• Familiar with Occupational Health & Safety Canada (safety standards and employee protection).
• Adept at monitoring all aspects through commissioning and start-up to timely client handover.
TRAINING
• Control of Work Training & Certification – BP Oil Terminal, Azerbaijan Nov / Dec.09
• CMDS Operator Competency Evaluation – KEREYA
• Hazard Assessment & Prevention – DNV 5 day course
• Project Management Training – P. Benyon & Associates
• Gas Processing Levels 1 – 10 – SAIT SOLIS
• Gas Processing Levels 1, 2 & 3 – PITTS
• Industry-related Training Courses – Numerous
EDUCATION
2008 - 2009 • Commissioning and start-up 80 mmscf Sour Gas Plant for Murphy Oil Corporation.
• Plant consists of amine train with acid gas sent to sulferox sulphur recovery system.
• 8000 HP compression with two refrigeration packages.
May-Oct 08 • Operator skills evaluations for BP Canada Ltd.
• Detailed operator competence evaluation on 15 separate process aspects of gas compression and units;
i.e. dehydration, gas compression, boiler operation, lock-out, energy isolation procedure & processing.
May-July 06 • Sumatera Island (Indonesia) Facility Start-up for PTRekayasa via Presson Energlex
• Checked and discussed Mechanical, Electrical & Instrumentation with Construction Company.
• Undertook purge, pressure test and leak checks to each unit and assembled burners / pilots / igniters.
• Carried out commissioning, start-up and operational handover of the facility to client (PT Rekayyasa).
2004 - 2005 • Relief Operating Facility Start-ups : New Paradigm Gas Processing.
• Worked on commissioning and start-up of Biological Sulphur Recovery Plant.
1999 – 2002 New Well & Facility Commissioning Coordinator : Grande Prairie Operating Unit
• Held responsibility for safe and efficient start-up of wells and facilities.
• Liaised with sand clean-up crews and well testers in order to coordinate start-up of wells.
• Assisted Project Engineers & Facility Engineers with coordination from conception to on-stream.
► New remote facilities by helicopter access
► Incinerators for the combustion of H2S gas
► Sweet and sour compression from 100HP to
• 2000HP
► Worked with SCADA, satellite and cellular well control systems
► High pressure sour line heaters and dehydrators (flows up to 3000 e3m3, 110 mmcf)
► Sweet and sour oil batteries with solution gas recovery and water injection / miscible flood.
1994 – 1999 Rigel Oil & Gas Ltd. British Columbia / Canada
1985 – 1986 Brainard Senior Plant Control Room Operator : sweet and sour process plants
1983 – 1985 Brainard Plant Operator : side by side plants
• 80 mmcf sour process gas plant with CLAUS sulphur recover.
• 75 mmcf sweet gas plant with 5000 HP compression and JOULES THOMPSON cooling process.
1980 – 1983 Construction Equipment Operator
• Seismic line cutting and pipeline construction.
• Log handling, road building and lease building.