You are on page 1of 9

PROYECTO : CONSTRUCCION DE MUROS DE CONTENCION

T1.

Hp =
FSD =
FSV =

4.00 m
1.50
1.75

(s) =
()

0.3

1.80 T/m3
34.40 Grados

( t) =

2.00
175.00
4200.00
4.00
7.50
2.40

f`c =
fy
=
recub. pantalla=
recub. cimentacin=
c =

Kg/cm2
kg/cm2
kg/cm2
cm
cm
T/m3

Hp

Para concreto vaciado in situ :


Coeficiente Friccion : f = tg =
0.685
debe ser < = 0.6, por lo tanto asumimos :
f =
0.6

T2
Hz

B2.

B1

^
Ka = tg^2 (45-/2)=

0.278

Ka x s =

0.500

Asumimos T1 =

0.3

Ton/m3
m

1. DIMENSIONAMIENTO DE LA PANTALLA
Mu = 1.7 M = 1.7 (Ka s) Hp^3/6
adems :
Mu = 0.9 x b x d`2 x fc x w x (1-0.59w)
w = ro x fy/fc =

9.073
siendo d =

Ton x m
Mu
0.9 * b * fc* w *(1-0.59w)

(a)

0.096

Remplazando valores en (a), se obtiene :


Refuerzo flexion Dvarilla =
T2 = d + recub+(Dvarilla/2) =
d (de diseo) =

45.21

d =

30.02

5/8 "
cm

25.22

USAR T2 =

cm

0.5

cm

2. VERIFICACION POR CORTE


Vdu = 1.7 Vd = 1.7 x 0.5 x (Ka x s) x (hp-d)^2 =

5.35

Vu / =

6.30

Vc = 0.53 x ( fc ^.5 ) x b x d =

31.70

Ton

Si As se traslapa en la base : Vce = 2/3 Vc =

21.13

Ton

Ton

>

Vu /() =

6.30

OK

3. DIMENSIONAMIENTO DE LA ZAPATA
Hz = T2 + 5 cm =
Po lo tanto : H = Hp + Hz =

55.00

cm

4.55

3.1.- CALCULO DE B1
-

B1 / H

> =
B1 =

USAR B1 =

FSD . (Ka . s) / (2 . m. f)
1.42

+ (T2-T1)/2 =

1.15

=
1.52

0.313

B1 > =

1.42

0.107

B2 > =

0.49

3.2.- CALCULO DE B2
-

B2 / H

>

f x FSV)/(3 x FSD) - B1/(2H)

Valor minimo de B2 =
USAR B2 =

Hz
1.25

=
0.55

PROYECTO : CONSTRUCCION DE MUROS DE CONTENCION


P5
T1.

VERIFICACION DE ESTABILIDAD
DATOS

Hp =
Hz =
B1 =
B2 =
T1 =
T2 =
B3
B
P5
P
P1
P2
P3
P4
P5
TOTAL

4.00
0.55
1.15
1.25
0.3
0.5
0.65
2.40
20 tn

P2
Ha = 1/2 Ka * Y *h^2
P3

PESOS (Ton) Brazo Giro(m)


3.17
1.2
2.88
1.6
0.96
1.38
4.68
2.075
5
1.6
16.69
P

Ka = tg^2 (45-/2)=

0.278

Ha=1/2 x (Ka x s) x H^2=

5.179

Ma =

7.855

P4

Hp

P*X
3.802
4.608
1.328
9.711
8.000
27.449
Mr

H3
B3

Hz

P1

B2.

B1

Ma = Ha * H / 3

H = Hz + Hp

Tn - m

VERIFICACION AL DESLIZAMIENTO Y AL VOLTEO


FSD = Hr/Ha = f * P/ Ha

FSV = Mr/Ma =

1.933

>

1.50

OK

3.494

>

1.75

OK

VERIFICACION DE PRESIONES SOBRE EL TERRENO


Xo

= (Mr-Ma) / P

1.174

e = B/2-Xo =

0.026

B/6=

0.40
e=

0.026

< B/6 =

q1 = P / B (1+ 6 * e /B) =

7.40

Tn/m2

q2 = P / B (1- 6 * e /B) =

6.50

Tn/m2

q mayor =

7.40

Determinacin de la Capacidad Portante del Suelo (Qu)

Resist. Terreno

0.75 Kg/cm2

0.40 m

OK, cae dentro del tercio c.

7.50

Tn /m2

OK

PROYECTO : CONSTRUCCION DE MUROS DE CONTENCION


DISEO POR FLEXIN DE LA PANTALLA :
En la Base :
Mu = 1.7 M = 1.7 (Ka s) Hp^3/6

As = Mu / ( 0.9 x f`y * (d - a/2) =


Asumiendo a

4.50

9.07

Ton-m

5.59

cm2

1.58

cm OK

cm

a = As x fy / ( .85 x fc x b ) =

Refuerzo Vertical
Mu =
B1 =
T2 =
d1 =
fy =
fc =
d2 =
Hp =
T1 =
Hz =
B=
q1 =
q2 =

9.07
1.15
0.5
45.21
4200
175
30
4.00
0.30
0.55
2.40
7.40
6.50

Ton x m
m
cm
kg/cm2
kg/cm2
cm

Verificamos el As min :
en T1 (Base) :
en T2 (Lado Sup.) :

Escogemos fierro de :

Asmin = 0.0018* b *d =
Asmin = 0.0018* b *d =
Acero
asumido
5/8 ''

8.14
5.40

cm2/m
cm2/m

Separacin
Calculada
Asumida
@ 24.58 cm
@ 35.00 cm

2.00 cm

Como la pantalla es de seccin variable, el momento resistente tambin vara linealmente.


se puede trazar lneas de resistencia para determinar los puntos de corte : Mmax/2
Mmax / 2 =

Mu / 2 =

4.54

Ton - m

Mu /Hp^3 * (Hp - Hc)^3 =

0.142

( 4 - Hc )^3

Determinacin del Punto de Corte (Lc):


Hc =

Hp - [ Mu/2 /0.17]^ 1/3 =


d (de diseo) =

Lc = 0.8256 + 0.4521 =
S1 =
S2 =
Lc =

0.8256
0.4521

m
m

1.280 m

0.35 m
0.18 m
1.28 m

UNIDAD DE ESTUDIOS Y PROYECTOS

3 de 9

PANTALLA
0.35 m

S1

Lc
1.280 =

S2

0.175 m

Refuerzo Horizontal
Ast = t x b x t

1)
2)

t =
t =

0.0020
0.0025

, si < = 5/8" y fy > = 4200 kg / cm2


, si > 5/8" o fy < 4200 kg / cm2

Si T2 > = 25 cm : usar refuerzo horizontal en 2 capas.


1 ) Arriba:

2/3 Ast =
1/3 Ast =
2 ) Intermedio

T1 =

30.00 cm =

0.002 x 100 x 30 =

4.00 cm2

usar

2.00 cm2

usar

Ti =

40.00 cm =

0.002 x 100 x 40 =

2/3 Ast =

5.33 cm2

usar

1/3 Ast =

2.67 cm2

usar

3 ) Abajo

T2 =

50.00 cm =

=
=

=
=

0.002 x 100 x 50 =

2/3 Ast =

6.67 cm2

usar

1/3 Ast =

3.33 cm2

usar

=
=

6.00
Acero
asumido

cm2/cm
Separacin
Calculada
Asumida

1/ 2 ''

@ 32.25 cm

@ 35 cm

1/ 2 ''

@ 64.50 cm

@ 45 cm

8.00
Acero
asumido

cm2/m
Separacin
Calculada
Asumida

1/ 2 ''

@ 24.19 cm

@ 25 cm

1/ 2 ''

@ 48.38 cm

@ 45 cm

10.00
Acero
asumido

cm2/m
Separacin
Calculada
Asumida

1/ 2 ''

@ 19.35 cm

@ 20 cm

1/ 2 ''

@ 38.70 cm

@ 45 cm

Refuerzo de Montaje
Espaciamiento usar s = 36 x
:

UNIDAD DE ESTUDIOS Y PROYECTOS

@ 1.27 cm

Acero
asumido
1/ 2 ''

Separacin
Calculada
Asumida
@ 45.72 cm
@ 45 cm

4 de 9

DISEO DE LA ZAPATA
Ws = s x Hp =
Wpp = Hz x 1.0 x wc =
q1 =
B2 =

7.20
1.32
7.40
1.25

Ton/m
Ton/m
Tn/m2
m

Z.A.

Z.P
Ws

B2.

A) Zapata Anterior

Wpp

Wu max = 1.7 x q1 - 0.9 x Wpp =

11.40

Tn/m
qd

Conservadoramente :
Mu = Wumax * ( B2 )2 / 2 =

8.905

To-m

As min =

8.14

cm2

As = Mu / ( 0.9 x f`y x 0.9 x d ) =

5.79

cm2

d = Hz - ( recub + ( D varilla / 2 ) ) =

46.9

cm

q1.

q2.
d
qd

0.0018 x b x d =

Acero
asumido
1/ 2 ''

Rige

Separacin
Calculada
Asumida
@ 15.85 cm
@ 20 cm

1.29 cm

Acero Transversal
Espaciamiento S = A . b / As
S=
15.85 cm
Valor de S asumido :

S max = 45 cm

20.00 cm
1/ 2 ''

@ 20.00 cm

Lab = 0.06 Ab . fy / f'c =


Ld = 1.4 Lab =

24.57
34.40

Ld asumido =

35.00

cm

B) Zapata Posterior
qB = ( q1-q2 ) x (B1-T2 ) / (B1+B2) =

0.24

Tn/m

qB = q2 + qB =

6.75

Tn/m

Wu = 1.4 x ( Ws + Wpp ) =

11.93

Tn/m

Mu = ( Wu -1.4 x q2) x ( B1 - T2 )^2 / 2 - 1.4 x qB x ( B1 - T2 )^2 / 6 =


As = Mu / ( 0.9 x f`y x0.9 x d ) =
As min =

d=

0.0018 x b x d =

8.44
Acero
asumido
1/ 2 ''

cm2

-0.07

Tn-m

46.9

cm

Rige

Separacin
Calculada
Asumida
@ 15.29 cm
@ 20 cm

1.29 cm

Acero Transversal
Espaciamiento S = A . b / As
S=
15.29 cm
Valor de S asumido :

S max = 45 cm

20.00 cm
1/ 2 ''

@ 20.00 cm

Lab = 0.06 Ab . fy / f'c =


Ld = 1.4 Lab =
Ld asumido =

UNIDAD DE ESTUDIOS Y PROYECTOS

24.57
34.40
35.00

cm

5 de 9

DISTRIBUCION DE ACERO

Acero principal :
5/ 8 ''

35.00 cm

Lc =

1.280 m

Ld =

35.00 cm

Acero de motaje :
1/ 2 ''

45.00 cm

Ld
Lab = 0.06 Ab . fy / f'c =
Ld = 1.4 Lab =
Ld asumido =

38.10
53.34
35.00

cm

1/2'' @

35.00 cm

1/2'' @

45.00 cm

1/2'' @

25.00 cm

1/2'' @

45.00 cm

1/2'' @

20.00 cm

1/2'' @

45.00 cm

Ld

Ld

Acero de principal =
Acero de reparticin =
La =
Ld =

UNIDAD DE ESTUDIOS Y PROYECTOS

1/ 2 ''
1/ 2 ''
15 cm
35 cm

@ 20 cm
@ 20 cm

Acero de principal =
Acero de reparticin =
La =
Ld =

1/ 2 ''
1/ 2 ''
15 cm
35 cm

@ 20 cm
@ 20 cm

6 de 9

UNIDAD DE ESTUDIOS Y PROYECTOS

7 de 9

9/4 ''
7/4 ''
1 1/8 ''
5/4 ''
9/8 ''
1/1 ''
7/8 ''
3/4 ''
5/8 ''
1/2 ''
3/8 ''

18
14
11
10
9
8
7
6
5
4
2

Area ( cm2 ) Peso ( Kg/m ) Dimetro ( pulg. )


25.810
14.520
10.060
8.190
6.450
5.100
3.870
2.840
2.000
1.290
0.710

20.238
11.348
7.906
6.403
5.060
3.973
3.042
2.235
1.552
0.994
0.560

2.257
1.693
1.410
1.270
1.128
1.000
0.875
0.750
0.655
0.500
0.375

Dimetro ( cm )
5.733
4.300
3.581
3.226
2.865
2.540
2.222
1.905
1.588
1.270
0.952

Gancho de anclaje ( cm )
68.80
51.60
42.97
38.71
34.38
30.48
26.66
22.86
19.06
15.24
11.42