LABOR PRODUCTION TABLE

ITEM NO.

A.

B.
C.

WORK DESCRIPTION

M.H./ UNIT

HIGH

FORM WORKS INSTALLATION


SQ.M.
SQ.M.
SQ.M.
SQ.M.

4.00
4.70
6.16
4.70

2.00
2.35
3.08
2.35

1.60
1.88
2.46
1.88

SQ.M.
SQ.M.

3.34
6.66

1.67
3.33

1.34
2.66

SQ.M.
SQ.M.
SQ.M.

17.20
22.00
1.00

9.00
11.00
0.60

6.88
8.80
0.40

FORMWORKS FABRICATION

SQ.M.

2.15

1.08

0.86

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

0.50
2.58
2.06
1.70

0.25
1.29
1.03
0.85

0.20
1.03
0.82
0.68

1.67
2.16

0.83
1.08

0.67
0.86

7.00
5.60

3.50
2.80

2.80
2.24

PC
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.

2.00
0.29
0.30
0.53
1.94
0.85
0.70
1.60
0.43
0.27
0.53
0.91

1.00
0.14
0.36
0.27
0.97
0.43
0.35
0.80
0.21
0.13
0.27
0.46

0.80
0.11
0.29
0.21
0.77
0.34
0.28
0.64
0.17
0.11
0.10
0.36

PC
S.F.

2.00
0.83

1.00
0.42

0.80
0.33

SQ.M.
SQ.M.
B.F.
B.F.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

2.66
2.00
0.26
0.36
1.00
14.00
9.00
7.00

1.33
1.00
0.13
0.18
0.50
7.00
4.50
3.50

1.06
0.90
0.10
0.14
0.40
5.60
3.60
2.80

PC.
PC.

0.80
4.00

0.40
2.00

0.32
1.60

SQ.M.
SQ.M.
SQ.M.
SQ.M.

9.26
6.24
9.26
6.34

4.63
3.12
4.63
3.12

3.70
2.50
3.70
2.50

STRIPPING OF FORMS

INSTALLION OF CARPENTRY WORKS


PLYWOOD PARTITION
T & G FLOORING AND SHORING
CEILING FRAME
SIDING FRAME
FLOORING FRAME
WOODEN POSS ERECTION
TRUSS FABRICATION
TRUSS INSTALLATION
GIRTS INSTALLTION
PLATES INSTALLATION
PURLINS INSTALLATION
FASCIA BOARD INSTALLATION
1/4" or 3/4" thk PLYWOOD
CUTTING BY MANUAL
ASSEMBLY
CEILNG:
FRAME INSTALLATION
PLYWOOD INSTALLLATION
CABINET BOARDING
CABINET FRAMING
WOOD WALL PARTITION
PANEL WALL
FORMING WEIGHT ANCHOR BOLT
WET FORMING

E.

AVERAGE

WALL ON THE GROUND


WALL ABOVER GROUND
BEAMS
COLUMN
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
FORMING ONLY
FORMING AND SHORING
WOOD WALL AND PARTITION

WALL ON GROUND
WALL ABOVE 10'
BEAMS
COLUMNS
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
STRIP OF FORMS
FLOOR SLAB AT GRADE STRIP OF FORMS

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

DOORS AND WINDOWS


W-PANEL INSTALLATION
STEEL WINDOWS INSTALLATION
LOUVER WINDOWS INSTALLATION:
FIXED ASBESTOS
FIXED METAL LOUVERS
FIXED GI SHEETS
FIXED GLASS
Page 1 of 6

LABOR PRODUCTION TABLE


ITEM NO.

WORK DESCRIPTION

M.H./ UNIT

FIXED WOODEN
ALUMINUM FRAME WINDOWS
SLIDING GLASS DOOR
HOLLOW METAL DOOR
ROLLING DOORS
FIXED WINDOW
DOOR LOCKSET
DOOR JAMB FABRICATION
DOOR JAMB INSTALLATION
CYCLONE WIRE INSTALLATION
F.

G.

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

AVERAGE

HIGH

SQ.M.
EACH
EACH
EACH
EACH
S.F.
SET
B.F.
B.F.
SQ.M.

6.76
20.00
24.00
20.00
50.00
0.63
3.20
0.44
0.66
6.24

3.38
10.00
12.00
10.00
25.00
0.31
1.60
0.22
0.33
3.12

2.70
8.00
9.60
8.00
20.00
0.25
1.28
0.18
0.26
2.50

TRADE MASONRY WORKS


GROUTING and TOL PLASTERING
PEBBLE FINISHED
MABLE INSTALLATION
1/4" x 2' x 8" RED BRICKS
GLAZED TILES
UNGLAZED TILES
GLAZED TILE WALL
CONC. BLOCK INT. WALL
CONC. BLOCK EXT. WALL
BRICKWORK
PLASTER WALL AND CEILING
HOLLOW TILE WALL
ACOUSTICAL TILE WALL
VINYL FLOOR TILE
UNGLAZED OR MOSAIC FLOOR TILE
LAYING OF CHB & ADOBE
CEMENT FINISH
CONC. HOLLOW BLOCK LAYING:
6" CHB
4" CHB
8" CHB
VIT. TILES FLOOR
VIT. TILES WALL

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

3.34
2.86
4.00
10.00
21.06
8.70
6.00
9.00
8.00
1.00
6.00
4.00
2.40
3.60
17.00
2.28
1.43

1.67
1.43
2.00
5.00
10.53
4.35
3.00
4.50
4.00
0.50
3.00
2.00
1.20
1.80
9.50
1.14
0.72

1.34
1.34
1.60
4.00
8.42
3.48
2.40
3.60
3.20
0.40
3.40
1.60
0.96
1.44
6.80
0.91
0.57

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

3.20
2.66
4.00
10.66
11.94

1.60
1.33
2.00
5.33
5.97

1.28
1.06
1.60
4.26
4.78

TINSMITHING WORK
CORR GI SHEETS:
LIFTING
INSTALLATION
INSTALLATION OF ASBESTOS ROOFING
INSTALLATION OF ALUMINUM GI SHEET
COPPER CLADDING ROOF DECK
FAB, GI GUTTER
GI SHEET ROOFING
FAB OF GI GUTTER
FAB. GI DOWNSPOUT
GUTTER CUT & SHAPE
INST. OF GUTTER
DOWNSPOUT CUT AND SHAPE
DOWNSPOUT INSTALLATION
CORR. GI ROOFING
CORR ALUMINUM ROOFING
BUILT UP ROOFING 4 PLY
PROTECTED METAL
CORR. ASBESTOS INST., LIFTING & HAULING
LEADERS & GUTTERS

SQ.M.
SQ.M.
SHT.
SHT.
L.M.
SHT.
SHT.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

2.16
6.12
2.00
1.60
1.01
6.94
1.64
1.05
1.94
0.32
1.78
0.59
0.27
3.60
3.60
17.00
4.00
3.40
1.20

1.08
3.06
1.00
9.80
0.51
3.47
0.82
0.53
0.97
0.16
9.00
0.30
0.13
1.80
1.80
8.50
2.00
1.70
0.60

0.86
2.45
0.80
0.64
0.40
2.78
0.66
0.42
1.78
0.13
0.71
0.24
0.11
1.44
1.44
6.80
1.60
1.36
0.48

CONCRETE AND REBAR WORKS


PLACING CONCRETE:
SLAB ON FILL
SLIP FORM

CU.M.
CU.M.

10.00
50.00

5.00
25.00

4.00
20.00

Page 2 of 6

LABOR PRODUCTION TABLE


ITEM NO.

WORK DESCRIPTION

M.H./ UNIT

FLR FINISH UNHARDENED


CONC. FINISH HARDENED
REBAR WORKS:
GROUND FLR. INSTALLATION
UPPER FLR. INSTALLATION
FABRICATION
MIXING MANUAL
MIXING MACHINE
MORE THAN 1.80 CU.M. POUR:
CHUTE FROM TRUCK
CRANE AND BUCKET
WHEELING
FINISHING
CONCRETE POUR ON ELEVATED AND SHORED
SLAB FORMING CHUTE & BUCKET
PLACEMENT OF REBARS ON FOOTING
FIELD FABRICATION OF REBARS
I.

EARTH WORKS
MACHINE EXCAVATION:
SAND
SAND AND MARL
MARL
GRANULAR BACKFILL
GRANULAR SOIL BACKFILL
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND
EXCAVATION OF SAND &MARL
EXCAVATION OF MARL
BACKFILL OF SAND
BACKFILL OF SAND &MARL
BACKFILL OF MARL
FLOOR SLAB & GRADE:
GRADING MANUAL
EXCAVATION AND BACKFILL
FINE GRADING & FINISHING
GRADING MANUAL
FINISHING SOIL SURFACE
DIKES
ROAD WORKS
BASE COURSE
CURBS & GUTTER
4" THK ROAD
6" THK ROAD
8" THK ROAD
TROWEL FINISH
SPECIAL TOPPING
4" STONE OR SHELL ROAD
6" STONE OR SHELL ROAD
8" STONE OR SHELL ROAD
ACID PROOFING
ASPHALT PAVING:
FINE GRADING & FINISHING
PLACE BASE COURSE
ASPHALT
ACID BLOCK OR PAVING BLOCK:
FIND GRADING
INSTALL BRICK
CRUSH STONE OR SHELL SURFACING
FINE GRADING
PLACE SPREAD AND COMPACT STONE TO 4"
OVER 9" THK
Page 3 of 6

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

AVERAGE

HIGH

SQ.M.
SQ.M.

2.00
2.86

1.00
1.43

0.80
1.14

KGS
KGS
KGS
CU.M.
CU.M.

0.14
0.16
0.20
32.00
3.60

0.07
0.08
0.10
16.00
1.80

0.06
0.06
0.08
12.80
1.44

CU.M.
CU.M.
CU.M.
SQ.M.

14.00
28.00
54.00
5.60

7.00
14.00
27.00
2.80

5.60
11.20
21.60
2.24

CU.M.
KGS
KGS

42.00
1.06
0.66

21.00
0.53
0.33

16.80
0.42
0.26

CU.M.
CU.M.
CU.M.
CU.M.
CU.M.

1.20
1.60
2.20
2.40
3.00

0.60
0.80
1.10
1.20
1.50

0.48
0.64
0.88
0.96
1.20

CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.

8.00
13.00
21.00
11.00
16.00
24.00

4.00
6.50
10.50
5.50
8.00
12.00

3.20
5.20
8.40
4.40
6.40
9.60

SQ.M.
CU.M.

2.60
36.00

1.30
18.00

1.04
14.40

SQ.M.
SQ.M.
CU.M.

0.90
1.10
2.40

0.45
0.55
1.20

0.36
0.44
0.96

SQ.M.
CU.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
CU.M.

0.24
3.60
2.60
2.80
3.00
0.64
2.40
0.64
0.84
1.04
1.20

0.12
1.80
1.30
1.40
1.50
0.32
1.20
0.32
0.42
0.52
0.60

0.10
1.44
1.04
1.12
1.20
0.26
0.96
0.26
0.34
0.42
0.48

SQ.M.
SQ.M.
SQ.M.

0.84
0.40
0.40

0.42
0.20
0.20

0.34
0.16
0.16

SQ.M.
SQ.M.

0.84
8.40

0.42
4.20

0.34
3.36

SQ.M.
SQ.M.
SQ.M.

0.64
0.84
1.04

0.32
0.42
0.52

0.26
0.34
0.42

LABOR PRODUCTION TABLE


ITEM NO.

WORK DESCRIPTION

M.H./ UNIT

TANK CUSHION
SAND CUSHION
APHALT RETAINER RING
NON GRANULAR BACKFILL
EXCAVATION MANUAL:
COMMON EARTH
LOAN OF SAND
CLAY OR HEAVY SOIL ROCK
ROCK
MECHANICAL EXCAVATION
COMMON EARTH
ROCK W/ JACKHAMMER
BACKFILLING
COMMON MANUAL
GRAVEL FILL MANUAL
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH
2 TO 3
3 TO 4
4 TO 5
PLACING BINDER GRAVEL
ESCOMBRO BACKFILLING
SPREADING, TAMPING AND GRADING
MECHANICAL COMPACTION, PLATE COMPACTION
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12"
CLEARING UNDERGROWTH AND SHRUBS
DISPOSAL OF SOIL
MAULING OF SOIL
GRAVEL FILL
EXCAVATION CRANE AND CLAMPSHELL
WITH 8-MEN AND 2 CARPENTERS

AVERAGE

HIGH

CU.M.
SQ.M.
CU.M.

1.40
0.40
4.00

0.70
0.20
2.00

0.56
0.16
1.60

CU.M.
CU.M.
CU.M.
CU.M.

16.00
2.62
3.28
5.26

8.00
1.31
1.64
2.63

6.40
1.05
1.31
2.10

CU.M.
CU.M.

13.34
33.34

6.67
16.67

5.34
13.34

CU.M.
CU.M.

1.64
10.00

0.82
5.00

0.66
4.00

L.M.
L.M.
L.M.
L.M.
CU.M.
CU.M.
SQ.M.
CU.M.

2.50
3.34
5.00
6.66
0.21
0.42
0.96
0.11

1.25
1.67
2.5
3.33
0.11
0.21
0.48
0.06

1
2.34
2
2.66
0.08
0.17
0.38
0.04

SQ.M.
SQ.M.
CU.M.
CU.M.
CU.M.

0.1
0.06
3.38
2.00
4.14

0.05
0.03
1.69
1.00
2.07

0.04
0.02
1.35
0.8
1.66

CU.M.

2.14

1.07

0.86

1.32
1.32
1.48
1.64
1.97
2.16
2.3
2.64

0.66
0.66
0.74
0.82
0.98
1.08
1.15
1.32

0.53
0.53
0.59
0.66
0.70
0.86
0.92
1.06

4.38
6.58
9.84
13.14
19.7
20.62
24.1
27.38
30.68
32.86
36.14
41.08

2.19
3.29
4.92
6.57
9.85
10.31
12.05
13.69
15.34
16.43
18.07
20.54

1.75
2.63
3.94
5.26
7.98
8.25
9.64
10.95
12.27
13.14
14.46
16.43

0.38
1.48
1.64
1.96

0.19
0.74
0.82
0.98

0.15
0.59
0.66
0.78

K.
TRADE: UNDERGROUND PIPING AND PLUMBING WORKS
1.00 LAYING ASBESTOS PIPES:
1//2
L.M.
3/4"
L.M.
1 1/4"
L.M.
1 1/2 TO 2"
L.M.
2 1/2"
L.M.
3"
L.M.
3 1/2"
L.M.
4"
L.M.
2.00 CAST IRON PIPE
2"
L.M.
4"
L.M.
6"
L.M.
8"
L.M.
10"
L.M.
12"
L.M.
14"
L.M.
16"
L.M.
18"
L.M.
20"
L.M.
24"
L.M.
30"
L.M.
3.00 LAYING PVC PIPE
1/2 TO 3/4"
L.M.
1 TO 1 1/4"
L.M.
1 1/2 TO 2"
L.M.
2 1/2"
L.M.
Page 4 of 6

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

LABOR PRODUCTION TABLE


ITEM NO.

WORK DESCRIPTION

M.H./ UNIT

3"
4"
5"
6"
4.00 LAYING RCP 8 MEN (1 TEAM)
24"
36"
48"
6-18"
LAVATORY
WATER CLOSET
URINAL UTILITY STALL
URINAL PEDESTRAL TYPE
SHOWER AND INSTALL
5 MAN GROUP SHOWER
BAH TUBS
SLOPE SINK
HOT WATER HEATER
16 PERSON WASH SINK
DRINKING FOUNTAIN
EYE WASH
MISC. FIXTURES
PARTITIONS
LAYING OF 24" RCP
LAYING OF 36" RCP
LAYING OF 48" RCP
L.

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

AVERAGE

L.M.
L.M.
L.M.
L.M.

2.16
2.62
3.28
4.92

L.M.
L.M.
L.M.
L.M.

9.00
12.8
21.34
2.66

1.08
1.31
1.64
2.46

HIGH

0.86
1.05
1.31
1.97

4.00
6.40
10.67
1.33

3.20
5.12
8.54
1.06

EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
PIPE
PIPE
PIPE

16.00
24.00
48.00
32.00
20.00
72.00
48.00
28.00
28.00
52.00
26.00
16.00
4.00
16.00
8.00
12.80
21.32

8.00
12.00
24.00
16.00
10.00
36.00
24.00
14.00
14.00
26.00
13.00
9.00
2.00
8.00
4.00
6.40
10.66

6.40
9.60
19.20
12.80
8.00
28.80
19.20
11.20
11.20
20.80
10.40
6.40
1.60
6.40
3.20
5.12
8.53

S.M.
S.M.
S.M.
S.M.

5.00
24.00
10.00
10.00

2.50
12.00
5.00
5.00

2.00
9.60
4.00
4.00

S.M.
S.M.

34.00
60.00

17.00
30.00

13.60
24.00

FLG.
S.M.
L.M.
EACH
EACH
EACH
EACH
L.M.
L.M.

8.00
1.60
5.40
3.00
16.00
12.00
8.00
7.40
3.00

4.00
0.80
2.70
1.50
8.00
6.00
4.00
3.70
1.50

3.20
0.64
2.16
1.20
6.40
4.80
3.20
2.96
1.20

EACH
S.M.

1.00
2.40

0.50
1.20

0.40
0.96

S.M.
S.M.
S.M.
S.M.
S.M.
S.M.

28.00
12.00
140.00
1.20
1.40
5.40

14.00
6.00
70.00
0.60
0.70
2.70

11.20
4.80
56.00
0.48
0.56
2.16

S.M.
PC.

2.40
1.60

1.20
0.80

0.96
0.64

TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS

FIELD FABRICATION INSULATION


FIELD FABRICATION SHEET METAL COVER
APPLY INSULATION
APPLY SHEET METAL COVER
PUMPS, COMPRESSORS & TURBINES
FABRICATE
APPLY
PIPINGS AND COMPONENT INSULATION
FIELD FABRICATE
FIELD FABRICATESHEET METAL COVER
APPLY INSULATION
APPLY SHEET METAL COVER OR METAL COVER
FABRICATE INSTRUMENT COVER
INSTALL INSTRUMENT COVER
INSULATE PIPE HANGERS
FOR STREAM TRACED LINES
REMOVAL OF OLD OR EXISTING INSTALLATION
M.

TRADE:FIRE PROOFING
INSTALL STUDS
INSTALL MESH
POURED
FORMING
STRIP FORMS
POUR CONCRETE
CURING/PATCHING
FINISHING
TROWEL, PLASTERED
PNEUMATIC APPLICATION
GUNITE
APPLY FINEBRICK OR BLOCK
Page 5 of 6

LABOR PRODUCTION TABLE


ITEM NO.

WORK DESCRIPTION

M.H./ UNIT

REMOVAL OF EXISTING OR OLD FIREPROOFING


APPLY FIREPROOFING PAINT
FIRE PROTERCTION:
FIRE PROTECTION EQUIPMENT INSTALLATION:
MONITOR
HOSE REELS AND CARTS
FIRE EXTINGUISHERS
PERSONAL EQUIPMENT:
EYE WASH
SAFETY SHOWERS
BREATHING APPARATUS
SPRINKLER SYSTEM
SPRAY NOZZLES
WATER CANNONS
N.

O.

P.

Q.

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

AVERAGE

HIGH

S.M.
S.M.

5.00
6.00

2.50
3.00

2.00
2.40

EACH
EACH
EACH

10.00
30.00
10.00

5.00
15.00
5.00

4.00
12.00
4.00

EACH
EACH
EACH

20.00
20.00
10.00

10.00
10.00
5.00

8.00
8.00
4.00

EACH
EACH

2.00
10.00

1.00
5.00

80.00
4.00

L.M.
L.M.
L.M.
L.M.

2.40
6.00
0.60
0.60

1.20
3.00
0.30
0.30

0.96
2.40
0.24
0.24

TON
S.M.
S.M.

20.00
1.10
0.64

1.00
0.55
0.32

9.00
44.00
26.00

TON
S.M.
TON

16.00
0.86
60.00

8.00
30.00

6.40
0.34
24.00

TRADE:HEATING VENTILATING AND CONDITIONING


HEAVY PIPING
DUCT WORK INSTALL
DUCT WORK FAB.
PACKAGE UNIT AIR CONDITIONER
UNIT HEATER
FINNED CONVERTER
EXHAUST FAN PROPELLER
GRAVITY ROOF PAINT
POWER ROOF VENT
ROUND ROOF VENT
PLUMBING PIPING

L.M.
S.M.
S.M.
EACH
EACH
EACH
EACH
L.M.
EACH
EACH
L.M.

7.00
12.00
36.00
48.00
24.00
10.00
16.00
14.00
48.00
16.00
7.00

3.50
6.00
18.00
24.00
12.00
5.00
8.00
7.30
24.00
8.00
3.50

2.80
4.80
14.40
19.20
9.60
4.00
6.40
5.84
19.20
6.40
2.80

MISCELLANEOUS
WATER STOP INSTALLATION
CAULKING SLAB JOINT
ASPHALTING
GROUTNG AND TOOL PLASTERING
WATER PROOFING RUBBERIZED
COPPER CLADDING ROOF DECK
WATER PROOFING FLINKOTE
DEMOLITION OF ADOBE WALL
PAINTING
COPPER WATER STOP CUT AND SHAPE
COPPER WATER STOP CUT AND INSTALLATION
SETTING ANCHOR BOLT
SETTING ANCHOR BOXES

L.M.
L.M.
S.M.
S.M.
S.M.
L.M.
S.M.
CU.M.
S.M.
L.M.
L.M.
KG
CU.M.

1.34
0.40
1.60
3.34
1.10
1.00
0.54
3.20
0.68
11.00
22.00
97.00
3.64

0.67
0.20
0.80
1.67
0.55
0.50
0.27
1.60
0.34
6.00
11.00
49.00
1.82

0.54
0.16
0.64
0.84
0.28
0.25
0.14
0.80
0.17
0.03
0.06
0.24
0.91

TRADE:PERMANENT FENCING
INSTALL FENCE
INSTALL GATES
TO RAIL
BARBE WIRE, 3 STRANDS
TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL
OLD STRUCTURAL STEEL
NEW FLAT FLAT PLATES
SURFACE PREPARATION:
IN TERMS OF WEIGHT
IN TERMS OF AREA
SAND PREPARATION

Page 6 of 6