Contractor Name:
Risk Assessment for: Split AC Units
Originator Name:
Contract
Signature
Date:
Risk Ranking
L=Low priority to be
M=Medium priority to be scheduled H=High priority to be acted upon
implemented when resources
as soon as practicable
immediately
allow
Task/Eleme
Potential Hazards
Populatio
Risk
Proposed Control measures
Revised
Action By
nt
n at risk
Ranking
Ranking
L M H
L M H
Transport of Traffic collision fall
Public
1. Conduct PEP talk before
Site
units
of material
Employee
loading/unloading.
engineer /
s and
2. Only inspected vehicles found fit shall
Section Inworkmen
be engaged.
charge
3. Condition of vehicle shall be checked
and approved before transport of units
4. The units shall be firmly placed in the
truck.
5. Units shall be tightly secured using
Nylon ropes.
6. Vehicle with suitable platform &
foldable side gates shall be engaged to
prevent fall of items.
Installation 1Fall of men from
Public
1. All Personnel equipments Shall be worn
Site
of Units
Ladder/scaffold.
Employee
by workmen.
engineer /
2. Fall of material
s and
2. Sufficient workmen / Rigger shall be
Section Infrom Height.
workmen
engaged for unloading of Units.
charge
3. Injury from using
3. Use of safety helmets, Shoes, Florescent
hack saw, cutter etc.
Jacket, and other relevant PPEs ensured
4. dust, debris and
for all workers.
Splinters
4. Tools and material shall not be scattered
5. Trip hazard
insulation
2. Allergy due to
material in case of
rock wool.
3. Dust, debris and
Splinters.
s and
workmen
Installation
of
insulation
Public
Employee
s and
workmen
Use of
extension
leads
Public
Employee
s and
workmen
Site
engineer /
Section Incharge
Electrical shock,
Burns and fire
Public
Employee
s and
workmen