Case Overview
-
Silver Fiddle Construction (SFC), hired by the Czopeks to build their dream home.
Specializes in building high quality and customized homes in the Grand Junction, Colorado
area.
Tentatively scheduled to complete 11 houses this year.
The promised final cost for the Czopeks house will range from $450,000.00 to $500,000.00.
It will take five (5) months to complete the house once groundbreaking has begun.
The Czopeks are willing to delay the project to save costs.
2. Use a risk assessment form similar to Figure 7.6 to analyze identified risks.
Risk Assessment Form
Risk Event
Likelihood
Impact
Detection
When it will
Difficulties
3
happen
Groundbreaking,
Unfavorable
weather
progress of the
conditions
projection, up to
its finishing
Absenteeism
phase.
Throughout the
and inconsistent
project proper.
workers
Revisions on the
After the
plans
foundation is
Price and
changes on
course of the
materials
House costs
project.
Throughout the
projects
projected cost
Possible reject or
completion
During the wiring
faulty
and installation
appliances,
phase of the
project.
3. Develop a risk response matrix similar to Figure 7.8 to outline how you would deal with
each of the risks.
Risk Response Matrix
Risk Event
Response
Contingency
Plan
Trigger
Who is
Responsible
Unfavorable
Retain
Adjust to the
Forecast of
weather
weather.
unfavorable
conditions
Prioritize what
weather in the
needs to be
area.
Contractor
Workers start to
Contractor,
and inconsistent
if it happens,
complain about
Foreman / Team
workers
company should
work schedules
leader assigned
be ready with
and pressure or
in the project.
back up or on
call consistent
the
workers.
By
management.
Not satisfied with
communicating
of the design,
if they change or
therefore they
revise certain
change
layouts or
preferences.
Absenteeism
Revisions on the
Avoid
Retain
plans
Contractor
designs it will
incur additional
cost to them.
Ensure that the
Economic
changes on
prices and
activity, prices
materials
quantity of
materials needed
demand in the
are already
market.
Price and
Avoid
calculated before
the costing is
presented to the
owners. The
contractor should
have carefully
projected the
possible change
Contractor
Cost of materials
Book keeper,
projection must
in the market
Contractor
projected cost
be done before
went up and
the project
more materials
begins. Allot
buffer /
projected the
allowance
projected
budget that
quantity.
House costs
Avoid
should be
communicated
with the owners
just in case.
Choose a
Appliance
Contractor,
faulty
reputable
Malfunction
Supplier
appliances,
materials.
Possible reject or
Avoid
Careful testing
must be done
before buying
these materials.