PROJECT:
Proposed One Block of 6-Storey Executive Suites with Commercial Space on Lot 3493, BTD, Jalan Tun Razak, Bintulu
Schedule
Activity
On-going
Progress
Plastering
PreSuccessor
Activity
Successor Activity
Left Side70%
Front- 90%
Back-80%
Right- 65%
Unconfirmed
Skim Coat
2nd Floor
3rd floor
Electric Wiring
ELV
Housekeeping /
Demobilization
Plumbing
Dewatering on
Basement
Lift Core
Water tightness on
internal Building
Percentage
Repairing
crack
Housekee
ping on
waste pipe
(avoid
blockage)
Remark
Lift installation
Bricklayering
ID Drawing
Bricklayeri
ng 5017
Critical
PROGRESS REPORT
PROJECT:
Proposed One Block of 6-Storey Executive Suites with Commercial Space on Lot 3493, BTD, Jalan Tun Razak, Bintulu
on toilet
Planned
4018, 5018)
15%
Yes
Bricklayering
->Plastering
Floor screeding
Remove
loading
bay
Housekee
ping
wastage
Rendering
-> Mock
Up Sample
-After CNY
-For ground floor, current external wall (without rendering)
is ideal for painting(commented by TBS Tang).
PROGRESS REPORT
PROJECT:
Proposed One Block of 6-Storey Executive Suites with Commercial Space on Lot 3493, BTD, Jalan Tun Razak, Bintulu
toilet Roof Garden
Inspection on Staircase
2
#Fadzil