PETROCHINA INTERNATIONAL JABUNG, LTD

PRODUCTION - HANDOVER NOTES


( 28 Apr 2010)
By Lukas Mitakda

HIGHLIGHTS

The Emergency Response and Potential risk list & planning of Production Operation It have
been made by North & South Area Supvs (Pak Fuad/Marcus & Pak Yunus/Wagiso), it had
been pulling in HSE department for further list number recording. (It was requested by
Pak Hu/Management). Those above subject including SOP/JSA will be reference also
related to upcoming Beijing EHS Auditor on May 02, 2010.

2010 New Pads/Facilities (6 facilities) - These new well pad locations that will be required new
separators completed with Tanks and Gas Boots are WB#2, SB#3, WBD#8, WBD#11,
SBD#3 and SBD#5. Confirmed that WB-D-8 will use ex Marmo-1.

Re-Organization Production with additional sections within department On April 16, 2010
was conducted Production Coordination Meeting with all Supervisor Area including new
section Supervisors (North, South, West, Well Testing, Admin, and Field crew) to discuss
various responsibilities under each own Area, (included 2010 Jabung Workover program
schedule). Please see the MOM results, The attendance list, and Flow Organization
Charts attached.

JOB DESCRIPTION for Well Testing & Monitoring Supervisor It has been made. Please be
reviewed prior implementation. The file is on the desktop.

The revision of the Flow Organitation Chart & Justification crew (description) have been
made. See the attached. And promoted 11 persons from TPC to DC. Need to re-discuss
since have no slot for DC non staff anymore in Approved RPTK 2010-2012, just for staff
only. See Copy attached.

Sent the Monthly Employee Requisition to FM (consist of 28 persons) No approved yet!.


Since we urgently needed for our Production operation including the additional sectios,
especially for the new 6 (six) pad/facilities at West are in this year. Need to check and
discuss with Pak Hu/Zhou. See copy complete with each area org. charts attached.

The SWB-2 Gas Re Injection Compressor Project ( AFE 09-1336 ) It have been started up
on April 27, 2010 (total gas injection rate of 2,979 mscfd is injecting into SWB-8 well. On
April 15, 2010 until now was down due to engine vibration.

Transfer Pumps for NB-1 station. Got confirmation from Jim Pettit and team that we have 2
ea Gould pumps that is stand by at KM-6. Pak Yunus and Arthur plans to direct switch NB4 and NB-10 SRP product to the old 6 transfer line to NEB station (inlet gas boot). Need
to reinstall the old jumper line on inlet gas boot at NEB station (Pak Yunus handled this).
Page 1 of 6

Refer to the email series attached, NB-10 SRP is still holded and waiting for approval from
Production Engineering Jkt (Mr. Hu). FOLLOWING TO THE EMAIL FROM PAK FADIL TO PAK HU,
DATED JAN. 24, 2010, BUT IT STILL NO CONFIRMATION YET . Need to discuss Pak Fadil for the
detail issues or with Jakarta Engineering since we plan to discontinue the existing trucking
crude business from NB to NEB.

Provided and signed BCRs of ; - 2 unit AC CPS MCC room, CPS Control Room extention,
Gemah Station building, Hand pallet truck for North Jbg, and CPS concrete. - All of these
items are confirmed carry forward to 2010 budget revision. Need to keep follow up with
Pak Theo for further approval by Head Quarter prior bring them into 2010 WP&B Budged
revision

Chemical PPD PR-5199 (Old stock = 41 drums) Those chemical have already expired (Last
accepted on the end of 2008). It occurance have been reported to the Chemical Company,
and got the feed back by email from Mr. Yu Lei that, the quality guarantee period for PR5199 is 2 years on the label, but infact it can be used until 3 years. Please read the
attached Mr. Yu Leis comments and the Investigation results from Lab Supv. for your
reference.

Marmo1 Facilities Separator set All facilities (separator, gas boot & square tank) have been
dismantled. Ready to move to WB-D-8 pad location. Waiting for Rig moving after
completion job. The last confirmation from Engineering group that WBD-8 surface facilities
set up for POP will be holded until WBD-13 (Workover Rig) completed the completion job
in May 2010. Please ask Pak Fadil for the detail..

SRP's gensets of WP 4 & WP 7 Temporary suspend - Re-emailed Pak Syarief to temporary


suspend these Gensets ( 09/04/10 my 2 nd email ), but Pak Syarief was forwarded the
message to Pak Agus Hermanto to process the temporary suspend letter to the Contractor
concerned since the contract under Jakarta department. The confirmation Temporary
suspend these gensets have been signed by my self for further process on April 27, 2010.

TK-8400/8410/8500s PVSV and TK-121/126s PVSV & PSV Plan to inspect and repair all
these existing PVSV & PSV, but need to have some spare first prior conduct repairs. WO
had been issued to Instrumentation to buy some PVSV & PSV. The OR/PR was created by
Maintenance Instrument ( OR-4591 ), but it is still on FM desk. Due to operation needed,
need to be approved for further process. The another order to be approved (on FM desk)
are : OR-4604 (body valve of LCV) and OR-4607 (Emergency VRV).

The 1 unit PD Meter, Strainer with Air Eliminator - have been received by Maintenance BGP,
and another one is still on order. Both of them to be used for Gemah and SWB crude oil
loading and offloading system. The one have been installed on Gemah offloading system,
but fail due to problem with strainer plugged by waxy & dirt. The another one is still on
order (Desi).

The 12 Gas sales Mechanical cleaning and Painting service - The Contract re-tender
process is still handling by Jakarta (BSD/Oper. Supp.). Pak Stevian is needed to remind
for this status progress.

2 (two) WA Contract process for the Mechanical Cleaning & Painting jobs of NEB Station and
the 10 (2 km) Crude oil line from CPS to Lagan staging - will re-create to FM approval
after get confirmation budget is approved on July 2010 (WP&B Budget Revision). (The
2009 approved budget have been cut due to the issued WA created on the end of 2009/
not commenced yet , and re-proposed/carry forwarded as additional in 2010 budget
revision when the Pak Theo & team came to Geragai).
Page 2 of 6

The Mechanical Cleaning & Painting job services 6 Crude oil pipeline from the NEB Station to
the BGP area - It work was commenced on April 21, 2010. CV. Alam Semesta is the
winner contractor (WA).

The additional 2 unit vacuum trucks (WA) to lower crude oil level on NB SRP wells Fac. &
SWB tank storages were extended.

Grass Cutting at all North Jabung well pads (NB, NEB & Gemah) WA proposal (included
Breakdown Cost Estimate & Scope Of Work) have been issued to FM for further approval
on April 28, 2010. Need to be approved for further process.

The Pre-bid Tender PCJ-1360-CA Tank Truck Rental Services (20 Units) was conducted on
Tuesday, 09 Feb. 2010 at Production Meeting Room Geragai. It still no news for the further
inplace process. On April 23, 2010v opened 2 nd envelope commercial (for price decision).

The Pre-bid Tender PCJ-1399-CA Tank Truck Rental Services /14 Units Call Out Basis
system (to replace the old PCJ-744-CA under PT. SMR) It was conducted on March 10,
2010 at PCI Office Jkt. On April 23, 2010v opened 2 nd envelope commercial (for price
decision).

Wells On Production ( POP ) :


-

Gemah 26 (gas) on March 22, 2010


Gemah 28 (gas) on April 06, 2010.
NG-37 (gas) on April 06, 2010
NG-38 (gas) on April 07, 2010
NG-38(D/gas) on April 11, 2010
NG-39 (gas) on April 20, 2010
NG-39 (D/gas) on April 23, 2010
NEB-34 (oil) on April 20, 2010
NEB-22 (gas, Low THP) on April 22, 2010

SABAR UTARA-1 The well has been completed completion job by Rig-11. The tested
results : 2.3 MMSCFD (zone 6371 6387 MD). Now the Rig-11 on Panen Utara-1 well for
completion (in progress).

Gemah-28 (gas) Plan to switch from CS to SS materials. Fab Shop is preparing the
materials.

Gemah-08 (gas) The SS pipeline fabrication and installation/hook up in progress. It


expected to be finished on the mid of May 2010.

RIG SCHEDULE :
-

Rig-2 on SB-D-8 well (drilling)


Rig-3 on SB-d-7 well (drilling)
Rig-6 on NEB-28 well (re-completion)
Rig-11 on Panen Utara-1 well (completion)
Rig-12 on WB-D-8 well (completion)

Page 3 of 6

The New Gas Header for NB SRP Engines (MOC: JPSC-141-MOC-10-0020) This program
was cancelled considering the efficiency and budget issue reasons after had short meeting
between Pak Rod, Fuad, & my self.

Vent Stack at CPS Technical Meeting On April 07, 2010 the meeting was conducted to
Production operation, Maintenance group, & HSE by Pak Syarief H. (as Lighting
Specialist- ITB) and Pak Supriyono (as Vent Stack Designer-ITB). Then conducted the site
inspection altogether on vent stack area. Attendance are : My self, Maulidu, Recky K,
Purwanto, Wagiso, HSE Supv.

Cooler Box modification & KV-128 valve repairs at BGP - Done on March 29 30, 2010. A
total of 48 gas wells were s/d during this works.

The recycle valve replacement at NEB GRF On April 13, 2010 NEB GRF was shut down for
12 hours to replace the recycle valve. Total 5 oil wells from NEB were shut in Done.

10 unit New Porta Cabin - 4 units new Porta cabing were borrowed by Maintenance (Jim
Pettit) to store next BGP S/D materials, 1 unit new Porta cabing was borrowed by Project
Contruction (Rod S.). Refer to some email series related to this subject, Pak Saiful &
Chandra were requested to note & record.

Two new light vehicles (WA Contract) - to be in placed in this week (May 01, 2010). 1 unit for
North Area Supv. (Marcus/Fuad) and 1 unit for Well Testing & Monitoring Supv.
(Paison/Solihin

NB 1 Pad security fence (requested by Pak Hu as the priority) - All iron picket are done, now
waiting on wire mesh materials, order by Civil.

Gemah 11 and NEB-46 Pad Security Fences - Took security fence ex Gemah 12 (S/I well) to
use on both both pads. No manpower from Fab Shop since they are concentrated on
Gemah-8 pipe line installation.

SWB-15 Pad Security fence The works 75% complete. Less wire mesh, waiting the on
order.

The West Area Semi Permanent Base Camp The budget have been proposed on 2010
budget outlook under Camp & maintenance/Admin Departments budget
(Jeffriando/Siswati). Waiting 2010 budget revision WP&B approval on next July for
further construction

The Identify Potential Safety Risk Meeting On April 10, 2010 the meeting was conducted
to all Services Contractors coordinators by Pak Andy R. (HSE) at the BGP Meeting room.
Attendance are : PT. Enecal, Pt. Maehindo, PT. UN, CV. Pelita, PT. SNP, & PT. Bumi
Jambi, included all Department Supt & FM.

The ROP & ROQ vs Chemical Consumption Plan to increase ROP/ROQ regarding to
increase of daily production crude oil rate since one month ago. All Chemical contractor
have been requested to optimize all chemical injection rate at Jabung fields. Left 1
contractor (PT. MI) will complete their work in this week. After that, Laboratory Supv is
requested to change ROP/ROQ based on those optimization results forwards versus
actual daily chemical rate consumption.
Page 4 of 6

7 (seven) Warning Letters Yunior Pane, Marwan, Rico Siahaan, Maris, Slamet Budi
(operators), Arif (Admin), and Tarigan (Pipeline Maint.) were given Warning Letter due to
undisplinary cases

TAHANG (employee status) 79 bbls crude oil stolen issue (From 02 Feb. 2010) have been
processed under Polres Tanjab Timur almost 3 months, but there is no decision until now,
thats way I could not give the Release letter?.

HAMDANI MCU done..!.

Darwis Nasution (Pipeline Supv - The copies old valid MCU has been issued to doctor
Syahridal. Darwis is suggested to re MCU in Jambi Hospital when he have started work on
May 01, 2010.

Attended the Socialization of Dana Bagi Hasil MIGAS (Central Government to Local
Government) Held on Suite Abadi Hoter for 2 days, presented and socialized by Dr. Ing.
Ir. Rudi Rubianto R.S. as the Lecturer of ITB (as BPMIGAS Representative). On April 05
06, 2010.

Mr. Yu Lei, Daniel C, and Jeffry Visiting schedule for( De-foamer bottle test) NOT YET
NOW NEWS

Choke Seat & Stem Trial There are 1 set choke seat & steam (product Pindad Factory) is
planned to conduct trial test for free in our well for 6 (six) months. If you agree, we try it
in one of our well afterwards. Please see The request letter from Vendor concern in Folder
Draft

GOOD LUCK - LM