Professional Documents
Culture Documents
List quantities
Date:
Notes
Location: Zaher no :
29797
Total
Price
/ 02 /
Quantity unit
Preparations
1
1
0
1
1
0
1
1
1
1
Lump
Lump
Lump
Lump
Lump
Lump
Lump
Lump
Lump
Lump
Temporary Wall
( )
Remove the old buildings(if any
1.20
1.30
1.40
1.50
Coordination and cleanliness of the site after the end of the work
1.10
1.60
1.70
1.80
1.90
25000
8
9
330
1050
1050
400
1050
1050
1050
0
0
3000
1300
1000
20
90
0
40
12
0
20
0
0
1
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
Lump
52500
94500
52500
240000
31500
18900
0
489900
1050
1050
1050
400
1050
1050
0
50
90
50
600
30
18
0
m3
m3
m3
m2
m3
m3
11250
0
48750
42500
0
0
102500
75
0
65
85
0
0
150
0
750
500
0
0
m2
m2
m2
m2
m2
2000
2400
24500
2000
0
0
30900
2000
40
70
20
0
0
1
60
350
100
0
0
Lump
m2
m2
m2
m2
Excavation
Backfill
Ordinary concrete
( )
( )
Columns
Beams
Slab
hourdi slab
Stairs
Decorative concrete
Other
Total
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
2.90
2.10
3.20
3.30
3.40
3.50
3.60
3.70
1/4
4.10
4.20
4.30
4.40
4.50
4.60
Insulation work
Foundations
Toilets, bathrooms and kitchens
Surfaces (excluding the cement tiles)
skirting at the edges of the surfaces
Water tanks
Basement walls
total
3.10
Acts of bricks
Blocks 20 cm Solid
Blocks 10 cm Solid
20
20
10
others
total
2.00
261721985.xls
1.10
5.10
5.20
5.30
5.40
5.50
5.60
List quantities
Date:
Notes
Location: Zaher no :
29797
Total
Price
/ 02 /
Quantity unit
Finishing work
33000
4500
15000
12400
2000
36000
7500
0
50
150
60
40
50
150
150
0
660
30
250
310
40
240
50
0
m2
m2
m2
m2
m2
m2
8250
6000
0
2000
1000
15
20
0
20
25
550
300
0
100
40
32500
13500
25000
25
15
50
1300
900
500
m2
m2
m2
21560
14700
480
440
22
15
12
22
980
980
40
20
m2
m2
m2
m2
2640
2640
99000
35000
9000
384110
22
22
90
35000
100
120
120
1100
1
90
m2
m2
m2
Lump
m2
14000
25200
3500
1400
4
18
0
0
0
0
0
80
0
0
0
0
0
nos.
nos.
nos.
nos.
nos.
nos.
nos.
m2
m2
1
2
3
4
5
6
7
8
1
2
3
4
5
1
2
3
4
1
2
3
4
5
6.20
1
2
3
4
5
Carpentry work
33600
420
72800
261721985.xls
2/4
6.10
7.10
7.20
7.30
7.40
7.50
7.60
7.70
7.80
7.90
7.10
List quantities
Date:
Notes
Location: Zaher no :
29797
Total
Price
15600
3200
15600
2000
2200
4200
2600
0
4000
6000
14000
2000
1300
800
1300
1000
1100
300
650
200
1000
1000
1000
1000
/ 02 /
Quantity unit
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
m2
Windows model - W1
Windows model - W2
Windows model - W3
Windows model - *W3
Windows model - W4
Windows model - W5
Windows model - W6
Windows model - W7
Doors model - AD1
Doors model - AD2
Doors model - AD3
Doors model - AD4
Upper kitchen cabinets (in the case of
aluminum)
The lower kitchen cabinets comprehensive
surface finishing
(in
the
case
of
aluminum)
Stair handrail - Wrought iron
-
Total
Lump
Lump
Lump
Lump
Lump
Lump
Lump
nos.
Lump
nos.
Lump
Lump
nos.
)(
Wire
Switches and sockets (exits) electric
Electrical distribution boards
Combat system and fire alarm
Systems and communications links
Systems and TV links
Exhaust fans
Intercom
Heaters
Connecting service fees (electricity)
Coupling cameras
Total
Lump
Lump
nos.
Lump
Lump
)(
Isolators or circuit breakers.
air conditioning units model - 1
Safeguards
Civil Works
others
Total
45000
15000
131400
750
750
7000
11000
10000
10000
0
5000
5000
4200
7000
11000
10000
10000
4200
25000
12000
8000
101400
300
25000
12000
2000
1
1
1
1
0
1
1
14
1
14
1
1
4
8000
10000
106400
0
6000
8000
10000
2800
0
6000
1
1
38
1
1
8.20
8.30
8.40
8.50
8.60
8.70
8.80
8.90
8.15
8.16
8.17
8.18
8.19
8.20
Electrical work
5000
5000
300
261721985.xls
3/4
9.10
9.20
9.30
9.40
9.50
9.60
9.70
9.80
9.90
9.10
9.11
9.11
9.13
130400
8.10
10.10
10.20
10.30
10.50
10.60
10.70
10
List quantities
Date:
Notes
Location: Zaher no :
29797
Total
Price
/ 02 /
Quantity unit
Health work
10000
10000
10000
10000
500
2000
1200
5000
1
1
0
2
2
2
1
Lump
Lump
Lump
nos.
nos.
nos.
Lump
1000
4000
2400
5000
10000
8000
45000
6600
0
102000
10000
8000
45000
600
0
1
1
1
11
0
Lump
Lump
Lump
nos.
Lump
12500
9600
1350
0
12000
72000
15000
50
60
45
250
160
30
0
4
90
2
0
1
m2
m2
Lump
nos.
nos.
nos.
Lump
Water connections
Pipes (pipe) and cut plug the external
Pipes (pipe) and cut the internal conduction
Mixers and bathroom accessories and toilet
Pumps
Overhead water tanks
Water tanks lower
Connecting service fees (water)
Drainage
Pipes (pipes) and special pieces - Exterior
Pipes (pipes) and special pieces - Interior
Kits (brushes) and bathrooms toilet
Connecting service fee (drainage)
Total
1
2
3
4
5
6
7
11.20
1
2
3
4
5
Foreign Business
1875960
261721985.xls
10000
132450
3000
800
7500
10000
4/4
11
11.10
12.10
12.20
12.30
12.40
12.50
12.60
12.70
12.80
12.90
12