You are on page 1of 3

Excavation for Boiler Foundations

HIRA-PM-001

Hazard Identification & Risk Assessment sheet


Area:

KGTPS

Responsible Manager:

Muhammad Javed

Location:
North & South Section1,2,3of Engine Room
EHS
Muhammad Danish
representative:
Review date:
08-09-2014
Excavation in the Generation Site

Prepared by
Saad Khan
Risk Assessment No: HIRA-PM-001

RISK ASSESSMENT GUIDELINES


Activity

Consider each of the occupations/disciplines and write down the individual activities
they are involved in to complete the job. Also consider others who may be working
nearby and who may be affected by the activity.

Hazard

Identify the hazards attached to each activity.

Hazard Effect

Determine the effect (consequence) of the hazard i.e. Injury, Damage or Loss which
could result.

Severity

Make a judgment on whether the hazard effect is low, medium or high (See Risk
Estimator Chart).

Probability

Make a judgment on the probability of an accident occurring e.g. low probability,


medium probability, high probability (see Risk Estimator Chart). Consider the
number of times the activity is carried out and how many people are involved in doing
it.

Risk

Multiply the two factors Severity x Probability. The product determines the level of
risk (See Risk Estimator Chart).

Existing

Review existing safeguards and determine whether they are adequate

Safeguard

to effectively control the risk.

Control Actions

Identify the actions required to eliminate or reduce the risk. Priority must be given to
potentially high and very high risks. Eliminate the risk through engineering controls
where possible.

Residual Risk

The recommended control actions and decide upon residual risk - is it trivial,
tolerable, moderate, high, very high. Are the control actions adequate? Is further
action required?

RISK ESTIMATOR CHART


Severity
Probability

Low

Low

x 2

High

(LTI / Fatality)

x1

Low Probability x Low


Severity 1 x 1 = 1

LP x MS
1x2 = 2

LP x HS
1x3 =3

x2

MP x LS
2x1 =2

MP X MS
2x2 =4

MP x HS
2x3 =6

x3

HP x LS
3 x 1 =3

HP X HS
3x2 = 6

HP x HS
3x3=9

(Happens all the time)

Significant Risk = High Risk (6-9)


or Medium Risk (3-4)
in terms of probability and severity
Tolerable Risk = Risk reduced to an acceptable level = Low Risk (1-2)
Residual Risk
= Risk remaining after implementing recommended control actions (usually very minor).
File: HIRA-PM-001

x3

(MTI / RWI)

(Once in a year)
High

Medium

(First Aid)
(Once in 5 years)
Medium

x1

Page 1 of 3

Excavation for Boiler Foundations

Sr.
No.

HIRA-PM-001

Activity (adjacent
activities)

Hazard

Electrical shock.

1.

Use of Jack Hammer


Machine for
Excavation
(Electrical Operated)

Noise

Dust/Sand Particles

High Pressurized Hose Pipe


2.

Contact of sand particle with


eye s& face

4.

5.

Injuries to persons.

Personal Injury.
Falling Objects.
Property Loss.
Stress

Cave In of Pit/Excavation
Debris

Which may cause


personal injuries &
Equipment damage?

Acute/Chronic Hearing
Problem.
Headache
- Eye Irritation
- Skin Irritation
- Inhalation of Dust
particles

Personal Injury
Property Loss

Hearing Loss.
Headache
Eye Irritation
Skin Irritation
Inhalation of dust

Use of Compressor
operated Jack
Hammer

Noise

3.

Hazard Effect

BASE RISK
Severity x
Probability =RISK

Manual Excavation

Working at depth
more than 2m

Placement of
excavated material

File: HIRA-PM-001

-Substandard tool
-Improper handling of tool
-Improper hole
-Slip of tool
-Slip / Trip

Open Pit.
Slipping Tripping

Re-fall of Material in
Excavated area

Page 2 of 3

Excavation for Boiler Foundations

6.

Underground Utility
Services(Electrical)
Earthling Mesh

Excavation

7.
De-Watering Pump
for Removal of Water

HIRA-PM-001

Electrical Hazard
Short Circuit
Noise

Electric Shock.
Cable Damage.
Dust.

Electric Shock
Personnel Injury
Hearing Loss
Equipment Damage

Step 2: Risk Assessment With Existing Safeguards.


Sr.
No.

Recommended Control Actions ( Specify the Engineering, Administrative, Training, PPE control
measures in the order of priority)

Responsib
le
person

1
2
3
4
VERIFICATION (Recommended control actions verified and agreed with following remarks) :

Project Engineer (PM)

HSE Incharge (PM)

Project Head (Descon)

OHSE Manager (K-E)

File: HIRA-PM-001

Page 3 of 3