING ROOF DECK
WATER PROOFING FLINKOTE
DEMOLITION OF ADOBE WALL
PAINTING
COPPER WATER STOP CUT AND SHAPE
COPPER WATER STOP CUT AND INSTALLATION
SETTING ANCHOR BOLT
SETTING ANCHOR BOXES
L.M.
L.M.
S.M.
S.M.
S.M.
L.M.
S.M.
CU.M.
S.M.
L.M.
L.M.
KG
CU.M.
1.34
0.40
1.60
3.34
1.10
1.00
0.54
3.20
0.68
11.00
22.00
97.00
3.64
0.67
0.20
0.80
1.67
0.55
0.50
0.27
1.60
0.34
6.00
11.00
49.00
1.82
0.54
0.16
0.64
0.84
0.28
0.25
0.14
0.80
0.17
0.03
0.06
0.24
0.91
TRADE:PERMANENT FENCING
INSTALL FENCE
INSTALL GATES
TO RAIL
BARBE WIRE, 3 STRANDS
TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL
OLD STRUCTURAL STEEL
NEW FLAT FLAT PLATES
SURFACE PREPARATION:
IN TERMS OF WEIGHT
IN TERMS OF AREA
SAND PREPARATION