Project: Sohail Salmeen Al Shamsi


item

Preparations

1
1
0
1
1
0
1
1
1
1

Lump
Lump
Lump
Lump
Lump
Lump
Lump
Lump
Lump
Lump

Temporary Wall
( )
Remove the old buildings(if any

1.20
1.30

site Offices (supervision) according to the specs

1.40

Temporary services (electricity, water, etc


( specifications)soil testing
(specifications) Tests & adoption of material
Drawings for business services
realistic charts after execution

1.50

Coordination and cleanliness of the site after the end of the work

1.10

1.60
1.70
1.80
1.90

25000

Earthworks and concrete bottom level of the ground floor


10400
9000
6600
94500
0
16000
12600
0
21000
0
0
3000
173100

8
9
330
1050
1050
400
1050
1050
1050
0
0
3000

1300
1000
20
90
0
40
12
0
20
0
0
1

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
Lump

52500
94500
52500
240000
31500
18900
0
489900

1050
1050
1050
400
1050
1050
0

50
90
50
600
30
18
0

m3
m3
m3
m2
m3
m3

11250
0
48750
42500
0
0
102500

75
0
65
85
0
0

150
0
750
500
0
0

m2
m2
m2
m2
m2

2000
2400
24500
2000
0
0
30900

2000
40
70
20
0
0

1
60
350
100
0
0

Lump
m2
m2

m2
m2

Excavation
Backfill
Ordinary concrete






( )
( )

Columns
Beams
Slab
hourdi slab
Stairs
Decorative concrete
Other
Total

2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
2.90
2.10

3.20
3.30
3.40
3.50
3.60
3.70

1/4

4.10
4.20
4.30
4.40
4.50
4.60

Insulation work
Foundations
Toilets, bathrooms and kitchens
Surfaces (excluding the cement tiles)
skirting at the edges of the surfaces
Water tanks
Basement walls
total

3.10

Acts of bricks
Blocks 20 cm Solid
Blocks 10 cm Solid
20
20
10
others
total

2.00

Concrete works of the ground floor and above

261721985.xls

1.10

5.10
5.20
5.30
5.40
5.50
5.60

National Housing Loans

List quantities
Date:
Notes

Location: Zaher no :
29797
Total

Price

/ 02 /

Quantity unit

Project: Sohail Salmeen Al Shamsi


item

Finishing work

33000
4500
15000
12400
2000
36000
7500
0

50
150
60
40
50
150
150
0

660
30
250
310
40
240
50
0

m2
m2
m2
m2
m2

m2

8250
6000
0
2000
1000

15
20
0
20
25

550
300
0
100
40

32500
13500
25000

25
15
50

1300
900
500

m2
m2
m2

21560
14700
480
440

22
15
12
22

980
980
40
20

m2
m2
m2
m2

2640
2640
99000
35000
9000
384110

22
22
90
35000
100

120
120
1100
1
90

m2
m2
m2
Lump
m2

14000
25200

3500
1400

4
18
0
0
0
0
0
80
0
0
0
0
0

nos.
nos.
nos.
nos.
nos.
nos.
nos.
m2
m2

First: interior finishes


Flooring A
Floor model - F1 (Ceramics)
Satisfactory model - F2 (Marble)
Floor model -F3 (Granite Chinese)
Floor model - F4 (Mosaic)
Floor model - F5 (Ceramics pools)
( )

others
B
model - S1 (Ceramics)
model - S2 (Marble)
S3 -
Model - S4 (Mosaic)
Stairs
Walls C
( - )
()The walls of the model - W1
The walls of the model - W2 (Ceramics)
others
Roof D
( - )
( )C1 -
( )C2 -
( ) C3 -

Second: The exterior finishes


( - )
Model - 1 (Acrylic)
Stone
Stone decorations
Brick
Total

1
2
3
4
5
6
7
8
1
2
3
4
5
1
2
3
4
1
2
3
4
5
6.20
1
2
3
4
5

Carpentry work

33600

420

72800

261721985.xls

2/4

External doors - Model D1


Interior doors - Model D2
External doors - Model
External doors - Model
Interior doors - Model
Interior doors - Model
Interior doors - Model
Wardrobes - Model - 1
Wardrobes - Model - 2
Upper kitchen cabinets (in the case of wood)
The lower kitchen cabinets comprehensive
surface finishingStair
(in the
case of- Model
wood)
handrail
Balcony railings - Model
Total

6.10

7.10
7.20
7.30
7.40
7.50
7.60
7.70
7.80
7.90
7.10

National Housing Loans

List quantities
Date:
Notes

Location: Zaher no :
29797
Total

Price

15600
3200
15600
2000
2200
4200
2600
0
4000
6000
14000
2000

1300
800
1300
1000
1100
300
650
200
1000
1000
1000
1000

/ 02 /

Quantity unit

Project: Sohail Salmeen Al Shamsi


item

Aluminum and glass works


12
4
12
2
2
14
4
0
4
6
14
2
0
0
60
20

nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.
nos.

m2

Windows model - W1
Windows model - W2
Windows model - W3
Windows model - *W3
Windows model - W4
Windows model - W5
Windows model - W6
Windows model - W7
Doors model - AD1
Doors model - AD2
Doors model - AD3
Doors model - AD4
Upper kitchen cabinets (in the case of
aluminum)
The lower kitchen cabinets comprehensive
surface finishing
(in
the
case
of
aluminum)
Stair handrail - Wrought iron
-
Total

Lump
Lump
Lump
Lump
Lump
Lump
Lump
nos.
Lump
nos.
Lump
Lump
nos.

)(
Wire
Switches and sockets (exits) electric
Electrical distribution boards
Combat system and fire alarm
Systems and communications links
Systems and TV links
Exhaust fans
Intercom
Heaters
Connecting service fees (electricity)

Coupling cameras
Total

Lump
Lump
nos.
Lump
Lump

)(
Isolators or circuit breakers.
air conditioning units model - 1
Safeguards
Civil Works
others
Total

45000
15000
131400

750
750

7000
11000
10000
10000
0
5000
5000
4200

7000
11000
10000
10000

4200
25000
12000
8000
101400

300
25000
12000
2000

1
1
1
1
0
1
1
14
1
14
1
1
4

8000
10000
106400
0
6000

8000
10000
2800
0
6000

1
1
38
1
1

8.20
8.30
8.40
8.50
8.60
8.70
8.80
8.90
8.15
8.16
8.17
8.18
8.19
8.20

Electrical work

5000
5000
300

261721985.xls

3/4

9.10
9.20
9.30
9.40
9.50
9.60
9.70
9.80
9.90
9.10
9.11
9.11
9.13

Work of air conditioning

130400

8.10

10.10
10.20
10.30
10.50
10.60
10.70

10

National Housing Loans

List quantities
Date:
Notes

Location: Zaher no :
29797
Total

Price

/ 02 /

Quantity unit

Project: Sohail Salmeen Al Shamsi


item

Health work

10000
10000

10000
10000
500
2000
1200
5000

1
1
0
2
2
2
1

Lump
Lump
Lump
nos.
nos.
nos.
Lump

1000
4000
2400
5000
10000
8000
45000
6600
0
102000

10000
8000
45000
600
0

1
1
1
11
0

Lump
Lump
Lump
nos.
Lump

12500
9600
1350
0
12000
72000
15000

50
60
45

250
160
30
0
4
90
2
0
1

m2
m2

Lump
nos.

nos.
nos.
Lump

Water connections
Pipes (pipe) and cut plug the external
Pipes (pipe) and cut the internal conduction
Mixers and bathroom accessories and toilet
Pumps
Overhead water tanks
Water tanks lower
Connecting service fees (water)
Drainage
Pipes (pipes) and special pieces - Exterior
Pipes (pipes) and special pieces - Interior
Kits (brushes) and bathrooms toilet

Connecting service fee (drainage)
Total

1
2
3
4
5
6
7
11.20
1
2
3
4
5

Foreign Business

1875960

261721985.xls

10000
132450

3000
800
7500
10000

4/4

Flooring exterior corridors (Pascoe 6 cm)


Flooring exterior corridors (Pascoe 8 cm)
Flooring exterior corridors (Kerbston)
Agriculture and external coordination

The outer wall
The gates
Garage doors
Room electricity
Total

11

11.10

12.10
12.20
12.30
12.40
12.50
12.60
12.70
12.80
12.90

12