Professional Documents
Culture Documents
Comparison of Alternatives
Siemens AG 2011
Energy Sector
SIC-SING Connection
Motivation for System Interconnections
Improving Reliability, sharing of reserve
capacity
Possibility to use larger and more
economical Power Plants
Cost-to-Performance Ratio
Benefits,
Efforts
Advantages of
interconnected Operation
Benefits
Optimum
Efforts
Size of interconnected Grid
Power Exchange
There are strong reasons to connect Transmission Networks
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Challenges System Interconnections
Propagation of Disturbances, Blackout
Synchronisation, frequency control
Transmission Limits: Thermal, Voltage and Phase Angle
Loop and Parallel Flows, Congestion Management
Oscillations
Load Shedding Strategies
Fault Currents
System Interconnection is a complex task and requires sound analisis
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Option 1: Short Connection (2 x 220 kV AC + HVDC BtB)
Crucero
SING
Coloso/Esmeralda
Paposo
SIC
Cardones
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Option 2: Long Connection 500 kV AC Transmission Line
Option 2a: Long Connection 500 kV
Crucero
SING
Coloso/Esmeralda
Paposo
SIC
Cardones
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Option 2: Long Connection 500 kV AC Transmission Line
Option 2a: Long Connection 500 kV
Crucero
SING
Coloso/Esmeralda
Paposo
SIC
Cardones
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Option 2: Long Connection 500 kV AC Transmission Line 1000 MW
Option 2a: Long Connection 500 kV
Crucero
SING
Coloso/Esmeralda
Paposo
SIC
Cardones
May2012
- Double Circuit
- plus HVDC Back to Back in one extreme
due to stability reasons
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Option 3: Long Connection 500 kV DC Transmission Line
Crucero
SING
Coloso/Esmeralda
Paposo
SIC
Cardones
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Technical Options
Option 1
Option 2a
2 x 220 kV AC 1 x 500 kV AC
+ Back to Back
max. 400MW
< 1000MW
Option 2b
2 x 500 kV AC
1000 MW
Option 2c
2 x 500 kV AC
+ Back to Back
1000 MW
Option 3
500 kV HVDC
Bipole
1000 MW
Low Investment
Known Solution
Known Solution
Stable Solution
Low Investment
AC enables
easy tapping
AC enables
easy tapping
AC enables
easy tapping
Low Losses
High Power
May2012
AC enables
easy tapping
Low Investment
High Losses
High Losses
Limited Capacity
Limited Capacity
Additional
Investment in
existing system
necesary
Stable Solution
High Risk
High Investment
Limited tapping
High Losses
no n-1 condition
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Options Estimated Total Cost
Option 1
Option 2a
2 x 220 kV AC 1 x 500 kV AC
+ Back to Back
max. 400MW
< 1000MW
Total Cost
700
1.350
Option 2b
2 x 500 kV AC
1000 MW
1.000
Option 2c
2 x 500 kV AC
+ Back to Back
1000 MW
1.350
Option 3
500 kV HVDC
Bipole
1000 MW
900
OPEX
OPEX
May2012
CAPEX
CAPEX
CAPEX
CAPEX
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Estimated Break Even Distance 2 x 500 kV AC HVDC Bipole 1000 MW
Kms
1.000
900
800
700
600
500
400
300
200
100
1000
900
800
700
600
500
400
300
200
100
Kms
AC
DC
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Advantages HVDC Link
-Stabilizing Function in case of failure in SING or SIC no cascading
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
How can HVDC help limiting Blackouts?
Europe needs
Enhancements, too
SIC-SING Connection
How can HVDC help limiting Blackouts?
HVDC EUROPE
Existing
Under Unstruction
Planned
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
How can HVDC help limiting Blackouts?
* now CE
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
How can HVDC help limiting Blackouts?
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
How can HVDC help limiting Blackouts?
HVDC EUROPE
Existing
Under Unstruction
Planned
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Conclusions
-A Connection of SIC and SING in 500 kV AC is very likely to generate
instalbility in both Systems
-In case a AC transmission line shall be implemented, at least one circuit
should be equipped with a BtB Station (Hybrid Solution)
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Muchas Gracias
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Backup Slides
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
i n
i s
i o
1000MW
SC 66%
C
i n
i s
i o
900MW
May2012
Siemens AG 2012
Energy Sector / Power Transmission Solutions
i n
i s
i o
0
8
A
1
1000MW
S
SC 33%
C
May2012
i n
i s
i o
A
8
100MW
Siemens AG 2012
Energy Sector / Power Transmission Solutions
SIC-SING Connection
Comparison LCC-VSC
Classic 4.2 GW & Bulk 11 GW Rating PLUS 1,100 MVA
Thyristor: very high Overload Capacity IGBT: strictly limited
1.5 % Total Converter & Station Losses close to 2 %
Available Frequency, Voltage & POD Control Available
High Dynamic Performance Very high
Stepwise linear Independent Control of Reactive Power Fully linear
Typ. 50 % Filter/Reactive Power Requirements None
High Space Requirements 45 to 50 % less
Difficult Grid Access for weak AC Networks Quite easy
No Supply of passive Networks and Black-Start Capability Yes
Complex Configuration of Multiterminal Systems Simple
Siemens AG 2012
Energy Sector / Power Transmission Solutions