PRODUCTION RATE
UNIT LOW AVE
5/16/2011
GENERAL
MOBILIZATION
DAYS
WKS
EA
EA
LF
EA
LF
LF
SY
EA
MI
EA
EA
15
MOT
1
2
15
500
18500
20
450
900
440
500
4
10
30
EROSION CONTROL
FILTER FABRIC
FLOATING TUBIDITY BARRIER
HAY BALES
ROCKBAGS/SAND BAGS
SILT FENCE
SOIL TRACKING DEVICE
TURBIDITY BARRIER
SY
LF
TON
EA
LF
EA
LF
2,500
3
750
1,500
1,500
2,500
20,000
1
EA
SY
SY
SY
Mi
Ac
EARTHWORK
BACKFILL AROUND STRUCT.
EXCAVATION - TRUCK HAUL
< 100,000
100,000 - 300,000
> 300,000
EXCAVATION - BORROW
EXCAVATION - REGULAR
EXCAVATION - SUBSOIL
EMBANKMENT
CY
50
CY
CY
CY
900
100
3,800
SEE CHART
SHOULDER GRADING
MI
0.5
20
50
5
5
50
100
DRAINAGE
ADJUST MANHOLE
CONCRETE BOX CULVERTS
CONCRETE BOX CULVERTS (PRECAST)
CONCRETE CLASS I (Culvert)
CONCRETE CLASS I (Endwalls)
CONCRETE ENDWALLS
DESILT PIPE
DESILT, CLEAN & SEAL JNT
DITCH PAVING
DRAINCRETE
GUNITE
INLET
JACK & BORE
JUNCTION BOX
MANHOLES
MISC. CONCRETE
MITERED END SECTIONS
PARTIAL MANHOLE
PIPE INSTALLATION < 5' deep
PIPE INSTALLATION > 5' deep
RIPRAP
STORM SEWERS, (Manholes & Inlet)
TEMPORARY PIPE(Slope Drain)
TRENCH DRAIN (Special)
VALVE BOX, ADJUST
WINGWALLS
EA
CY
LF
CY
CY
CY
LF
LF
SY
LF
CF
EA
LF
EA
EA
CY
EA
EA
LF
LF
TN
LF
LF
LF
EA
SF
65
1,000
30
200
1,500
130
20
13
200
100
100
50
300
100
100
150
ROADWORK
BASE
CONCRETE BARRIER WALL
CONCRETE CURB & GUTTER
CONCRETE PAVING
DIAMOND GRINDING CONC
MILLING
MILLING ASPHALT
MISC ASPHALT PAVEMENT
RUBBLIZATION
RUMBLE STRIP GRINDING
STABILIZE ROADBED
STABLIZATION
TEMPORARY PAV'T
TEXTURED PAVEMENT
TRAFFIC SEPERATOR
TURNOUT CONSTRUCTION
LF
LF
SY
SY
SY
SY
TN
SY
MI
SY
SY
SY
SY
LF
SY
SEE CHART
200
300
400
600
5,000
2,000
1,400
1,400
8,000
60
7,000
5
1,500
1,600
150
800
200
GUARDRAIL
REMOVE EXISTING
FURNISH & INSTALL
END ANCHORS
LF
LF
EA
200
LF
100
< 10,000
> 10,000
GATES
LF
LF
EA
500
EA
EA
LF
SY
EA
LF
NM
SY
SF
LF
GM
NM
SF
LF
LF
SY
EA
GM
NM
MI
MI
LF
LF
LF
LF
LF
LF
NM
GM
LF
500
25
2,000
1,000
8
RAILING
FENCE
1,200
10
PAVEMENT MARKING
DELINEATOR TUBULAR (Flexible)
DIRECTIONAL ARROWS
GUIDE LINES (Thermo)(White)
ISLAND NOSE PAINT
MESSAGES
MISC. STRIPE
PAINTED PAV'T MARKINGS (Final Surface)
REFLECTIVE PAINT (Island Nose)
REMOVE EXIST THERMO (White/Black)(Other)
REMOVE EXIST THERMO (White/Black)(Solid)
REMOVE EXIST THERMO (White/Black/Blue)(Skip)
REMOVE EXIST THERMO (White/Black/Blue)(Solid)(6")
REMOVE EXIST THERMO (Yellow)(Other)
REMOVE EXIST THERMO (Yellow)(Skip)
REMOVE EXIST THERMO (Yellow)(Solid)
REMOVE EXISTING THERMO
RPM's (0 - 5,000)
STRIPING SKIP
STRIPING SOLID
THERMOPLASTIC STRIPING
TRAFFIC STRIPE
TRAFFIC STRIPE SKIP (Thermo)(White/Black/Blue)
TRAFFIC STRIPE SKIP (Yellow)
TRAFFIC STRIPE SOLID (Paint)(White)(24")
TRAFFIC STRIPE SOLID (Paint)(White/Black)
TRAFFIC STRIPE SOLID (Two Component)(Yellow)(18")
TRAFFIC STRIPE SOLID (Yellow)(18")
TRAFFIC STRIPE SOLID (Yellow)(6")
TRAFFIC STRIPE SKIP (Standard)(White)(6")
TRAFFIC STRIPE SKIP (White)(6")
2,000
2,000
2,000
2,000
2,000
500
SIGNALIZATION
DIRECTIONAL BORE < 6"
DIRECTIONAL BORE 6" to < 12" (3- 1 Innerduct)
LF
LF
400
400
750
2,000
55
30
3,000
7
30
2,400
4,800
7
7
4,800
2,400
2,400
350
750
7
7
6.7
7
2,000
2,000
2,000
2,000
2,000
2,000
7
7
2,000
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
PI
PI
LF
EA
EA
EA
EA
EA
EA
EA
AS
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
AS
AS
EA
EA
EA
EA
EA
LF
LF
LF
400
50
50
500
500
500
500
500
500
500
500
500
500
500
500
500
500
1,000
10
10
5
10
10
10
1
500
5
5
2,000
8
15
2
1,000
2
2
0.5
0.5
0.5
0.5
0.5
0.5
0.5
10
2
3
3
1
1
0.2
1,000
1,000
1,000
LF
LF
LF
EA
AS
AS
AS
EA
EA
EA
EA
AS
EA
DAYS
AS
EA
EA
EA
EA
EA
LF
EA
EA
AS
AS
AS
AS
EA
EA
1,000
1,000
1,000
2
2
1
2
4
0.5
4
4
4
3
15
3
10
10
0.5
20
8
1,000
4
3
8
10
6
6
8
6
LIGHTING
CONDUCTORS
MISC. CONCRETE
UNDERGROUND CONDUIT
PULL & JUNCTION BOXES
POLES
HIGHWAY STANDARD
LF
CY
LF
EA
EA
EA
750
15
750
8
10
5
DELINEATORS
DIRECTIONAL BORE
MILTIPOST REMOVAL
MULITPOST (F & I)
OBJECT MARKER
OVERHEAD SIGNS
RELOCATE SIGN PANELS
REMOVE SIGN PANELS
SIGN PANELS
EA
LF
AS
AS
EA
SF
EA
EA
EA
10
600
15.0
10.0
10.0
SIGNING
0.2
10
12
15.0
AS
AS
AS
AS
EA
EA
EA
ASPHALT
2" SIDEWALK
Hot-In Place 1.5 "
ARMI Layer
Micro-Surfacing
SUPERPAVE ASPH CONC (Structural)
FRICTION COURSE
SY
SY
SY
SY
4
15
10
30
0.2
10
20
0.5
SEE CHART
800
6,000
7,040
20,000
SEE CHART
SEE CHART
CONCRETE
ADA RAMPS
EA
0.5
BARRIER WALL
BLOCK SOUND WALLS
BOX CULVERT
BREAK, COMPACT PAVEM'T
CURB & GUTTER
DITCH PAVEMENT
PAVING
SIDEWALK
SLAB REPLACEMENT
LF
SF
CY
SY
LF
SY
SY
SY
SY
200
400
20
400
5,000
600
200
5,000
300
130
LANDSCAPING
PLANTS (Small)
PLANTS (Large)
SEEDLINGS (Trees & Shrubs)
1 GAL
3 GAL
7 GAL
SCRUB - 30 GAL
DIRECTIONAL BORE
FINISH SOIL LAYER (LANDSCAPING OPERATIONS)
FENCING (Type B(5.1 -6.0) (With Vinyl Coating)
FENCING GATE (Type B (Double 6.1 -12.0') Opening
ARTIFICIAL COVERING
SODDING
SEEDING
PERFORMANCE TURF
EA
EA
EA
EA
EA
EA
EA
LF
CY
LF
EA
SY
SY
SY
SY
30
15
800
400
200
100
30
600
1,500
2
1,500
1,500
500
3
23,500
1,500
PERFORMANCE SOD
PLASTIC EROSION MAT,(TURF REINFORCED, TYPE 3)
PATTERNED/TEXTURED PAVEMENT (Asphalt)
PAVERS, Architectural (Roadway)
SY
SY
SY
SY
1,500
1,500
150
150
GRASSING
SEED & MULCH
SOD
FINISH SOIL LAYER (TOPSOIL)
MISC CONSTRUCTION
SY
SY
SY
23,500
1,500
15,000
PRODUCTION RATES
HIGH
COMMENTS
3,000
750
500
400
3,000
5
600
25
600
3,500
10
200
7,500
SEE CHART
6
80
150
10
10
15
6
24" Diameter
6
4
15
6
400
200
400
400
400
8
200
SEE CHART
400
800
8,000
1,800
60
District 7
1,500
400
3,500
1,000
50
55
4,800
9,600
9,600
4,800
4,800
1,000
800
800
800
400
400
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
2,500
2,500
20
20
10
20
20
20
4
2,500
0.7
0.7
Add 7 Days for Conc. Cure
20
5
5
6
4
4
0.5
5,000
10,000
10,000
10,000
10,000
10,000
5
5
3
5
8
2
12
12
12
6
1,500
0.7
12.0
0.7
30
SEE CHART
1,192
1,000
500
5,000
5,000
250
200
2,200
BRIDGE
PRODUCTION RATE
UNIT LOW
AVE
HIGH
60
COFFERDAMS
SY
100
200
300
1.5
CY
CY
250
500
DREDGEING
DRAG LINE
PUMP
DEMOLITION
BRIDGE
FENDER SYSTEM
SAW CUT DECK - 1" DEEP
BRIDGE RAIL
DECK & HANDRAIL
PARAPET
TIMBER BRIDGE
SF
LF
LF
LF
SY
LF
SY
270
30
60
40
375
50
550
50
35
115
50
GRINDING
River Gravel Agg.
Limestone Agg.
SY
SY
2,600
4,000
SF
SF
600
215
ACROW BRIDGE
600
40
180
60
LF
30
EA
LF
LF
200
0.8
300
7
400
EA
SF
SHTS/day
LF
640
32
15
2,000
40
200
4,000
48
PILES
TEST PILES 24" - 30"
PRODUCTION PILES
PILE JACKETS 18" - 24"
SHEET PILING
CONCRETE PILE - 5 ft x 20 ft
SHEET STEEL PILING
SHEET STEEL PILING
STEEL PILE LENGTH - 40 ft
DRILLED SHAFT
? WHAT SIZE ?
60" x 130 ft'
74" x 40 ft
LF
EA
EA
200
300
0.2
0.5
400
CY
10
11
30
CY
CY
LF
LF
4
10
12
30
250
8
20
150
425
600
CY
LF
6
80
11
120
14
160
BOX CULVERT
SUBSTRUCTURE
COLUMNS / CAPS / BENTS
FOOTINGS
STEEL BEAMS
PRECAST BEAMS
SUPERSTRUCTURE
BRIDGE DECK
BARRIER WALL
APPROACH SLABS
3,000
CY
15
EXPANSION JOINTS
CLEANING & RESEALING
MECHANICAL
SAW CUT/EPOXY/ANCHOR
LF
LF
LANE
3,000
3,500
35
1
50
100
SF
LF
MI
LF
MI
SY
CY
SY
LF
0
0
0
0
555
24
0
30
7,000
5,280
1
1,478
0.14
1,500
60
500
50
TON
10.5
LF
LF
150
250
200
250
600
LF
80
160
200
LF
150
225
300
LF
150
10,560
2
1,478
0.28
2,700
94
80
BEAM ERECTION
STEEL
PRECAST
HANDRAILS - BRIDGE
WALLS
RETAINING
BARRIER WALL
SF
LF
LF
LF
SF
SF
SF
DAYS
350
5
SF
TN
SF
SF
per Leaf
SF
TN
2,500
20
2,000
2,000
20
2,000
9
SF
SF
SF
SF
SF
60
28
235
1,500
1,500
TON
TON
750
185
PER BENT
100
100
150
200
55
750
2,000
150
PAINTING
ANTI-GRAFFITI COAT
STEEL
BRIDGE PAINTING
CLASS 5 APPLICATION
SMALL BASCULE
STEEL GIRDERS
STEEL GIRDERS
PAINT REMOVAL
DRY BLASTING
POWER TOOLED
WATER BLASTING
SANDBLASTING
STEEL GIRDER-SANDBLASTING
RIP RAP
DUMPED
PLACED
200
200
PLACED
SAND BAG
Gabion mats & baskets
Gabion mats & baskets
CY
SY
SY
CY
40
20
EA
EA
10
0.2
MTH
MTH
MTH
75
120
850
45
1,300
80
SIGNS
HIGHWAY
OVERHEAD
30
0.7
TOLL PLAZAS
RAMP
MID SIZE
MAINLINE
8
12
18
Comments
PROCUREMENT
UNIT
AMOUNT
ALUMINUM HANDRAIL
WKS
2-6
BUILDING PERMIT
DAYS
45
DAYS
DAYS
DAYS
30
60
90
RESURFACING - SUPERPAVE
< 20,000 TONS
20,000 - 60,000 TONS
> 60,000 TONS
HIGHWAY LIGHTING
DAYS
CONVERT MERCURY TO Na DAYS
120-150
90
PILES
WKS
3-5
DAYS
45
PUMP STATION
WKS
12
DAYS
DAYS
90
150
SIGN TRUSS
DAYS
150
SIGNS
DAYS
60
STEEL BEAMS
MTHS
30
SIGNALS
CONCRETE STRAIN POLES
STEEL MAST ARMS
UTILITIES
PRODUCTION RATE
UNIT LOW
AVE
HIGH
EA
WATERMAIN
LF
LF
4
75
100
3
150
EARTHWORK
DAYS
CUBIC YARDS
0
10
15
19
23
30
37
43
47
50
52
54.5
57
63.5
68
70
72
76
80
84
88
91
95
98
102
106
110
0
5,000
10,000
15,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
150,000
200,000
240,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000
EARTHWORK
110
100
90
80
70
60
DAYS
50
40
30
20
10
0
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
CUBIC YARDS
800,000
900,000
1,000,000
CUBIC YARDS
900,000
1,000,000
1,100,000
1,200,000
1,300,000
BASE
WORK DAYS
SQUARE YARDS
0.0
8.0
9.4
11.0
11.3
12.0
14.0
16.0
20.0
22.0
26.0
80.0
0
8,000
10,000
13,000
14,000
15,000
20,000
26,000
42,000
50,000
64,000
260,000
BASE
80.0
70.0
60.0
50.0
WORK DAYS
40.0
30.0
20.0
10.0
0.0
0
50,000
100,000
150,000
SQUARE YARDS
200,000
0,000
250,000
300,000
SUPERPAVE
WORK DAYS
TONS
0.0
3.0
4.5
5.7
6.3
7.0
73.5
0
500
1,000
1,500
2,000
2,500
65,000
SUPERPAVE
80.0
70.0
60.0
50.0
WORK DAYS
40.0
30.0
20.0
10.0
0.0
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
TONS
40,000
45,000
50,000
55,000
= 0.0250 x SY
= 0.0313 x SY
= 0.0375 x SY
= 0.0500 x SY
= 0.0625 x SY
= 0.0750 x SY
= 0.0875 x SY
= 0.1000 x SY
= 0.1125 x SY
= 0.1250 x SY
= 0.1375 x SY
3"
3 1/2"
4"
4 1/2"
5"
6"
7"
8"
9"
9 1/2"
= 0.1500 x SY
= 0.1750 x SY
= 0.2000 x SY
= 0.2250 x SY
= 0.2500 x SY
= 0.3000 x SY
= 0.3500 x SY
= 0.4000 x SY
= 0.4500 x SY
= 0.4750 x SY
55,000
60,000
65,000