You are on page 1of 3

Brian C.

Loberg

Box # 242
Beaverlodge Alberta
Canada
T0H-0C0

 (780) 356-2104  brian.loberg@totalenerflex.com (780) 831-6771

PROFILE

A HARD-WORKING, ADAPTABLE AND RELIABLE INDIVIDUAL


with more than 25 years’ extensive experience in the Oil & Gas Industry, who offers:
• Expertise in commissioning, testing and start-up of major plants and facilities.
• Planning, organising and coordinating flair.
• Control and regulatory compliance skills.
• Time management competence.
• Team leadership and man-management capabilities.
• Health & Safety awareness – accustomed to investigating incidents.
STRENGTHS

• Familiar with Occupational Health & Safety Canada (safety standards and employee protection).
• Adept at monitoring all aspects through commissioning and start-up to timely client handover.
TRAINING

• Control of Work Training & Certification – BP Oil Terminal, Azerbaijan Nov / Dec.09
• CMDS Operator Competency Evaluation – KEREYA
• Hazard Assessment & Prevention – DNV 5 day course
• Project Management Training – P. Benyon & Associates
• Gas Processing Levels 1 – 10 – SAIT SOLIS
• Gas Processing Levels 1, 2 & 3 – PITTS
• Industry-related Training Courses – Numerous
EDUCATION

• Matriculation Diploma – Grade 12


LAST POST

Total Enerflex : Canada & Indonesia 2005- 2009

2008 - 2009 • Commissioning and start-up 80 mmscf Sour Gas Plant for Murphy Oil Corporation.
• Plant consists of amine train with acid gas sent to sulferox sulphur recovery system.
• 8000 HP compression with two refrigeration packages.
May-Oct 08 • Operator skills evaluations for BP Canada Ltd.
• Detailed operator competence evaluation on 15 separate process aspects of gas compression and units;
i.e. dehydration, gas compression, boiler operation, lock-out, energy isolation procedure & processing.
May-July 06 • Sumatera Island (Indonesia) Facility Start-up for PTRekayasa via Presson Energlex
• Checked and discussed Mechanical, Electrical & Instrumentation with Construction Company.
• Undertook purge, pressure test and leak checks to each unit and assembled burners / pilots / igniters.
• Carried out commissioning, start-up and operational handover of the facility to client (PT Rekayyasa).
2004 - 2005 • Relief Operating Facility Start-ups : New Paradigm Gas Processing.
• Worked on commissioning and start-up of Biological Sulphur Recovery Plant.

One month’s notice required Career History on Page 2


Page 2 Brian Loberg
1999 – 2004 Talisman Energy Canada Inc. Talisman purchased RIGEL Oil & Gas Ltd. in 1999

2002 – 2004 Loss Control & Regulatory Compliance Coordinator


• Worked with the Alberta Workers’ Rights Board.
• Coordinated and updated Emergency Response Plan.
• Ensured that all safety programs were in place and implemented.
• Developed procedures / practices and implemented to help prevent incidents.
• Liaised with the Alberta Environment & Utilities Board on regulatory compliance.
• Monitored and tracked loss control results for the entire Grande Prairie Operating Unit.
• Investigated and determined causes of incidents (200+ employees, 700+ wells and facilities).
• Worked with Occupational Health & Safety Canada on safety standards and employee protection.

1999 – 2002 New Well & Facility Commissioning Coordinator : Grande Prairie Operating Unit
• Held responsibility for safe and efficient start-up of wells and facilities.
• Liaised with sand clean-up crews and well testers in order to coordinate start-up of wells.
• Assisted Project Engineers & Facility Engineers with coordination from conception to on-stream.
► New remote facilities by helicopter access
► Incinerators for the combustion of H2S gas
► Sweet and sour compression from 100HP to
• 2000HP
► Worked with SCADA, satellite and cellular well control systems
► High pressure sour line heaters and dehydrators (flows up to 3000 e3m3, 110 mmcf)
► Sweet and sour oil batteries with solution gas recovery and water injection / miscible flood.

1994 – 1999 Rigel Oil & Gas Ltd. British Columbia / Canada

1998 – 1999 Senior Lead Field Operator : Montney Field


• Montney field high pressure sour gas with 5000HP of compression, line heaters and dehydrators.
1996 – 1998 Senior Lead Plant & Field Operator : Silver Valley Field
• Worked with gas lift oil recovery.
• Started up sour oilfield with high pressure oil wells and pump jacks.
• Started up Amine Gas Plant for sour solution gas recovery off of oil battery and sour gas incineration.
1994 – 1996 Senior Field Operator : Wembley, Valhall, Knopcik and Sinclair
• High and low pressure sour gas; pump jacks; gas injection; water flood facility for oil recovery.
• Compression consisted of gas and electric drivers; oil battery with both treater and compression.

1987 – 1994 Total Petroleum Canada Ltd. British Columbia

1992 – 1994 Senior Plant Operator : Bucking Horse Gas Plant


• High pressure sour gas processing plant with amine H2S removal 4000 e3m3 gas production.
1986 – 1992 Plant & Field Operator : Knopcik Gas Plant : Well site dehydration
• Stabilization of condensate with separation of propane and butane.
• 20 mmcf plant with compression and refrigeration -40 degrees F (sweet gas).

1983 – 1986 Chieftan Development Ltd. Alberta

1985 – 1986 Brainard Senior Plant Control Room Operator : sweet and sour process plants
1983 – 1985 Brainard Plant Operator : side by side plants
• 80 mmcf sour process gas plant with CLAUS sulphur recover.
• 75 mmcf sweet gas plant with 5000 HP compression and JOULES THOMPSON cooling process.
1980 – 1983 Construction Equipment Operator
• Seismic line cutting and pipeline construction.
• Log handling, road building and lease building.

► Commissioned Referees supplied upon


request

You might also like