You are on page 1of 88

FOP SECTION-2

SCHEDULE OF PRICES AND QUANTITIES

UNITS OF MEASUREMENT
LM
SM
M3
EA
LOT

Linear meter
Square meter
Cubic meter
Each
Lot

LS

Lump Sum

* The amount proposed for mobilization shall not exceed


5% of the total Contractor price proposed by Bidder.

CODES:

Aug 2013

Intermediate Boys School in Haii Al-Jaar 1 (IBS)

Secondary Boys School in Haii Al-Aziziah 5 (SBS)

FOP-2-3

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Aug 2013

FOP-2-4

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Aug 2013

FOP-2-5

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Aug 2013

FOP-2-6

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

I.

FIXED PRICE ITEMS

01.01.

Mobilization*
(Complete attached "Mobilization Breakdown for Payment"
form)

LS

01.02.

Demobilization and Clean-up

LS

TOTAL AMOUNT FOR FIXED PRICE ITEMS


II.

UNIT PRICE ITEMS

02.

SITE WORK

02.01.

Site Preparation

02.01.01.B

Demolition (sidewalk and road paving)

SM

447

02.01.02.A
02.01.02.B

Site Clearing and Grubbing


Site Clearing and Grubbing

SM
SM

37,900
48,309

02.01.03.A
02.01.03.B

Borrow Materials, Backfill Compaction


Borrow Materials, Backfill Compaction

M3
M3

78,300
24,200

02.01.04.B

Cutting

M3

2,400

02.01.05.A

Excavation, Grading and Compaction

M3

7,580

02.02.

Hardscape

02.02.01.A
02.02.01.B

Pre-Cast Concrete Pavers


Pre-Cast Concrete Pavers

SM
SM

900
9,354

02.02.02.A
02.02.02.B

Pre-Cast Concrete Curb Stone


Pre-Cast Concrete Curb Stone

LM
LM

1,600
3,581

Aug 2013

FOP-2-4

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

LM
LM

70
20

SM
SM

4,200
1,275

02.02.03.A
02.02.03.B

Depressed Curb
Depressed Curb

02.02.04.B

NOT USED

02.02.05.A
02.02.05.B

Cast in Place Concrete Side Walks


Cast in Place Concrete Side Walks

02.02.06.B

NOT USED

02.02.07.A
02.02.07.B

Pre-Cast Concrete Wheel Stopper


Pre-Cast Concrete Wheel Stopper

EA
EA

149
403

02.03.
02.03.01.A
02.03.01.B

Boundary Wall
Cast in Place Boundary Wall
Cast in Place Boundary Wall

M3
M3

234
270

02.03.02.A
02.03.02.B

200mm Thick Boundary Wall - Flutted Type CMU


200mm Thick Boundary Wall - Flutted Type CMU

LM
LM

370
420

02.04.
02.04.01.A

Gates
6.5m Wide x 1.65 Meter High Double Galvanized Steel Swing EA
Gate
6.5m Wide x 1.65 Meter High Double Galvanized Steel Swing EA
Gate

02.04.01.B

2
2

02.04.02.A
02.04.02.B

1.0m Wide X 1.65 Meter High Galvanized Steel Main Gate


1.0m Wide X 1.65 Meter High Galvanized Steel Main Gate

EA
EA

1
1

02.04.03.A
02.04.03.B

Key Box Assembly


Key Box Assembly

EA
EA

1
1

02.05.
02.05.01.A
02.05.01.B

Flagpole Assembly
Flagpole Assembly
Flagpole Assembly

EA
EA

1
1

02.06.

Roads

Aug 2013

FOP-2-5

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

SM
SM

10,270
19,467

02.06.01.02.
Asphalt Base Course
02.06.01.02.01.A Roads area ( 65 mm thick )
02.06.01.02.01.B Roads area ( 65 mm thick )

SM
SM

7,320
5,609

02.06.01.02.02.A Parking area ( 100 mm thick )


02.06.01.02.02.B Parking area ( 100 mm thick )

SM
SM

2,950
13,858

02.06.01.03.A
02.06.01.03.B

Granular Base Course, 100mm Thick


Granular Base Course, 100mm Thick

SM
SM

10,270
19,467

02.06.02.B

Speed Humps

SM

192

02.06.03.A
02.06.03.B

Pavement Marking
Pavement Marking

SM
SM

485
385

02.06.04.A
02.06.04.B

Traffic Signs
Traffic Signs

EA
EA

31
19

02.06.05.
02.06.05.01.A
02.06.05.02.A

Concrete Trench
Excavation
Cast-In-Place Concrete

M3
M3

35
3

02.07.
02.07.01.
02.07.01.01.B

Potable Water & Fire Water System


uPVC Class -V Pipes
80mm Diameter

LM

40

02.07.01.02.A
02.07.01.02.B

110mm Diameter
110mm Diameter

LM
LM

72
387

02.07.01.03.B

160mm Diameter

LM

36

02.07.01.04.A

160mm Diameter (PW-FW)

LM

12

02.06.01.
02.06.01.01.A
02.06.01.01.B

Aug 2013

Asphalt Concrete Pavement


Asphalt Wearing Course, 50mm Thick
Asphalt Wearing Course, 50mm Thick

FOP-2-6

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

02.07.01.05.A
02.07.01.05.B

200mm Diameter (PW-FW)


200mm Diameter (PW-FW)

LM
LM

680
594

02.07.02.
02.07.02.01.A
02.07.02.01.B

Butterfly Valve in Concrete Chamber


200mm Diameter
200mm Diameter

EA
EA

2
2

02.07.03.A
02.07.03.B

Water Meter Assembly in Concrete Chamber


Water Meter Assembly in Concrete Chamber

EA
EA

2
2

02.07.04.A
02.07.04.B

Fire Water Assembly in Concrete Chamber


Fire Water Assembly in Concrete Chamber

EA
EA

1
2

02.07.05.A
02.07.05.B

Fire Hydrant Assembly


Fire Hydrant Assembly

EA
EA

4
3

02.07.06.
02.07.06.01.A

Gate Valves
Gate Valve 160 mm Diameter

EA

02.07.06.02.B

Gate Valve 200 mm Diameter

EA

02.07.07.A
02.07.07.B

Post Indicator Valve (PIV)


Post Indicator Valve (PIV)

EA
EA

2
2

02.07.08.A
02.07.08.B

Guard Post
Guard Post

EA
EA

36
32

02.07.09.A
02.07.09.B

Concrete Thrust Block


Concrete Thrust Block

M3
M3

18
18

02.07.10.
02.07.10.01.A

Pipe Sleeves at Road Crossing


200 mm Diameter

LM

45

02.08.
02.08.01.
02.08.01.01.A
02.08.01.01.B

Sanitary Wastewater Collection System


uPVC Class-III Pipe, Gravity Sewers in Trench
110mm Diameter
110mm Diameter

LM
LM

11
245

Aug 2013

FOP-2-7

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

02.08.01.02.A

160mm Diameter

LM

239

02.08.01.03.A
02.08.01.03.B

200mm Diameter
200mm Diameter

LM
LM

232
402

02.08.01.04.A

225mm Diameter

LM

70

02.08.02.A
02.08.02.B

Fiberglass Sanitary Manholes


Fiberglass Sanitary Manholes

EA
EA

9
6

02.08.03.A
02.08.03.B

Clean Outs
Clean Outs

EA
EA

7
5

02.08.04.A

Neutralization Tank

EA

02.09.
02.09.01.
02.09.01.01.B

Irrigation System
uPVC Class V Pipe
160mm Diameter

02.09.01.02.B

90mm Diameter

LM

15

02.09.01.03.A
02.09.01.03.B

75mm Diameter
75mm Diameter

LM
LM

280
165

02.09.01.04.A

32mm Diameter

LM

550

02.09.01.05.A

25mm Diameter

LM

250

02.09.02.
02.09.02.01.A
02.09.02.02.A
02.09.02.02.B
02.09.02.03.A
02.09.02.03.B

Pipe Sleeves at Road Crossing


15mm Diameter
32mm Diameter
32mm Diameter
75mm Diameter
75mm Diameter

LM
LM
LM
LM
LM

15
40
60
90
25

02.09.03.A

Field Control Module

EA

Aug 2013

LM

FOP-2-8

95

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

02.09.03.B

Field Control Module

EA

02.09.04.A
02.09.04.B

Irrigation Water Meter Assembly with Meter Box


Irrigation Water Meter Assembly with Meter Box

EA
EA

1
1

02.09.05.A
02.09.05.B

Remote Control Valve Assembly with Valve Box


Remote Control Valve Assembly with Valve Box

EA
EA

4
4

02.09.06.A
02.09.06.B

Gate Valve Inside Box


Gate Valve Inside Box

EA
EA

1
1

02.09.07.A
02.09.07.B

Tertiary Irrigation
Tertiary Irrigation

LS
LS

02.10.
02.10.01.
02.10.02.

Landscaping:
Shrubs
Trees

EA
EA

102
47

02.11.

Site Electrical & Telecommunications

02.11.01.
02.11.01.01.A
02.11.01.01.B

13.8KV Manhole
Type "C"
Type "C"

EA
EA

1
1

02.11.01.02.A

Type "CC'

EA

02.11.01.03.A

Type "X"

EA

02.11.02.
02.11.02.01.A

13.8KV PVC Duct Bank, Encased in Structural Concrete


9 x 160mm

LM

197

02.11.02.02.A
02.11.02.02.B

4 x 110mm
4 x 110mm

LM
LM

135
140

02.11.03.
02.11.03.01.A
02.11.03.01.B

13.8KV PVC Duct Bank, Encased in Concrete


4 x 110mm
4 x 110mm

LM
LM

20
8

Aug 2013

FOP-2-9

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

02.11.04.
02.11.04.01.A
02.11.04.01.B

Low Voltage Electrical PVC Duct Encased in Concrete


50mm
50mm

LM
LM

165
230

02.11.05.
02.11.05.01.A
02.11.05.01.B

Low Voltage Electrical PVC Duct Encased in Sand


1 x 50mm
1 x 50mm

LM
LM

440
802

02.11.06.A
02.11.06.B

Telecommunication Handhole, Type II


Telecommunication Handhole, Type II

EA
EA

1
1

02.11.07.
02.11.07.01.A

Telecommunication PVC Duct Bank, Encased in Structural


Concrete
4 x 50mm

LM

16

02.11.07.02.A
02.11.07.02.B

2 x 110mm
2 x 110mm

LM
LM

180
124

02.11.07.03.A

8 x 110mm

LM

195

02.11.08.
02.11.08.01.A
02.11.08.01.B

Telecommunication PVC Duct Bank, Encased in Concrete


4 x 50mm
4 x 50mm

LM
LM

25
18

02.11.08.02.A

2 x 110mm

LM

02.11.09.
02.11.09.01.A
02.11.09.01.B

15KV XLPE Single Core Copper Cable, in Triplexed


3, 1/C x 70mm2
3, 1/C x 120mm2

LM
LM

510
630

02.11.10.A
02.11.10.B

Lighting Pole Concrete Foundation


Lighting Pole Concrete Foundation

EA
EA

32
60

02.11.11.A

Lighting Pole with One Meter Arm Extender and Side Mount
Lighting Fixture
Lighting Pole with One Meter Arm Extender and Side Mount
Lighting Fixture

EA

18

EA

02.11.11.B
Aug 2013

FOP-2-10

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

02.11.12.A
02.11.12.B

Lighting Pole with Pole Top Mount Lighting Fixture


Lighting Pole with Pole Top Mount Lighting Fixture

EA
EA

14
54

02.11.13.
02.11.13.01.A

Multi-core Cable, XLPE Insulated, Direct Buried Cable,


600/1.0KV
Four core, 10mm2 Plus 6 mm2 Ground

LM

50

02.11.13.02.A
02.11.13.02.B

Four Core, 10mm2 Plus 4 mm2 Ground


Four Core, 10mm2 Plus 4 mm2 Ground

LM
LM

720
2,120

02.11.13.03.A
02.11.13.03.B

Two Core, 10mm2 Plus 4 mm2 Ground


Two Core, 10mm2 Plus 4 mm2 Ground

LM
LM

80
450

02.11.14.
02.11.14.01.A

Package Substation, Outdoor Type


1500 kVA, 13.8kV-400/230V, 3 Phase, 60Hz

EA

02.11.14.02.B

1000 kVA, 13.8kV-400/230V, 3 Phase, 60Hz

EA

02.11.15.A
02.11.15.B

Street Lighting Panel, NEMA 4x Enclosure


Street Lighting Panel, NEMA 4x Enclosure

EA
EA

1
1

03.

CONCRETE

03.01.A
03.01.B

Reinforced Concrete in Substructure


Reinforced Concrete in Substructure

M3
M3

1,430
1,681

03.02.A
03.02.B

Reinforced concrete in Superstructure


Reinforced concrete in Superstructure

M3
M3

1,280
1,772

03.03.A
03.03.B

Precast Concrete Double T Panels


Precast Concrete Double T Panels

SM
SM

450
635

04.

MASONRY

04.01.
04.01.01.A

Concrete Masonry Unit


100 mm

SM

750

Aug 2013

FOP-2-11

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

04.01.01.B

100 mm

SM

397

04.01.02.B

150 mm

SM

240

04.01.03.A
04.01.03.B

200 mm
200 mm

SM
SM

1,412
2,322

04.01.04.A
04.01.04.B

200 mm, Fire rated


200 mm, Fire rated

SM
SM

1,985
2,556

04.01.05.A
04.01.05.B

Fluted Block
Fluted Block

SM
SM

2,980
2,292

04.02.A
04.02.B

Pre-cast Concrete Scuppers with Roof Drain & Downpipe


Pre-cast Concrete Scuppers with Roof Drain & Downpipe

EA
EA

32
47

04.03.A

Pre-cast Concrete Splash Block

EA

04.04.A
04.04.B

Pre-cast Concrete Sill (70 mm thk x 326 mm wide)


Pre-cast Concrete Sill (70 mm thk x 326 mm wide)

LM
LM

192
210

05.

METALS

05.01.A
05.01.B

Galvanized and painted steel access ladder with cage


Galvanized and painted steel access ladder with cage

EA
EA

2
2

05.02.A
05.02.B

Galvanized and painted steel handrail to wall in stage room


Galvanized and painted steel handrail to wall in stage room

EA
EA

2
2

05.03.B

Handrail outside Actors Room (external)

EA

06.

WOOD AND PLASTICS

06.01.
06.01.01.
06.01.01.01.A
06.01.01.01.B

Cabinet and Casework


Cabinets for buffet room
Base cabinet with kitchen sink
Base cabinet with kitchen sink

EA
EA

1
1

Aug 2013

FOP-2-12

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

06.01.01.02.A
06.01.01.02.B

Serving counter & base cabinet


Serving counter & base cabinet

EA
EA

1
1

06.01.02.
06.01.02.01.A
06.01.02.01.B

Cabinets for pantry/tearoom


Base cabinet with sink
Base cabinet with sink

EA
EA

2
3

06.01.02.02.A

Wall cabinet

EA

06.01.03.
06.01.03.01.A
06.01.03.01.B

Counters at
Library
Library

EA
EA

1
1

06.01.03.02.A
06.01.03.02.B

General Office
General Office

EA
EA

1
1

06.01.04.A

Cabinets for Art Classrooms - table counter with sink

EA

06.01.05.
06.01.05.01.A
06.01.05.02.B

Cabinets for science classrooms


Work bench with acid resistant cupboard
Base cabinet with acid-resistant cupboard

EA
EA

2
3

06.01.06.
06.01.06.01.A

Worktop table with sink for science rooms


Laboratory table student workshop

EA

27

06.01.06.02.B

Instructor

EA

06.01.06.03.B

Student

EA

45

06.01.07.A

Medicine cabinet with stainless steel sink for examination


room and health room
Medicine cabinet with stainless steel sink for examination
room and health room

EA

EA

06.01.07.B

07.

Aug 2013

THERMAL AND MOISTURE PROTECTION

FOP-2-13

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

07.01.A
07.01.B

Wall Insulation System


Wall Insulation System

SM
SM

1,985
2,777

07.02.A
07.02.B

Inverted Roofing System


Inverted Roofing System

SM
SM

5,713
6,550

07.03.
07.03.01.A
07.03.01.B

Aluminum Flashing
At parapet
At parapet

LM
LM

722
981

07.03.02.A
07.03.02.B

At building joint
At building joint

LM
LM

75
80

07.04.A
07.04.B

Pre-cast Concrete Roof Pavers Over Separation Layer


Pre-cast Concrete Roof Pavers Over Separation Layer

SM
SM

413
710

07.05.A
07.05.B

Floor Expansion Joint Cover


Floor Expansion Joint Cover

LM
LM

65
80

08.

DOORS AND WINDOWS

08.01.A
08.01.B

Hollow Metal Doors and Frames including Hardware sets


Hollow Metal Doors and Frames including Hardware sets

LOT
LOT

1
1

08.02.A
08.02.B

Wood Doors and Metal Frames including Hardware Sets


Wood Doors and Metal Frames including Hardware Sets

LOT
LOT

1
1

08.03.A

Aluminum Doors and Frames with Hardware Sets at Building


Entrances
Aluminum Doors and Frames with Hardware Sets at Building
Entrances

LOT

LOT

08.04.A
08.04.B

Aluminum Windows with Glass and Glazing


Aluminum Windows with Glass and Glazing

LOT
LOT

1
1

08.05.A
08.05.B

Roll-up Shutter at Buffet Room


Roll-up Shutter at Buffet Room

EA
EA

2
2

08.03.B

Aug 2013

FOP-2-14

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

09.

FINISHES

09.01.
09.01.01.A
09.01.01.B

Wall Finishes
Glass Blocks
Glass Blocks

SM
SM

47
26

09.01.02.A
09.01.02.B

Cement Plaster with Paint


Cement Plaster with Paint

SM
SM

8,185
3,015

09.01.03.B

Cement plaster without paint

SM

2,831

09.01.04.A
09.01.04.B

Paint to concrete (interior)


Paint to concrete (interior)

SM
SM

152
205

09.01.05.A
09.01.05.B

One layer gypsum board with paint


One layer gypsum board with paint

SM
SM

1,618
1,250

09.01.06.B

One layer gypsum board without paint

SM

110

09.01.07.A
09.01.07.B

Ceramic tile
Ceramic tile

SM
SM

485
685

09.01.08.A
09.01.08.B

Texture paint (exterior)


Texture paint (exterior)

SM
SM

1,342
4,910

09.02.
09.02.01.A
09.02.01.B

Floor Finishes
Non-slip ceramic tiles
Non-slip ceramic tiles

SM
SM

1,405
1,550

09.02.02.A
09.02.02.B

Vinyl tiles
Vinyl tiles

SM
SM

2,920
2,610

09.02.03.A
09.02.03.B

Quarry tiles
Quarry tiles

SM
SM

105
300

Aug 2013

FOP-2-15

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

Multi-purpose hall rubber sports flooring including floor


marking for basketball & volleyball courts
Multi-purpose hall rubber sports flooring including floor
marking for basketball & volleyball courts

SM

541

SM

550

09.02.05.A
09.02.05.B

Porcelain tiles
Porcelain tiles

SM
SM

420
900

09.02.06.A
09.02.06.B

Marble for ablution seat


Marble for ablution seat

SM
SM

3
13

09.02.07.A
09.02.07.B

Chemical floor hardener, non-slip finish


Chemical floor hardener, non-slip finish

SM
SM

74
150

09.02.08.A
09.02.08.B

Vinyl sheet flooring at stage with vinyl nosing at steps


Vinyl sheet flooring at stage with vinyl nosing at steps

SM
SM

41
45

09.03.
09.03.01.A
09.03.01.B

Skirting
Vinyl base
Vinyl base

LM
LM

1,100
1,275

09.03.02.A
09.03.02.B

Ceramic tile base


Ceramic tile base

LM
LM

1,072
1,400

09.03.03.A
09.03.03.B

Porcelain tile base


Porcelain tile base

LM
LM

370
465

09.03.04.A
09.03.04.B

Quarry tile base


Quarry tile base

LM
LM

44
130

09.04.
09.04.01.A
09.04.01.B

Ceiling Finishes
Acoustical tile
Acoustical tile

SM
SM

4,658
4,720

09.04.02.A
09.04.02.B

Painted exposed structure


Painted exposed structure

SM
SM

619
694

09.04.03.B

Cement plaster ceiling

SM

218

09.02.04.A
09.02.04.B

Aug 2013

FOP-2-16

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

10.

SPECIALTIES

10.01.A
10.01.B

Wall Protection Guard, 300 mm high


Wall Protection Guard, 300 mm high

LM
LM

389
240

10.02.A
10.02.B

Flag Pole
Flag Pole

EA
EA

1
1

10.03.A
10.03.B

Fabric Shade Structure at Courtyard


Fabric Shade Structure at Courtyard

LOT
LOT

1
1

10.04.A

Guard Room

LOT

10.05.A
10.05.B

Waiting Room
Waiting Room

LOT
LOT

1
1

10.06.
10.06.01.A
10.06.01.B

Toilet Accessories
Mirror
Mirror

EA
EA

26
34

10.06.02.A
10.06.02.B

Tissue paper dispenser


Tissue paper dispenser

EA
EA

11
16

10.06.03.A
10.06.03.B

Paper towel dispenser


Paper towel dispenser

EA
EA

9
11

10.06.04.A
10.06.04.B

Liquid soap dispenser


Liquid soap dispenser

EA
EA

26
20

10.06.05.A
10.06.05.B

Robe hook
Robe hook

EA
EA

44
41

10.06.06.A
10.06.06.B

Handicap bar set


Handicap bar set

EA
EA

5
3

10.06.07.A

Soap holder

EA

Aug 2013

FOP-2-17

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

10.06.07.B

Soap holder

EA

10.06.08.A
10.06.08.B

Shower curtain & rod assembly


Shower curtain & rod assembly

EA
EA

1
4

10.07.A
10.07.B

Signage
Signage

LOT
LOT

1
1

11.

EQUIPMENT

11.01.B

Undercounter Refrigerator, EQ-2

EA

11.02.A
11.02.B

Refrigerator, EQ-2A
Refrigerator, EQ-2A

EA
EA

1
2

11.03. to 11.08.

NOT USED

11.09.A
11.09.B

Garbage Disposal, EQ-8


Garbage Disposal, EQ-8

EA
EA

1
1

12.

FURNISHINGS

12.01.
12.01.01.A
12.01.01.B

Furniture and Accessories


Desk, single pedestal
Desk, single pedestal

EA
EA

78
73

12.01.02.A
12.01.02.B

Chair, swivel
Chair, swivel

EA
EA

60
60

12.01.03.A
12.01.03.B

Filing Cabinet, three (3) drawers 670 x 460 x 1030 high


Filing Cabinet, three (3) drawers 670 x 460 x 1030 high

EA
EA

17
16

12.01.04.A
12.01.04.B

Filing Cabinet, four (4) drawers 670 x 460 x 1320 mm high


Filing Cabinet, four (4) drawers 670 x 460 x 1320 mm high

EA
EA

19
18

12.01.05.A
12.01.05.B

Oak veneered double pedestal desk


Oak veneered double pedestal desk

EA
EA

3
3

Aug 2013

FOP-2-18

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

12.01.06.A
12.01.06.B

Desk, double pedestal


Desk, double pedestal

EA
EA

8
10

12.01.07.A
12.01.07.B

Arm chair
Arm chair

EA
EA

11
13

12.01.08.A
12.01.08.B

Arm chair
Arm chair

EA
EA

31
40

12.01.09.A
12.01.09.B

Table, corner , 600 x 600 x 500 mm high


Table, corner , 600 x 600 x 500 mm high

EA
EA

8
6

12.01.10.A
12.01.10.B

Table, Conference, 4200 x 1400 x 800 mm high


Table, Conference, 4200 x 1400 x 800 mm high

EA
EA

1
1

12.01.11.A

Chair, 3-seater

EA

12.01.12.A
12.01.12.B

Stool, 350 adjustable height


Stool, 350 adjustable height

EA
EA

122
180

12.01.13.A
12.01.13.B

Student desk, classroom


Student desk, classroom

EA
EA

1,120
870

12.01.14.A
12.01.14.B

Chair, student
Chair, student

EA
EA

1,307
960

12.01.15.A
12.01.16.A

Desk, Art Classroom 1500 x 800 x 700


Desk, Art Classroom 1000 x 800 x 700

EA
EA

16
10

12.01.17.A
12.01.17.B

Table, 1500 x 800 x 730 mm high


Table, 1500 x 800 x 730 mm high

EA
EA

6
1

12.01.18.A
12.01.18.B

Table, language instructor console


Table, language instructor console

EA
EA

1
1

12.01.19.A
12.01.19.B

Computer desk, student


Computer desk, student

EA
EA

60
60

Aug 2013

FOP-2-19

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

12.01.20.A
12.01.20.B

Computer desk, instructor


Computer desk, instructor

EA
EA

2
2

12.01.21.A
12.01.21.B

Language console table


Language console table

EA
EA

30
30

12.01.22.A
12.01.22.B

Table, examination
Table, examination

EA
EA

2
2

12.01.23.A
12.01.23.B

Chair, hardwood varnished


Chair, hardwood varnished

EA
EA

32
56

12.01.24.A
12.01.24.B

Table, hardwood varnished


Table, hardwood varnished

EA
EA

4
8

12.01.25.
12.01.25.01.A
12.01.25.01.B

Stacks
3400 x 300 x 2000 mm high
3400 x 300 x 2000 mm high

EA
EA

2
6

12.01.25.02.A
12.01.25.02.B

3400 x 300 x 1200 mm high


3400 x 300 x 1200 mm high

EA
EA

7
6

12.01.25.03.B

3750 x 300 x 1200 mm high

EA

12.01.26.A

Filling Cabinet, 460 x 670 x 1320 mm high

EA

12.01.27.A

Lockers

EA

10

12.01.28.A
12.01.28.B

Counter, check-in 3000 x 750 x 1000 mm high


Counter, check-in 3000 x 750 x 1000 mm high

EA
EA

1
1

12.01.29.B

Rack, periodicals

EA

12.01.30.A
12.01.30.B

Table, coffee
Table, coffee

EA
EA

6
4

Aug 2013

FOP-2-20

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

12.01.31.A
12.01.31.B

Chair
Chair

EA
EA

59
42

12.01.32.A
12.01.32.B

Shelf, custodian, stainless steel


Shelf, custodian, stainless steel

EA
EA

1
3

12.01.33.A

Louver drapes, 1200 x 1700 mm vertical blinds

EA

23

12.01.34.
12.01.34.01.A
12.01.34.01.B

Blinds
1830 x 900 mm horizontal
1830 x 900 mm horizontal

EA
EA

80
143

12.01.34.02.A
12.01.34.02.B

1630 x 1700 mm horizontal


1630 x 1700 mm horizontal

EA
EA

71
60

12.01.35.B

Cabinet, card catalogue

EA

12.01.36.A
12.01.36.B

Cabinet, chemical store, 600 x 1200 x 2000 mm high


Cabinet, chemical store, 600 x 1200 x 2000 mm high

EA
EA

3
5

12.01.37.A
12.01.37.B

Cupboard, instruments, 600 x 1000 x 2000 mm high


Cupboard, instruments, 600 x 1000 x 2000 mm high

EA
EA

3
5

12.01.38.A
12.01.38.B

Cupboard, fume, 740 x 1200 x 2170 mm high


Cupboard, fume, 740 x 1200 x 2170 mm high

EA
EA

3
3

12.01.39.A
12.01.39.B

Cupboard, general storage 1000 x 600 x 2000 mm high


Cupboard, general storage 1000 x 600 x 2000 mm high

EA
EA

7
8

12.01.40.B

Stool, actors

EA

12.01.41.B

Mirror, actors

EA

12.01.42.B

Dressing table, actors

EA

12.01.43.A
12.01.43.B

Equipment cart, portable 700 x 500 x 820 mm high


Equipment cart, portable 700 x 500 x 820 mm high

EA
EA

1
3

Aug 2013

FOP-2-21

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

12.01.44.A
12.01.44.B

Laboratory table, instructor worktop


Laboratory table, instructor worktop

EA
EA

1
1

12.01.45.A
12.01.45.B

Cupboard, 700 x 600 x 900 mm high


Cupboard, 700 x 600 x 900 mm high

EA
EA

1
1

12.01.46.A
12.01.46.B

Cart/Trolley mobile
Cart/Trolley mobile

EA
EA

2
2

12.01.47.A
12.01.47.B

Chair, stackable
Chair, stackable

EA
EA

13
388

12.01.48.A
12.01.48.B

Dolly
Dolly

EA
EA

3
1

12.01.49.A
12.01.49.B

Chalkboard, 4800 x 1200 mm


Chalkboard, 4800 x 1200 mm

EA
EA

40
37

12.01.50.B

Project Screen

EA

39

15.

MECHANICAL

15.01.

Plumbing for Domestic Water System

15.01.01.
15.01.01.01.A
15.01.01.01.B

Coldwater pipe system, including copper pipe,


valves, fittings, supports and sleeves.
15 mm diameter pipe
15 mm diameter pipe

LM
LM

253
413

15.01.01.02.A
15.01.01.02.B

20 mm diameter pipe
20 mm diameter pipe

LM
LM

129
147

15.01.01.03.A
15.01.01.03.B

25 mm diameter pipe
25 mm diameter pipe

LM
LM

77
214

15.01.01.04.A
15.01.01.04.B

32 mm diameter pipe
32 mm diameter pipe

LM
LM

29
17

Aug 2013

FOP-2-22

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.01.01.05.A
15.01.01.05.B

40 mm diameter pipe
40 mm diameter pipe

LM
LM

60
22

15.01.01.06.A
15.01.01.06.B

50 mm diameter pipe
50 mm diameter pipe

LM
LM

6
12

15.01.01.07.A
15.01.01.07.B

65 mm diameter pipe
65 mm diameter pipe

LM
LM

12
15

15.01.01.08.A

75/80 mm diameter pipe

LM

495

15.01.01.09.A
15.01.01.09.B

110 mm diameter pipe


110 mm diameter pipe

LM
LM

9
260

15.01.02.
15.01.02.01.A
15.01.02.01.B

Hot water pipe system, including copper pipe, valves, fittings,


insulation, supports and sleeves.
15 mm diameter pipe
15 mm diameter pipe

LM
LM

9
14

15.01.02.02.A
15.01.02.02.B

20 mm diameter pipe
20 mm diameter pipe

LM
LM

12
18

15.01.03.A
15.01.03.B

Water hammer arrestors various sizes


Water hammer arrestors various sizes

EA
EA

14
39

15.01.04.
15.01.04.01.A
15.01.04.01.B

Hot water heaters installed including P/TV above


30 liter, 2 kW
30 liter, 2 kW

EA
EA

2
4

15.01.04.02.A

120 liter, 6 kW

EA

15.01.05.
15.01.05.01.A
15.01.05.01.B

Water closets including support, valves, connecting piping &


flushing mechanism
T-2
T-2

EA
EA

10
8

15.01.05.02.A

T-5

EA

22

Aug 2013

FOP-2-23

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.01.05.02.B

T-5

EA

31

15.01.06.
15.01.06.01.A
15.01.06.01.B

Lavatories, wall hung, including fixtures, valves, connecting,


piping and P-traps
L-2
L-2

EA
EA

26
35

15.01.06.02.A

L-1

EA

15.01.07.
15.01.07.01.A
15.01.07.01.B

Sinks including supports, fixtures, valves and connecting


piping and P-traps
SK-1
SK-1

EA
EA

5
4

15.01.07.02.A
15.01.07.02.B

SK - 2
SK - 2

EA
EA

1
1

15.01.07.03.A
15.01.07.03.B

SK 3
SK 3

EA
EA

30
50

15.01.07.04.A
15.01.07.04.B

JMS
JMS

EA
EA

1
3

15.01.07.05.A

Shower, including fixtures, valves, supports and P-traps (SH)

EA

15.01.07.06.A

Ablution hose including perineal spray self closing valve,


shutoff valve, hose, vacuum breaker and hook (PS)
Ablution hose including perineal spray self closing valve,
shutoff valve, hose, vacuum breaker and hook (PS)

EA

32

EA

40

15.01.07.07.A
15.01.07.07.B

Ablution Faucet, including vacuum breaker (AF)


Ablution Faucet, including vacuum breaker (AF)

EA
EA

16
57

15.01.07.08.A

Electric Water Cooler, including fittings, valve, support and


power connection (EWC)
Electric Water Cooler, including fittings, valve, support and
power connection (EWC)

EA

11

EA

15.01.07.06.B

15.01.07.08.B

Aug 2013

FOP-2-24

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.01.07.09.A
15.01.07.09.B

Hose Bibbs, including vacuum breaker (HB)


Hose Bibbs, including vacuum breaker (HB)

EA
EA

13
21

15.01.07.10.A
15.01.07.10.B

Eyewash, emergency
Eyewash, emergency

EA
EA

3
5

15.02.

Plumbing for Sanitary Sewer System

15.02.01.
15.02.01.01.A
15.02.01.01.B

Waste and vent pipe including pipe, fittings, supports and


sleeves
50 mm diameter pipe
50 mm diameter pipe

LM
LM

90
15

15.02.01.02.A
15.02.01.02.B

63 mm diameter pipe
63 mm diameter pipe

LM
LM

155
116

15.02.01.03.A

75 mm diameter pipe

LM

45

15.02.01.04.A
15.02.01.04.B

90 mm diameter pipe
90 mm diameter pipe

LM
LM

145
145

15.02.01.05.A
15.02.01.05.B

110 mm diameter pipe


110 mm diameter pipe

LM
LM

235
145

15.02.01.06.A
15.02.01.06.B

Cleanouts (Wall & Floor)


Cleanouts (Wall & Floor)

EA
EA

32
30

15.02.01.07.A
15.02.01.07.B

Floor drains (90 mm)


Floor drains (90 mm)

EA
EA

18
32

15.02.02.
15.02.02.01.A

Above ground service weight cast iron pipes and fittings


conforming to latest ASTM A-888 and/or CISP-301 & 310
50 mm diameter pipe

LM

130

15.02.02.02.A

75 mm diameter pipe

LM

80

Aug 2013

FOP-2-25

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.02.03.
15.02.03.01.A
15.02.03.01.B

Laboratory waste and vent, including fittings


40mm diameter pipe
40mm diameter pipe

LM
LM

30
45

15.02.03.02.A
15.02.03.02.B

50mm diameter pipe


50mm diameter pipe

LM
LM

66
90

15.02.03.03.A
15.02.03.03.B

63 mm diameter pipe
63 mm diameter pipe

LM
LM

30
45

15.02.03.04.A
15.02.03.04.B

75/80mm diameter pipe


75/80mm diameter pipe

LM
LM

195
225

15.02.03.05.B

90 mm diameter pipe

LM

30

15.02.03.06.B

110 mm diameter pipe

LM

120

15.02.04.A
15.02.04.B

Neutralization tank with concrete chamber cover & fittings


Neutralization tank with concrete chamber cover & fittings

EA
EA

3
4

15.02.05.A
15.02.05.B

Cleanouts (Wall & Floor)


Cleanouts (Wall & Floor)

EA
EA

24
39

15.02.06.A
15.02.06.B

Gas Distribution System (LPG)


Gas Distribution System (LPG)

LS
LS

1
1

15.03.

Fire Protection System

15.03.01.
15.03.01.01.A
15.03.01.01.B

Carbon steel pipe, including fittings, valves, supports, hangers


and sleeves.
65 mm diameter pipe
65 mm diameter pipe

LM
LM

11
30

15.03.01.02.A
15.03.01.02.B

80/75 mm diameter pipe


80/75 mm diameter pipe

LM
LM

95
24

15.03.01.03.A

90/100 mm diameter pipe

LM

166

Aug 2013

FOP-2-26

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.03.01.03.B

90/100 mm diameter pipe

LM

444

15.03.01.04.A
15.03.01.04.B

150/160 mm diameter pipe


150/160 mm diameter pipe

LM
LM

50
66

15.03.02.A

UPVC Underground Pipe, including Fittings (160 mm


diameter)
UPVC Underground Pipe, including Fittings (160 mm
diameter)

LM

20

LM

16

15.03.03.01.A
15.03.03.01.B

Fire Hose Cabinets, including Angle Valve, Hose rack, hose


and 4.5 kg Fire Extinguishers
FHC
FHC

EA
EA

7
7

15.03.03.02.A
15.03.03.02.B

Fire Extinguishers (FE)


Fire Extinguishers (FE)

EA
EA

12
18

15.04.

HVAC Units

15.04.01.
15.04.01.01.A
15.04.01.01.B

Air Cooled Package Roof-top Air Conditioning Units


PACU-1
PACU-1

EA
EA

1
1

15.04.01.02.A
15.04.01.02.B

PACU-2
PACU-2

EA
EA

1
1

15.04.01.03.A
15.04.01.03.B

PACU-3
PACU-3

EA
EA

1
1

15.04.01.04.A
15.04.01.04.B

PACU-4
PACU-4

EA
EA

1
1

15.04.01.05.A
15.04.01.05.B

PACU-5
PACU-5

EA
EA

1
1

15.04.01.06.A

PACU-6

EA

15.03.02.B

15.03.03.

Aug 2013

FOP-2-27

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.01.06.B

PACU-6

EA

15.04.01.07.A
15.04.01.07.B

PACU-7
PACU-7

EA
EA

1
1

15.04.01.08.A
15.04.01.08.B

PACU-8
PACU-8

EA
EA

1
1

15.04.01.09.A
15.04.01.09.B

PACU-9
PACU-9

EA
EA

1
1

15.04.01.10.A
15.04.01.10.B

PACU-10
PACU-10

EA
EA

1
1

15.04.01.11.A
15.04.01.11.B

PACU-11
PACU-11

EA
EA

1
1

15.04.01.12.A
15.04.01.12.B

PACU-12
PACU-12

EA
EA

1
1

15.04.01.13.A
15.04.01.13.B

PACU-13
PACU-13

EA
EA

1
1

15.04.01.14.A
15.04.01.14.B

PACU-14
PACU-14

EA
EA

1
1

15.04.01.15.A
15.04.01.15.B

PACU-15
PACU-15

EA
EA

1
1

15.04.01.16.A
15.04.01.16.B

PACU-16
PACU-16

EA
EA

1
1

15.04.01.17.A
15.04.01.17.B

PACU-17
PACU-17

EA
EA

1
1

15.04.02.A

Window Type A/C Units

EA

15.04.03.

Sound Attenuators

Aug 2013

FOP-2-28

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.03.01.A
15.04.03.01.B

SA-01 (S)
SA-01 (S)

EA
EA

1
1

15.04.03.02.A
15.04.03.02.B

SA-01 (R)
SA-01 (R)

EA
EA

1
1

15.04.03.03.A
15.04.03.03.B

SA-02 (S)
SA-02 (S)

EA
EA

1
1

15.04.03.04.A
15.04.03.04.B

SA-02 (R)
SA-02 (R)

EA
EA

1
1

15.04.03.05.A
15.04.03.05.B

SA-03 (S)
SA-03 (S)

EA
EA

1
1

15.04.03.06.A
15.04.03.06.B

SA-03 (R)
SA-03 (R)

EA
EA

1
1

15.04.03.07.A
15.04.03.07.B

SA-04 (S)
SA-04 (S)

EA
EA

1
1

15.04.03.08.A
15.04.03.08.B

SA-04 (R)
SA-04 (R)

EA
EA

1
1

15.04.03.09.A
15.04.03.09.B

SA-05 (S)
SA-05 (S)

EA
EA

1
1

15.04.03.10.A
15.04.03.10.B

SA-05 (R)
SA-05 (R)

EA
EA

1
1

15.04.03.11.A
15.04.03.11.B

SA-06 (S)
SA-06 (S)

EA
EA

1
1

15.04.03.12.A
15.04.03.12.B

SA-06 (R)
SA-06 (R)

EA
EA

1
1

15.04.03.13.A
15.04.03.13.B

SA-07 (S)
SA-07 (S)

EA
EA

1
1

Aug 2013

FOP-2-29

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.03.14.A
15.04.03.14.B

SA-07 (R)
SA-07 (R)

EA
EA

1
1

15.04.03.15.A
15.04.03.15.B

SA-08 (S)
SA-08 (S)

EA
EA

1
1

15.04.03.16.A
15.04.03.16.B

SA-08 (R)
SA-08 (R)

EA
EA

1
1

15.04.03.17.A
15.04.03.17.B

SA-09 (S)
SA-09 (S)

EA
EA

1
1

15.04.03.18.A
15.04.03.18.B

SA-09 (R)
SA-09 (R)

EA
EA

1
1

15.04.03.19.A
15.04.03.19.B

SA-10 (S)
SA-10 (S)

EA
EA

1
1

15.04.03.20.A
15.04.03.20.B

SA-10 (R)
SA-10 (R)

EA
EA

1
1

15.04.03.21.A
15.04.03.21.B

SA-11 (S)
SA-11 (S)

EA
EA

1
1

15.04.03.22.A
15.04.03.22.B

SA-11 (R)
SA-11 (R)

EA
EA

1
1

15.04.03.23.A
15.04.03.23.B

SA-12 (S)
SA-12 (S)

EA
EA

1
1

15.04.03.24.A
15.04.03.24.B

SA-12 (R)
SA-12 (R)

EA
EA

1
1

15.04.03.25.A
15.04.03.25.B

SA-13 (S)
SA-13 (S)

EA
EA

1
1

15.04.03.26.A

SA-13 (R)

EA

Aug 2013

FOP-2-30

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.03.26.B

SA-13 (R)

EA

15.04.03.27.A
15.04.03.27.B

SA-14 (S)
SA-14 (S)

EA
EA

1
1

15.04.03.28.A
15.04.03.28.B

SA-14 (R)
SA-14 (R)

EA
EA

1
1

15.04.03.29.A
15.04.03.29.B

SA-15 (S)
SA-15 (S)

EA
EA

1
1

15.04.03.30.A
15.04.03.30.B

SA-15 (R)
SA-15(R)

EA
EA

1
1

15.04.03.31.A
15.04.03.31.B

SA-16 (S)
SA-16 (S)

EA
EA

1
1

15.04.03.32.A
15.04.03.32.B

SA-16 (R)
SA-16 (R)

EA
EA

1
1

15.04.03.33.A
15.04.03.33.B

SA-17 (S)
SA-17 (S)

EA
EA

1
1

15.04.03.34.A
15.04.03.34.B

SA-17 (R)
SA-17 (R)

EA
EA

1
1

15.04.04.
15.04.04.01.A
15.04.04.01.B

Inertial Filters with Bleed Fans


IF-01 c/w BF-01
IF-01 c/w BF-01

EA
EA

1
1

15.04.04.02.A

IF-02 c/w BF-02

EA

15.04.04.03.A
15.04.04.03.B

IF-03 c/w BF-03


IF-03 c/w BF-03

EA
EA

1
1

15.04.04.04.A
15.04.04.04.B

IF-04 c/w BF-04


IF-04 c/w BF-04

EA
EA

1
1

Aug 2013

FOP-2-31

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.04.05.A
15.04.04.05.B

IF-05 c/w BF-05


IF-05 c/w BF-05

EA
EA

1
1

15.04.04.06.A
15.04.04.06.B

IF-06 c/w BF-06


IF-06 c/w BF-06

EA
EA

1
1

15.04.04.07.A
15.04.04.07.B

IF-07 c/w BF-07


IF-07 c/w BF-07

EA
EA

1
1

15.04.04.08.A
15.04.04.08.B

IF-08 c/w BF-08


IF-08 c/w BF-08

EA
EA

1
1

15.04.04.09.A
15.04.04.09.B

IF-09 c/w BF-09


IF-09 c/w BF-09

EA
EA

1
1

15.04.04.10.A
15.04.04.10.B

IF-10 c/w BF-10


IF-10 c/w BF-10

EA
EA

1
1

15.04.04.11.A
15.04.04.11.B

IF-11 c/w BF-11


IF-11 c/w BF-11

EA
EA

1
1

15.04.04.12.A
15.04.04.12.B

IF-12 c/w BF-12


IF-12 c/w BF-12

EA
EA

1
1

15.04.04.13.A
15.04.04.13.B

IF-13 c/w BF-13


IF-13 c/w BF-13

EA
EA

1
1

15.04.04.14.A
15.04.04.14.B

IF-15 c/w BF-15


IF-15 c/w BF-15

EA
EA

1
1

15.04.04.15.A
15.04.04.15.B

IF-16 c/w BF-16


IF-16 c/w BF-16

EA
EA

1
1

15.04.04.16.A
15.04.04.16.B

IF-17 c/w BF-17


IF-17 c/w BF-17

EA
EA

1
1

Aug 2013

FOP-2-32

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.05.01.A

Copper condensate drain pipe, including union fittings, Ptraps and supports
50 mm diameter pipe

LM

18

15.04.05.02.A
15.04.05.02.B

40 mm diameter pipe
40 mm diameter pipe

LM
LM

30
6

15.04.05.03.A
15.04.05.03.B

32 mm diameter pipe
32 mm diameter pipe

LM
LM

190
86

SM
SM

3,200
3,975

15.04.06.01.02.A Duct Lining 25 mm Fiber Glass Board, 48 kg/m Density,


complete with accessories, fasteners, etc.
15.04.06.01.02.B Duct Lining 25 mm Fiber Glass Board, 48 kg/m Density,
complete with accessories, fasteners, etc.

SM

2,134

SM

2,675

15.04.06.01.03.A Duct Wrap, 25 mm Fiber Glass, 24 kg/m density (complete)


15.04.06.01.03.B Duct Wrap, 25 mm Fiber Glass, 24 kg/m density (complete)

SM
SM

1,066
1,300

15.04.06.02.01.A Supply diffusers


15.04.06.02.01.B Supply diffusers

EA
EA

142
155

15.04.06.02.02.A Supply registers


15.04.06.02.02.B Supply registers

EA
EA

4
6

15.04.06.02.03.A Return / Exhaust diffusers and Grilles


15.04.06.02.03.B Return / Exhaust diffusers and Grilles

EA
EA

150
92

15.04.06.02.04.A Return and exhaust registers


15.04.06.02.04.B Return and exhaust registers

EA
EA

6
15

15.04.05.

15.04.06.
15.04.06.01.

HVAC Duct Work System


Galvanized steel ductwork, including fittings, hangers,
supports, accessories installation & testing
15.04.06.01.01.A Galvanized steel, 22 gauge (0.8534 mm)
15.04.06.01.01.B Galvanized steel, 22 gauge (0.8534 mm)

15.04.06.02.

Aug 2013

Air supply and return diffusers, registers, and grilles,


including insulation, connecting ductwork, (for flexible and
rigid), diffuser boxes and supports

FOP-2-33

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.06.02.05.A Supply diffusers round neck


15.04.06.02.05.B Supply diffusers round neck

EA
EA

17
12

15.04.06.02.06.A Return Linear bar grille 5.3 m effective length


15.04.06.02.06.B Return Linear bar grille 5.3 m effective length

EA
EA

2
2

15.04.06.02.07.A Transfer Grille

EA

LOT
LOT

1
1

15.04.07.
15.04.07.01.

Dampers
Volume Control Dampers, including installation,
support, fittings and insulation

15.04.07.01.01.A Sizes 100 x 100 mm to 1200 x 600 mm


15.04.07.01.01.B Sizes 100 x 100 mm to 1200 x 400 mm
15.04.07.02.A

Electrically actuated combination of fire and smoke dampers,


(FSD) 150 x 150 to 1200 x 350 (Various Sizes as shown on
drawings.)

EA

41

15.04.07.02.B

Electrically actuated combination of fire and smoke dampers,


(FSD) 175 x 100 to 1350 x 500 (Various Sizes as shown on
drawings.)

EA

60

15.04.08.
15.04.08.01.

Exhaust System
Exhaust fan units, including installation, supports, back draft
damper, fittings with power connection and operational. Note:
Size/capacity and type of exhaust fans EF-1 thru EF-10 varies
for Intermediate and Secondary schools.

15.04.08.01.01.A EF 1
15.04.08.01.01.B EF 1

EA
EA

1
1

15.04.08.01.02.A EF 2
15.04.08.01.02.B EF 2

EA
EA

1
1

15.04.08.01.03.A EF 3
15.04.08.01.03.B EF 3

EA
EA

1
1

Aug 2013

FOP-2-34

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.08.01.04.A EF 4
15.04.08.01.04.B EF 4

EA
EA

1
1

15.04.08.01.05.A EF 5
15.04.08.01.05.B EF 5

EA
EA

1
1

15.04.08.01.06.A EF 6
15.04.08.01.06.B EF 6

EA
EA

1
1

15.04.08.01.07.A EF 7
15.04.08.01.07.B EF 7

EA
EA

1
1

15.04.08.01.08.A EF 8
15.04.08.01.08.B EF 8

EA
EA

1
1

15.04.08.01.09.A EF 9
15.04.08.01.09.B EF 9

EA
EA

1
1

15.04.08.01.10.A EF 10
15.04.08.01.10.B EF 10

EA
EA

1
1

15.04.08.01.11.B EF 11

EA

15.04.08.01.12.B EF 12

EA

15.04.08.01.13.B EF 13

EA

15.04.08.01.14.B EF 14

EA

15.04.08.01.15.B EF 15

EA

15.04.08.01.16.B EF 16

EA

15.04.08.01.17.A Fume Hood Cupboard Exhaust Fans (EF-11)

EA

15.04.08.01.17.B Fume Hood Cupboard Exhaust Fans (built-in w/ fume hood


cab.)

EA

Aug 2013

FOP-2-35

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

15.04.08.01.18.A Fume Hood Cupboard Supply Fans (SF-1)


15.04.08.01.18.B Fume Hood Cupboard Supply Fans (SP-1, SP-2 & SP-3)
SP-4 & SP-5)

EA
EA

3
5

15.04.08.01.19.A EF- GH (Exhaust Fan for Guard House)

EA

15.04.08.02.A

Relief damper installed complete, including


damper, roof penetration and hood.
Relief damper installed complete, including
damper, roof penetration and hood.

EA

EA

15.04.09.A
15.04.09.B

HVAC Control System


HVAC Control System

LS
LS

1
1

15.04.10.A
15.04.10.B

Testing, Adjustment & Balancing


Testing, Adjustment & Balancing

LS
LS

1
1

16.

ELECTRICAL

16.01.

Electrical Power, Lighting and Telecommunications

16.01.01.A
16.01.01.B

Main Switchboard (MSB)


Main Switchboard (MSB)

EA
EA

1
1

16.01.02.A
16.01.02.B

Main Distribution Panel (MDP)


Main Distribution Panel (MDP)

EA
EA

4
5

16.01.03.A
16.01.03.B

Power Panel
Power Panel

EA
EA

5
2

16.01.04.A
16.01.04.B

Lighting Panel
Lighting Panel

EA
EA

5
6

16.01.05.
16.01.05.01.A
16.01.05.01.B

Disconnecting Switch
30 Ampere
30 Ampere

EA
EA

23
31

16.01.05.02.A

60 Ampere

EA

15.04.08.02.B

Aug 2013

FOP-2-36

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.01.05.03.A
16.01.05.03.B

100 Ampere
100 Ampere

EA
EA

12
14

16.01.05.04.A
16.01.05.04.B

200 Ampere
200 Ampere

EA
EA

3
3

16.01.06.A
16.01.06.B

Reinforced concrete handhole for low voltage


Reinforced concrete handhole for low voltage

EA
EA

4
1

16.01.07.
16.01.07.01.B

PVC conduit concrete encased low voltage duct bank


8 x 160 mm

LM

16.01.07.02.A
16.01.07.02.B

6 x 110 mm
6 x 110 mm

LM
LM

12
8

16.01.07.03.A
16.01.07.03.B

4 x 110 mm
4 x 110 mm

LM
LM

39
52

16.01.07.04.A
16.01.07.04.B

2 x 110 mm
2 x 110 mm

LM
LM

168
207

16.01.07.05.A
16.01.07.05.B

1 x 110 mm
1 x 110 mm

LM
LM

15
5

16.01.07.06.B

2 x 90 mm

LM

55

16.01.07.07.B

1 x 40 mm

LM

26

16.01.08.
16.01.08.01.A
16.01.08.01.B

Lighting fixture
Type A
Type A

EA
EA

345
440

16.01.08.02.A

Type A with emergency battery pack

EA

43

16.01.08.03.A
16.01.08.03.B

Type A1
Type A1

EA
EA

33
60

Aug 2013

FOP-2-37

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.01.08.04.A

Type A1 with emergency battery pack

EA

16.01.08.05.A
16.01.08.05.B

Type A2
Type A2

EA
EA

94
128

16.01.08.06.A
16.01.08.06.B

Type A2 with emergency battery pack


Type A2 with emergency battery pack

EA
EA

28
21

16.01.08.07.B

Type B

EA

16

16.01.08.08.A
16.01.08.08.B

Type C
Type C

EA
EA

58
82

16.01.08.09.B

Type C with emergency battery pack

EA

16.01.08.10.A
16.01.08.10.B

Type D
Type D

EA
EA

12
12

16.01.08.11.A

Type D with emergency battery pack

EA

16.01.08.12.B

Type D1

EA

16.01.08.13.A
16.01.08.13.B

Type D2
Type D2

EA
EA

2
23

16.01.08.14.A
16.01.08.14.B

Type H
Type H

EA
EA

8
15

16.01.08.15.A
16.01.08.15.B

Type J
Type J

EA
EA

20
16

16.01.08.16.A

Type L

EA

16.01.08.17.A
16.01.08.17.B

Type M
Type M

EA
EA

11
10

16.01.08.18.A
16.01.08.18.B

Type M1
Type M1

EA
EA

26
21

Aug 2013

FOP-2-38

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.01.08.19.A
16.01.08.19.B

Type N
Type N

EA
EA

24
28

16.01.08.20.A
16.01.08.20.B

Type P
Type P

EA
EA

7
12

16.01.08.21.A
16.01.08.21.B

Type P1
Type P1

EA
EA

6
7

16.01.08.22.A
16.01.08.22.B

Type R
Type R

EA
EA

35
48

16.01.08.23.A
16.01.08.23.B

Type R1
Type R1

EA
EA

8
8

16.01.08.24.A
16.01.08.24.B

Type S
Type S

EA
EA

20
20

16.01.09.
16.01.09.01.A
16.01.09.01.B

Outlet Box complete with light switches


One gang
One gang

EA
EA

95
119

16.01.09.02.B

One gang, WP

EA

16.1.09.03.A
16.1.09.03.B

Two gang
Two gang

EA
EA

8
22

16.1.09.04.A

Three gang

EA

10

16.01.10.A

MS manual single phase starter 230 volts for exhaust fan and
fume unit
MS manual single phase starter 230 volts for exhaust fan and
fume unit

EA

20

EA

21

EA

295

16.01.10.B

16.01.11.
16.01.11.01.A
Aug 2013

Outlet box complete with receptacles (Single & Duplex


Outlets)
Receptacles (Single & Duplex)
FOP-2-39

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.01.11.01.B

Receptacles (Single & Duplex)

EA

297

16.01.11.02.A
16.01.11.02.B

Single, WP
Single, WP

EA
EA

6
6

16.01.11.03.A
16.01.11.03.B

Duplex, floor mounted


Duplex, floor mounted

EA
EA

138
100

16.01.11.04.A
16.01.11.04.B

Duplex, WP
Duplex, WP

EA
EA

9
7

16.01.12.A

Rigid and flexible conduits (PVC, RGS & EMT) and metal
boxes complete with supports and fittings
Rigid and flexible conduits (PVC, RGS & EMT) and metal
boxes complete with supports and fittings

LOT

LOT

16.01.13.01.A
16.01.13.01.B

Single core cables, Copper conductor, XLPE insulated,


600/1.0KV
95 mm
95 mm

LM
LM

385
780

16.01.13.02.B

120 mm

LM

634

16.01.13.03.B

150 mm

LM

48

16.01.13.04.B

185 mm

LM

1,324

16.01.13.05.A
16.01.13.05.B

240 mm
240 mm

LM
LM

2,168
144

16.01.14

Single core cables copper conductor, XLPE insulated,


600/1.0KV
70 mm to 10 mm
70 mm to 10 mm

LOT
LOT

1
1

Single core cables copper conductor, PVC 85C insulated,


600/1.0 kV
6 mm to 2.5 mm

LOT

16.01.12.B

16.01.13.

16.01.14.A
16.01.14.B
16.01.15.
16.01.15.A
Aug 2013

FOP-2-40

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

LOT

LOT
LOT

1
1

16.01.15.B
16.01.16.
16.01.16.A
16.01.16.B

6 mm to 2.5 mm
Steel Conduits
Steel conduits - 32 mm diameter to 110 mm diameter
Steel conduits - 32 mm diameter to 110 mm diameter

16.02.

Data/Voice System

16.02.01.A
16.02.01.B

Data Server Cabinet


Data Server Cabinet

EA
EA

3
3

16.02.02.A
16.02.02.B

Fiber Optic Distribution Frame


Fiber Optic Distribution Frame

EA
EA

3
3

16.02.03.A
16.02.03.B

Patch Panel
Patch Panel

EA
EA

3
3

16.02.04.A
16.02.04.B

Patch Cords (Fiber and Cat 6 UTP)


Patch Cords (Fiber and Cat 6 UTP)

LOT
LOT

1
1

16.02.05.A
16.02.05.B

Cat 6, UTP Cables


Cat 6, UTP Cables

LOT
LOT

1
1

16.02.06.A
16.02.06.B

Fiber Optic Cable


Fiber Optic Cable

LOT
LOT

1
1

16.02.07.A
16.02.07.B

Data & Power Outlets


Data & Power Outlets

LOT
LOT

1
1

16.02.08.A
16.02.08.B

Line Extender
Line Extender

LOT
LOT

1
1

16.02.09.A

Cable Tray, Conduits and boxes complete with supports and


fittings
Cable Tray, Conduits and boxes complete with supports and
fittings

LOT

LOT

Wires and connectors

LOT

16.02.09.B

16.02.10.A
Aug 2013

FOP-2-41

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

LOT

16.02.10.B

Wires and connectors

16.03.

Sound System

16.03.01.A
16.03.01.B

240 Watts Master control unit with Power Amplifier


240 Watts Master control unit with Power Amplifier

EA
EA

1
1

16.03.02.A
16.03.02.B

120 Watts Local Amplifier


120 Watts Local Amplifier

EA
EA

1
1

16.03.03.
16.03.03.01.A
16.03.03.01.B

Speakers
Ceiling mounted
Ceiling mounted

EA
EA

19
18

16.03.03.02.A
16.03.03.02.B

Column mounted
Column mounted

EA
EA

4
4

16.03.03.03.A
16.03.03.03.B

Horn Type (weatherproof)


Horn Type (weatherproof)

EA
EA

5
4

16.03.04.
16.03.04.01.A
16.03.04.01.B

Microphone outlet complete with cord and microphone


Desk Type
Desk Type

EA
EA

3
2

16.03.04.02.A
16.03.04.02.B

Stand/Hand use
Stand/Hand use

EA
EA

2
4

16.03.05.A
16.03.05.B

Conduits and boxes complete with supports and fittings


Conduits and boxes complete with supports and fittings

LOT
LOT

1
1

16.03.06.A
16.03.06.B

Speakers/Microphone cables and connectors


Speakers/Microphone cables and connectors

LOT
LOT

1
1

16.04.

Bell and Clock System

16.04.01.A
16.04.01.B

Master Time Panel


Master Time Panel

EA
EA

1
1

Aug 2013

FOP-2-42

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.04.02.
16.04.02.01.A
16.04.02.01.B

Bells
Indoor
Indoor

EA
EA

12
10

16.04.02.02.A
16.04.02.02.B

Outdoor
Outdoor

EA
EA

6
6

16.04.03.A
16.04.03.B

Conduits and boxes complete with supports and fittings


Conduits and boxes complete with supports and fittings

LOT
LOT

1
1

16.04.04.A
16.04.04.B

Wires and connectors


Wires and connectors

LOT
LOT

1
1

16.05.

Fire Alarm and Detection System

16.05.01.A
16.05.01.B

Fire Alarm Control Panel including battery and charger unit


Fire Alarm Control Panel including battery and charger unit

EA
EA

1
1

16.05.02.A
16.05.02.B

Fire Alarm Graphic Annunciator Panel


Fire Alarm Graphic Annunciator Panel

EA
EA

1
1

16.05.03.
16.05.03.01.A
16.05.03.01.B

Detectors
Ionization type Detector
Ionization type Detector

EA
EA

110
128

16.05.03.02.A
16.05.03.02.B

Air Duct Detector with Remote Visual Indicator (LED)


Air Duct Detector with Remote Visual Indicator (LED)

EA
EA

34
34

16.05.03.03.A
16.05.03.03.B

Thermal Detectors, Fixed Temperature


Thermal Detectors, Fixed Temperature

EA
EA

2
6

16.05.04.A
16.05.04.B

Manual Fire Alarm Pull Station


Manual Fire Alarm Pull Station

EA
EA

11
14

16.05.05.A
16.05.05.B

Valve Indication (tamper switch)


Valve Indication (tamper switch)

LOT
LOT

1
1

Aug 2013

FOP-2-43

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.05.06.
16.05.06.01.A
16.05.06.01.B

Fire Alarm Bells


Indoor
Indoor

EA
EA

11
15

16.05.06.02.A
16.05.06.02.B

Outdoor, WP
Outdoor, WP

EA
EA

8
2

16.05.07.A
16.05.07.B

Magnetic Door Holder


Magnetic Door Holder

EA
EA

8
8

16.05.08.A

RGS conduit and boxes complete with supports and fittings

LOT

16.05.08.B

RGS conduit and boxes complete with supports and fittings

LOT

16.05.09.A
16.05.09.B

Fire alarm and Cat 6a UTP cables and connectors


Fire alarm and Cat 6a UTP cables and connectors

LOT
LOT

1
1

16.06.

CCTV Surveillance System

16.06.01.A
16.06.01.B

Equipment Cabinet
Equipment Cabinet

EA
EA

1
1

16.06.02.A
16.06.02.B

Network Video Recorder (NVR)


Network Video Recorder (NVR)

EA
EA

1
1

16.06.03.A
16.06.03.B

LCD Monitor
LCD Monitor

EA
EA

1
1

16.06.04.
16.06.04.01.A
16.06.04.01.B

CCTV Camera, PTZ High Resolution


Indoor
Indoor

EA
EA

9
10

16.06.04.02.A
16.06.04.02.B

Outdoor
Outdoor

EA
EA

6
6

Aug 2013

FOP-2-44

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

Intermediate Boys School in Haii Al-Jaar 1 & Secondary Boys Schools in Haii Al-Azizia

Pay Item
(Ref.to
Description
Section 01150)

Unit

Estimated
Quantity

16.06.05.A
16.06.05.B

Data Switch, 24 ports


Data Switch, 24 ports

EA
EA

1
1

16.06.06.A
16.06.06.B

Patch Panel, 24 ports


Patch Panel, 24 ports

EA
EA

1
1

16.06.07.A
16.06.07.B

Cat 6, UTP Cables


Cat 6, UTP Cables

LOT
LOT

1
1

16.06.09.A
16.06.09.B

Line Extender
Line Extender

LOT
LOT

1
1

16.06.10.A.
16.06.10.B.

Conduits and boxes complete with supports and fittings


Conduits and boxes complete with supports and fittings

LOT
LOT

1
1

16.07.

Under Floor Duct System

16.07.01.A.
16.07.01.B.

Flushduct infloor ducts, (Single, Double, Triple)


Flushduct infloor ducts, (Single, Double, Triple)

LOT
LOT

4
3

16.07.02.A.
16.07.02.B.

Flushduct fittings, (Adapter, Elbow, Offset)


Flushduct fittings, (Adapter, Elbow, Offset)

LOT
LOT

4
3

16.07.03.A.
16.07.03.B.

Flushduct Junction Box (Single, Double, Triple)


Flushduct Junction Box (Single, Double, Triple)

LOT
LOT

4
3

16.07.04.A.
16.07.04.B.

Data & Power Outlets


Data & Power Outlets

LOT
LOT

4
3

TOTAL AMOUNT FOR THE ABOVE ITEMS SHALL BE


ENTERED IN THE PROPOSAL LETTER (FOP SECTION 1)
IN NUMBERS AND WORDS

Aug 2013

FOP-2-45

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-46

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-47

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-48

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-49

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-50

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-51

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-52

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-53

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-54

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-55

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-56

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-57

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-58

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-59

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-60

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-61

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-62

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-63

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-64

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-65

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-66

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-67

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-68

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-69

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-70

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-71

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-72

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-73

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-74

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-75

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-76

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-77

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-78

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-79

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-80

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-81

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-82

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-83

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-84

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-85

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-86

PIC G-1507A (Re-Bid)

FOP SECTION-2
SCHEDULE OF PRICES AND QUANTITIES

hools in Haii Al-Aziziah 5

Unit Price
(SR.)

Aug 2013

Estimated
Amount (SR.)

FOP-2-87

PIC G-1507A (Re-Bid)

You might also like