ACKNOWLEDGEMENT
yr
Firstly I would like to express praise Allah the Almighty, which have helped and guided
al
co
p
me in completing my final year project. My all most gratitude goes to Mr Anayet Karim who
was willingly given his time and effort when I needed help, advice and suggestions at the various
in
stage development of this project. Not only that a lot of thankfulness for his kindness and
or
ig
willingness to guide me until this project has done. He had given me advices and taught me the
by
procedure on doing this project. His contributions and personal sacrifices are truly appreciated
and will be remembered. I would also like to express my full appreciation to them for guiding me
ec
te
d
until this report was completed. In additional my thanks also go to my friends who help me
especially in hands on training of how to use AutoCAD. Besides, I also gained my knowledge in
pr
ot
Software Skills. They open the ways and help me on how to solve the faced problem in my final
is
year project. My thanks are also reserved for other academic and administrative staffs, which
have been helping me directly and indirectly towards completion of this thesis. Finally, my
te
deepest gratitude and special thank you are for my family for their support, understanding and
si
encouragement during the past months. Lastly, I hope that my objective to Mechanical &
Th
i
Electrical Design Estimation For 3 Star Hotel Infrastructure will be achieved and can be applied
by other colleagues.
DECLARATION SHEET
I hereby declare that my Final Year Project Thesis is the result of my research work under
supervision of Mr Anayet Karim . All literature sources used for the writing of this thesis
or
ig
in
al
co
p
yr
ig
ht
Candidate number
: 071090465
Supervisor
: MR ANAYET KARIM
Title of thesis
: ELECTRICAL
ot
ec
te
d
by
Name
AND
MECHANICAL
DESIGN
Th
i
si
te
is
pr
Date: ..
ii
ig
ht
yr
This project report titled Electrical & Mechanical Design Estimation For 3 Star Hotel
al
co
p
Infrastructure was prepared and submitted by Mohd Fitri Bin Adenan (Matrix
Number: 071090465) and has been found satisfactory in terms of scope, quality and
in
ot
ec
te
d
by
or
ig
_______________________
(ANAYET KARIM)
Project Supervisor
Th
i
si
te
is
pr
Jun 2011
iii
ht
in
al
co
p
yr
ig
ABSTRAK
or
ig
by
rekabentuk Elektrikal & Mekanikal (M&E) untuk hotel 3 bintang, Hotel Putra Palace, Perlis.
Projek ini banyak mengutamakan kerja-kerja yang berdasarkan ekperimental pengumpulan data.
ec
te
d
Pemerhatian di tapak kerja adalah hal penting yang utama untuk mendapatkan semua maklumat
dan data yang berkaitan dengan kerja Elektrikal & Mekanikal (M&E) di Hotel Putra Palace,
pr
ot
Perlis. Lukisan yang menggunakan AutoCAD juga penting untuk projek ini terutamanya yang
is
membabitkan gambar rajah pelan, gambar rajah litar skema dan gambar rajah pelan pendawaian
supaya memudahkan kerja merujuk pada struktur bangunan. Projek tahun akhir ini (FYP) akan
te
mendedahkan diri kepada kerja yang berorientasikan amal praktikal dan idea untuk
si
menyelesaikan pekerjaan. Penekanan yang diberikan untuk mencari konsep rekabentuk untuk
Th
i
indeks bilik, pemilihan kabel, papan pengagihan, pemutus litar, rekabentuk pencawang, bas bar
ducting dan semua yang pemilihan yang berkaitan unsur-unsur Elektrikal & Mekanikal (M&E).
iv
ht
HOTEL INFRASTUCTURE
in
al
co
p
yr
ig
ABSTRACT
or
ig
This project discusses about Electrical & Mechanical (M&E) Design Estimation for 3
by
Star Hotel, Putra Palace Hotel, Perlis. This project mainly to search for experimental work based
on data collection and design estimation for Electrical and Mechanical (M&E) work. The
ec
te
d
observation work on sites is the main important thing in order to get all information and data
related to M&E work in Putra Palace Hotel, Perlis. An AutoCAD drawing is also important for
pr
ot
this project especially drawing of site plan schematic wiring diagram, electrical layout diagram,
is
layout plan with referent to easily recognize building and structure. This Final Years Project
(FYP) will get practical field oriented hands on idea to complete the work. The emphasis given
te
to find the design concept for room index, cable selection, distribution board, substation
Th
i
si
estimation, bus bar ducting and all Electrical & Mechanical (M&E) elements selection.
TABLE OF CONTENTS
ht
Page
ig
ACKNOWLEDGEMENT
yr
al
co
p
ABSTRAK
ABSTRACT
in
TABLE OF CONTENTS
or
ig
LIST OF TABLES
by
LIST OF FIGURES
ec
te
d
i
ii
iii
iv
v
xi
xiii
xv
CHAPTER 1 INTRODUCTION
Introduction
1.2
1.3
Problem Statement/Gap
1.4
1.5
Project Overview
1.6
1
2
2
3
Th
i
si
te
is
pr
ot
1.1
Introduction
2.2
2.3
Interior Lighting
2.3.1
Maintenance Factor
10
10
11
vi
11
12
2.4
12
14
15
Ballast Effect
15
ht
2.3.6
ig
yr
al
co
p
in
or
ig
by
17
18
18
18
18
19
2.4.4.5 Lighting
19
20
20
ot
pr
ec
te
d
19
is
20
21
21
22
Th
i
si
te
17
2.4.4.4 Equipment
2.5
16
Distribution Board
23
23
24
24
24
24
25
26
vii
26
2.5.3.2 Miniature Circuit Breaker (MCB) & Moulded Case Circuit Breaker
27
28
29
ht
2.6
(MCCB)
ig
yr
al
co
p
in
or
by
2.7
ig
31
31
31
32
33
34
34
pr
ot
ec
te
d
is
te
34
35
37
37
37
38
39
40
PA System
41
41
41
41
42
42
si
Fire System
Th
i
30
32
2.9
29
2.8
29
viii
42
43
43
44
Soil Resistivity
44
45
ht
2.10
ig
47
al
co
p
yr
46
Introduction
3.2
48
3.3
49
3.4
50
3.5
50
3.6
51
3.7
3.8
3.9
3.10
57
3.11
Summary
58
48
53
55
56
Th
i
si
te
is
pr
ot
ec
te
d
or
ig
3.1
by
in
CHAPTER 3 METHODOLOGY
Introduction
59
4.2
59
59
4.2.2 Interior Lighting Estimation for Suite, King, & Standard Room
62
62
63
4.3
ix
4.4
63
65
66
67
67
68
ht
ig
yr
al
co
p
or
ig
in
4.5
4.6
by
68
69
70
70
70
71
72
74
74
74
ec
te
d
pr
ot
4.6.3 Rating of Incoming MCCB & RCCB Distribution Board (DB) for Suite Room 75
is
4.6.4 Size of Incoming Cable, Rating MCCB and RCCB Distribution Board for Suite,
te
4.7
76
77
77
78
78
4.8.2 Rating of MCCB in MSB for Bus Duct and Essential Switchboard
79
4.9
80
4.10
81
Th
i
4.8
si
81
81
CHAPTER 5 CONCLUSION
5.1
Conclusion
83
5.2
84
85
yr
ig
ht
REFERENCE
al
co
p
APPENDICES
88
Utilization Factor
Appendix B
94
Appendix C
97
Appendix D
Appendix E
102
Appendix F
Voltage Drop & Rating of MCCB for Single Phase and Three Phase
106
Appendix G
112
Appendix H
116
Appendix I
Appendix J
Appendix K
Architecture Drawing
99
119
122
127
Th
i
si
te
is
pr
ot
ec
te
d
by
or
ig
in
Appendix A
xi
LIST OF TABLES
Table No.
Page
11
2.2
2.3
2.4
16
2.5
21
2.6
2.7
Typical values of cable size available plus corresponding current rating and maximum
12
14
28
or
ig
in
al
co
p
yr
ig
ht
2.1
29
30
2.9
37
2.10
40
2.11
44
2.12
4.1
62
4.2
65
4.3
68
4.4
68
69
4.6
70
4.7
71
4.8
72
4.9
73
4.10
75
4.11
Rating of MCCB and Size outgoing Cable for Ground, 1st and 2nd Floor in MSB
77
4.12
79
4.13
Transformer Tail
80
ot
pr
is
te
si
Th
i
4.5
ec
te
d
2.8
by
power rating
47
xii
LIST OF FIGURES
Page
2.1
2.2
2.3
13
2.4
14
2.5
2.6
2.7
2.8
27
2.9
27
2.10
28
2.11
2.12
2.13
34
2.14
35
2.15
Shower Tap
35
35
2.17
36
2.18
36
2.19
Smoke Detector
39
2.20
Heat Detector
40
2.21
Sprinkler
40
3.1
49
3.2
52
3.3
54
yr
al
co
p
in
ig
or
by
ec
te
d
ot
pr
is
si
Th
i
2.16
ig
1.1
te
ht
Figure No.
4
6
13
15
21
22
32
33
xiii
55
3.5
56
3.6
57
3.7
58
Th
i
si
te
is
pr
ot
ec
te
d
by
or
ig
in
al
co
p
yr
ig
ht
3.4
xiv
TNB
JKR
IEE
IES
SIRIM
HP
Horsepower
KVA
Kilo Volt-Ampere
KW
Kilowatt
KWh
Kilowatt hours
LUX
SI Unit of Illuminance
MF
Maintenance Factor
Room Index
CU
Co-efficient of Utilization
Th
i
si
BTU
MSB
ig
yr
al
co
p
in
ig
or
by
ec
te
d
ot
pr
is
Utilization Factor
te
UF
ht
UniMAP
DB
Distribution Board
CFM
TCL
MD
Maximum Demand
HVAC
SPN
TPN
RCD / RCCB
MCCB
ELCB
DF
Diversity Factor
NRV
MWS
HWS
LTHW
F&R
PA
Power Amplifier
N.E.B
PVC
Polyvinyl Chloride
HT
High Tension