Responsibility Matrix

KMAC PERSONNEL
Item

SUBCONTRACTOR

DESCRIPTION
Jayasankar

Arun

1.1 Loadout Procedure

1.2 Weighing of Hull

1.3 Barge HUTA Strength Check Calculations

1.4 Hull Strength Check Calculations

1.0

HULL LOADOUT

Tony B

Tony K

Bill

Ramon

Richard

Manoj

Anatoily

Loadout of Hull

1.6

Quay Side Strengthening

1.7

Leg Jetting & Eductor Piping


HULL

Sendhil

Snehal

Ravi

Ronnie

Al Jaber

Dry Docks

Varco

Load Master

MES

Amasco

AST

S
S

2.2 Long. BHD Modification

Hull Modification IWO of Raw Water System

2.4

Jack House Installation - FWD

2.5

Jack House Installation - PORT

2.6

Jack House Installation - STBD

2.7

Accommodation FWD Section

2.8

Accommodation AFT Section

2.9

Accommodation Bridge Module

2.10 Equipment Foundations

2.11 Raw Water System

2.12 Hull Penetrations IWO of OVBD , Dump etc.

2.13 Installation of P tanks, Surge Tanks & other loose tanks

2.14 Shale Shaker System

2.15 Main Deck Houses ( RO house, CO2 Room etc)

2.16 Sea Chest Installation

2.17 Equipment Installation & Commisioning

JACK HOUSE

S
S

RigFit

Thermo

ATHE

STS

2.3

3.0

Gulf Engg

2.1 Underdeck for Mooring Equipment

2.18 Condutor Tensioning Deck

IGOMS

1.5

2.0

Ajai

S
S

S
S

3.1

3rd Unit FWD

3.2

3rd Unit PORT

3.3

3rd Unit STBD

4.0

JACKING SYSTEM

S
S

4.1

Cable Installation

4.2

Equipment Installation

4.3

Gear Unit Installation

4.4

Motor Installation

5.0

S
S
S
S

HELIDECK

5.1

Support Structure

5.2

Helideck Safety Netting

5.3

Helideck Escape Route

5.4

Helideck Lighting

5.5

Helideck Drain System

5.6

Helideck Foam System

6.0

PIPING
6.1

S
S
S

All Systems

7.0

SECONDARY STRUCTURES

S
S

7.1

Accommodation Walkways

7.2

Hull Handrails

7.3

Jack House Platform

7.4

Pump Room Gratings

7.5

Mud Pump Room Gratings

7.6

Engine Room Gratings

7.7

Pipe & Cable Supports

7.8

Pipe Penetraions

S
S

Page 1 of 2

Responsibility Matrix
KMAC PERSONNEL
Item

SUBCONTRACTOR

DESCRIPTION

8.0

CANTILEVER

Tony B

Tony K

Bill

Ramon

Richard

Manoj

Anatoily

Jayasankar

Arun

Ajai

Sendhil

Ravi

Ronnie

Al Jaber

Dry Docks

Varco

Load Master

MES

Amasco

AST

IGOMS

Gulf Engg

RigFit

Thermo

ATHE

8.1

Structure

8.2

Secondary Steel

8.3

Skidding System Package

8.4

Pipe Rack

8.5

S
S
S

BOP Hydraulic System

8.6

Hydraulic Piping

9.1

Structure

9.2

Equipment Foundation

9.3

Skidding System Package

9.4

Wind Wall

9.5

Hydraulic Piipng

9.6

Equipment Installation & Commisioning

9.7

HP System Piping

9.8

Drainage System Piping

9.0

DRILL FLOOR

10.0

S
DERRICK

S
S

10.1 Structure

10.2 Piping

10.3 Cable

10.4 Equipment Installation


11.0

Snehal

SUB CONTRACTOR JOB

S
S

11.2 HVAC in Accommodation & Machinery Deck

11.3 Deck Equipment

LEGS

S
S

11.1 Installation of existing 114' section

S
S

11.2 Fabrication & Assemble of Bays 10 to 16

11.3 Fabrication of sections for Bay 17 to 32

S
S

11.4 Assembly & Installation of Legs from Bay 17 to 32

11.1 Accommodation Outfitting

11.0

11.4 Installation of Anode

11.5 Installation of Leg Ladders

11.6 Installation of Jetting Pipes

Page 2 of 2