Future
Are We Ready to Transition
to a Smart Grid?
52
1540-7977/09/$25.002009 IEEE
march/april 2009
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
IMAGESTATE
march/april 2009
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
53
Fuel
Cost
Environmental
Benefit
Yes
No
No
Yes
No
Yes
No
Yes
No
Yes
Yes
No
Yes
No
Nuclear
Solar (PV)
Solar (CSP)
Wind
Geothermal
Natural Gas/CC
Coal
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
march/april 2009
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
of new wind generation capacity. The large penetration of wind generation may also lead to overgeneration conditions.
Accurate hourly and subhourly wind and solar generation
forecasting is needed to allow for other unit commitment
and ancillary service provision as well as the scheduling and
dispatch of the required hourly ramping and load following.
Regional scheduling practices for intermittent resources
need to be further enhanced to address banking and shaping
in addition to energy balancing needs.
Energy storage, DR, distributed resource management,
and the dispatch of wind and solar resources could partially
alleviate some of these challenges.
Ra
mp
80%
st
60%
Fa
100%
40%
20%
0%
0
10
12 14 16 18
Wind Speed (m/s)
20
22
24
26
28
30
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
55
Battery
Energy
kWh
Mile/kWh
Sedan
40
16
Compact
150
Roadster
220
Type
Single-Phase
Three-Phase
Level I
Level II
Level II
Level III
120V/15 A
1.4 kW
120V/30 A
3.3 kW
208V/32 A
6.6 kW
208V/80 A
16 kW
35
45
22
53
57
33
12
light-duty fleet. Whats more, switching from gas-only vehicles to mostly plug-in vehicles could reduce the importation of
oil by up to 52%, according to the PNNL.
Proper or optimal use of the power grid, however, may
not be as simple as it sounds. Plug-in vehicles will represent
a significant new load on the existing primary and secondary
distribution networks, with many of these circuits not having
any spare capacity and no monitoring and automation capability. The additional charging load will typically be behind
either an existing secondary distribution transformer in a
residential neighborhood or a circuit/transformer connected
to a distribution feeder. A charge for 3040 miles of driving
will require 710 kWh of power, since most plug-in vehicles
require 0.20.3 kWh of charging power for a mile of driving.
This will add significant load to the distribution network as
the penetration level of PEVs increase.
Figure 3 provides a summary of some of the PHEV models that have been recently announced. They range in battery
2.5
kW Load
2
1.5
1
0.5
0
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hours
figure 4. Typical residential home load profile in Southern California with superimposed PHEV charging load.
56
march/april 2009
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
138 kV
Substation
21 MVA
138/12.47
Voltage Regulator
12.47 kV
Primary Feeder
400-A Peak
600-A Emergency
Feeder Rating
Single-Phase Residential
25 kVA
50 kVA
12.47 kV/ 220 V
Secondary Distribution
Distribution Congestion
69 p.m.
Three-Phase Residential
Recloser
Single-Phase Residential
5 MVA
12.47 kV
1 MVA
12.47 kV/4160/480 V
1.5 MVA
12.47 kV/4160/2.4 kV
Open Tie
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
57
100
Level ISingle Phase
Level IIIThree Phase
10
100
250
0.1
1,000
relief (TLR), may emerge. But most likely, these issues will
be addressed through DR and distributed resource management strategies. In addition, mandating the use of time-of-use
meters, coupled with improved rates and tariffs that would
provide additional granularity and accurately reflect the cost
of distribution system congestions at the point of sale, would
encourage natural demand-side control and would promote
proper scheduling of plug-in vehicle charging.
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
enable DR to reach its promised potential. Some ISOs and RTOs are taking
the approach of treating DR simply
as negative generation and imposing
the existing tariffs and technology requirements on DR resources.
1,000
ade .
y Gr
n
Utilit ted Ge
u
rib
t
PV
is
D
DG
tio
ribu
Dist sets
As
er M
ns
tem
Sys
IEDs
Automation
Xfrm
Switch
DG PV
tio
pera
arke
ting
orat
HR
Trading
Scheduling
Finance
Ops Data
Settlements
Warehouse
Forecasting
ning
Billing and
EMS
Plan
m
e
t
Acctng
ys
S
GIS
Doc Mgmt
DMS
System
Data
DSM
Planning Warehouse
SCADA
OMS
Wind
n
statio
Sub ation
m
Auto
Cap
Pow
Corp
Microwave
du
In
RF
st
DR
ria
RF
Real-Time
Frontend
MDM
Mesh
DG PV
Fiber
AMI
Frontend
BPL/PLC
om
m
er
PHEV
DR
ci
al
R
es
d
. an
Acq l
a
t
a
o
l D Contr
khau
Wifi/Wimax
Bac ms
e
il
m
o
-M
Last ms C
ers
Com
Met
and s
way
a
G te
CDMA
id
PHEV
PV DR
en
tia
l
Cus
tom
ers
Work Mgmt
CIS
T1
IVR
Cus
tom
er S
Asset Mgmt
and
ring
inee ance
g
n
E
ten
Main
rvice
ERP
Corp
orat
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
59
Power Factor
Substation
Feeder
Breaker
EMS
Solar PV
0.9
0.8
0.7
1/1
Capacitor
Controller
Regulator
Controller
Demand Response
Meter
Data Communications
PHEV, Storage
Integration Middleware
Asset
Mgmt
GIS
SCADA
DMS
CIS
MDM
Electrical Network
Billing and
Accting
Scheduling
Dispatch
Forecasting
Information Network
Planning and
Business Case
6 Months
Regulatory
Approval
48 Months
Detailed
Specification
46 Months
Procurement
36 Months
Development
and Deployment
1236 Months
Integration
and Testing
48 Months
Rollout and
Change Mgmt
612 Months
march/april 2009
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
the project timeline can be shortened by conducting activities in parallel, there are other complicating factors.
Some of the challenges associated with smart-grid projects include:
Not having a clearly defined end state: The driving forces for the smart grid are a function of many
external factors, including the economy, oil prices,
and political and regulatory mandates. As a result, the
requirements and the timing of the end state are not
established well enough to allow the development of
detailed technical and business specifications.
The incremental and evolving nature of the applications: Many of the changing requirements are
incremental with respect to the existing capabilities.
Forklift replacement of the existing systems to add
these incremental capabilities might not be an economical and operationally acceptable option.
The many legacy business functions and systems they
touch: Smart-grid functions touch many existing op-
-B
nteg
rati
id
on M
dlew
t
ar
Sm m
ed for
as at
-B Pl
eb id
W Gr
Web
dI
ase
/RTO
ISO
kets
Mar
rty
d Pa
Thir tems
Sys
s
hup
Mas
Geo l
tia
a
p
S
s
Map
are
sN
App
s2
App
s1
App
HR
PV
Trading
DG
Scheduling
Wind
n
statio
Sub ation
m
o
t
u
A
tion
ribu
Dist sets
As
ri
st
du
In
Cap
al
DG
Ops Data
Warehouse
EMS
GIS
IEDs
Automation
Xfrm
Finance
Settlements
Forecasting
System
Planning
DMS
Switch
DSM
SCADA
Doc Mgmt
Data
Warehouse
OMS
PV
Microwave
ERP
RF
DR
RF
Real-Time
Frontend
CIS
Asset Mgmt
MDM
Mesh
DG
PV
Fiber
BPL/PLC
om
m
er
PHEV
CDMA
ci
DR
al
R
PHEV
Work Mgmt
AMI
Frontend
T1
Wifi/Wimax
es
id
en
tia
l
khau
Bac ms
Com
-Mile
PV DR
Last
s
nd Comm
a
s
er
Met ways
s
r
e
Gate
tom
Cus
IVR
Authorized licensed use limited to: Cairo Univeristy. Downloaded on June 06,2010 at 12:37:54 UTC from IEEE Xplore. Restrictions apply.
61
Concluding Remarks
The traditional modellarge remote power stations with
central dispatch, long transmission lines, and a distribution system primarily designed to deliver power from
transmission substations to load centers with established
load profilesmay be evolving into a new approach. This
new approach will accommodate greater levels of demandside management; generation and storage resources on
the distribution system; generation closer to the loads;
perhaps greater flexibility for islanding and micro-grids;
and considerably higher levels of intermittent generation,
especially on the transmission system. These changes not
only may require changes to the power system capacity and
capabilities, but they also will have a significant impact on
the IT needed to monitor and control the reliable operation
of the power system in a most economical fashion. The IT
impact is particularly significant for the distribution grid,
where, traditionally, very limited sensors, automation, and
information are available. These IT capabilities are the key
to the smart grid.
Biographies
Ali Ipakchi is vice president of smart grid and renewable resources at Open Access Technology International
(OATI).
Farrokh Albuyeh is vice president of market services
p&e
and consulting at OATI.
march/april 2009