Ingham Consult
- Independent Danish Wind Consultants since 1990
Our clients:
Developers
Governments and EU
Banks and Investors
Utility Companies
Ingham
Ingham
Ingham
GERMANY
Thyssen Rheinstahl Technik
Thyssen-Krupp
EtaPlan
Renerco
General Electric
UK
Energy Parks UK/Wales
Shell International
THE NETHERLANDS
NUON
Koop Durzaame Energie
SPAIN
Parque Eolica La Caracha
Parque Eolica Plane de Jarreta
Ingham
SUCCESSFUL Development
of a
Ingham
Ingham
MW
16629
8263
3117
1125
1078
888
606
522
465
442
386
339
160
95
82
63
35
26
20
17
Ingham
Germany
48%
15000
10000
Spain
24%
5000
0
End
2002
Germany
End
2003
Spain
Others
19%
End
2004
Denmark
Other
Denmark
9%
Ingham
AEP
8000
AEP/kW
AEP/m2
Liner (AEP)
6000
4000
2000
0
0
500
1000
1500
2000
2500
Ingham
1600
1400
1200
1000
800
600
400
200
0
0
500
1000
1500
WTG size, kW
2000
2500
3000
Ingham
Height, z (m)
120
100
80
60
40
20
260%
240%
220%
200%
180%
160%
140%
120%
100%
0
0
0.5
1.0
1.5
2.0
500
1000
1500
WTG size, kW
2000
2500
3000
Ingham
Ingham
THE
SITE
WIND
ELECTRIC
GRID
Ingham
P = V3 A
1. The wind speed increases with height (wind shear)
1. The wind speed increases over a hill
1. The wind speed at a given height is reduced over rough terrain
Wind profiles vs. roughness
1200
1000
Heigth, m agl
800
600
400
200
0
0%
20%
40%
60%
80%
100%
120%
rkl1
rkl2
rkl4
rjl3
Ingham
1.
2.
3.
4.
5.
Ingham
The Site
The final selection of a site for a wind power plant is not only based on the
wind study. Other important parameters are:
Ingham
Ingham
Case Study:
Ingham Consult has carried out a
complete visualization study for the
Andmyran 200 MW wind farm
(Norway). For each of 5 view points
selected for the planning application
a visualization was carried out
showing the WTGs
Client: Andmyran Vindpark A/S.
Andmyran Wind farm
camera position and sector
Ingham
Ingham
Ingham
Ingham
139204.6 MWh/yr
Losses
Array losses
WTG performance (power curve)
WTG downtime
Losses in MV/HV grid and trafos
O&M downtime outside contract
Misc. Other losses
Total losses (by multiplication)
Total Net Annual Energy delivered to the grid
Average net annual energy delivered per WTG
Average equivalent full load hours
Average equivalent capacity factor
6.3
2.0
3.0
2.5
1.0
1.0
14.9
%
%
%
%
%
%
%
-20718.9 MWh/yr
118486 MWh/yr
2236 MWh/yr
1490 hours/yr
0.17
Ingham
END OF SESSION
THANK YOU FOR YOUR ATTENTION !
For further information or request for our
assistance on wind energy projects,
please contact:
Peter Ingham, Mng. Director
phone: (+45)3066-0120
mail@ingham.dk