ELECTRICAL AND MECHANICAL DESIGN ESTIMATION

ec
te
d

by

or

by

ig

in

al
co
p

yr

ig

ht

FOR 3 STAR HOTEL INFRASTRUCTURE

Th
i

si

te

is

pr

ot

MOHD FITRI BIN ADENAN

Report submitted in partial fulfillment


of the requirements for the degree
of Bachelor of Engineering (Electrical Systems Engineering)

JUN 2011

ig

ht

ACKNOWLEDGEMENT

yr

Firstly I would like to express praise Allah the Almighty, which have helped and guided

al
co
p

me in completing my final year project. My all most gratitude goes to Mr Anayet Karim who
was willingly given his time and effort when I needed help, advice and suggestions at the various

in

stage development of this project. Not only that a lot of thankfulness for his kindness and

or

ig

willingness to guide me until this project has done. He had given me advices and taught me the

by

procedure on doing this project. His contributions and personal sacrifices are truly appreciated
and will be remembered. I would also like to express my full appreciation to them for guiding me

ec
te
d

until this report was completed. In additional my thanks also go to my friends who help me
especially in hands on training of how to use AutoCAD. Besides, I also gained my knowledge in

pr

ot

Software Skills. They open the ways and help me on how to solve the faced problem in my final

is

year project. My thanks are also reserved for other academic and administrative staffs, which

have been helping me directly and indirectly towards completion of this thesis. Finally, my

te

deepest gratitude and special thank you are for my family for their support, understanding and

si

encouragement during the past months. Lastly, I hope that my objective to Mechanical &

Th
i

Electrical Design Estimation For 3 Star Hotel Infrastructure will be achieved and can be applied

by other colleagues.

DECLARATION SHEET

I hereby declare that my Final Year Project Thesis is the result of my research work under
supervision of Mr Anayet Karim . All literature sources used for the writing of this thesis

or

ig

in

al
co
p

yr

ig

ht

have been adequately referenced.

: MOHD FITRI BIN ADENAN

Candidate number

: 071090465

Supervisor

: MR ANAYET KARIM

Title of thesis

: ELECTRICAL

ot

ec
te
d

by

Name

AND

MECHANICAL

DESIGN

Th
i

si

te

is

pr

ESTIMATION FOR 3 STAR HOTEL INFRASTRUCTURE

Candidates signature: . . Supervisor signature: ...


Date: ..

Date: ..

ii

ig

ht

APPROVAL AND DECLARATION SHEET

yr

This project report titled Electrical & Mechanical Design Estimation For 3 Star Hotel

al
co
p

Infrastructure was prepared and submitted by Mohd Fitri Bin Adenan (Matrix
Number: 071090465) and has been found satisfactory in terms of scope, quality and

in

presentation as partial fulfillment of the requirement for the Bachelor of Engineering

ot

ec
te
d

by

or

ig

(Electrical Systems Engineering) in Universiti Malaysia Perlis (UniMAP).

_______________________
(ANAYET KARIM)
Project Supervisor

Th
i

si

te

is

pr

Checked and Approved by

School of Electrical Systems Engineering


Universiti Malaysia Perlis

Jun 2011

iii

MENGENALPASTI SERTA MENGANGGAR REKABENTUK ELEKTRIKAL &

ht

MEKANIKAL UNTUK INFRASTRUKTUR HOTEL 3 BINTANG

in

al
co
p

yr

ig

ABSTRAK

or

ig

Projek ini membincangkan tentang kerja-kerja menganggar dan mengenalpasti

by

rekabentuk Elektrikal & Mekanikal (M&E) untuk hotel 3 bintang, Hotel Putra Palace, Perlis.
Projek ini banyak mengutamakan kerja-kerja yang berdasarkan ekperimental pengumpulan data.

ec
te
d

Pemerhatian di tapak kerja adalah hal penting yang utama untuk mendapatkan semua maklumat
dan data yang berkaitan dengan kerja Elektrikal & Mekanikal (M&E) di Hotel Putra Palace,

pr

ot

Perlis. Lukisan yang menggunakan AutoCAD juga penting untuk projek ini terutamanya yang

is

membabitkan gambar rajah pelan, gambar rajah litar skema dan gambar rajah pelan pendawaian

supaya memudahkan kerja merujuk pada struktur bangunan. Projek tahun akhir ini (FYP) akan

te

mendedahkan diri kepada kerja yang berorientasikan amal praktikal dan idea untuk

si

menyelesaikan pekerjaan. Penekanan yang diberikan untuk mencari konsep rekabentuk untuk

Th
i

indeks bilik, pemilihan kabel, papan pengagihan, pemutus litar, rekabentuk pencawang, bas bar

ducting dan semua yang pemilihan yang berkaitan unsur-unsur Elektrikal & Mekanikal (M&E).

iv

ELECTRICAL AND MECHANICAL DESIGN ESTIMATION FOR POWER 3 STAR

ht

HOTEL INFRASTUCTURE

in

al
co
p

yr

ig

ABSTRACT

or

ig

This project discusses about Electrical & Mechanical (M&E) Design Estimation for 3

by

Star Hotel, Putra Palace Hotel, Perlis. This project mainly to search for experimental work based
on data collection and design estimation for Electrical and Mechanical (M&E) work. The

ec
te
d

observation work on sites is the main important thing in order to get all information and data
related to M&E work in Putra Palace Hotel, Perlis. An AutoCAD drawing is also important for

pr

ot

this project especially drawing of site plan schematic wiring diagram, electrical layout diagram,

is

layout plan with referent to easily recognize building and structure. This Final Years Project

(FYP) will get practical field oriented hands on idea to complete the work. The emphasis given

te

to find the design concept for room index, cable selection, distribution board, substation

Th
i

si

estimation, bus bar ducting and all Electrical & Mechanical (M&E) elements selection.

TABLE OF CONTENTS

ht

Page

ig

ACKNOWLEDGEMENT

yr

APPROVAL AND DECLARATION

al
co
p

ABSTRAK
ABSTRACT

in

TABLE OF CONTENTS

or

ig

LIST OF TABLES

by

LIST OF FIGURES

ec
te
d

LIST OF SYMBOLS, ABBREVIATIONS OR NOMENCLATURE

i
ii
iii
iv
v
xi
xiii
xv

CHAPTER 1 INTRODUCTION
Introduction

1.2

Aims & Objective

1.3

Problem Statement/Gap

1.4

Scope of the Project

1.5

Project Overview

1.6

Outline of the Project

1
2
2
3

Th
i

si

te

is

pr

ot

1.1

CHAPTER 2 LITERATURE REVIEW


2.1

Introduction

2.2

Goal of System Design

2.3

Interior Lighting

2.3.1

Maintenance Factor

10

2.3.2 Co-Efficient of Utilization (CU)

10

2.3.3 Room Index

11
vi

2.3.4 The utilization factor (UF)

11

2.3.5 Fluorescent Lampr

12

2.4

12

2.3.5.2 List of Components

14

2.3.5.3 Connection Diagram

15

Ballast Effect

15

ht

2.3.6

2.3.5.1 A Fluorescent Overview

ig

Introduction of Air Conditioner Estimation

yr

2.4.1 Air Conditioning Estimation

al
co
p

2.4.2 Cooling Capacity


2.4.3 Heat Load

in

2.4.4 Heat Load Calculation

or

ig

2.4.4.1 Floor Area of Room

by

2.4.4.2 Window Size and Position


2.4.4.3 Occupants

17
18
18
18
18
19

2.4.4.5 Lighting

19
20
20

ot

2.4.4.6 Total Cooling required

pr

ec
te
d

19

is

20
21

2.4.4.10Air Conditioner Component Parts

21

2.4.4.11Air Conditioner Block Diagram

22

Th
i

si

2.4.4.9 The Circuit & Cycle Diagram

te

2.4.4.8 The Horse Power Estimation

17

2.4.4.4 Equipment

2.4.4.7 Number of Air Conditioner units required

2.5

16

Distribution Board

23

2.5.1 Selecting a Distribution Scheme

23

2.5.2 Final Circuit

24

2.5.2.1 Definition of a Final Circuit

24

2.5.2.2 Socket Outlet

24

2.5.2.3 IEE Regulation for Final Circuit

24

2.5.2.4 Final Circuit Distribution

25

2.5.3 Main Component Distribution Board

26

vii

2.5.3.1 Residual Current Cirucuit Breaker (RCCB) or Earth Leakage Circuit


Breaker (ELCB)

26

2.5.3.2 Miniature Circuit Breaker (MCB) & Moulded Case Circuit Breaker
27

2.5.3.3 List of Components

28

Cable Selection and Installation

29

ht

2.6

(MCCB)

ig

2.6.1 Choosing the Correct Size Cable in Wiring

yr

2.6.2 Total Connected Load (TCL)

al
co
p

2.6.3 Group Diversity


2.6.4 Maximum Demand

in

2.6.5 Current Carrying capacity

or

Hot & Cold Water System

by

2.7

ig

2.6.6 Voltage Drop

31
31
31
32

33

2.7.4 Suggested Design Process

34

2.7.5 Standard Type of Basin and Shower Tap

34

pr

ot

ec
te
d

2.7.2 Notes on System Design

is

te

2.7.6 List of Components Water System

34
35
37
37

2.8.1 Fire Protection System

37

2.8.2 Fire Fighting System

38

2.8.3 Fire Alarm Panel

39

2.8.4 List of Components in Fire System

40

PA System

41

2.9.1 PA System Design Consideration

41

2.9.2 Clean Sound

41

2.9.3 Clear Sound

41

2.9.4 Intelligible Sound

42

2.9.5 Natural Sound

42

si

Fire System

Th
i

30

32

2.7.5.2 Shower & Bathtub Tap

2.9

29

2.7.1 Hot Water System Pressurization

2.7.5.1 Basin Tap

2.8

29

viii

42

2.9.7 Evenly Dispersed Sound

43

2.9.8 Adequate Sound Level

43

2.9.9 List of Components in PA System

44

Soil Resistivity

44

2.10.1 Theory of Soil Resistivity

45

ht

2.10

2.9.6 Balance Sound

ig

2.10.2 Common Earthing Systems

47

al
co
p

yr

2.10.3 List of Components Earthing System

46

Introduction

3.2

Level one: Information Gathering Method

48

3.3

Level Two: Data Collection Method

49

3.4

Level Three: The Estimation Method

50

3.5

Level Four : Drawing Method

50

3.6

Interior Lighting Estimation Methodology

51

3.7

Air Conditioner Estimation Methodology

3.8

Exhaust Fan Estimation Methodology

3.9

Cable Selection Estimation Methodology

3.10

Transformer Design Estimation Methdology

57

3.11

Summary

58

48

53
55
56

Th
i

si

te

is

pr

ot

ec
te
d

or

ig

3.1

by

in

CHAPTER 3 METHODOLOGY

CHAPTER 4 RESULTS AND DISCUSSION


4.1

Introduction

59

4.2

Interior Lighting Estimation

59

4.2.1 Interior Lighting Estimation for Suite Room

59

4.2.2 Interior Lighting Estimation for Suite, King, & Standard Room

62

4.2.3 Other Interior Lighting

62

Air Conditioner Estimation

63

4.3

ix

4.4

4.3.1 Air Conditioner Estimation for Suite Room Area

63

4.3.2 Air Conditioner Estimation for Other Room

65

4.3.3 Exhaust Fan for Bathroom

66

Estimation of Total Load

67

4.4.1 Total Connected Load (TCL) & Maximum Demand (MD)

67
68

ht

4.4.1.1 TCL and MD for Standard Room

ig

4.4.1.2 TCL and MD for King Room

yr

4.4.1.3 TCL and MD for Suite Room

al
co
p

4.4.1.4 TCL and MD for Passageway, Lobby and Staicase Area


4.5.1 Total Load for 3rd Floor to 10th Floor

or

ig

4.5.2 Total Estimation Load for The Hotel

in

Total Load for The Hotel

4.5

4.6

Distribution Board Design

by

4.5.3 Cable Size Selection for Wiring Circuit

68
69
70
70
70
71
72
74
74

4.6.2 Size of Incoming Cable Distribution Board of Suite Room

74

ec
te
d

4.6.1 Fuse Rating for MCB

pr

ot

4.6.3 Rating of Incoming MCCB & RCCB Distribution Board (DB) for Suite Room 75

is

4.6.4 Size of Incoming Cable, Rating MCCB and RCCB Distribution Board for Suite,

King, Standard Room and Lobby Area


Bus Bar Ducting System

te

4.7

76
77
77

Main Switchboard (MSB) Design

78

4.8.1 Rating of MCCB in Main Switchboard and Size of Outgoing Cable

78

4.8.2 Rating of MCCB in MSB for Bus Duct and Essential Switchboard

79

4.9

Standby Generator Set

80

4.10

Simple Substation Calculation

81

Th
i

4.8

si

4.7.1 Rating of Bus Duct

4.10.1 Transformer Estimation

81

4.10.2 Transformer Tail Cables

81

CHAPTER 5 CONCLUSION
5.1

Conclusion

83

5.2

Recommendation for Future Project

84

85

yr

ig

ht

REFERENCE

al
co
p

APPENDICES

88

Utilization Factor

Appendix B

Standard Lumens for Menthol / Tube Lighting

94

Appendix C

Lux Regulation (JKR Standard)

97

Appendix D

Example of Exhaust Fan ( KDK Company)

Appendix E

Electrical Arrangement for Hotel Room

102

Appendix F

Voltage Drop & Rating of MCCB for Single Phase and Three Phase

106

Appendix G

Schematic Diagram of DB for Hotel Room

112

Appendix H

Bus Bar Ducting Rating and Example of Arrangement ( LG Company)

116

Appendix I

Detail Distribution Load System for Whole Building

Appendix J

Air Conditioner Detail View

Appendix K

Architecture Drawing

99

119
122
127

Th
i

si

te

is

pr

ot

ec
te
d

by

or

ig

in

Appendix A

xi

LIST OF TABLES

Table No.

Page

Typical Reflectance Values

11

2.2

Typical Reflectance Values Recommends in Offices / Command Rooms

2.3

List of Fluorescent Lamp Components

2.4

Minimum Energy Performance Standard(MEPS) for Fluorescent lamp Ballast

16

2.5

List of Air Conditioner Components

21

2.6

List of Distribution Board Components

2.7

Typical values of cable size available plus corresponding current rating and maximum

12
14

28

or

ig

in

al
co
p

yr

ig

ht

2.1

29

Typical value for diversity factor for various customer classes

30

2.9

List of Items in Water System

37

2.10

List of Items in Fire System

40

2.11

List of Items in PA System

44

2.12

List if Items in Earthing System

4.1

Interior Lighting Estimation

62

4.2

Air Conditioner Estimation

65

4.3

Calculation TCL and MD for Standard Room

68

4.4

Calculation TCL and MD for King Room

68

Calculation TCL and MD for Suite Room

69

4.6

Calculation TCL and MD for Lobby Area

70

4.7

Total Load for Hotel

71

4.8

Cable Sizing for Wiring in Standard Design

72

4.9

Fuse Rating Rules for MCB Design

73

4.10

Rating MCCB and Size Incoming Cable for 3rd Floor

75

4.11

Rating of MCCB and Size outgoing Cable for Ground, 1st and 2nd Floor in MSB

77

4.12

The recommend maximum planning load demands

79

4.13

Transformer Tail

80

ot

pr

is

te

si

Th
i

4.5

ec
te
d

2.8

by

power rating

47

xii

LIST OF FIGURES

Page

Flow Chart of Project Overview

2.1

Basic of Building System

2.2

Diagram of Preheat Circuit Fluorescent Lamp

2.3

Diagram of Instant Start Circuit Fluorescent Lamp

13

2.4

Diagram of Rapid Start Circuit Fluorescent Lamp

14

2.5

Connection Diagram of Fluorescent Lamp

2.6

Cycle Diagram of Air Conditioner

2.7

Block Diagram of Air Conditioner

2.8

Two Pole (2P) Residual Current Circuit Breaker

27

2.9

Different Rating Type of MCB

27

2.10

Example of Single Line Diagram for DB

28

2.11

Hot & Cold Water Systems

2.12

Hot & Cold Water System Using Boosters Pumps

2.13

Single Lever Basin Tap

34

2.14

Twin Handle Basin Tap

35

2.15

Shower Tap

35

Bathtub Mixer Tap

35

2.17

Twin Handle Bathtub Mixer Tap

36

2.18

Shower & Bathtub Mixer Tap Combine

36

2.19

Smoke Detector

39

2.20

Heat Detector

40

2.21

Sprinkler

40

3.1

Information Gathering Method

49

3.2

Procedure of Interior Lighting System

52

3.3

Procedure of Total Cooling Requirement

54

yr
al
co
p

in

ig

or
by

ec
te
d

ot

pr

is

si

Th
i

2.16

ig

1.1

te

ht

Figure No.

4
6
13

15
21
22

32
33

xiii

Procedure of Air Conditioner Estimation

55

3.5

Procedure of Design Exhaust Fan

56

3.6

Procedure of Determine The Incoming Cable to Distribution Board

57

3.7

Procedure of Determine The Size of Transformer

58

Th
i

si

te

is

pr

ot

ec
te
d

by

or

ig

in

al
co
p

yr

ig

ht

3.4

xiv

LIST OF SYMBOLS, ABBREVIATIONS OR NOMENCLATURE

University Malaysia Perlis

TNB

Tenaga Nasional Berhad

JKR

Jabatan Kerja Rasa

IEE

Institute of Electrical Engineers

IES

Illumination Engineer Society

SIRIM

Standard and Industrial Research Institute of Malaysia

HP

Horsepower

KVA

Kilo Volt-Ampere

KW

Kilowatt

KWh

Kilowatt hours

LUX

SI Unit of Illuminance

MF

Maintenance Factor

Room Index

CU

Co-efficient of Utilization

Th
i

si

BTU

MSB

ig
yr
al
co
p

in

ig
or
by

ec
te
d

ot

pr

is

Utilization Factor

te

UF

ht

UniMAP

British Thermal Unit


Fahrenheit
Main Switchboard

DB

Distribution Board

CFM

Cubic Feet per Minutes

TCL

Total Connected Load

MD

Maximum Demand

HVAC

Heating, Ventilation and Air Conditioning

SPN

Single Pole Neutral

TPN

Three Pole Neutral

RCD / RCCB

Residual Current Device / Residual Current Circuit Breaker


xv

Miniature Circuit Breaker

MCCB

Moulded Case Circuit Breaker

ELCB

Earth Leakage Circuit Breaker

DF

Diversity Factor

NRV

Non Return Valve

MWS

Main Water Service

HWS

Hot Water Service

LTHW

Low Temperature Hot Water

F&R

Flow and Return

PA

Power Amplifier

N.E.B

National Electric Board

PVC

Polyvinyl Chloride

HT

High Tension

LV

Low Voltage

Al

Aluminum

Cu

Copper

Th
i

si

te

is

pr

ot

ec
te
d

by

or

ig

in

al
co
p

yr

ig

ht

MCB

xvi