Package : SUPERSTRUCTURE
MATERIAL SUBMITTAL MONITORING REGISTER
Item
Ref No
Material submission
EMAF.001.RB
EMAF.002.RB
EMAF.003.WM
Sample
Letter 004
EMAF.004.SIK
Supplier /
Subcontractor
Submission
date
AVN response
ref.
Response
date
Response
days
Status
SMC
25-Jun-12
VBB/S06/CFC/EM
AF/001
26-Jul-12
31
APPROVED
SMC
25-Jun-12
VBB/S06/CFC/EM
AF/002
26-Jul-12
31
APPROVED
Song hp lc
25-Jun-12
Letter 002-12
26-Jul-12
31
1
APPROVED
Sika
27-Jun-12
VBB/S06/CFC/EM
AF/003
28-Jun-12
25//06/2012
Letter 008-12
8/7/2012
Action
APPROVED
Letter
018
EMAF.006.RAMSET
EMAF.007A.SAND
River sand
Send letter
Send letter
23-Jul-12
TRUONG
AN PHU
M
PHNG
NGOC PHU
PHAT
NGOC PHU
31-May-13
312
APPROVED
20/07/2012
6-Sep-12
3-Oct-12
27
APPROVED
APPROVED
7-Aug-13
19-Aug-13
APPROVED
26-Nov-12
21-Dec-12
25
APPROVED
1-Nov-12
6-Nov-12
APPROVED
Hilti
6-Sep-12
3-Oct-12
27
APPROVED
HOLCIM
11-Sep-12
10-Nov-12
60
APPROVED
26-Jun-13
65
APPROVED
31-May-13
127
APPROVED
IS TO PROVIDE
MORE SAMPLE
PHAT
17-Aug-13
Letter0196
EMAF.008B.BOLT
EMAF.009B.VINKEM
10
EMAF.010.BOLT
11
EMAF.011.CEM
EMAF.012B.BLOCK
Concrete block
03 samples
for 3 kinds
HICRETE
22-Apr-13
EMAF.013A.PAR
01 sample
IS
24-Jan-13
EMAF.014A.ROXUL
01 sample
IS
13-May-13
26-Jun-13
44
APPROVED
NEED APAVE TO
SIGN AND
RETURN SAMPLE
01 sample.
More 3
samples
IS
16-Aug-13
22-Aug-13
APPROVED
EMAF.015B.PAR
02 samples
No sample
In the meeting
9/4/13, design have
no comments
Page 1 of 7
Item
Ref No
EMAF.016B.PAR
(provide doc as comment on
EMAF.016A)
EMAF.017C.COL
EMAF.018C.CEI
EMAF.019B.CEI
provide test as comment of
Aicha in the meeting
11/4/2013
EMAF.020C.CEI
Sample
Supplier /
Subcontractor
Submission
date
01 sample
IS
Material submission
Response
date
Response
days
Status
15-May-13
22-Aug-13
99
APPROVED
IS
22-Nov-13
19-Dec-13
27
APPROVED
IS
19-Jun-13
22-Aug-13
64
APPROVED
IS
18-Apr-13
26-Jun-13
69
APPROVED
01
sample.
More 3
samples
IS
29-Aug-13
15-Sep-13
17
APPROVED
03 samples
(03 boxes)
IS
15-Aug-13
22-Aug-13
APPROVED
31-May-13
197
APPROVED
EMAF.022B.SPS
EMAF.023A.FRAME
IS
15-Nov-12
EMAF.023B.FRAME
IS
24-Jan-14
5-Mar-14
40
APPROVED
EMAF.024A.SHADE
Shadeband material
RolaShades
27-May-13
14-Aug-13
79
APPROVED
EMAF.025E.HAFELE
Hafele
3-Mar-14
24-Mar-14
21
APPROVED
EMAF.026C.TRAVERTINE
IBS
15-Jul-13
14-Aug-13
30
APPROVED W/
EMAF.030C.NIPPON
IPS-10
Nippon
13-Sep-13
28-Nov-13
76
APPROVED
33
AVN response
ref.
In the meeting
9/4/13, design have
no comments
COMMENTS
EMAF.031A.NIPPON
Nippon
13-Jun-13
22-Aug-13
70
APPROVED
EMAF.032A.NIPPON
Nippon
13-Jun-13
22-Aug-13
70
APPROVED
EMAF.033A.NIPPON
Nippon
13-Sep-13
28-Nov-13
76
APPROVED
EMAF.035B.NIPPON
Nippon
13-Aug-13
20-Sep-13
38
APPROVED
EMAF.037A.CERAMIC
DONG TAM
13-Jul-13
14-Aug-13
32
APPROVED
Page 2 of 7
Action
W
W
Item
40
Ref No
Material submission
Sample
Supplier /
Subcontractor
Submission
date
AVN response
ref.
Response
date
Response
days
Status
EMAF.038B.RAISEDFLO
03
samples
AB TECH
18-Jul-13
21-Oct-13
95
APPROVED
NEED APAVE TO
SIGN AND
RETURN SAMPLE
EMAF.039A.SAHANA
03
samples
IBS
30-May-13
26-Jun-13
27
APPROVED
NEED APAVE TO
SIGN AND
RETURN SAMPLE
EMAF.040.ROSO
IBS
25-Jan-13
In the meeting
10/4/13, design
11-May-13
approve
106
RETURN FOR
CORRECTION
SIGNED AND
RETURNED 01
Send letter
EMAF.041A.CHINAGOLD1
(HONED FINISH)
SO6/CFC/LTR/0
23-May-13
SAMPLE
25-May-13
APPROVED
20-Sep-13
56
APPROVED
NEED APAVE TO
SIGN AND
RETURN SAMPLE
NEED APAVE TO
SIGN AND
RETURN SAMPLE
24-13
26-Jul-13
03
samples
IBS
IBS
26-Jan-13
20-Sep-13
237
APPROVED
42
EMAF.042.CHINAGOLD2
(BUSH HAMMER FINISH)
03
China Gold Beach Stone for 7th floor
terrace
samples
43
EMAF.043.T.B.ANCHOR
No sample
PRO-BEL
25-Feb-13
13-Mar-13
16
APPROVED
EMAF.043A.T.B.ANCHOR
3
SAMPLES
Trung Dung
25-Jun-14
19-Aug-14
55
APPROVED
EMAF.045A.ROLLER
01 mock-up
RolaShades
6-Aug-13
14-Aug-13
APPROVED
EMAF.048B.WHB
MHB
28-Jun-13
6-Aug-13
39
APPROVED THE
WOOD WALL
FDC
49
EMAF.049.WSWELLER
50
EMAF.050.RADCON7
No sample
51
EMAF.051.SHWASH
Shanghai wash
03 samples
5-Apr-13
21-May-13
46
APPROVED
15-Apr-13
31-May-13
46
APPROVED
23-Apr-13
26-Jun-13
64
APPROVED
52B
EMAF.051A.SHWASH
WALL SAMPLE
EMAF.052B.SEALER
No sample
5-Nov-14
15-Nov-14
10
APPROVED
IBS
5-Sep-13
20-Sep-13
15
APPROVED
Page 3 of 7
RETURNED 01
SAMPLE
Thanh An
SIGNED AND
RETURNED 01
SIGNED AND
Thanh An
Action
Item
53A
56
57
Material submission
Sample
Supplier /
Subcontractor
Submission
date
EMAF.053A.SMFLEX
MIWA
EMAF.053B.SMFLEX
MIWA
EMAF.056.TILE
03 samples
ZZ6872,
03samples
ZZ6879
Ref No
EMAF.057.WALLTILE
03 samples
Y02,
03samples
Y03
58B
EMAF.058B.BAREFLOOR
59
EMAF.059.STEEL
60
EMAF.060.INSTUMENT
61
EMAF.061.BLOCK
Concrete block
Send letter
215
VIETCERA
MIC
VIETCERA
MIC
AVN response
ref.
Response
date
Response
days
Status
11-May-13
26-Jun-13
46
APPROVED
10-Feb-14
5-Mar-14
23
APPROVED
18-Jun-13
22-Aug-13
65
APPROVED
65
APPROVED
SIGNED AND
SIGNED AND
18-Jun-13
22-Aug-13
25
APPROVED
19-Jun-13
25-Jun-13
APPROVED
20-Jun-13
9-Aug-13
50
APPROVED
24-Jun-13
25-Jul-13
9-Aug-13
15
APPROVED
AB TECH
27-Nov-13
15-Jan-14
49
APPROVED
VICEM HA
TIEN
RETURNED 01
SAMPLE
15-Jan-14
VIETVIET
RETURNED 01
SAMPLE
21-Dec-13
IBS
SO6/CFC/LTR/
22-Jun-13
154-13
EMAF.062A.ALUSKIRTING
63A
EMAF.063A.METALHUNG
03 samples
MHB
16-Sep-13
10-Oct-13
24
APPROVED
NEED APAVE TO
SIGN AND
RETURN SAMPLE
64
EMAF.064.WOODBASWE
03 samples
MHB
28-Jun-13
15-Sep-13
79
APPROVED
NEED APAVE TO
SIGN AND
RETURN SAMPLE
EMAF.065A.EXPANSIONBOLT
01 sample
3-Jul-13
16-Jul-13
13
APPROVED
EMAF.066A.EBLOCK
01 sample
6-Aug-13
28-Aug-13
22
APPROVED
67
EMAF.067.JOTUN
12-Jul-13
19-Jul-13
APPROVED
68A
EMAF.068A.MAPEI
16-Sep-13
10-Oct-13
24
APPROVED
69
EMAF.069.MESH
13-Jul-13
9-Aug-13
27
APPROVED
KHAI
NGUYEN
TAN KY
NGUYEN
COFICO HT
SAMPLE IN
COFICO HT
Page 4 of 7
APPROVED
EMAF
Action
Item
Ref No
Material submission
Sample
Supplier /
Subcontractor
Submission
date
AVN response
ref.
Response
date
Response
days
Status
70A
EMAF.070A.KUS
03 board
sample
KUS
29-Aug-13
15-Sep-13
17
APPROVED
71
EMAF.071.FIREDOOR
01 actual
door
LNPhat
15-Aug-13
15-Sep-13
31
APPROVED
LTDong
1-Nov-13
27-Nov-13
26
APPROVED
IS
20-Aug-13
15-Sep-13
26
APPROVED
72
EMAF.072A.FORMICA
Toilet partition
73
EMAF.073.PARA5
74A
EMAF.074A.MHB
03 samples
NEED APAVE TO
SIGN AND
RETURN SAMPLE
SIGNED AND
MHB
19-Sep-13
10-Oct-13
21
APPROVED
RETURNED 01
SAMPLE
SIGNED AND
DONG TAM
EMAF.075.CORRIDORTILE
03 samples
EMAF.076.KUS
Sample
attachs with
EMAF
KUS
77
EMAF.077.SKIMCOAT
No sample
NIPPON
18-Sep-13
80
EMAF.080A.CLADDED
IS
81
EMAF.081A.PLATFORM
82
EMAF.082.SSTEEL
83
EMAF.083A.EPOXY
84
EMAF.084.STEEL
85
EMAF.085A.ROCKWOOL
03 samples
86
EMAF.086.BOLT
01 sample
87
EMAF.087.ACCESSORIES
03 sample
boards
75
76
3 sample
boards
23-Aug-13
21-Oct-13
59
APPROVED
RETURNED 01
SAMPLE
SAMPLE IN
15
APPROVED
10-Oct-13
22
APPROVED
27-Nov-13
19-Dec-13
22
APPROVED
5-Dec-13
15-Jan-14
41
APPROVED
HOAGIANG
27-Nov-13
19-Dec-13
22
APPROVED
FLOWCRETE
9-Dec-13
17-Apr-14
129
APPROVED
VNT
17-Dec-13
17-Apr-14
121
APPROVED
MHB
18-Mar-14
2-Apr-14
15
APPROVED
7-Jan-14
17-Jan-14
10
APPROVED
8-Jan-14
14-Jan-14
ITEMS, REJECTED
31-Aug-13
15-Sep-13
Page 5 of 7
APPROVED
EMAF
APPROVED 4
IBS
1 ITEM
Action
Item
Ref No
Material submission
Sample
Supplier /
Subcontractor
Submission
date
AVN response
ref.
Response
date
Response
days
Status
EMAF.088A.XBOND
AB TECH
4-Apr-14
12-Apr-14
APPROVED
89
EMAF.089.GRITONE
IBS
11-Jan-14
19-Feb-14
39
APPROVED
90
EMAF.090.NOSETILE
03 samples
THANH AN
17-Jan-14
19-Feb-14
33
APPROVED
91
EMAF.091.PEDESTAL
03 samples
AB TECH
13-Feb-14
18-Mar-14
33
APPROVED
92
EMAF.092A.FRAME25x40
MHB
28-Feb-14
2-Apr-14
33
APPROVED
93
EMAF.093.HANDRAIL
Handrail of staircase 1, 2
Thuan Thang
3-Mar-14
24-Mar-14
21
APPROVED
94
EMAF.094.JOTUN
Thuan Thang
4-Mar-14
18-Mar-14
14
APPROVED
95
EMAF.095.VERSIJACK
Miwa
14-Mar-14
17-Apr-14
34
APPROVED
96
EMAF.096.DURAFLEX
AB TECH
20-Mar-14
2-Apr-14
13
APPROVED
97
EMAF.097.SSTEEL1
HOAGIANG
28-Mar-14
2-Apr-14
98
EMAF.098A.SSTEEL2
HOAGIANG
16-Apr-14
14-May-14
28
APPROVED
99
EMAF.099A.PLYWOOD
MHB
28-Apr-14
10-May-14
12
APPROVED
100
EMAF.100.ANCHORBOLT
AB TECH
21-Apr-14
10-May-14
19
APPROVED W/
101
EMAF.101A.GRATING
DAIKURE
8-Jul-14
22-Jul-14
14
APPROVED
102
EMAF.102.TOPSEAL107
16-May-14
2-Jun-14
17
APPROVED
103
EMAF.103.VINKEMS
20-May-14
11-Jul-14
52
APPROVED
EMAF.105A.MIRROR
(replace appeoved EMAF.105)
MHB
21-Jul-14
6-Aug-14
16
APPROVED
EMAF.106.MDF
MHB
2-Jun-14
27-Jun-14
25
APPROVED
MHB
2-Jun-14
27-Jun-14
25
APPROVED
MHB
4-Aug-14
EMAF.107.KORESEAL
EMAF.107A.XBOND
COMMENTS
APPROVED
EMAF.108A.ACCESS
LNPhat
30-Oct-14
7-Nov-14
RESUBMIT
EMAF.109.PARTITION
LTDong
9-Jun-14
11-Jul-14
32
APPROVED
Page 6 of 7
REJECTED SS SKIRTING
Action
Item
Ref No
Material submission
Sample
Supplier /
Subcontractor
Submission
date
AVN response
ref.
Response
date
Response
days
Status
Action
APAVE
EMAF.110.BLOCKER
Hydraulic blocker
ASTECH
17-Jun-14
EMAF.111.FLOODGATE
Flood gate
ASTECH
17-Jun-14
11-Jul-14
24
APPROVED
EMAF.112.RWB
AB TECH
1-Aug-14
3-Sep-14
33
APPROVED
EMAF.113.X66
AB TECH
1-Aug-14
3-Sep-14
33
APPROVED
EMAF.114.BOLLARD
EMAF.115.IBSBOLT
APAVE
11-Aug-14
IBS
12-Aug-14
3-Sep-14
22
APPROVED
CFC
29-Aug-14
13-Sep-14
15
APPROVED
EMAF.117.APOLLOFOAM
LNPhat
4-Sep-14
APAVE
EMAF.118.PARKING
MTSG
13-Oct-14
APAVE
EMAF.119.HAFELE
Hafele
15-Oct-14
APAVE
EMAF.120.BOLTGRATING
PNL
20-Oct-14
28-Oct-14
APPROVED
EMAF.121.FENCE
Thuan Thang
3-Nov-14
11-Nov-14
APPROVED
EMAF.122.SKIMCOAT
4-Nov-14
11-Nov-14
APPROVED
EMAF.123.BUMPER
7-Nov-14
15-Nov-14
APPROVED
EMAF.124A.TILEROOF
17-Nov-14
APAVE
EMAF.125.HYDRODUCT500
17-Nov-14
APAVE
EMAF.126.BDSTONE
17-Nov-14
19-Nov-14
Page 7 of 7
REJECTED