You are on page 1of 1

PT BANYU BIRU SEJATI

Water and Waste Water Treatment Contractor


Bumi Satria Kencana, Block C No. 9
Jln. KH Noer Ali, Bekasi 17144
Tel. 021-8841762 Fax. 021-8856176

FACTORY ACCEPTANCE TEST


PO No.
IDBC-RH-MXXER-C00975-090
JOB No.
11-1511
Spec and Drawing Reference
As per engineer approved

Client

Test No.
PT Rekayasa Industri

Equipment/Material Description
Sewage Treatment Package
Laundry Waste Water Treatment Unit

Inspection Notes

BBS-RI-114
Inspection Date
03-Nop-14
Inspection Location
Vendor Workshop
Technician
ADING

Value

1)

Visual Inspection

A.

Overall dimensions within tolerance per technical drawing(s)

B.

Overall manufacturing and weld quality to standard requirement

C.

Weld slog and spotter removal

D.

Interconnecting Pipe and Fitting

E.

Pipe runs property supported

F.

Materials of construction (as per spec)

2)

General Hydraulic Inspection

A.

Fittings checked for fightness

B.

Inlet port size and location

C.

Drain connection size and location

D.

Piping material and configuration conformance

3)

Test Result

A.

Leakage Test

B.

Electrical and Control System Test

Accept

Reject

Prepared By

Approved By

Acknowledged By

Ading

Nuryanto

Agung Purbianto

Date:

Date:

Date:
1

You might also like