You are on page 1of 19

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.
4.1

UNIT

4.2

New Pipe Culvert

4.2.1

Earthworks
i)

ii)

4.2.3

4.2.4

4.2.5

RATE
(RM)

AMOUNT
(RM)
(SEN)

Temporary Works
Provide, erect,maintain and remove from site on
completion of works temporary crossing all in
accordance with the relevant sub section of the
specification for the proposed culverts.

4.2.2

QTY

sum

Excavate, load, haul and deposit to spoil any


material except rock to any depth for structural
foundation.

m3

- ditto - for rock

m3

Type A - Reinforced Concrete Cradle Foundation


i)

Lean concrete grade 15/20, 50mm thick.

m2

ii)

Formwork with Class F1 finishes.

m2

iii) Steel Fabric Reinforcement x.mm.

m2

iv) Concrete grade 25/20.

m3

Type B - Normal Foundation


Fill, spread, grade and compact granular fill material.
i) Mining sand

m3

ii)

m3

Crushed aggregate

Type B1 - Soft Foundation


Fill, spread, grade and compact granular fill material.
i) Mining sand

m3

ii)

m3

Crushed aggregate

Type B2 - Hard Foundation


Fill, spread, grade and compact granular fill material.
i) Mining sand

m3

ii)

m3

Crushed aggregate

Carried to Collection

BQ 4/1

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.
4.2.6

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Pile Foundation
i)

ii)

Allow for mobilization and demobilization of all


labour, plants piling, equipments, etc on site for
proposed piling works

sum

. x mm precast RC piles .m length,


inclusive of all reinforcements,mild steel plates
and provision for extension and lifting holes
no

4.2.7

iii) - Ditto - not exceeding ...m length extension


piles

nr

iv) Provide pile shoes to initial piles as in the


drawing.

nr

v) Welding for extension of piles as in the drawing.

nr

vi) Handle, sling and pitch vertical piles not


exceeding . m long.

nr

vii) Drive vertical piles to required depth.

viii) Cut off piles to required level,dispose off surplus


pile head from site.

nr

ix) Lean concrete grade 10/25, 50mm thick.

m2

x) Formwork with Class F1 finishes.

m2

xi) Steel Fabric Reinforcement ...x...mm.

m2

xii) Concrete grade 20/20.

m3

Pipe Culverts
Precast reinforced concrete pipe culvert including
jointing.
i)

600 mm diameter Class Y

ii)

900 mm diameter Class Y

iii) Twin 1200 mm diameter Class Y


4.2.8

Concrete Surround Pipe Culvert


i)

m2

Formwork with Class F1 finishes.

Carried to Collection

BQ 4/2

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

ii)

UNIT

Concrete grade 20/20.

Extension Of Existing Pipe Culvert

4.3.1

Demolition and hacking of existing inlet / outlet


structure to receive new extension.

4.3.2

Earthworks

ii)
4.3.3

4.3.4

4.3.5

RATE
(RM)

AMOUNT
(RM)
(SEN)

m3

4.3

i)

QTY

nr

Excavate, load, haul and deposit to spoil any


material except rock to any depth for structural
foundation.

m3

-Ditto- for rock

m3

Type A - Reinforced Concrete Cradle Foundation


i)

Lean concrete grade 10/25, 50mm thick.

m2

ii)

Formwork with Class F1 finishes.

m2

iii) Steel Fabric Reinforcement ..x..mm.

m2

iv) Concrete grade 20/20.

m3

Type B - Normal Foundation


Fill, spread, grade and compact granular fill material.
i) Mining / river sand *

m3

ii)

m3

Crushed aggregate

Type B1 - Soft Foundation


Fill, spread, grade and compact granular fill material.
i) Mining / river sand *

m3
m3

ii)
4.3.6

Crushed aggregate

Type B2 - Hard Foundation


Fill, spread, grade and compact granular fill material.
i) Mining / river sand *

m3

ii)

m3

Crushed aggregate

Carried to Collection

BQ 4/3

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

4.3.7

UNIT

RATE
(RM)

AMOUNT
(RM)
(SEN)

Pile Foundation
i)

ii)

Allow for mobilization and demobilization of all


labour, plants piling, equipments, etc on site for
proposed piling works

sum

. x mm precast RC piles .m length,


inclusive of all reinforcements,mild steel plates
and provision for extension and lifting holes

nr

iii) - Ditto - not exceeding ...m length extension


piles
iv) Provide pile shoes to initial piles as in the
drawing.
v) Welding for extension of piles as in the drawing.

4.3.8

QTY

nr
nr
nr

vi) Handle, sling and pitch vertical piles not


exceeding . m long.

nr

vii) Drive vertical piles to required depth.

viii) Cut off piles to required level,dispose off surplus


pile head from site.

nr

ix) Lean concrete grade 10/25, 50mm thick.

m2

x) Formwork with Class F1 finishes.

m2

xi) Steel Fabric Reinforcement ...x...mm.

m2

xii) Concrete grade 20/20.

m3

Pipe Culverts
Precast reinforced concrete pipe culvert including
jointing.
i)
ii)

4.3.9

. mm diameter Class . (.. joints)


Twin . mm diameter Class .. (....
joints)

m
m

Concrete Surround Pipe Culvert


i)

Formwork with Class F1 finishes.

m2

ii)

Concrete grade 20/20.

m3

Carried to Collection

BQ 4/4

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

4.4

Inlet / Outlet Structures

4.4.1

Reinforced concrete headwall, wingwall, base slab


including excavation work, formworks, concrete,
reinforcement, lean concrete and shoring for:-

4.5

i)

600 mm diameter single pipe culvert.

nr

i)

900 mm diameter single pipe culvert.

nr

i)

1200 mm diameter single pipe culvert.

nr

i)

1500 mm diameter single pipe culvert.

nr

ii)

Twin ... mm diameter pipe culvert.

nr

i)

Filling with suitable material in layers up to


formation level including compaction.

m3

ii)

Imported filling with suitable material in layers up


to formation level including compaction.

m3

New Box Culvert For Size < 3.0 m wide

4.6.1

Earthworks
i)

ii)

Excavate, load, haul and deposit to spoil any


material except rock to any depth for structural
foundation.

m3

-Ditto- for rock

m3

AMOUNT
(RM)
(SEN)

Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining sand
ii)

m3
m3

Crushed aggregate

iii) Lean concrete grade 15/20, 100mm thick.


4.6.3

RATE
(RM)

Fill Material

4.6

4.6.2

QTY

m2

Pile Foundation
i)

Allow for mobilization and demobilization of all


labour, plants piling, equipments, etc on site for
proposed piling works

sum

Carried to Collection

BQ 4/5

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

ii)

UNIT

. x mm precast RC piles .m length,


inclusive of all reinforcements,mild steel plates
and provision for extension and lifting holes

iii) - Ditto - not exceeding ...m length extension


piles
iv) Provide pile shoes to initial piles as in the
drawing.
v) Welding for extension of piles as in the drawing.

4.6.4

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

nr

nr
nr
nr

vi) Handle, sling and pitch vertical piles not


exceeding . m long.

nr

vii) Drive vertical piles to required depth.

viii) Cut off piles to required level,dispose off surplus


pile head from site.

nr

ix) Lean concrete grade 10/25, 50mm thick.

m2

x) Formwork with Class F1 finishes.

m2

xi) Steel Fabric Reinforcement ...x...mm.

m2

xii) Concrete grade 20/20.

m3

Precast Box Culvert


Box culvert and flat lid including joint.

4.7
4.7.1

4.7.2

i)

.mm x..mm size box culvert.

ii)

Twin.mm xmm size box culvert.

Extension of Existing Box CulvertFor Size < 3.0m


wide
Demolition and hacking of existing inlet/outlet
structure to receive new extension.

nr

Earthworks
i)

ii)

Excavate, load, haul and deposit to spoil any


material except rock to any depth for structural
foundation.

m3

-Ditto- for rock

m3

BQ 4/6

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection
4.7.3

Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining / river sand
ii)

Crushed aggregate.

m3

iii) Lean concrete grade 15/20, 100mm thick.


4.7.4

m3

m2

Pile Foundation
i)

ii)

Allow for mobilization and demobilization of all


labour, plants piling, equipments, etc on site for
proposed piling works

sum

. x mm precast RC piles .m length,


inclusive of all reinforcements,mild steel plates
and provision for extension and lifting holes
nr

iii) - Ditto - not exceeding ...m length extension


piles
iv) Provide pile shoes to initial piles as in the
drawing.
v) Welding for extension of piles as in the drawing.

4.7.5

nr
nr
nr

vi) Handle, sling and pitch vertical piles not


exceeding . m long.

nr

vii) Drive vertical piles to required depth.

viii) Cut off piles to required level,dispose off surplus


pile head from site.

nr

ix) Lean concrete grade 10/25, 50mm thick.

m2

x) Formwork with Class F1 finishes.

m2

xi) Steel Fabric Reinforcement ...x...mm.

m2

xii) Concrete grade 20/20.

m3

Precast Box Culvert


Box culvert and flat lid including joint.
i)

.mm x..mm size box culvert.

ii)

Twin.mm xmm size box culvert.

BQ 4/7

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection

4.8

Cast Insitu Box Culvert

4.8.1

Earthworks
i)

ii)
4.8.2

Excavate, load, haul and deposit to spoil any


material except rock to any depth for structural
foundation.

m3

-Ditto- for rock

m3

Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining sand
ii)

m3

Crushed aggregate.

iii) Lean concrete grade 15/20, 100mm thick.


4.8.3

m3

m2

Pile Foundation
i)

ii)

Allow for mobilization and demobilization of all


labour, plants piling, equipments, etc on site for
proposed piling works

sum

250 x 250 mm precast RC piles 12 m length,


inclusive of all reinforcements,mild steel plates
and provision for extension and lifting holes

nr

iii) - Ditto - not exceeding 6 m length extension piles

iv) Provide pile shoes to initial piles as in the


drawing.
v) Welding for extension of piles as in the drawing.

nr
nr
nr

vi) Handle, sling and pitch vertical piles not


exceeding 12 m long.

nr

vii) Drive vertical piles to required depth.

viii) Cut off piles to required level,dispose off surplus


pile head from site.

nr

ix) Lean concrete grade 10/25, 50mm thick.

m2

x) Formwork with Class F1 finishes.

m2

xi) Steel Fabric Reinforcement ...x...mm.

m2

BQ 4/8

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection
xii) Concrete grade 20/20.

m3

4.8.4

Formwork for box culvert,headwall and wingwall with


Class F1 Finishes.

m2

4.8.5

Reinforcement for Insitu box culvert High Yield Steel.


i) 12mm diameter
ii) 16mm diameter
iii) 20mm diameter
iv) 25mm diameter
v) 32mm diameter

t
t
t
t
t

4.8.6

Reinforcement for headwall and wingwall.


High Yield Steel
i) 10mm diameter
ii) 12mm diameter
iii) 16mm diameter
iv) 25mm diameter

t
t
t
t

Mild Steel.
i) 12mm diameter
ii) 16mm diameter

t
t

4.8.7

4.8.8

4.8.9

4.8.10

Grade 40/20 concrete at box culvert, wingwall and


headwall.
Install 150mm wide rubber waterstop at construction
and movement joints.

Provide T32mm diameter steel dowel bars 600mm


long at 300mm centres as in the drawing

nr

4.9

Extension Of Existing Cast Insitu Box Culvert

4.9.1

Earthworks

4.9.2

m3

i)

Excavate, load, haul and deposit to spoil any


material except rock to any depth for structural
foundation.

m3

ii)

-Ditto- for rock

m3

Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining / river sand
ii)

m3
m3

Crushed aggregate

BQ 4/9

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM
NO.

ITEM DESCRIPTION

UNIT

iii) Lean concrete grade 15/20, 100mm thick.

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

m2

Carried to Collection

4.9.3

Pile Foundation
i)

ii)

Allow for mobilization and demobilization of all


labour, plants piling, equipments, etc on site for
proposed piling works

sum

. x mm precast RC piles .m length,


inclusive of all reinforcements,mild steel plates
and provision for extension and lifting holes

nr

iii) - Ditto - not exceeding ...m length extension


piles
iv) Provide pile shoes to initial piles as in the
drawing.
v) Welding for extension of piles as in the drawing.

nr
nr
nr

vi) Handle, sling and pitch vertical piles not


exceeding . m long.

nr

vii) Drive vertical piles to required depth.

viii) Cut off piles to required level,dispose off surplus


pile head from site.

nr

ix) Lean concrete grade 10/25, 50mm thick.

m2

x) Formwork with Class F1 finishes.

m2

xi) Steel Fabric Reinforcement ...x...mm.

m2

xii) Concrete grade 20/20.

m3

Formwork for box culvert,headwall and wingwall with


Class F1 Finishes.

m2

4.9.5

High Yield Steel Reinforcement for Insitu box culvert


i) 12mm diameter
ii) 16mm diameter
iii) 20mm diameter
iv) 25mm diameter
v) 32mm diameter

t
t
t
t
t

4.9.6

Reinforcement for headwall and wingwall.


High Yield Steel
i) 10mm diameter
ii) 12mm diameter

t
t

4.9.4

BQ 4/10

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

iii) 25mm diameter

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection

4.9.7

Mild Steel.
i) 12mm diameter
ii) 16mm diameter

t
t

4.9.8

Grade 40/20 concrete at box culvert, wingwall and


headwall

4.9.9

Install 150mm wide rubber waterstop at construction


and movement joints.

4.9.10

Provide T32mm diameter steel dowel bars 600mm


long at 300mm centres as in detail.

nr

4.10

Inlet / Outlet Structures

4.10.1

Reinforced concrete headwall,wingwall,base slab


including excavation work, formworks, concrete,
reinforcement, lean concrete and shoring for:-

m3

i)

2000 mm x 2000 mm size box culvert.

nr

ii)

Twin 2000 mm x 1500 mm size box culvert.

nr

4.11 Fill Material


Filling with suitable material in layers up to
formation level including compaction.
Imported filling with suitable material in layers up
Unlined drains, half round glazed earthenware and
to formation level including compaction.
ii)
Insitu Reinforced Concrete grade 20/20 drains at any
inclination including excavation,cascading,lean
SURFACE
DRAINS
concrete,jointing,reinforcement,formwork,rendering,
fixing precast RC slab,backfilling and disposal of
surplus material.
i)

4.12

4.12.1

m3
m3

Roadside Drains For Rural Area


i)

ii)

Unlined drains Type 1 (RSD 1)


- 300mm to 500mm deep

Cast in situ concrete drain Type 2 (RSD 2)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iii) Precast concrete block drain Type 3 (RSD 3)


- 300mm to 500mm deep
- exceeding 500mm deep

BQ 4/11

m
m

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection

4.12.2

iv) Stone - lined drain Type 4 (RSD 4)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

v) ..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

Roadside Drains For Urban Area


i)

Precast concrete block drain Type U1 (RSDU1)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

ii)

..mm half round glazed earthenware drain Type


U2 (RSDU2)
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iii) ..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

Embankment Toe Drains

4.12.3
i)

Unlined drain Type 1 (TD1) ..mm wide.


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

ii)

Cast in situ concrete drain Type 2 (TD2)...mm


wide.
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iii) Precast concrete block drain Type 3 (TD3)


600mm wide.
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iv) Stone lined drain Type 4 (TD4) ..mm base


wide.
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

v)

..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

BQ 4/12

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection
4.12.4

Interceptor Drain
i)

ii)

4.12.5

Precast concrete block with stone wall Type 1


along top edge of cutting (ID 1)
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

Cast in situ concrete Type 2 (ID2) ..mm base


wide.
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iii) Stone lined Type 3 (ID3) ..mm base wide.


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iv) ..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

Bench Drain
i)

Cast in situ concrete V shape Type 1 (BC1)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

ii)

Half round glazed earthenware Type 2 (BC2)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iii) ..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

Berm Drain

4.12.6
i)

Cast in situ concrete V shape Type 1 (BF1)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

ii)

Half round glazed earthenware Type 2 (BF2)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m

iii) ..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

BQ 4/13

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection
4.12.7

Shoulder Drain
i)

ii)

4.12.8

4.12.9

Embankment shoulder drain Type 1 (SD 1 )


- 300mm to 500mm deep

..
- 300mm to 500mm deep

Cascade Drain
i)

Stone pitching Type 1 (OD1) with handrails.

ii)

In-situ reinforced concrete outfall drain Type 2


(OD2)

iii) Outfall chute Type 3 (OD3)

iv) Precast concrete block drain Type 4 (OD4)

v) ..

Median Drain For Rural Area


Cast in situ concrete half round glazed
i) earthenware Type 1 (MD1)
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

Stone lined Type 2 ( MD 2 )


- 300mm to 500mm deep
- exceeding 500mm deep
Precast block Type 3 (MD3) 600mm thick grouted
iii) stone pitching.
- 300mm to 500mm deep
- exceeding 500mm deep
ii)

iv) Cast insitu concrete u-drain with BRC A6


- 300mm to 500mm deep
- exceeding 500mm deep
4.12.10

m
m

m
m

m
m

Median Drains For Urban Area

BQ 4/14

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Reinforced Concrete drain and half round glazed


earthenware drains lay at any inclination,including
joints, stepping, excavation bedding, reinforcement,
formwork where necessary, bricklaying, rendering,
fixing precast R.C slab, backfilling and disposal of
surplus material.

Carried to Collection
i)

ii)

....mm Precast concrete Type 1(MDU1)


- 300mm to 500mm deep
- exceeding 500mm deep
...mm half round glazed earthenware Type 2
(MDU2)
- 300mm to 500mm deep
- exceeding 500mm deep

m
m
m
m
m
m

iii) mm Precast concrete Type 3 (MDU3)


- 300mm to 500mm deep
- exceeding 500mm deep

m
m
m

iv) ..mm half round glazed earthenware Type 4


(MDU4)
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

v) ..
- 300mm to 500mm deep
- exceeding 500mm deep

m
m

4.13

SUB-SURFACE DRAIN

4.13.1

Subsoil Drains
i)

ii)

iii)

Subsoil drains including excavation, porous pipe


and filter material as per Specifications Type 1
(SSD 1).

ii) Subsoil drains including excavation, non-woven


geotextiles fabric and filter material as per
drawing Type 2 (SSD 2).

4.14

SUMPS

4.14.1

Sump At Cut

BQ 4/15

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Stone pitched sump including excavation, lean


concrete, joints, backfilling and disposal of surplus
material.
i)

Type SC1 at top.

nr

ii)

Type SC2 at benchs.

nr

iii) Type SC3 at shoulder.

nr

iv)

nr

Carried to Collection
4.14.2

Sump At Fill
Brick sump including excavation, lean concrete,
concrete bedding, plastering, formworks, joints,
backfilling and disposal of surplus material.

4.14.3

4.14.4

i)

Type SF1 at shoulder .

nr

ii)

Type SF2 at berms.

nr

iii) Type SF3 at embankment toe.

nr

iv)
Brick sump including excavation, lean concrete,
concrete bedding, reinforcement, plastering,
Median Sump
(Rural
Area)
formworks,
joints,
stone
pitching, laying outlets
concrete pipe, fix with grating, iron steps, backfill and
disposal of surplus material.

nr

i)

Type MSR1 with...(type) ... grating at sag.

nr

ii)

Type MSR2 with...(type) MS grating

nr

Sump (Urban Area)

Typical sump from brickworks including excavation,


lean concrete, reinforcement, plastering, formworks,
joints, stone pitching, laying outlets concrete pipe, fix
with grating, iron steps, backfill and disposal of
surplus material.
i)

ii)

4.14.5

Median Sump Type MSU1 with .(type) grating


and culvert outlet.

nr

Median Sump Type SU1 with.(type)grating In


Urban Area at road side drain.

nr

Rubble Retaining Walls

BQ 4/16

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM DESCRIPTION

ITEM
NO.

UNIT

225mm thick grouted stone pitching including all


necessary excavation works at both inlet and outlet of
culverts as show in the drawing.
4.14.6

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

m2

Earth Channels Excavation


Excavate for earth channels to shapes and sizes as
shown in the drawings including slopes protection.
i)

Earth Channel excavation.

m3

Carried to Collection
ii)

Channel bed protection using gabion rock


mattresses mm thick.

m2

iii) Channel slope protection using gabion rock


mattresses.

m2

iv) Channel slope protection 300mm thick mortar rip


rap.

m2

BQ 4/17

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM
NO.

ITEM DESCRIPTION

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

Carried to Collection

COLLECTION PAGE
BQ 4/1
BQ 4/2
BQ 4/3
BQ 4/4
BQ 4/5
BQ 4/6
BQ 4/7
BQ 4/8
BQ 4/9
BQ 4/10
BQ 4/11
BQ 4/12
BQ 4/13
BQ 4/14
BQ 4/15
BQ 4/16
BQ 4/17

BQ 4/18

02/24/2015

PROJEK :

BILL NO 4 - DRAINAGE WORKS


ITEM
NO.

ITEM DESCRIPTION

UNIT

QTY

RATE
(RM)

AMOUNT
(RM)
(SEN)

BQ 4/18

TOTAL CARRIED TO SUMMARY

BQ 4/19

02/24/2015